Bidders Questions and Answers.docx

DOCX document 14 KB Posted

Attached to
Construct Canopy and Concrete Work Federal contract opportunity
Solicitation number
W50S70-21-R-0014
Issued by
Department of the Army Georgia Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Construct Canopy and Concrete Work, newest first.
File Type Posted
W50S70-21-R-0014 RFI FORM.pdf PDF
PXL_20210526_150500588.jpg JPG image
PXL_20210526_150513854.jpg JPG image
Past Performance Questionnaire.pdf PDF
W50S7021R0014 Solicitation.pdf PDF
XDQU212063 SOW JISCC.docx DOCX document
PXL_20210526_150526588.jpg JPG image
proposed JISCC pad and canopy as of 3_24_21.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bidders Questions and Answers

1) Is the spoils of the 12” of topsoil to be stored on site or hauled off? If not being hauled off, is it to be stockpiled or wasted and how far will this activity be from the work area? The 12” of material is to be spread near the site. There’s a large grassy area and the contractor has one (1) acre to work with for spreading this topsoil.

2) What is the extent of the silt fencing? Drawings nor SOW dictate limits. Since the excavation area is approximately 9’ x 40’ (360 sf) and 12” deep, the government is not too concerned with silt fencing so as long as topsoil is spread during excavation. If soil is piled up in a mound, silt fencing would need to be placed around the topsoil pile until it is spread by the contractor at a later date.

3) Does the new concrete pad require a gravel base? First off, thank you for asking this question as this detail should have been put into the initial drawing set. Contractor is to use #57 crushed stone and compact to 98%.

4) Asbestos abatement was mentioned in the contract. Are you all thinking that asbestos is in the concrete? Otherwise I am very confused about this being included. The asbestos mentioned in the contract is a “catch-all” for all contracts whether it’s building repair/renovation, demolition, etc. as is any lead paint reference, etc. This particular project doesn’t have asbestos or lead paint to be concerned with. Please ignore the mentioning of asbestos with this contract.