Questions and Answers_Fire Alarm_Sprinkler Repair_ Responses Due 16 May - Copy.docx
DOCX document 3 MB Posted
- Attached to
- 113 OG Fire Sprinkler/Fire Alarms
- Solicitation number
- W50S6W25Q0002
- Issued by
-
Department of the Army National Guard
About this file
This document is a Questions and Answers file for a fire alarm and sprinkler repair federal contract opportunity. The solicitation (W50S6W25Q0002) involves the Department of the Army National Guard seeking a contractor to design, fabricate, and install a complete fire sprinkler and alarm system in two specific buildings at Joint Base Andrews, MD. The project requires comprehensive services including materials, equipment, tools, personnel, labor, supervision, and management for installing a new fire system within an Operations Support Squadron Building located in a Secure Compartmentalized Information Space (SCIF) and replacing the existing fire alarm system in Building 2493. The responses for this solicitation are due on 16 May, though no specific award date is mentioned in the provided file.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers Solicitation Number: W50S6W25Q0002 Title: Fire Alarm and Sprinkler Repair
1. Question: There are a few sprinklers heads that need changing, are you also requesting to add those sprinklers to SCIF?
Answer: SOW 1.2.1 a.; b.; and c.
2. Question: Do you have drawings for the project?
Answer: As built drawings provided to SMSgt Little for building 1217. Drawings do not include current fire suppression plumbing.
3. Question: B1217 - Are dielectric breaks required for the existing Fire Alarm (FA) circuits being fed into the SCIF? Is a power filter of the incoming FA circuit preferred.
Answer: UFC 4-010-05, 3-4.22.7 “For eavesdropping (using the speakers as microphones), a simple buffer amplifier is the standard mitigation. For most systems, this is a simple amplifier within the perimeter that takes the incoming audio signal and amplifies/distributes the signal to the speakers within the space. However, equipment such as pre-amplifiers, amplifiers and products translating or converting live voice signals for use in mass notification systems must comply with the applicable requirements in UL 864, the Standard for Amplifiers for Fire-Protective Signaling Systems. Therefore, any amplifier used in a MNS must meet UL 864.”
4. Question: B1217 - Are duct detectors required for the new HVAC unit to be added at a later date?
Answer: Per the architectural drawings, the HVAC duct is to have a sensor installed. Please see page M-302 of drawings. Specifications for the HVAC unit are 7.5 Ton with a CFM of 6200 per the HVAC schedule.
5. Question: B1217 - Can you provide pictures of the incoming sprinkler main?
Answer:
6. Question: B1217 - Is the location of sprinkler main accessible without a ladder?
Answer: A ladder will be required.
7. Question: B1217 - Please provide a Fire Alarm build drawing of the building?
Answer: Current Drawings are not available
8. Question: Is there an opportunity for another site visit?
Answer: We will allow another site visit after contract award
9. Question: B1217 - Provide Fire Sprinkler (FS) drawings for the current SCIF layout and indicate which specifics heads need to be relocated?
Answer: Current Drawings are not available. Sprinkler head in Room 112 needs to be relocated.
10. Question: B1217 - Upon site visit we observed there was another sprinkler drop that was too close to the wall and needed to be relocated, please confirm if that will be added to the Statement of Work?
Answer: Work is captured in the SOW.
a. Section 1.2.1b. - Delete sprinkler head close to the wall in room 111 labeled Main Area
11. Question: B2493 - Please provide Fire Alarm as-builts for this building?
Answer: Current Drawings are not available.
12. Question: B2493 - There is an existing Eye Wash Station FA module in the building that is not included in the SOW. Please confirm if this is to be monitored by the new system?
Answer: Yes; Work added to SOW
13. Question: Statement of Work dated February 28th, 2025, states that in B2493 there is an existing Siemens fire alarm panel. Would it be acceptable to propose a migration of the panel to the current Siemens Desigo panel?
Answer: No, Panel must be a Monaco MAAP-X panel.
image1.jpeg image2.jpeg image3.jpg image4.jpeg image5.jpg image6.jpeg