RFI Q_A -- W50S6T22Q0032 -- Repair Asphalt at MSA (23 Aug 2022).pdf
PDF 47 KB Posted
- Attached to
- Repair Asphalt at MSA
- Solicitation number
- W50S6T22Q0032
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W50S6T22Q0032 RFQ SF1442 -Asphalt MSA.pdf | ||
| Drawings -HAYW221767-REPAIR MSA ROADS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI) Responses Project: Repair Asphalt at MSA
Solicitation Number: W50S6T22Q0032 Date: 23 August 2022
# Request Government Response 1 Will we need to maintain access on a paved road at all times? Or will we be allow to remove the entire roadway surface and AB and run cars on dirt during construction?
Access on a paved road must be maintained at all times.
2 Will we be allowed to take out the entire parking lot at one time or will we be required to do it ½ at a time?
½ at a time. Parking must remain available to personnel assigned to the area throughout performance.
File details come from the government source that posted it. Updated .