W50S6S22Q0003 Q and A.docx

DOCX document 15 KB Posted

Attached to
Waste Water Sampling / Testing
Solicitation number
W50S6S22Q0003
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S6S22Q0003 Q&A

Q1. We need clarity of the following:

a. We would like to see the permit requirements.

b. Type of flow meter is installed or if we provide a flow meter?

c. What type of fix flow device is in place or pipe?

d. What analytes, EPA methods?

e. Is web based posting to owners site or our site?

A1.

a. Redacted permit is posted to the attachments section.

b. Contractor is responsible to provide flow meter.

c. No fix flow device

d. Please refer to permit

e. Web based posting not permitted; please refer to PWS for deliverables.

Q2.

a. We are hoping to find out if there is (was) an incumbent contractor performing these services, or if this is a brand new contract.

b. If there is an incumbent, could you please provide the current / previous contract number?

A2.

a. New contract

b. N/A

File details come from the government source that posted it. Updated .