Q & A Modular Walls Q & A modular walls W50S6S-20-Q-0024
Q1. Do you have photos you can share so we can design the wall elevations to match existing as closely as possible?
A1. Attached
Q2. What is the ceiling height?
A2. 9 feet
Q3. Please clarify the walls and doors at 2nd floor Open Lounge. Keynotes 6 and 17 – and the 17 at what appears to be the existing double doors.
A3. Keynote 6: non-factor Keynote 17: The intent is to move the existing double doors to the training room and newly create office (keynote 1). There currently two sets of double doors; plan is to use all four doors.
Q4. Some wall tabulation letters are missing but are referenced on plan in 2nd floor pdf. Please clarify.
A4.
0. Same as wall tabulation N
0. B is a removal of existing wall
0. C is currently a door; needs to be a wall
0. D is incorrect
0. E is correct
0. F is a wall removal
0. G the wall is correct; door will be on the west side of the new wall
0. H is correct
0. I is a repurposed solid wall from open lounge and current hallway
0. J is correct
0. K is correct
0. L is not part of the 2nd floor drawing
0. M is not part of the 2nd floor drawing
0. N will not need to be a low wall for HVAC concerns; will need to be top half glass to match the rest of the hallway
0. O will not need to be a low wall for HVAC concerns; will need to be top half glass to match the rest of the hallway
0. P is correct
0. Q is not identified but we need the open lounge wall on the north and east to be removed along with existing wall at P
0. R is not identified but we need to either repurpose existing wall (14) or new wall to enclose Commander’s suite
Q5. Shall we include data backboxes with all power locations?
A5. Yes
Q6. Do we need light switch boxes at newly enclosed rooms or is all of the lighting on Single control?
A6. Need new light switches in all newly created office areas.
Q7. Note that our pricing will not include the following scope that is noted in the plans provided:
a. Any floor repair/finish work
b. Any ceiling repair/finish work
c. Any drywall or existing modular to remain repair/finish work
d. Any electrical hardwiring – demo or new
e. Any life safety/fire alarm/sprinkler work
f. Any data cabling removal or installation – new DIRTT walls will include backbox and conduit only
g. Any electrical or other low voltage wiring for security, switch glass, power, lighting, etc.
h. Any HVAC or lighting relocation, adjustments.
A7. Need electrical work inside of modular walls included in the quote.