RFQ W50S6R21Q5013

MXG RADIANT HEAT

QUESTIONS AND ANSWERS

CURRENT AS OF 03 AUG 2021

1. Q: Do labor rates apply?

A: Yes, see attached to announcement.

2. Q: What is the overall objective of the solution?

A: The overall objective:

- Installation of high efficiency dual stage radiant heat system with a twenty five (25) year lifecycle which in accordance with the attached statement of work:

o Has a separate controller (Local Control) that does not integrate with any building management system, but has the ability to adapt to one if necessary o Keeps the hangar at a minimum of 68 degrees Fahrenheit minimum when as needed.

o Drains conditioned (acid neutralized) condensate into sanitary drain in hangar.

o Installation and operation in accordance with applicable electrical, gas fired radiant heaters (equipment meets ANSI Z83.20/CSA 2.34 standards / NFPA 409-1985 STANDARDS FOR AIRCRAFT HANGARS) , DoD Unified Facilities Criteria, and the latest Air Force Technical Orders and Manuals as relates to this type of application inside Fuel Cell Hangars.

3. Q: Do the gas lines need to be labeled per code, AND also painted?

A: Yes. The gas lines must be labeled. The gas lines must also be painted yellow to match the existing gas lines plumbed for the radiant heat system inside the adjacent isochronal maintenance hangar.

4. Q: Are as built plans available?

A: Yes – see attached to announcement.