AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1.) Amend the Statement of Work (SOW) and Plans for this project. The new SOW and Plans are attached to the solicitation at https://beta.sam.gov, and dated 15 June 2020.

2.) Change the description/requirement for CLIN 0001, 0002 and 0003.

3.) All other conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S6Q20B0004

X 9B. DATED (SEE ITEM 11)

28-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jun-2020

CODE

USPFO AR 188 MISSION SUPPORT CONTRACTING

4850 LEIGH AVE MAP

FORT SMITH AR 72903-6096

W50S6Q 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S6Q20B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

CLIN 0001

The CLIN extended description has changed from:

Concrete sidewalks formed and constructed per the statement of work and City of Fort Smith Details and Specifications. Total linear footage will be between 1,500 and 3,800.

To:

Concrete sidewalks formed and constructed per the statement of work and City of Fort Smith Details and Specifications. Total linear footage will be between 800 and 4,100.

CLIN 0002

The CLIN description has changed from Fiberglass Footbridge to Sidewalk Culvert Crossing.

The CLIN extended description has changed from:

Provide and install 40' long x 5' wide fiberglass reinforced polymer pedestrian truss bridge, per statement of work

(SOW)

Phantom Drive Sidewalk Culvert Crossing Headwall and Toewall with Rails:Install new headwall around two existing 32” HDPE culvert pipes. Install handrail across the top of headwall where adjacent to sidewalk. Install toe wall at a minimum of 3’ depth from finish grade. Head wall to provide adequate bank armoring against erosion.

Contractor will submit detail of headwall construction for approval prior to construction. See plans for location and requirements.

CLIN 0003

The CLIN extended description has changed from:

Place handicap access ramps in sidewalk per statement of work (SOW) and provided plans, and constructed per standard drawings. Quantity of ramps will be between 5 and 16, based on available funding.

Place handicap access ramps in sidewalk per statement of work (SOW) and provided plans, and constructed per standard drawings. Quantity of ramps will be between 5 and 17, based on available funding.

W50S6Q20B0004

(End of Summary of Changes)