BID REPORT.pdf
PDF 75 KB Posted
- Solicitation number
- W50S6P25BA001
- Issued by
-
Department of the Army National Guard
About this file
This document is a Bid Opening/Negotiations Report for a repair project at Little Rock Air Force Base, Arkansas. The project, designated as B112 Soffit Repair (Project No. NKAK242112//W50S6P25BA001), involves removing and replacing the existing exterior insulation finishing system (EIFS), damaged metal framing, metal soffit panels and trim, soffit mounted can light fixtures, and pre-formed metal gutters and downspouts for Building 112. The project is funded at $137,963.00 for fiscal year 2025 using SRM (Sustainment, Restoration, and Modernization) funds, with a 180-day construction timeline and an anticipated award date of 17-Sep-25. Two bids were received: Avcor Construction, LLC submitted the low bid of $143,718.00, and Terra Firma Restorations LLC submitted the second low bid of $269,000.00, compared to the government estimate of $110,857.34. The project is set aside for small businesses, with wage rates valid through 31-Dec-25, and requires a complete repair meeting all requirements in the statement of work, architect's drawings, and applicable codes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. GENERAL:
Installation and Location:
Project No:
Project Title:
FY: 2025 Fund Type (321, 341, SRM): SRM
Program Amount (PA): $137,963.00 Project Completion Critical Need Date: N/A
2. BID OPENING DATA:
Date of Report: 29-Jul-25 Method of Contract: IFB Solicitation Date: 13-Jun-25 # of Bids: 2
Bid Opening Date: 29-Jul-25 # of Options or Additive Bid Items (ABIs): 5 Bid Acceptance Period: 46 Days Small Business (Yes or No): Yes
Anticipated Award Date: 17-Sep-25 8(a) Set-Aside (Yes or No): No Construction Time: 180 Wage Rates Expiration Date: 31-Dec-25
Low Bidder: Name:
City: State: AR Zip: 72007
2nd Low Bidder: Name:
City: State: AR Zip: 72719
Low Bid 2nd Low Bid High Bid
Base Bid: 137,963.00$ 249,000.00$
ABI Bid: 5,755.00$ 20,000.00$
Total: 143,718.00$ 269,000.00$
3. FUNDING DATA:
Basic ABIs/Options Total
Construction Costs: 137,963.00$ N/A 137,963.00$
Contingency (Applies to MCP only @ 2% construction cost):
Type C Services:
Other:
Total CWE (Construction Cost + Type C + Other + Contingency): 137,963.00$
8/3/2012
BID OPENING/NEGOTIATIONS REPORT
Austin Terra Firma Restorations LLC
Avcor Construction, LLC
The requirements of this project are to remove and replace the existing exterior insulation finishing system (EIFS), damaged metal framing, metal soffit panels and trim, soffit mounted can light fixtures, and pre-formed metal gutters and downspouts. The contractor shall be responsible for all work necessary to remove and properly dispose of all existing materials and furnish and install all new materials as described in the drawings and specification by SCM Architects, dated 1 November 2024, entitled “Building 112 Soffit Repair and Replacement.” This project must result in a complete, and fully functional repair that meet all requirements in the statement of work, architect’s drawings and specifications, and all applicable codes.
This standard form is required for reporting all bids (MCP and SRM) funded by NGB. It is advisable to immediately report the accepted bid via email or phone to expedite funding. For source selection-sensitive projects, report only releasable information until after award.
Gov't Est
110,857.34$
Little Rock Air Force Base, AR
NKAK242112// W50S6P25BA001
B112 SOFFIT REPAIR
101,303.84$
Centerton
4. REMARKS: (At minimum, if any ABIs or options are included, list and describe them here)
9,553.50$
P:\PDS\Proj Attachments\
AR\LITTLE R\NKAK162998A\
BidOpeningRpt_NKAK162998A
File details come from the government source that posted it. Updated .