RFI Questions and Answers Fuel Tank Removal Project (002).docx

DOCX document 15 KB Posted

Attached to
117 Fuel Tank Removal
Solicitation number
W50S6M26QA018
Issued by

About this file

This file is a Questions and Answers document for the 117 Fuel Tank Removal project solicitation (W50S6M26QA018) issued by the 117th Air Refueling Wing, Birmingham, Alabama, under the Department of the Army Alabama Army National Guard.

The solicitation requires non-personal services for the removal of three fuel tanks and existing catwalk, scaffolding, and electrical components leading to Building 40 at the installation located at 5401 East Lake Blvd., Birmingham, AL 35217. The contractor must provide all personnel, equipment, supplies, supervision, and other items and services necessary to complete the work as detailed in the attached Statement of Work. The Government intends to award a Firm Fixed Price (FFP) contract to the responsible vendor whose offer is determined most advantageous based on price, technical evaluation, and past performance. A site visit was scheduled for September 17, 2026, at 10:00 A.M. CDT at Building 700, Civil Engineering Squadron Conference Room, with pre-registration required at least three business days prior. Written questions regarding the solicitation must be submitted via email to MSgt Jonathan Werkmeister (jonathan.werkmeister@us.af.mil) with sufficient time allowed for response before the offer submission deadline, referencing solicitation number W50S6M26QA018. Offers must be submitted electronically to both MSgt Jonathan Werkmeister and william.hall.65@us.af.mil no later than the specified response date and time.

View the file

Other files

File Type Posted
Solicitation - W50S6M26QA018.pdf PDF
Service Wage Determination.pdf PDF
Fuel Tank Removal Statement of Work.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Questions and Answers Fuel Tank Removal Project

1. Type of Fuel Stored in the ASTs? : Jet-A Fuel

2. Are they Steel? Yes

3. Is bollard removal included? No

4. Aboveground electrical removal only? Remove all electrical associated with the tanks, metering system, & emergency shutoff leading up to and in to B40 office.

5. Will the electrical be disconnected/locked out prior to arrival? This would need to be coordinated with CE for disconnection/lockout.

6. What is the weight of individual fuel tanks? The weight of individual tanks is not known but could be lifted with a suitable crane.

7. Are the tanks double walled? Yes.

8. In the removal of all electrical conduit all the way back to building 40, it appears the conduit is placed underground until it reaches the tank. Can we terminate and cap flush the conduit at the concrete turnup and leave in place? Terminate and cap electrical conduit associated with the abandoned tanks above conduit splice which is approximately 3 inches above concrete surface. Remove all wiring from conduit and label associated breaker labels with “empty” or other trade specific terminology to notate and in used breaker section.

These instructions are for all electrical wiring associated with the tanks to include metering system and electrical shutoff and other miscellaneous electrical wiring.

These instructions are for all electrical wiring associated with the tanks to include metering system and electrical shutoff and other miscellaneous electrical wiring.

9. What is the maximum height and width of clearances to exit the main gate for haul off of the tanks? Unknown at this time but alternative exit points closer to the project site could possibly be used to minimize truck traffic in and out of the base.

10. Is removal of existing light poles and foundations a part of this scope? No

11. Is Removal of the existing bollards a part of this scope? No