DRAFT SOW_Comm Facility.pdf

PDF 22 KB Posted

Attached to
Construct Communications Admin & Storage Facility Federal contract opportunity
Solicitation number
W50S6L-20-B-0014
Issued by
Department of the Army Alaska Army National Guard

About this file

This statement of work and related federal contract opportunity describe requirements for constructing a communications facility addition. Work includes building a 3,200 square foot addition with office, shop, secure compartmented information facility space and general support areas. The expected period of performance is 210 days from notice to proceed. The total project value is estimated between $500,000 to $1,000,000. Interested parties must register in the System for Award Management and have a Cage code to respond. The solicitation will be issued on or around May 25th 2020 with responses due on or around June 25th 2020 through the Federal Business Opportunities website. The North American Industry Classification System code is 236220 and it is anticipated to be a total small business set-aside with a size standard of $36.5 million average annual revenue.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Communications Admin & Storage Facility, newest first.
File Type Posted
FXSB182172 - SOW Att 1 - Drawings.pdf PDF
A02. Comm Facility_SOW.pdf PDF
FXSB182172 - SOW Att 2 - Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLANNING/CONSTRUCTION SERVICES

STATEMENT OF WORK

Construct Communications Admin & Storage Facility

FXSB182172

1. GENERAL

1. The work covered by this Statement of Work (SOW) includes providing all plant, labor, equipment, and materials required to perform planning and construction of the tasks outlined below. The contractor shall be responsible for necessary travel and services required to perform the work.

2. The contract procedures and project objective provide only general direction of what is required and does not constitute a complete explanation of the work involved. The government is relying on the contractor’s expertise in providing planning and construction that meets the intent of the task. The contractor shall work closely with designated government representative to work out details.

3. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

4. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

5. Contractor Manpower Reporting Application (CMRA):

a. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the National Guard Bureau (or your organization) via a secure data collection site.

b. The contractor shall completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at http://www.ecmra.mil.

6. Work shall comply with local, state, and federal codes and applicable ANG

Engineering Technical Letters (ETLs).

7. Materials incorporated into the work shall be new.

8. Asbestos Containing Materials (ACM) are not present in this facility.

2. CONTRACT PROCEDURES

1. This contract shall be awarded on a firm fixed price basis.

2. The government has provided a complete design for this project.

3. The contractor will be provided the project design via BETA SAM.

4. The contractor shall clean up all construction debris and remove all unused materials.

5. The contractor shall walk the site with the government project manager for a final inspection to verify all tasks are complete and that objectives were achieved.

6. The contractor shall submit as-built drawings depicting actual work completed.

3. PROJECT OBJECTIVE

1. Base Bid Item: The contractor shall provide cost to Construct Communications Admin & Storage Facility. Contractor shall also provide price for two optional bid items:

Option 1: Run and terminate telecommunications cabling, install ports, and other associated telecom work described in the plans.

Option 2: Furnish and install building furnishings, to include transportation to the facility and furniture assembly and placement.

http://www.ecmra.mil/

2. The expected Period of Performance (PoP) for this work will be 210 days from Notice to Proceed (NTP).

ATTACHMENT 1 - FXSB182172 Drawings dated 17 April 2020

ATTACHMENT 2 - FXSB182172 Specifications dated 17 April 2020

5 May 2020

File details come from the government source that posted it. Updated .