This document contains an amendment to a solicitation for the construction of a communications administration and storage facility. The amendment provides clarifications to the drawings and specifications, including revisions to bollard details, clarifying that insulated metal wall panels with rigid foam sheathing are required, and revising ceiling types and room dimensions. The related federal contract opportunity is for the construction of a 3,200 square foot addition to an existing communications administration and storage facility at the 176th Wing of the Alaska Air National Guard. The project includes office, shop, and storage space as well as a secure compartmented information facility. The base bid is for construction, with options for telecommunications cabling and furnishings. The total project value is estimated between $1 million and $5 million. The NAICS code is 236220 and it is anticipated to be a total small business set-aside.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Communications Admin & Storage Facility, newest first.
File Type Posted
Bid Abstract_BetaSAM.pdf PDF
Amendment 1.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
SOW_Comm Facility 20200610.pdf PDF
A02.6 Attachment 2 - Comm Facility_Specs 100%.pdf PDF
Attachment 3 - eCMRA Memo.pdf PDF
A02.5 Attachment 1 - Comm Facility_Drawings 100%.pdf PDF
W50S6L-20-B-0011.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TO ALL BIDDERS AMENDMENT 1- Q&A

3 September 2020

Project: Construct Communication Administration / Storage Facility

Project No.: FXSB182172

The following changes, additions, and/or clarifications shall be made to the specifications for the work of the above project.

This addendum forms a part of the contract documents and in case of a conflict between drawings, specifications, and this addendum, the addendum shall govern.

Bid Questions, received 8/28/20 and 9/1/20 via emails from Major Koch:

1. Bollards –

a. Sheet C-001 Detail 2 indicates a 12” diameter x 38” concrete foundation with a 7’-0”

(typo. Should be 4’-0”) x 6” diameter schedule 40 steel pipe with yellow powder coat finish.

AE Response: Detail on C-001 to be re-numbered to reflect Detail 3/C-001.

b. Sheet CS101 keynote 10 calls out Detail 3 on C-001, there is no detail 3 on C-001.

AE Response: Detail on C-001 will be re-numbered to reflect Detail 3/C-001.

c. Sheet A-0.2 keynote 2 calls out a 4” diameter x 4’-0” high bollard.

AE Response: Remove the bollard dimensions on A-0.2 and reference only the given detail (Detail 3/C-001).

d. Sheet A-0.4 keynote 4 calls out a 4” diameter bollard, see civil drawings Detail 2/C-001.

AE Response: Remove the bollard dimensions on A-0.4 and reference only the given detail (Detail 3 / C-001)

e. Sheet A-0.8 Div. 12 indicates – Bollards “Installation Method: Cast in 18” diameter x 36” concrete footing.

AE Response: Remove the bollard dimensions on A-0.8 and reference only the given detail (Detail 3 / C-001).

2. Sheet A-0.6 Details 13 and 14 call ½”sheathing, vapor retarder, and 7/8” hat channel and metal panel system on exterior window head and sill framing. Details 1,2, 5, and 6 on the same sheet, calls out “Exterior Pre-insulate Meal Wall Panel System, Typ”. detail 16 on the same sheet, calls out “Insulated Mtl. Wall Panel System o/ 1 ½” Polyiso Foam Sheathing and Waterproofing Underlayment”.

AE Response: Follow Details 1,2, 5, 6, 16 and provide Insulated Metal Wall Panel over 1 ½” Polyiso Foam Sheathing and Waterproofing.

3. Sheet A-0.2 Demo Note 1 states – Remove and relocate existing door and associated hardware;

provide new frame”. No indication of demo note 1 referencing this door can be found on this sheet other than in the Demolition Key Notes.

AE Response: Demolition Key Note 1 to be removed.

4. Sheet A-0.2 Demo Note 2 states – “ remove existing East wall insulated metal panel wall system down to steel girt framing”. There is no new work indicated on the drawing related to the East side of the existing building that can be found.

AE Response: This is intended for the new door at 107C, into the existing PEMB.

5. Sheet A-0.2 keynote 17 states “relocate existing door” pointing to door 107C, Sheet A-0.5 – Door Schedule indicates door 107C as a new door.

AE Response: Remove Key Note 17 this is a new door (107C).

6. Sheet A-0.4 keynotes 18 & 19 reference below grade insulation and slab on grade insulation. No reference to rigid insulation related to the foundation can be found on the structural drawings.

AE Response: Rigid insulation not required at foundation Keynotes 18 & 19 to be removed.

7. Sheet A-0.4 keynote 9 references “Pre-insulated metal wall panel system, match existing”. Sheet A-0.6 various details offer conflicting metal panels and component system build-up.

AE Response: Provide Insulation Metal Wall Panel System to coordinate with 1, 2, 5, 6 & 16 on A-0.6.

8. Sheet A-0.4 keynote 13 indicates 1” plywood sheathing over structural metal girts, 16’-0” AFF, Sheet A-0.2 keynote 14 indicates plywood sheathing (no thickness given) o/metal stud framing to 14’-0” AFF, Sheet A-0.6 – Detail 16 – Exterior Wall Assembly – indicates 1” fire treated plywood o/ mtl framing @ 16” o.co to 8’-0” AFF @ end walls and 16’-0” AFF @ side walls, Sheet A-0.5 – Room Finish Schedule – indicates wall substrate as “GYP” everywhere, no plywood mentioned.

AE Response: The plywood finish is just intended for the Storage/Shop 107 area. Change to a standard height of 10’ AFF for all 4 walls.

9. Sheet A-0.5 – Room Finish Schedule – indicate rooms 101 &102 as ACT ceiling, Sheet A-0.3 – Reflected Ceiling Plan – Indicates room 101 as gypsum board ceiling assembly & room 102 as “open to structure above”.

AE Response: Follow the Reflected Ceiling Plan:

100 – Suspended Gypsum Ceiling 101 – Suspended Gypsum Ceiling 102 – Open to Structure 103 – Open to Structure 104 – Suspended Gypsum Ceiling 105 – Suspended Gypsum Ceiling 106 – Open to Structure 107 – Open to Structure 108 – Suspended Acoustic Ceiling Tile 109 - Suspended Acoustic Ceiling Tile 110 - Suspended Acoustic Ceiling Tile 111 - Suspended Acoustic Ceiling Tile 112 - Suspended Acoustic Ceiling Tile 113 - Suspended Acoustic Ceiling Tile 114 – Suspended ACT below metal framing (and deck for SCIF) 114B – Open to metal framing (and deck for SCIF)

10. Sheet A-0.5 – Room Finish Schedule – indicates room 107 wall substrate as “GYP”, Sheet A-0.2 keynote 14 – pointing to room 107 indicates “plywood sheathing o/ metal stud framing to 14’-0”

AFF”.

AE Response: Remove ‘GYP’ from room 107. See #8. above for plywood.

11. Sheet A-0.5 – Room Finish Schedule – indicates rooms 108 – 114 ceiling substrates as “EXP” – exposed to structure, Sheet A-0.3 – Reflected Ceiling Plan – shows rooms 108-114 as ACT – Acoustic Ceiling Tile.

AE Response: See #9. Above.

12. Sheet A-0.6 – Detail 16 – Exterior Wall Assembly – indicates inside wall surface as “1” fire treated plywood” to 8’-0” & 16’-0” AFF. Details 13 & 14 on same sheet call for 5/8” gyp board as wall surface.

AE Response: See #8. above. Details 13 &14 are not for Shop/Storage.

13. Sheet A-0.8 – Division 6 – states “Sheathing” Type A interior plywood, Material fire-retardant-treated interior Type A plywood”, Sheet A-0.5 – Room Finish Schedule – general note 1 states “wall plywood shall be CDX grade”. Sheet A-0.5 – Room finish Schedule – Wall substrates for all rooms indicated as “GYP”. (Note division 6 is not referenced in the project specification packages).

AE Response: See #8 above.

14. Please provide interior room dimensions for rooms 100, 101, 102, and 114B. No dimensions provided on Sheet A-0.2 – Floor Plan – for East/West walls.

AE Response: See dimensions to rooms below.

Bid Questions dated: 8/31/20:

· SECTION 284621.11 paragraph 2.9 Asks for an Emergency Responder Radio Coverage system.

This building is very small. Is an ERRCS system required in this building?

o AE Response: An Emergency Responder Radio Coverage system is not required.

· On drawing F-1.0 Note 7 it says to provide a self-amplified secured area fire alarm/Mass notification speaker strobe. We are not aware of any self-amplified fire alarm system devices. Is the intention to provide a sub panel in the SCIF area connected via fiber to the main fire alarm panel as section 3-5.15.5 of UFC 4-010-05 says? Or is the intention to provide a stand-alone 120V Smoke Alarm?

o AE Response: Please refer to the attached cutsheet as an example of an available product for self-amplified speaker strobes. The addition of a sub panel in the SCIF area connected via fiber to the main fire alarm panel is one method of compliance with UFC 4-010-05 Section 3-5.15.5. It is not the intent to provide a stand-alone 120V smoke alarm.