This document appears to be a set of questions and answers related to the warehouse requirements for the INSCOM G4 Global Intelligence Logistics and Engineering Support (GILE) contract.

The key details are:

  • The contract requires the contractor to provide a warehouse facility within 45 miles of INSCOM headquarters that meets specific requirements, including 12,000 square feet of open storage space, a commercial dock, and a 1,800 square foot hardstand.
  • There are no clearance-level requirements for the warehouse facility itself, as the government will provide the necessary SCIF space.
  • The government will not be cancelling the existing Alban Road warehouse lease, as they do not hold that lease. Decisions regarding the Alban Road facility will be made by the incoming and outgoing contractors.
  • The warehouse costs will be evaluated as part of the Total Evaluated Price for the contract.

The document provides clarification on the warehouse requirements outlined in the Performance Work Statement for the GILE contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to INSCOM G4 Global Intelligence Logisitcs and Engineering Support (GILE), newest first.
File Type Posted
W50NH924R0005.pdf PDF
TEM meeting questions and answers.xlsx XLSX spreadsheet
Draft RFP QA FINAL.xlsx XLSX spreadsheet
Attachment 0002 GILE GFPM Format.xlsx XLSX spreadsheet
W50NH924R0005.pdf PDF
Attachment 0001 Draft DD254 and Addendum.pdf PDF
Attachment 0002 GILE GFPM Format.xlsx XLSX spreadsheet
Attachment 0004 Past Performance Questionnaire (PPQ).pdf PDF
Attachment 0005 - Past Performance Matrix.xlsx XLSX spreadsheet
Attachment 0008 Government Furnished Property (GFP).xlsx XLSX spreadsheet
Attachment 0003 Contract Data Requirements List (CDRLs).pdf PDF
Attachment 0009 GILE Density List.xlsx XLSX spreadsheet
Attachment 0006 SBP-Workbook.xlsx XLSX spreadsheet
Attachment 0007 SBP-WorkbookInstructions.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

NUMBERPWS SECTIONPG #, PARAGRAPHQUESTIONANSWER
11.6.11.7Page 126According to 1.6.11.7 Warehouse: "The contractor shall provide facilities within 45 miles or less from HQ INSCOM which are capable of warehouse support to the logistical function of this contract. 1.6.11.7.1 The warehouse facilities shall meet the following requirements: a. Facility shall be capable of storing material, shipping, receiving, packaging, staging, and admin space for on-site support. b. The open storage shall be 12,000 square feet with a minimum ceiling height of no less than 32 linear feet. c. Shall have a commercial dock size 4 feet from ground, with a door of at least 10 feet tall and 8-feetwide with enough clearance to allow for loading and unloading of 53-foot tractor trailers. d. The docking plate shall be 7 feet wide, a hardstand 1,800 square feet, and a scale to handle at least 10,000 pounds." Question: Section 1.6.11.7 defines the requirements of the warehouse; are there any clearance-level requirements for the warehouse facility itself? If it is collocated with the SCIF (within the same building), does the Government concede that only the portion of the building containing the SCIF must be cleared TS/SCI?There are no clearance-level requirements for the warehouse facility and all SCIF requirements will be provided by the Government. There is not a requirement for a SCIF within the warehouse facility.
21.6.11.7Page 126Same section as above. Question: Section 1.6.11.7 defines the requirements of the warehouse; will the Government please provide detailed requirements specific to the non-warehouse office and SCIF spaces? Requirements would include the square footage of the office, server, and conference rooms, as well as power, cooling, etc. for SCIF and non-SCIF spaces.The Government will supply SCIF space. In accordance with PWS Section 1.6.11.7.1, the warehouse shall include admin office space to conduct warehouse opeartions: "The warehouse facilities shall meet the following requirements: a. Facility shall be capable of storing material, shipping, receiving, packaging, stating, and admin space for on-site support." It is up to the vendor to decide how to organize the admin space for on-site support.
3PWS, Section 1.6.11.7Page 126"The Government has updated the PWS section 1.6.11.7 and reads: Warehouse: The contractor shall provide facilities within 45 miles or less from HQ INSCOM which are capable of warehouse support to the logistical function of this contract.
1.6.11.7.1 The warehouse facilities shall meet the following requirements: a. Facility shall be capable of storing material, shipping, receiving, packaging, staging, and admin space for on-site support. b. The open storage shall be 12,000 square feet with a minimum ceiling height of no less than 32 linear feet. c. Shall have a commercial dock size 4 feet from ground, with a door of at least 10 feet tall and 8-feetwide with enough clearance to allow for loading and unloading of 53-foot tractor trailers. d. The docking plate shall be 7 feet wide, a hardstand 1,800 square feet, and a scale to handle at least 10,000 pounds."" See updated section PWS 1.6.31.2 which reads: ""1.6.31.2 Phase-In Requirements: 1. The contractor shall include in its transition-in plan and perform, at a minimum, the following activities during the phase-in period: Maintain operational warehouse and transition in all GFP IAW Attachment 0008."" See updated Section L.2.5 Facility Lease: ""The Offeror shall submit a current lease, deed, or lease offer contingent upon contract award of a facility located within 45 miles or less of HQ INSCOM (IAW PWS 1.6.11.7) that can meet the requirements identified in PWS 1.6.11.7. Attachment (Facility Diagram) is given as an example to demonstrate a facility meeting mission needs to assist offerors in their proposal development. This information will not be evaluated as part of the source selection decision, but failure to submit the documentation may result in rejection IAW M.2." Question: Is the Government intending to cancel the existing Alban Warehouse lease and have the Offeror provide and price for a new warehouse?The Government does not hold the lease for the Alban Road location. Any decisions regarding the Alban Road lease will be made by the incoming and outgoing vendors.
4PWS, Section 1.6.11.7Page 126Same section as above. Question: Does the Government intend to have the associated warehouse costs evaluated in the final TEP?Yes there is a fixed price associated with warehouse costs.

File details come from the government source that posted it. Updated .