QASP_RS595-8.pdf
PDF 37 KB Posted
- Solicitation number
- W31P4Q18Q0170
About this file
Quality Assurance Surveillance Plan
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W31P4Q18Q0170.pdf | ||
| 2018-AMRDEC-OPSEC-Plan-May2018.pdf | ||
| PWS_RS595-8.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCE SELECTION INFORMATION – SEE FAR 2.101 and 3.104
FOR OFFICIAL USE ONLY
10 August 2018
Quality Assurance Surveillance Plan
Technical Support for the Development of an Engine Overhaul Manual
1. Description:
The Propulsion Technology Function (RDMR-WDP-P) of the Weapons Development and Integration Directorate (WDI) requests the services of UAV Engines Limited (UEL), in Great Britain, to provide technical support for the development of the US Army UEL LOP-AR74-1102 Engine Overhaul Manual in Support of the U.S. Army PM Unmanned Aircraft Systems (UAS).
2. Purchase Requirements:
The contractor shall provide technical support for the development of the US Army UEL LOP-AR74-1102 Engine Overhaul Manual:
A. The contractor shall provide technical support in the form of answers questions that may arise during the development of the US Army LOP-AR74-1102 Engine Overhaul Manual. The questions may be submitted and answered through emails and by teleconferencing.
B. The contractor shall review and provide concurrence for the technical accuracy of the information within the draft US Army UEL LOP-AR74-1102 Engine Overhaul Manual.
C. The contractor shall provide On-Site Review of the final draft copy of the US Army UEL LOP-AR74-1102 Overhaul Manual. The location of the On-Site Review will be at Redstone Arsenal, Alabama.
3. Method of Surveillance:
The On-Site Review will be held by the government technical POC, who is a subject matter expert in Unmanned Aircraft System engines. Other stakeholders such as, PM UAS, Aviation Engineering Directorate and the 1108th Theater Aviation Sustainment Maintenance Group will also take part in the review.
4. Performance Metrics:
Performance metrics are met when all stakeholders are in agreement that the final draft of the US Army UEL LOP-AR74-1102 Engine Overhaul Manual is accurate and complete.
5. Acceptable Quality Level:
10 August 2018
The On-Site Review should be held by the end of the period of performance.
File details come from the government source that posted it.