Request For Proposal W31P4Q-16-R-0049
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W31P4Q-16-R-0049 X
DOA2
SEE SCHEDULE
W31P4Q
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
DAVID C WEBB
(256)842-7685
CCAM-SM-C
DAVID.C.WEBB8.CIV@MAIL.MIL
1 59
X 1
X 3 X 9
X 10 X 12 X 13
X 14
X 16
X 19
X 44
X 45
X 53
X 57
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DAVID C WEBB
Buyer Office Symbol/Telephone Number: CCAM-SM-C/(256)842-7685
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A-1. The Army Contracting Command - Redstone hereby issues this Request for Proposal (RFP), W31P4Q-16-R-0049, for the procurement of
Squib Activated Batteries in accordance with Attachment 0001, Statement of Work (SOW), on a Firm Fixed Price (FFP), Indefinite Delivery
Indefinite Quantity (IDIQ) basis in support of a Foreign Military Sales (FMS) customer as follows:
CLIN NSN APN Noun Quanity (Min/Max)____ ___ ___ ____ ___________________
0001 Base Ordering Period 6135-00-484-8556 10181788 Squibb, Battery Activated 1-275
0002 1st Ordering Period 6135-00-484-8556 10181788 Squibb, Battery Activated 1-275
0003 2nd Ordering Period 6135-00-484-8556 10181788 Squibb, Battery Activated 1-275
Total: 825
A-2. The award shall be on an All or None-Basis. Award will be made to a single offeror whose offer responds to the item included in
Attachment 0001, Statement of Work (SOW). Failure to provide for the item shall render the offer non-responsive or may cause the offeror's proposal to be rejected.
A-3. The Government will select for award the proposal that provides the Lowest Price Technically Acceptable (LPTA) and other factors considered. The Government intends to evaluate proposals and award a contract without discussions with offerors. Therefore, an offeror's proposal should contain the offeror's best terms from a technical and price standpoint. The Government reserves the right to conduct discussions if the Contracting Officer determines the discussions to be necessary.
A-4. As described in all four (4) Contract Data Requirements List (CDRLs A001 - A004), this acquisition contains an Export Control
Warning, technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 ET SEQ) or the Export
Administration Act (Title 50, U.S.C., App 2401-2402) Executive Order 121470. This information cannot be released outside the United
States without prior approval from the Government.
A-5. Copies of the Technical Data Package (TDP) are available and may be requested by email to david.c.webb8.civ@mail.mil, or malissa.h.blake.civ@mail.mil.
A-6. Offers shall be submitted in accordance with FAR 52.215-1. Contractors may email offers to david.c.webb8.civ@mail.mil with courtesy copy to malissa.h.blake.civ@mail.mil, Not Later Than 1600 (4:00 PM) Central Standard Time (CST) on 21 March 2016.
A-7. Please complete the following Point of Contact information:
NAME: ______________________________________________
Phone: _______________________________________________
E-mail: _______________________________________________
*** END OF NARRATIVE A0001 ***
2 59
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 SQUIB ACTIVATED BATTERIES
NSN: 6135-00-484-8556
0001AA CY16 ORDERING PERIOD - BASE YEAR 153 EA $ $ ________________________________ ______________ __________________
COMMODITY NAME: SQUIB ACTIVATED BATTERIES
CLIN CONTRACT TYPE:
Firm Fixed Price
P/N: 10181788
NSN: 6135-00-484-8556
The contractor shall provide Squib, Battery Activate in accordance with the statement of work, Attachment
0001.
The minumum/maximum order quantites are set forth below:
Quantity Unit Price: 1-275
$_________ Each
(End of narrative B001)
Units to be tested is 1 each. Begin testing 30 days after contract award (DACA). First Article Test
Report due 90 DACA. The Government has 30 days to
Approve/Disapprove the test report.
Submit First Article Test Report to:
Commander
U.S. Army Aviation and Missile Lifecycle Command
5304 Martin Road
Attn: Ms. Bobbie Daniels
AMSAM-SAT-MS Room 4337
Redstone Arsenal, Al 35859
Testing requirements will be waived if sufficient data is submitted prior to Bidding to the Non-
Standard Missile Systems Division, Non-Standard
Missile Systems Management Branch (MSMB) showing proof of sales of exact or similar units to any US
Government agency within the past five (5) years.
(End of narrative B002)
Packaging and Marking _____________________
3 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packing and Crating shall be level "A/B" for overseas shipping in accordance with (IAW) MIL-STD-2073-1, and shall ship the parts in accordance with DD Form 2169, SPECIAL PACKAGING INSTRUCTIONS, dated June 1997.
Marking of all shipping containers shall be in accordance with (IAW) MIL-STD-129, MIL-STD-130, and
MIL-STD-1285.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 MIN: 1
002 MAX: 275
FOB POINT: Destination
SHIP TO: ADDRESS TO BE FURNISHED AT A LATER DATE
Ship To:
SR W39Z LETTERKENNY MUNITIONS CTR
ROUTE 997
VOELZ GATE
CHAMBERSBURG, PA 17201-4150
Mark For:
SR W39Z LETTERKENNY MUNITIONS CTR
ROUTE 997
VOELZ GATE
CHAMBERBURG, PA 17201-4150
(End of narrative F001)
0002 SQUIB ACTIVATED BATTERIES
NSN: 6135-00-484-8556
0002AA CY17 1ST ORDERING PERIOD $ $ __________________________ ______________ __________________
COMMODITY NAME: SQUIB ACTIVATED BATTERIES
CLIN CONTRACT TYPE:
Firm Fixed Price
P/N: 10181788
NSN: 6135-00-484-8556
4 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
The contractor shall provide Squib, Battery Activate in accordance with the Statement of Work, Attachment
0001.
The minumum/maximum order quantites are set forth below:
Quantity Unit Price: 1-275
$_____________ each
(End of narrative B001)
Packaging and Marking _____________________
Packing and Crating shall be level "A/B" for overseas shipping in accordance with (IAW) MIL-STD-2073-1, and shall ship the parts in accordance with DD Form 2169, SPECIAL PACKAGING INSTRUCTIONS, dated June 1997.
Marking of all shipping containers shall be in accordance with (IAW) MIL-STD-129, MIL-STD-130, and
MIL-STD-1285.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 MIN: 1
002 MAX: 275
FOB POINT: Destination
SHIP TO: ADDRESS TO BE FURNISHED AT A LATER DATE
Ship To:
SR W39Z LETTERKENNY MUNITIONS CTR
ROUTE 997
VOELZ GATE
CHAMBERSBURG, PA 17201-4150
Mark For:
SR W39Z LETTERKENNY MUNITIONS CTR
ROUTE 997
VOELZ GATE
CHAMBERSBURG, PA 17201-4150
(End of narrative F001)
5 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0003 SQUIB, BATTERY ACTIVATE
NSN: 6135-00-484-8556
0003AA CY18 2ND ORDERING PERIOD $ $ ________________________ ______________ __________________
COMMODITY NAME: SQUIB, BATTERY ACTIVATE
CLIN CONTRACT TYPE:
Firm Fixed Price
P/N: 10181788
NSN: 6135-00-484-8556
The contractor shall provide Squib, Battery Activate in accordance with the Statement of Work, Attachment
0001.
The minumum/maximum order quantites are set forth below:
Quantity Unit Price: 1-275
$__________ Each
(End of narrative B001)
Packaging and Marking _____________________
Packing and Crating shall be level "A/B" for overseas shipping in accordance with (IAW) MIL-STD-2073-1, and shall ship the parts in accordance with DD Form 2169, SPECIAL PACKAGING INSTRUCTIONS, dated June 1997.
Marking of all shipping containers shall be in accordance with (IAW) MIL-STD-129, MIL-STD-130, and
MIL-STD-1285.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 MIN: 1
002 MAX: 275
FOB POINT: Destination
6 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SHIP TO: ADDRESS TO BE FURNISHED AT A LATER DATE
Ship To:
SR W39Z LETTERKENNY MUNITIONS CTR
ROUTE 997
VOELZ GATE
CHAMBERSBURG, PA 17201-4150
Mark For:
SR W39Z LETTERKENNY MUNITIONS CTR
ROUTE 997
VOELZ GATE
CHAMBERSBURG, PA 17201-4150
(End of narrative F001)
7 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
B-1 52.209-4710 PRODUCTION QUANTITY WITH FIRST ARTICLE - CONTRACTOR TESTING JUN/1997
A first article is required but is not being procured as a separate CLIN. CLIN 0001 includes one (1) each first article and contractor testing of the first article, in accordance with FIRST ARTICLE APPROVAL - CONTRACTOR TESTING, FAR 52.209-3 (ALTERNATE I). The first article, when accepted, will become part of the production quantity. See the first article approval clause for the first article test report delivery schedule.
Since the First Article, after acceptance, will be used as part of the production units, it shall not be subjected to environmental testing unless such testing is specifically identified on the documentation as acceptance testing that must be performed on all production units. First Article inspection, at a minimum, shall include evaluation of processes, material, any related certification, surface finish, dimensional and functional requirements of the contract, applicable specifications and drawings.
(End of Clause)
8 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
C-1 52.246.4007 TECHNICAL DATA PACKAGE LIST (TDPL) OCT/1992
9 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
D-1 52.208-4701 WOOD PACKING MATERIALS REQUIREMENTS JUL/2007
A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures
(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and ouside of the United
States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD
HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement
Regulations (see http://www.alsc.org/).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.
D. Replacement Preservative for Pentachlorophenol
If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or
1.8 percent copper 8 quinolinolate.
(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated.
All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their
National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
(End of Clause)
D-2 52.246-4703 MARKINGS OF WARRANTED MATERIAL MUST BE AS FOLLOWS: JUN/1997
(1) MARKINGS: ________
(a) Items delivered under this contract shall be stamped or marked in accordance with MIL Standard 129, ("Marking for shipments and storage") and MIL Standard 130, ("Identification Marking of US Military Property").
(b) Each primary component delivered under this contract shall be marked as follows:
(1) A warranty identification label or plate shall be securely applied, fastened, or attached to each warranted item in a conspicuous location.
(2) The contractor shall submit drawing of the warranty label or plate identification to be used on the warranted item(s).
(3) The warranty label or plate identification shall be of an alternating blue and clear diagonal stripe background color.
10 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(4) The plate or label shall have imprinted the following data:
(a) Warranty: The word warranty shall be in predominate bold letters.
(b) NSN: National Stock Number shall be imprinted.
(c) TB: TB shall identify the applicable technical bulletin for warranted item.
(d) EXP: EXP shall indicate the date of warranty expiration by year and month, i.e., 8612 or the specific warranty period coverage time, months, indication the start date by year and month, i.e., 8412.
(e) FSCM: The Federal Supply Code for Manufacturers (FSCM) shall be indicated, i.e., 99584.
These marking labels must be on the warranted items as well as their shipping container.
(End of Clause)
D-3 52.247-4700 BAR CODE MARKINGS MAY/2014
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
(End of Clause)
11 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-4 52.209-4705 FIRST ARTICLE - INSPECTION AND ACCEPTANCE JUN/1997
The Government shall perform Contract Quality Assurance at origin; however, test and evaluation, final inspection, acceptance, and approval shall be at destination. The first article submitted for testing under this contract shall meet such performance requirements and material, dimensional, heat treat, surface finish and functional requirements as set forth in the drawings, supplementary quality assurance provisions and specifications. The Government will perform such chemical, physical functional and environmental tests as necessary to determine that the requirements of the applicable specifications and drawings have been met.
12 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
F-2 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-3 52.211-11 LIQUIDATED DAMAGES--SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT SEP/2000
(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of -1- per calendar day of delay.
(b) If the Government terminates this contract in whole or in part under the Default -- Fixed-Price Supply and Service clause, the
Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default -- Fixed-Price Supply and Service clause in this contract.
(End of Clause)
13 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION G - CONTRACT ADMINISTRATION DATA
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this
Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
TBD
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
Origin/Origin
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD
Issue By DoDAAC TBD
Admin DoDAAC TBD
Inspect By DoDAAC TBD
Ship To Code TBD
Ship From Code TBD
Mark For Code TBD
Service Approver (DoDAAC) TBD
Service Acceptor (DoDAAC) TBD
Accept at Other DoDAAC TBD
LPO DoDAAC TBD
DCAA Auditor DoDAAC TBD
Other DoDAAC(s) TBD
14 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email
Notifications" field of WAWF once a document is submitted in the system.
TBD
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
TBD
(2) For technical WAWF help, contact the WAWF helpdesk at 866-
618-5988.
(End of clause)
15 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION H - SPECIAL CONTRACT REQUIREMENTS
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
H-1 52.243-4000 ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, MAR/2011
REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND
SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations
(RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.
2. Format. _______
a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government
Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II
ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using
RDMR Form 523 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office
(CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block 5 of the form.)
e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.
f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense
Contract Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.
g. Classification of RFDs/RFVs.
(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance;
interchangeability; reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.
j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.
16 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the Contractor and the Government.
l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice"
(SCN), for each specification that would require revision if the ECP were approved.
m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.
n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.
o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.
3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer __________
(ACO). One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, RFVs or RFDs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.
4. Distribution. ____________
a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft _______________________
Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Army Contracting Command - Redstone Website (http://www.redstone.army.mil/amrdec/rdmr-se/tdmd/ConfigMgt.htm) by clicking on "Forms/Checksheets." The forms are in both "Adobe Acrobat" and "Form Flow" formats. In order to access and use the forms, the user must have the "Adobe Acrobat" or "Form Flow" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO. Contractors who do not have access to the Army Contracting Command - Redstone website will need to contact the PCO, the appropriate Project Office Configuration Management Office, or the Technical Data Management Division (RDMR-SET) to have the forms sent to their facility.
b. Hard Copy Distribution of Class I or II ECPs and RFD/RFVs, For each Class I or II ECP, or each RFD/RFV that the
ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:
Aviation and Missile Research, Development, and Engineering Center
ATTN: RDMR-SET
Redstone Arsenal, Al 35898-5000
Telephone: 256-876-1335
c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, _______________________________ the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the VEPM.
Aviation and Missile Research, Development, and Engineering Center
ATTN: RDMR-SEI
Redstone Arsenal, Al 35898-5000
Telephone: 256-876-8163
5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a ___________________________________________________ different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or _____________________ execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The Government will notify the Contractor in writing if a proposal is determined to be unacceptable.
17 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(End of clause)
18 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
I-1 52.202-1 DEFINITIONS NOV/2013
I-2 52.203-3 GRATUITIES APR/1984
I-3 52.203-5 COVENANT AGAINST CONTINGENT FEES MAY/2014
I-4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT SEP/2006
I-5 52.203-7 ANTI-KICKBACK PROCEDURES MAY/2014
I-6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR MAY/2014
IMPROPER ACTIVITY
I-7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY MAY/2014
I-8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS OCT/2010
I-9 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER MAY/2011
I-10 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS OCT/2015
I-11 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE JUL/2013
I-12 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH OCT/2015
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
I-13 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY JUL/2013
MATTERS
I-14 52.211-5 MATERIAL REQUIREMENTS AUG/2000
I-15 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS APR/2008
I-16 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT OCT/1997
I-17 52.215-14 INTEGRITY OF UNIT PRICES OCT/2010
I-18 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS OCT/2010
I-19 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS (PRB) JUL/2005
OTHER THAN PENSIONS
I-20 52.217-2 CANCELLATION UNDER MULTI-YEAR CONTRACTS OCT/1997
I-21 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS OCT/2014
I-22 52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES FEB/2016
I-23 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT EXCEEDING MAY/2014
$15,000
I-24 52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR/2015
I-25 52.222-26 EQUAL OPPORTUNITY APR/2015
I-26 52.222-37 EMPLOYMENT REPORTS ON VETERANS OCT/2015
I-27 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS DEC/2010
ACT
I-28 52.222-50 COMBATING TRAFFICKING IN PERSONS MAR/2015
I-29 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION OCT/2015
I-30 52.223-6 DRUG-FREE WORKPLACE MAY/2001
I-31 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING AUG/2011
I-32 52.227-1 AUTHORIZATION AND CONSENT DEC/2007
I-33 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT DEC/2007
I-34 52.229-3 FEDERAL, STATE, AND LOCAL TAXES FEB/2013
I-35 52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS JUN/2010
I-36 52.232-1 PAYMENTS APR/1984
I-37 52.232-8 DISCOUNTS FOR PROMPT PAYMENT FEB/2002
I-38 52.232-11 EXTRAS APR/1984
I-39 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) APR/1984
I-40 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN/2013
I-41 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS DEC/2013
I-42 52.233-3 PROTEST AFTER AWARD AUG/1996
I-43 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT/2004
I-44 52.242-13 BANKRUPTCY JUL/1995
I-45 52.243-1 CHANGES--FIXED PRICE AUG/1987
I-46 52.246-23 LIMITATION OF LIABILITY FEB/1997
I-47 52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS JUN/2003
I-48 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) APR/2012
I-49 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) APR/1984
I-50 52.253-1 COMPUTER GENERATED FORMS JAN/1991
I-51 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS SEP/2011
I-52 252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT- DEC/2008
RELATED FELONIES
I-53 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS SEP/2013
I-54 252.204-7000 DISCLOSURE OF INFORMATION AUG/2013
I-55 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT APR/1992
19 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
I-56 252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT FEB/2014
I-57 252.204-7015 DISCLOSURE OF INFORMATION TO LITIGATION SUPPORT CONTRACTORS FEB/2014
I-58 252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS DEC/1991
I-59 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE OCT/2015
GOVERNMENT OF A TERRORIST COUNTRY
I-60 252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS DEC/2012
I-61 252.217-7000 EXERCISE OF OPTION TO FULFILL FOREIGN MILITARY SALES COMMITMENTS (Nov NOV/2014
2014) -- ALTERNATE I (NOV 2014)
I-62 252.223-7004 DRUG-FREE WORK FORCE SEP/1988
I-63 252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM JUN/2013
I-64 252.225-7048 EXPORT-CONTROLLED ITEMS JUN/2013
I-65 252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC SEP/2004
ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS
I-66 252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL ITEMS FEB/2014
I-67 252.227-7014 RIGHTS IN NONCOMMERCIAL COMPUTER SOFTWARE AND NONCOMMERCIAL COMPUTER FEB/2014
SOFTWARE DOCUMENTATION
I-68 252.227-7015 TECHNICAL DATA--COMMERCIAL ITEMS FEB/2014
I-69 252.227-7016 RIGHTS IN BID OR PROPOSAL INFORMATION JAN/2011
I-70 252.227-7019 VALIDATION OF ASSERTED RESTRICTIONS--COMPUTER SOFTWARE SEP/2011
I-71 252.227-7025 LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED MAY/2013
INFORMATION MARKED WITH RESTRICTIVE LEGENDS
I-72 252.227-7027 DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE APR/1988
I-73 252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT MAR/2000
I-74 252.227-7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA JUN/2013
I-75 252.231-7000 SUPPLEMENTAL COST PRINCIPLES DEC/1991
I-76 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS JUN/2012
I-77 252.232-7010 LEVIES ON CONTRACT PAYMENTS DEC/2006
I-78 252.239-7001 INFORMATION ASSURANCE CONTRACTOR TRAINING AND CERTIFICATION JAN/2008
I-79 252.243-7001 PRICING OF CONTRACT MODIFICATIONS DEC/1991
I-80 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT DEC/2012
I-81 252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS JUN/2013
I-82 252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT MAR/2008
I-83 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC APR/2014
I-84 252.249-7002 NOTIFICATION OF ANTICIPATED CONTRACT TERMINATION OR REDUCTION OCT/2015
I-85 5152.250-1- ADDITIONAL INFORMATION ON INDEMNIFICATION REQUESTS UNDER CONTRACTS NOV/2004
9000 FOR A QUALIFIED ANTI-TERRORISM TECHNOLOGY
I-86 52.209-1 QUALIFICATION REQUIREMENTS FEB/1995
(a) Definition. Qualification requirement, as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.
(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item under this contract or simply a component of an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list.
Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.
(Name) -1-
(Address) -2-
(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.
Offerors Name _______________________________________________________
Manufacturers Name __________________________________________________
Sources Name ________________________________________________________
20 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Item Name ____________________________________________________________
Service Identification _______________________________________________
Test Number (to the extent known) __________________________________________________________
(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Governments best interests.
(e) If an offeror, manufacturer, source, product or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Governments interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.
(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.
(End of Clause)
I-87 52.216-19 ORDER LIMITATIONS OCT/1995
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than one (1), the
Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor --
(1) Any order for a single item in excess of 825;
(2) Any order for a combination of items in excess of 825; or
(3) A series of orders from the same ordering office within 1095 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition
Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within -5- days after issuance, with written notice stating the Contractors intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of Clause)
I-88 52.216-21 REQUIREMENTS OCT/1995
(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Governments requirements do not result in orders in the quantities described as estimated or maximum in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies
21 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the
Contractor within the time specified in the order. The contract shall govern the Contractors and Governments rights and obligations with respect to that…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .