OP1

ASPHALT/ROAD REPAIR AND PAINTING
W25G1V-23-R-0012
EXHIBIT B - LINE ITEM BREAKDOWN AND PRICING REV. 1

1ST YEAR OF ORDERING PERIOD PRICING

EXHIBIT B
LINE ITEM NUMBERTask DescriptionUnit/MeasurementUnit Price
Column1Column2Column3Column4
012A SUB BASE MATERIAL INCLUDING INSTALLATIONCUBIC YARD (CY)
02ID-2 WEARING MATERIAL INCLUDING INSTALLATIONSQUARE YARD (SY)
03SEAL SURFACE OF EXISTING PAVEMENTSQUARE YARD (SY)
04REPAIR SEAM CRACKSLINEAR FOOT (LF)
05BC-BC MATERIAL INCLUDING INSTALLATIONSQUARE YARD (SY)
06MILLINGSQUARE YARD (SY)
07DISPOSAL OF SPOILSCUBIC YARD (CY)
08SAW CUTTINGLINEAR FOOT (LF)
09EXCAVATIONCUBIC YARD (CY)
10FINE GRADE SUBGRADESQUARE YARD (SY)
11TRANSITION MILLINGSQUARE YARD (SY)
12TACK COATSQUARE YARD (SY)
13HAND POT HOLE PATCHING INCLUDING INSTALLATION20-39 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION40-69 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION70-99 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION>100 CUBIC FEET (CF)
ROADWAY MARKINGS/LINE STRIPING, SWEEPING, EMERGENCY
Column3Column1Column2
EXHIBIT B
LINE ITEM NUMBERTaskUnit Price
14Walkways (White)
15Crosswalks
16Stop and Bar
17Stop Bar
18Exit Only
19Bus Stop
20Arrows
21Handicap Sign
22No Parking
23Truck Lane
24Loading Zone
25One Way
26Do Not Enter
27Truck Gate Markings
28Bldg. 20 Gate Markings
29Scranton Gate Markings
30Stroudsburg Gate Markings
314" White Line (LF)
324" Yellow Line (LF)
334" Blue Line (LF)
341" High Letters (Each)
35Scarify Existing/Blackened (LF)
36Large PENNDOT Arrows (Each)
372' High Letters (Each)
38Access Aisle
39Car Stall (Each)
408' High Stop Logo
41Crosswalk Blocks (Each)
42Yield Triangle (Each)
432' Yellow Hash (LF)
441' Yellow Hash (LF)
45SWEEPING: Roads and Parking Areas, to be done twice yearly. Provide price for one cleaning.
46OCCASIONAL SWEEPING: To be performed on an as needed basis. Provide a per sq. ft. unit price.
47EMERGENCY CALL: See SOW for further detail. This shall be a fixed fee, per occurence.

OP2

ASPHALT/ROAD REPAIR AND PAINTING
W25G1V-23-R-0012
EXHIBIT B - LINE ITEM BREAKDOWN AND PRICING REV. 1

2ND YEAR OF ORDERING PERIOD PRICING

EXHIBIT B
LINE ITEM NUMBERTask DescriptionUnit/MeasurementUnit Price
Column1Column2Column3Column4
012A SUB BASE MATERIAL INCLUDING INSTALLATIONCUBIC YARD (CY)
02ID-2 WEARING MATERIAL INCLUDING INSTALLATIONSQUARE YARD (SY)
03SEAL SURFACE OF EXISTING PAVEMENTSQUARE YARD (SY)
04REPAIR SEAM CRACKSLINEAR FOOT (LF)
05BC-BC MATERIAL INCLUDING INSTALLATIONSQUARE YARD (SY)
06MILLINGSQUARE YARD (SY)
07DISPOSAL OF SPOILSCUBIC YARD (CY)
08SAW CUTTINGLINEAR FOOT (LF)
09EXCAVATIONCUBIC YARD (CY)
10FINE GRADE SUBGRADESQUARE YARD (SY)
11TRANSITION MILLINGSQUARE YARD (SY)
12TACK COATSQUARE YARD (SY)
13HAND POT HOLE PATCHING INCLUDING INSTALLATION20-39 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION40-69 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION70-99 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION>100 CUBIC FEET (CF)
ROADWAY MARKINGS/LINE STRIPING, SWEEPING, EMERGENCY
Column3Column1Column2
EXHIBIT B
LINE ITEM NUMBERTaskUnit Price
14Walkways (White)
15Crosswalks
16Stop and Bar
17Stop Bar
18Exit Only
19Bus Stop
20Arrows
21Handicap Sign
22No Parking
23Truck Lane
24Loading Zone
25One Way
26Do Not Enter
27Truck Gate Markings
28Bldg. 20 Gate Markings
29Scranton Gate Markings
30Stroudsburg Gate Markings
314" White Line (LF)
324" Yellow Line (LF)
334" Blue Line (LF)
341" High Letters (Each)
35Scarify Existing/Blackened (LF)
36Large PENNDOT Arrows (Each)
372' High Letters (Each)
38Access Aisle
39Car Stall (Each)
408' High Stop Logo
41Crosswalk Blocks (Each)
42Yield Triangle (Each)
432' Yellow Hash (LF)
441' Yellow Hash (LF)
45SWEEPING: Roads and Parking Areas, to be done twice yearly. Provide price for one cleaning.
46OCCASIONAL SWEEPING: To be performed on an as needed basis. Provide a per sq. ft. unit price.
47EMERGENCY CALL: See SOW for further detail. This shall be a fixed fee, per occurence.

OP3

ASPHALT/ROAD REPAIR AND PAINTING
W25G1V-23-R-0012
EXHIBIT B - LINE ITEM BREAKDOWN AND PRICING REV. 1

3RD YEAR OF ORDERING PERIOD PRICING

EXHIBIT B
LINE ITEM NUMBERTask DescriptionUnit/MeasurementUnit Price
Column1Column2Column3Column4
012A SUB BASE MATERIAL INCLUDING INSTALLATIONCUBIC YARD (CY)
02ID-2 WEARING MATERIAL INCLUDING INSTALLATIONSQUARE YARD (SY)
03SEAL SURFACE OF EXISTING PAVEMENTSQUARE YARD (SY)
04REPAIR SEAM CRACKSLINEAR FOOT (LF)
05BC-BC MATERIAL INCLUDING INSTALLATIONSQUARE YARD (SY)
06MILLINGSQUARE YARD (SY)
07DISPOSAL OF SPOILSCUBIC YARD (CY)
08SAW CUTTINGLINEAR FOOT (LF)
09EXCAVATIONCUBIC YARD (CY)
10FINE GRADE SUBGRADESQUARE YARD (SY)
11TRANSITION MILLINGSQUARE YARD (SY)
12TACK COATSQUARE YARD (SY)
13HAND POT HOLE PATCHING INCLUDING INSTALLATION20-39 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION40-69 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION70-99 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION>100 CUBIC FEET (CF)
ROADWAY MARKINGS/LINE STRIPING, SWEEPING, EMERGENCY
Column3Column1Column2
EXHIBIT B
LINE ITEM NUMBERTaskUnit Price
14Walkways (White)
15Crosswalks
16Stop and Bar
17Stop Bar
18Exit Only
19Bus Stop
20Arrows
21Handicap Sign
22No Parking
23Truck Lane
24Loading Zone
25One Way
26Do Not Enter
27Truck Gate Markings
28Bldg. 20 Gate Markings
29Scranton Gate Markings
30Stroudsburg Gate Markings
314" White Line (LF)
324" Yellow Line (LF)
334" Blue Line (LF)
341" High Letters (Each)
35Scarify Existing/Blackened (LF)
36Large PENNDOT Arrows (Each)
372' High Letters (Each)
38Access Aisle
39Car Stall (Each)
408' High Stop Logo
41Crosswalk Blocks (Each)
42Yield Triangle (Each)
432' Yellow Hash (LF)
441' Yellow Hash (LF)
45SWEEPING: Roads and Parking Areas, to be done twice yearly. Provide price for one cleaning.
46OCCASIONAL SWEEPING: To be performed on an as needed basis. Provide a per sq. ft. unit price.
47EMERGENCY CALL: See SOW for further detail. This shall be a fixed fee, per occurence.

OP4

ASPHALT/ROAD REPAIR AND PAINTING
W25G1V-23-R-0012
EXHIBIT B - LINE ITEM BREAKDOWN AND PRICING REV. 1

4TH YEAR OF ORDERING PERIOD PRICING

EXHIBIT B
LINE ITEM NUMBERTask DescriptionUnit/MeasurementUnit Price
Column1Column2Column3Column4
012A SUB BASE MATERIAL INCLUDING INSTALLATIONCUBIC YARD (CY)
02ID-2 WEARING MATERIAL INCLUDING INSTALLATIONSQUARE YARD (SY)
03SEAL SURFACE OF EXISTING PAVEMENTSQUARE YARD (SY)
04REPAIR SEAM CRACKSLINEAR FOOT (LF)
05BC-BC MATERIAL INCLUDING INSTALLATIONSQUARE YARD (SY)
06MILLINGSQUARE YARD (SY)
07DISPOSAL OF SPOILSCUBIC YARD (CY)
08SAW CUTTINGLINEAR FOOT (LF)
09EXCAVATIONCUBIC YARD (CY)
10FINE GRADE SUBGRADESQUARE YARD (SY)
11TRANSITION MILLINGSQUARE YARD (SY)
12TACK COATSQUARE YARD (SY)
13HAND POT HOLE PATCHING INCLUDING INSTALLATION20-39 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION40-69 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION70-99 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION>100 CUBIC FEET (CF)
ROADWAY MARKINGS/LINE STRIPING, SWEEPING, EMERGENCY
Column3Column1Column2
EXHIBIT B
LINE ITEM NUMBERTaskUnit Price
14Walkways (White)
15Crosswalks
16Stop and Bar
17Stop Bar
18Exit Only
19Bus Stop
20Arrows
21Handicap Sign
22No Parking
23Truck Lane
24Loading Zone
25One Way
26Do Not Enter
27Truck Gate Markings
28Bldg. 20 Gate Markings
29Scranton Gate Markings
30Stroudsburg Gate Markings
314" White Line (LF)
324" Yellow Line (LF)
334" Blue Line (LF)
341" High Letters (Each)
35Scarify Existing/Blackened (LF)
36Large PENNDOT Arrows (Each)
372' High Letters (Each)
38Access Aisle
39Car Stall (Each)
408' High Stop Logo
41Crosswalk Blocks (Each)
42Yield Triangle (Each)
432' Yellow Hash (LF)
441' Yellow Hash (LF)
45SWEEPING: Roads and Parking Areas, to be done twice yearly. Provide price for one cleaning.
46OCCASIONAL SWEEPING: To be performed on an as needed basis. Provide a per sq. ft. unit price.
47EMERGENCY CALL: See SOW for further detail. This shall be a fixed fee, per occurence.

OP5

ASPHALT/ROAD REPAIR AND PAINTING
W25G1V-23-R-0012
EXHIBIT B - LINE ITEM BREAKDOWN AND PRICING REV. 1

5TH YEAR OF ORDERING PERIOD PRICING

EXHIBIT B
LINE ITEM NUMBERTask DescriptionUnit/MeasurementUnit Price
Column1Column2Column3Column4
012A SUB BASE MATERIAL INCLUDING INSTALLATIONCUBIC YARD (CY)
02ID-2 WEARING MATERIAL INCLUDING INSTALLATIONSQUARE YARD (SY)
03SEAL SURFACE OF EXISTING PAVEMENTSQUARE YARD (SY)
04REPAIR SEAM CRACKSLINEAR FOOT (LF)
05BC-BC MATERIAL INCLUDING INSTALLATIONSQUARE YARD (SY)
06MILLINGSQUARE YARD (SY)
07DISPOSAL OF SPOILSCUBIC YARD (CY)
08SAW CUTTINGLINEAR FOOT (LF)
09EXCAVATIONCUBIC YARD (CY)
10FINE GRADE SUBGRADESQUARE YARD (SY)
11TRANSITION MILLINGSQUARE YARD (SY)
12TACK COATSQUARE YARD (SY)
13HAND POT HOLE PATCHING INCLUDING INSTALLATION20-39 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION40-69 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION70-99 CUBIC FEET (CF)
HAND POT HOLE PATCHING INCLUDING INSTALLATION>100 CUBIC FEET (CF)
ROADWAY MARKINGS/LINE STRIPING, SWEEPING, EMERGENCY
Column3Column1Column2
EXHIBIT B
LINE ITEM NUMBERTaskUnit Price
14Walkways (White)
15Crosswalks
16Stop and Bar
17Stop Bar
18Exit Only
19Bus Stop
20Arrows
21Handicap Sign
22No Parking
23Truck Lane
24Loading Zone
25One Way
26Do Not Enter
27Truck Gate Markings
28Bldg. 20 Gate Markings
29Scranton Gate Markings
30Stroudsburg Gate Markings
314" White Line (LF)
324" Yellow Line (LF)
334" Blue Line (LF)
341" High Letters (Each)
35Scarify Existing/Blackened (LF)
36Large PENNDOT Arrows (Each)
372' High Letters (Each)
38Access Aisle
39Car Stall (Each)
408' High Stop Logo
41Crosswalk Blocks (Each)
42Yield Triangle (Each)
432' Yellow Hash (LF)
441' Yellow Hash (LF)
45SWEEPING: Roads and Parking Areas, to be done twice yearly. Provide price for one cleaning.
46OCCASIONAL SWEEPING: To be performed on an as needed basis. Provide a per sq. ft. unit price.
47EMERGENCY CALL: See SOW for further detail. This shall be a fixed fee, per occurence.

File details come from the government source that posted it. Updated .