W25G1V-23-Q-0074-0001CONFORMED AMENDMENT.pdf
PDF 883 KB Posted
- Attached to
- Carpet Install Federal contract opportunity
- Solicitation number
- W25G1V-23-Q-0074
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W25G1V-23-Q-0074 Amendment 002.pdf | ||
| W25G1V-23-Q-0074 Conformed Amendement 002.pdf | ||
| W25G1V-23-Q-0074 SOLICITATION AMENDMENT.pdf | ||
| Sole Source redacted_Redacted.pdf | ||
| Floor Plan 11-1-499.pdf | ||
| W25G1V-23-Q-0074 SOLICITATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W25G1V23Q0074 21-Apr-2023
b. TELEPHONE NUMBER
570-615-9554
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 05 May 2023
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W25G1V9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MICHAEL J. CLARK
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25G1V308800PZ
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ACC-APG, TOBYHANNA DIVISION
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466-5100
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W25G1V 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
SEE BELOW FOR SEPARATE SHIPPING INSTRUCT
XXX
XXX PA 00000
TEL: FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$19,000,000
NAICS:
238330
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF51
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W25G1V23Q0074
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Carpet Install
FFP
BLG. 11 COMMAND GROUP CARPET REPLACEMENT. PER ATTACHED
STATEMENT OF WORK.
COR MIKE BOYLAN 570-615-6265
FOB: Destination
NSN: AASSVC308800PZ
MILSTRIP: W25G1V308800PZ
PURCHASE REQUEST NUMBER: W25G1V308800PZ
PSC CD: S214
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
DELIVERY
Work will be performed at:
Tobyhanna Army Depot Building 11, 3rd Floor 11 Hap Arnold Blvd Tobyhanna Army Depot 18466
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 05-MAY-2023 TO
30-MAY-2023
N/A SEE BELOW FOR SEPARATE SHIPPING
INSTRUCT
XXX
XXX PA 00000
FOB: Destination
W25G1V
ADDENDUM
ADDENDUM
Addendum This Request for this RFQ (W25G1V-23-Q-0074) is a service to perform all necessary operations for Carpet installation at building (Bldg.) 11 third floor at the Tobyhanna Army Depot (TYAD). The for treatment of floors and new carpet installation for the 3rd Floor Command Group is 2100 square feet. The services necessary to complete this project shall include providing all licenses, permits, labor, materials, equipment, supervision, and management to complete the project. This Service will be for a Brand Name Firm Fixed Price purchase order. Solicitation will be conducted on a competitive basis as a small business set aside and pursued in accordance with Federal Acquisition Regulations, (FAR) Part 13, (Simplified Acquisition Procedures).
Contractors are encouraged to attend a site visit on Thursday 04/27/2023 at 09:00 am at the security building 20.
Please arrive an hour early for signing in at the visitor center building 606. See performance work statement 4.4
BASIS OF AWARD: See 52.212-2 Evaluation – Commercial Items.
FAR 52.217-8 Option to Extend is incorporated into this solicitation. Evaluation is not needed for this extension, as it would allow for additional time only.
MSDS Safety data sheet shall be submitted with proposal for approval by environmental prior to the award of the contact.
CONTRACTOR SUBMITTED QUESTIONS: Offerors are advised to submit any questions regarding this solicitation in writing to the purchasing agent via email: michael.j.clark238.civ@army.mil. Any and all questions made verbally, (e.g. telephone call), by interested contractors, will have the same answer. Please submit in writing via email to the purchasing agent identified in the solicitation.” Answers to questions will be posted in the same manner in which the solicitation is posted and be incorporated into the resultant award. Questions will not be accepted within two (2) business days of the solicitation closing date. Additionally, when submitting questions.
The Government is not responsible for any costs incurred for contractor’s time or materials expended in preparing a proposal for this solicitation. Parts used for this service such as after market or grey items will not be accepted.
QUOTATION SUBMISSION: Parties interested in responding to this RFQ SHALL:
(a) Submit their offer on a completed standard form (SF) 1449 http://www.forms.gov, BLOCK Numbers 17a, 19 thru 24, 30a, 30b, and 30c. The offer, (SF1449), must be signed by a company official authorized to contractually bind the company.
(b) Include all, (if any), signed amendments. Any amendments issued to this solicitation will be synopsized in the same manner as thissolicitation. All Offerors are advised to acknowledge all amendments issued to the solicitation with their proposal by completing and signing page one (1) and including one (1) copy of each Solicitation amendment with their quotation.
(c) Submit three Past Performance references (within last five years) of similar installs. Include contact name, phone number, date of contract, contract number, description of services and location the where the was work performed.
Each offer must be submitted electronically before closing date and time to the purchasing agent, Michael Clark at michael.j.clark238.civ@army.mil The email size must not exceed 9MB.
To receive an award, the company must have an active registration in the System for Award Management (SAM) https://www.sam.gov. Prospective offerors must be found to be responsible in accordance with FAR 9.1 and have no delinquent federal debt.
If a complete offer, including any/all applicable attachments, does not appear in the email inbox of the purchasing agent identified in this solicitation before the closing date and time, then it is considered as not received and the offeror’s entire offer is late and will not be considered for award.
If the offeror does not receive written confirmation of receipt from the purchasing agent before the closing date and time, it is the responsibility of the offeror prior to the closing of the solicitation to contact the purchasing agent, to confirm that their complete offer has been received.
The Government will not consider offers that were delayed, or otherwise not timely delivered to the Purchasing Agent’s email inbox due to complications with the offeror’s or the Government’s service providers, to include email maintenance, firewall, delivery to any other email inbox, (e.g. junk folder, spam folder, etc.), or that the purchasing agent’s email inbox has reached maximum capacity; offerors should anticipate delays in transmission and are advised to plan ahead and to begin transmitting their offer in enough time to ensure successful delivery prior to the close of the solicitation.
Attachments:
Redacted sole source Floor Plan 11-1-499
PWS PERFORMANCE WORK STATEMENT
Performance work Statement Building 11 Command Group Carpet Replacement
TOBYHANNA ARMY DEPOT
1. GENERAL:
1.1. SUMMARY:
1.1.1. Project Description:
This order will consist of services associated with the replacement of both the field and border carpet tiles only in the areas that were affected by a previous Glycol spill, located in building 11 3rd floor command group area. The areas in question total approx. 2100 square feet. The services necessary to complete this project shall include providing all licenses, permits, labor, materials, equipment, supervision, and management to complete the project.
All and any exceptions shall be submitted in writing.
1.1.2. Scope of Work:
The contractor shall furnish all labor, tools, equipment, and materials in order to replace the damaged (Glycol spill) carpet tiles located in the areas specified (see floor plan with dimensions that will be attached as part of the solicitation). The total area of replacement is approx. 2100 square feet. The carpet flooring system shall be installed in accordance with the manufacturer’s recommendations and by following specifications in the CRI 104/105.
Removal of all construction/demolition debris shall be the sole responsibility of the contractor. The contractor shall dispose of any waste materials according to Tobyhanna Army Depot Recycling Policy.
2. KEY ELEMENTS:
2.1. The carpet flooring shall follow manufacturer’s recommendations and specifications as outlined below.
2.1.1. FLOORING:
A. Available Products: Subject to compliance with the following requirements B. Floor System Characteristics:
1. 7/16” thickness square carpet tiles
2. 2’x2’ square carpet tiles
3. Affixed with heavy adhesive
4. Adhesive to have zero VOC off gassing
5. Installed in a nondirectional pattern
2.2. Deliverables: The contractor shall provide the following.
a. The contractor shall match the existing carpet field tile as well as the existing carpet border tile.
*No substitutions will be allowed.
b. Border Areas - Shaw 54786 Color Accents #62761 Portabella.
C. Field Tile - Shaw 54475 Unscripted #305 Improvisation
3 MATERIALS:
Provide materials used in the flooring of each room from a single manufacturer and dye lot. Furnish and install 2’x2’ Carpet tiles of 7/16” thickness. Adhesives and floor treatments to be used shall comply with all EPA regulations. New carpet tiles shall match existing carpet color and pattern design.
3.1 Adhesive
Type recommended by the manufacturer to allow for heavy traffic. Shall be of the solvent free, nonflammable and zero VOC type.
3.2 Thresholds
Shall be “T” style with a rubber finish to replicate the thresholds to be replaced.
3.3 Floor Treatment
The concrete floor in the affected area (all of the approx. 2100 square feet) must be ground smooth by use of concrete floor surface grinder (with self-contained vacuum system), of an adhesive/contaminant and leveled using a Cementous floor leveler.
3.5 Molding
All Shoe molding shall be carefully removed and re-installed or if damaged, replaced to its original form. The molding color is custom and cannot be matched. All molding currently in place shall remain in place or shall be put back in place if removal is necessary for carpet installation.
3.6 Furniture
Contractor will be responsible for moving/re-locating furniture in the affected area, with guidance from TYAD personnel.
3.7 Cleaning
Contractor will be responsible for the complete removal of all construction waste and general clean-up. TYAD will assist with the clean-up i.e., finish vacuuming, dusting and window washing.
4. MISCELLANEOUS
Contractor will proceed 5 days after acceptance of award. Estimated Completion will be on or before May 25,2023
4.1 The COR for this contract will be Mr. Mike Boylan, Tel :(570) 615-6265.
4.2 Work will be performed during normal working hours 07:00 AM - 15:30 PM Monday through Friday, unless prior authorization is confirmed with the COR. Any work performed outside of normal working hours shall be requested in writing to the COR 48 hours in advance. COR will make determination if alternate scheduling will be approved.
4.3 COR will approve of all materials prior to installation.
4.4 Contractors are encouraged to attend a site visit that on Thursday April 27th, 2023 at 9:00am to check all dimensions and otherwise acquaint himself with all details and conditions affecting the work, quantities and type of materials and all factors to meet the purpose and intent of these specifications and the terms of the contract. It shall be the responsibility of the prospective bidders to visit the sites of the proposed work at Tobyhanna Army Depot, Tobyhanna, PA. Prospective bidders are requested to report to the lobby of the Visitor Control Center (building 606) at Tobyhanna Army Depot, Tobyhanna, PA, at the appointed hour. If any departure from the specifications or drawing(s) is deemed necessary by the prospective bidder(s), details of such departure and reason therefore shall be brought to the attention of the government contracting office.
5. PRODUCTS, MATERIALS AND EXECUTION
5.1 All work shall be installed in accordance with the manufacturer’s recommendations and the following specifications in the CRI 104/105. If there are any concerns about the code, then the authority having jurisdiction will define the code. The Department of Public Works will be the authority having jurisdiction. The specification format shall follow the Uniform Facilities Guide Specifications that are part of the Construction Criteria Base published by the National Institute of Building Sciences. Execution shall be coordinated to ensure there is no disruption to current test work in progress.
IN ADDITION, ALL DESIGNS AND INSTALLATIONS SHALL COMPLY WITH TOBYHANNA ARMY
DEPOT DESIGN/INSTALLATION GUIDELINES WHICH ARE SPECIFIC TO THE DEPOT.
6. Conflicts
6.1 IN CONFLICTS BETWEEN SPECIFICATIONS (CODES) AND TYAD DESIGN/INSTALLATION
GUIDELINES, TYAD GUIDELINES SHALL BE IMMIDIATELY REPORTED TO THE COR.
7. QUALITY ASSURANCE
7.1. The construction services are to be performed by laborers, who through related training and on the job, experience is familiar with the techniques and hazards of this work including floor maintenance, repairing, removal and applicable equipment in such operations.
7.2. Rejection of Work: Indication of lack of quality workmanship or safety practices on the part of the contractor shall be sufficient grounds for the Government to reject work at no additional cost to the Government.
8. SUBMITTALS
8.1 Initial SDS
MSDS Safety data sheet shall be submitted with proposal for approval by environmental prior to the award of the contact.
A. Job Specific Safety Plan
9. SECURITY REQUIREMENTS
Contractor personnel working on the Tobyhanna Army Depot must be fully identified. Contractors register with TYAD Security in Building 606. All employees, staff, and subcontractor personnel, etc., which will require access must present the following to access TYAD:
A. Full name B. Driver’s License C. Nationality (if non-U.S. Citizen, alien registration number) If Contractor vehicles are required for use on TYAD, the following ID is required:
A. Make B. Model C. State Registration D. Insurance E. License Plate # Contract personnel are expected to perform work during normal TYAD duty hours (0700-1630). If work must be performed otherwise, permission must be obtained three working days prior from the Security Office through the TYAD Representative. Contractor personnel must confine themselves to the work sites specified in their contract.
Visiting other areas is prohibited. Alcoholic beverages, weapons, cameras, sound recorders, proscribed drugs and explosives are prohibited on Government property. Use of Government property without prior written approval of the On-Site Representative is prohibited.
TYAD will arrange for special Contractor parking if required. Contractor personnel must not park in numbered spaces, areas reserved for carpools, grassy areas or other prohibited areas. Posted speed limits and traffic restrictions must be always observed. Accidents or problems of a security/safety nature must be reported to the Security (570.615.7550) and TYAD Representative (570.615.7306/8139) immediately. Contractor personnel working on station for less than 30 days may be required to log in and out at the Visitor's Center each day and will not be issued an Extended Entry Contractor's Badge. The On-Site Representative will provide information on how to obtain an Extended Entry Contractor's Badge if one is required. Pursuant to federal regulations, all personnel and vehicles on Government property are subject to search by authorized personnel at any time. All Contractors personnel are required to display the TYAD issued identification badge on their person at all times while present on the installation. Access to Government property will not be allowed without this identification badge. The badge is to be displayed on the person outer clothing, above the waist and in full view. Identification badges and vehicle passes issued to Contractor personnel remain the property of the U.S. Government and must be surrendered upon completion of the Contractor at the termination of individual employment, and when requested by the Government.
A list of all personnel working under this contract should be turned in immediately after award in order to allow sufficient time to process security information.
APPENDIX A
Standard Specifications for Projects Under the National Environmental Policy Act in Accordance with 32 CFR 651 Proponent ELTY-ISR-E
****Spill Response Procedures 1-2-3**** 1.Stop work
2. Call 911
3. Evacuate Area
*********Damaged Asbestos?********* Call Environmental Branch (EB) at 615- 7098
*******Environmental
1.Air Pollution Control The contractor must control fugitive emissions, including dust, during the course of their contract. The contractor must obtain approval from the Environmental Branch (EB) prior to exhausting equipment to the outside. The contractor must not allow any pollutant or particulate matter to be released to the atmosphere at levels that are visible from outside of Tobyhanna Army Depot (TYAD). The contractor must not perform work that will release pollutants or particulate matter to the atmosphere when the wind speed exceeds ten miles per hour and will result in adverse effects to the surrounding areas. TYAD will monitor the wind speed; it is the contractor’s responsibility to obtain wind speed information through the Contracting Officer Representative (COR).
2.Asbestos The contractor must ensure that all materials used in the performance of this contract are asbestos-free.
Unless specified in the contract, the contractor must not disturb any existing Asbestos- Containing Material (ACM) in the performance of this contract. If ACM, or suspect ACM might be disturbed in performance of this contract, the contractor must avoid coming in contact with the material and immediately notify the COR and the Contract Administrator in writing. The COR must coordinate with EB to have the material tested to determine if there is ACM. If the material is determined to be ACM and the contractor cannot avoid disturbing the material, the COR will notify the Contracting Officer. The Contracting Officer will direct a change pursuant to the contract clauses entitled “Changes” and “Differing Site Conditions.” If ACM, or suspect ACM has been disturbed, the contractor must immediately notify the COR and call the EB. The contractor will shut down and not move any equipment or supplies near the damaged ACM. The contractor will evacuate all non-contaminated contractor personnel from the immediate vicinity. Any contractor personnel thought to be contaminated with asbestos must remain in the area until the EB responds. If the damaged material is determined to be ACM and there is potential for further damage, the Contracting Officer will direct a change pursuant to the clauses of the contract clauses entitled “Changes” and “Differing Site Conditions.”
Asbestos abatement required under the contract as originally awarded must be in accordance with United Facilities Guide Specification 02 83 14 00 10 and as otherwise required in the contract. Asbestos abatement not required under the contract as originally awarded, can be incorporated into the existing contract via contract modification, or by the Government taking responsibility for the asbestos abatement. The method of acquiring the abatement is at the discretion of the Government. The contractor must have an asbestos abatement work plan that has been approved by EB prior to beginning any asbestos abatement work.
3. Backflow The contractor shall have a backflow prevention device installed on all contractor equipment that is connected to Tobyhanna Army Depot’s (TYAD) water distribution system. The contractor shall have a water meter installed to monitor water consumption during all phases of the contract. Water use will be reported monthly to the Environmental Branch.
4. Burning The contractor must not burn refuse and debris anywhere on TYAD.
5. Buy Recycled-Content Materials The Contractor must comply with Resource Conservation and Recovery Act (RCRA) Section 6002 (42 U.S.C. 6962, Federal Procurement) in the acquisition of materials with recycled content to meet the standards of Executive Order 13693, Planning for Federal Sustainability in the Next Decade; March 19, 2015. Specific designated items in this contract for which recycled content standards have been established have been set forth in the specification (e.g., insulation, roofing materials, carpet, carpet pad, paint, floor tiles, shower and restroom dividers). Recovered Material Certification: As required by the RCRA, the contractor must certify that the percentage of recovered materials to be used in the performance of the contract will be at least the amount required by the applicable contract specifications (see Federal Acquisition Regulation (FAR) Provision 52.223-4, Recovered Material Certification).
Prior to application for final payment, the contractor must provide a report in accordance with FAR Clause 52.223- 9, Estimate of Percentage of Recovered Material Content for Environmental Protection Agency (EPA) Designated Items, to the Contracting Office. Compliance with this program does not relieve the contractor from meeting all other specification requirements.
6. Cultural Resources The contractor must not adversely affect any property listed on the National Register of Historic Places (NRHP) or properties eligible for inclusion on the NRHP without consultation and approval from the EB through the COR. If there is a discovery of any historic properties, including archeological sites and graveyards, work will cease immediately until requirements of National Historic Preservation Act, as amended, have been met. All archaeological artifacts found at TYAD or TYAD-controlled properties are U. S. Government property until a determination is made otherwise.
7. Demolition Notification If a project involves the demolition of any load-bearing structural members, whether or not asbestos is present, 25 days prior to the demolition, the Commonwealth of Pennsylvania Asbestos Abatement and Demolition/Renovation Notification Form 2700-FM-BAQ0021 must be submitted to EB as specified in the Unified Facilities Guide Specification 02 82 13.00 10. The contractor may obtain a copy of the form from the EB.
8. Drinking Water The contractor must not perform any work on the TYAD potable water system prior to obtaining approval from the EB and the Installation Planning and Maintenance Division certified operator through the COR. If a permit is required due to construction or proposed chemical feed changes, it will be the responsibility of the contractor to obtain all permits associated with the project.
Permit applications will first be reviewed and approved by the Environmental Branch before being submitted to regulatory authorities. Any piping or additions added to the TYAD water system must be disinfected following American Water Works Association circular C651-14 "Disinfecting Water Mains." Construction will be kept outside of drinking water wellhead protection zones when feasible. All new buildings and remodeled buildings will be equipped with a water meter that can easily be read from the exterior of the building.
9. Endangered Species The contractor is responsible for meeting requirements of the Endangered Species Act of 1973. The contractor must not disturb any endangered species, their habitat or offspring during the implementation of this contract.
10. Emergency/Spills
All emergencies and spills must be reported to the TYAD Fire Department by calling 911 from a TYAD phone or
(570) 615-7300. If a 911 call is placed on a cell phone, the call will go to the Monroe County Emergency Office.
Notify the Monroe County Emergency Office that you are at TYAD and the call will be forwarded to TYADs Fire Department. The contractor must ensure all personnel working on site are trained in the proper procedure according to 29 CFR 1910.120 (if applicable) to initiate a spill response to handle the hazardous substances they are working with. The contractor will take the necessary actions to prevent and contain spills of hazardous materials.
11. Energy Efficiency The Energy Policy Act of 2005 section 109 and the Energy Independence and Security Act of 2007 require all new construction at federal facilities to be 30% better than ASHRAE 90.1.
Energy Policy Act of 2005 section 104 and the Energy Independence and Security Act of 2007 require all new equipment to be Energy Star qualified when available. This is applicable to heating, ventilation and air conditioning equipment, plumbing, building materials, lighting, commercial food service equipment and appliances.
12. Environmental Automation and Control Systems The contractor will not alter, modify, remove or tamper with any environmental automation or control system unless previous arrangement have been made with EB. This includes sensors, programmable logic controllers, equipment housing, power supplies, meters or other hardware/sensor technology.
13. Erosion and Sedimentation Control The contractor shall protect streams, lakes and wetlands from sediment discharges caused by the contractor's activities. The contractor shall also provide (where applicable) an erosion and sedimentation control plan in compliance with state and local laws and regulations, to the COR for approval prior to executing any soil-disturbing activities. The contractor must submit a National Pollutant Discharge Elimination System Permit to the Pennsylvania Department of Environmental Protection (PADEP) prior to any construction activity that encompasses more than one acre. All permits must be reviewed and approved by the EB prior to being sent to any regulatory authority. The contractor shall not disturb any wetlands. Contractor will remove all silt fencing and other temporary control measures once the site is stabilized. Contractor will remove all spoils from TYAD unless a previously approved disposal site has been established.
The contract COR will be responsible for management and control of the spoils disposal site.
14. Fluorescent and Mercury-Bearing Lamps The contractor is to collect, containerize, manage and recycle fluorescent and mercury-bearing lamps in accordance with 40 CFR 273, Standards for Universal Waste Management. A copy of the manifest/Bill of Lading must be given to the EB through the COR five days in advance of shipment by the contractor so that it can be reviewed for accuracy and completeness. The contractor must install low mercury bulbs when available.
15. Hazardous Materials Stored and Labeled The contractor must ensure all hazardous materials (HM) at the work site are properly stored and labeled. The contractor must not leave any HM behind at the completion of the job for any reason. HM must not be stored outside without adequate secondary containment and shelter.
16. Hazardous Waste The contractor must ensure that all hazardous wastes (HW) at the work site are properly stored and labeled in a pre-approved location designated by the EB. The contractor must provide copies of any shipping documents for HW/Universal Waste/Toxic Substances Control Act waste. If the TYAD EPA number is being used for shipping purposes, only EB is authorized to sign a manifest and the manifest (or copy) must be supplied prior to the day of shipment for review.
The EB will keep originals. If HW or waste requiring special handling (e.g., asbestos) is being turned over to the government for disposal, the contactor must notify the EB through the COR when the waste is ready to be moved.
17. ISO 14001
TYAD is an ISO 14001 certified facility. All contractor and subcontractor employees on site must comply with TYAD Regulation 200-5, “Environmental Management System (EMS).” The contractor may obtain these regulations through the project COR.
18. Limit of Disturbance The contractor must confine the limit of disturbance of the project to the smallest area possible.
19. Mercury-Bearing Equipment The contractor must not install any equipment, switches, or devices (including thermostats) that contain mercury or lead.
20. Safety Data Sheets (SDSs) The contractor must submit SDSs for all hazardous materials proposed for use, including paints, solvents, adhesives, etc., to the EB through the COR five working days prior to material being brought on post. The contractor must keep a copy of all SDSs required for the project at the jobsite.
21. Migratory Bird Protection The contractor is responsible for meeting requirements of the Migratory Bird Treaty Act of 1918 (as amended). The contractor must not disturb any migratory bird, their nesting area or offspring during the implementation of this contract.
22. National Pollutant Discharge Elimination System (NPDES) Permits The contractor must not perform any work on existing NPDES structures or treatment units unless previously approved in writing by the Installation Planning and Maintenance Division certified operators and the Environmental Branch. This includes work within the sewage treatment plant, sewage lift stations, sewage conveyance pipes, Industrial Operations Facility pretreatment plant, and storm water sewer systems. If a permit is required, it will be the responsibility of the contractor to obtain all permits prior to work being performed. All permit application packages must first be reviewed by the Environmental Branch prior to being sent to any regulatory authority.
23. Net Zero Water The contractor will minimize the use of potable water during the construction project. Water used during the construction project will be monitored and measured using portable water meters if possible. Installed restroom equipment will consist of high-efficiency fixtures that use reduced volumes of water. Employ strategies that in aggregate use 20% less water than the water use baseline calculated for the building after meeting the Energy Policy Act of 1992 fixture performance requirements. Automatic hands-free flushometers will not be used. Water-free urinals will not be used. Flushometers will be the piston variety that fail in the closed position.
New building construction and renovations will include installation of a water meter that is capable of being read from the outside of the building.
24. Noise The contractor must not allow the noise level to exceed 65 decibels at any point outside TYAD property. If noise levels exceed 65 decibels, a plan must be prepared by the contractor to mitigate the noise levels and submit to the EB for approval through the COR. The contractor will monitor the fence line to confirm this limit.
25. Ozone Depleting Substances (ODS) The contractor must be responsible for ensuring that all personnel who perform maintenance and repair activities on refrigeration equipment have been trained and certified by an EPA-approved Section 608 program. The contractor must not use Class I or Class II ODS or install equipment that contains Class I or II ODS.
25. Paints The contractor must not use paints containing zinc chromate or strontium chromate pigments and paints containing lead in excess of 0.06 percent by weight of the total nonvolatile content (calculated as lead metal).
26. Pest Management At no time during the execution of this contract must the contractor provide a food source or harborage for any pests. The contractor must coordinate through the COR to the EB prior to application any pesticide usage. Pesticides are required to be approved by the EB. The contractor must report all usage of pesticides through the COR to the
EB. After completion of the contract, the contractor must ensure there is no passage for pests to enter facilities or structures related to work performed by the contractor.
27. Polychlorinated Biphenyls (PCBs) The contractor must not bring items containing PCBs onto TYAD. Light ballasts that are clearly marked "Contains no PCBs," or that are marked with a manufacture date after 1978 must be disposed of by the contractor as construction demolition debris. Any light ballast that is not marked as containing no PCBs that has a manufacture date prior to 1978, or that cannot be determined whether it contains PCBs, must be disposed of by the contractor at an approved and licensed facility for PCBs. The contractor must submit a shipping manifest and certificate of disposal of the PCB-containing items to the EB through the COR.
28. Recycling The contractor must comply with TYADs general recycling plan for recyclable materials such as aluminum, steel, cardboard, paper, plastic and wood. The contractor should contact the EB for additional information on the recycling of materials through the COR. The COR will coordinate with EB to have the contractor recycle metals, cardboard, etc., through TYADs recycling program. All Construction and Demolition (C&D) material transferred from a construction project into the TYAD recycling program must be segregated and material type and weights submitted to the project COR for consolidation. Any material entering the TYAD recycling program that is not documented and properly reported will be absorbed into the TYAD recycling program and not count towards the C&D requirement of the project. Clean wood shall be recycled by the contractor off TYAD property.
29. Refuse and Construction Demolition Debris Removal and Disposal During the performance of all construction, renovation and demolition projects, a minimum of 60 percent of all non-hazardous construction demolition debris shall be diverted from the landfill for reuse or recycling. The contractor shall provide written certification to the COR of the type and tonnage of debris reused or recycled from the contract.
All refuse and the construction demolition debris not recovered for reuse or recycling shall be disposed of at a PADEP permitted and Monroe County Municipal Waste Management Authority authorized facility. The contractor shall comply with the Monroe County Solid Waste Management Plan and PA Act 90, including all licensing requirements. Monroe County has specific landfills that is must be transported to per Monroe County guidance which is available on the county website (http://www.thewasteauthority.com) and any contractors can call the Monroe County Municipal Waste Management Authority at (570) 643-6100. The contractor shall provide a disposal certificate or landfill weight slip to the COR for all solid waste disposed of during the performance of this contract.
The COR will then provide copies of the disposal certificate or landfill weight slips with the quarterly consolidated C&D report from The Installation Planning and Maintenance Division to EB.
30. Removal Materials The contractor must remove from the site prior to the acceptance of work by the Government, all materials not identified to remain in place, including excess paints, building materials and equipment purchased by the contractor for the execution of this project.
31. Site Preservation and Restoration The contractor must ensure that the land resources associated under this contract be preserved in their present condition, or be restored to a like condition after completion of construction. This post construction appearance will appear to be natural and not detract from the appearance of the project.
32. Trees and Shrubs Protection The contractor must be responsible for the protection of all trees and shrubs on site. The contractor must not allow any heavy equipment, vehicular traffic or stockpiling of materials within ten feet from the drip line of any tree. The contractor must not allow any toxic materials to be stored within 100 feet (35.5 meters) of the drip line of any tree.
The contractor must not nail protective devices, signs, utility boxes or other objects to trees to be retained on the site.
33. Unexploded Ordnance (UXO) All work that is done in the UXO area must include the support and clearance by a UXO technician. In addition, all personnel entering the UXO area must have UXO recognition training. The COR will escort the contractor to the EB for UXO recognition training. The COR will provide a map of the UXO area to the contractor.
34. Water Quality The contractor shall not pollute streams, lakes or reservoirs. All work under this contract shall be performed in such a manner that pollution will not be created in streams, surface waters or underground water located within, or adjacent to the project area. The contractor shall not spill, emit, dump or otherwise discharge any hazardous, toxic, harmful or unauthorized pollutant, substance or material, including petroleum products, cleaning agents or paints, onto the ground, into the air or into any waters or nearby storm drain. The contractor shall execute any preventative measures required to prevent any hazardous, toxic or harmful material stored or used on the project site from entering any stormwater drain. Nothing shall be allowed to spill, emit, dump or otherwise discharge any hazardous, toxic or harmful material or pollutant into any sink, toilet, drain, utility or receptacle without written permission from the EB through the COR. The contractor shall protect streams, lakes and wetlands from sediment discharges caused by his activities.
APPENDIX B
CONTRACTOR SAFETY STANDARDS FOR TYAD
June 2018
Below are the contractor requirements for any work done on Tobyhanna Army Depot (TYAD). It is the responsibility of the contractor to enforce the below requirements. Failure to enforce safety requirements on the depot can result in termination of the contract.
Important Phone Numbers Emergency: 911 Security: 570-615-7550 Fire Department – (Non-Emergency): 570-615-7300 Safety: 570-615-7027
Changes in this document for June 2018:
The contractor is solely responsible for jobsite safety S10.0.
Update on the red card program in S 10.0.5.
Update on confined space S 10.6.3.
Subcontractors are the responsibility of the prime contractors, S 10.10.4.
S.10.0 THE CONTRACTOR IS SOLELY RESPONSIBLE AND LIABLE FOR JOB- SITE SAFETY.
Review of the project plans and other documents by the Tobyhanna Safety Office does not constitute an acceptance of Federal responsibility or liability for the adequacy of the safety measures identified for the job or for the Contractor's compliance with OSHA rules and regulations. The Contractor remains solely responsible and liable for job-site safety at all times during the term of the contract.
Contractors shall comply with the following:
1. Tobyhanna Army depot has restrictions on the use of fossil fuels in all buildings. The contractor must follow the TYAD fossil fuel memorandum of understanding.
2. All direct construction supervision including subcontractors must have completed the OSHA 10 hour safety course for construction. These certificates must be submitted with the site safety plan BEFORE construction starts.
3. Red card program - Tobyhanna Army Depot utilizes a program to allow employees to stop an action which is considered unsafe. Employees carry small red cards that can be thrown down when the employee sees an action they consider unsafe. Work ceases until TYAD management can decide if it is safe or not. Contractors are required to comply with this. If a Tobyhanna employee presents his red card to a contractor, the contractor must stop working until the COR and the safety office can determine if there is a safety hazard or not.
S.10.1 CODE COMPLIANCE
Tobyhanna Army Depot requires full contractor compliance with all safety regulations and standards. The Contractor is responsible for maintaining, monitoring and enforcing all rules, regulations and codes, by ALL personnel working for the contractor including all subcontractors. These codes include:
• Title 29 Code of Federal Regulations-1910 (OSHA General Industry Standards)
• Title 29 Code of Federal Regulations-1926 (Construction Industry Standards)
• National Fire Protection Association Codes
• Uniform Facilities Code
• Other codes as required to maintain safety standards.
S.10.2 JOB HAZARD ANALYSIS (JHA)
Prior to the start of work, the contractor shall prepare a JHA for each phase of work that will be done under the contract. A phase is any operations involving a certain type of work. Examples include demolition, excavation, masonry work, concrete pouring, roofing, and electrical wiring. Work done by each subcontractor is also a phase.
The JHA will:
1. List the activity being performed and identify the sequence of work steps.
2. List the hazards associated with each step, and the procedures and training required to eliminate or reduce the risk to an acceptable level.
S.10.3 SAFETY PLAN
Contractors will submit a written Contractor Safety Plan prior to beginning construction. The plan must follow the guidelines in OSHA 1926.
1. Who will implement the plan, including who is responsible for safety and accident prevention.
2. A means for coordinating and controlling subcontractors and suppliers.
3. Safety training.
4. Who will investigate accidents.
5. Emergency response.
6. Job site cleanup and safe access.
7. Public safety requirements such as signs and barricades.
S.10.4 FALL PROTECTION
1. Personnel performing any work on elevated surfaces, six (6) feet or more above a lower level, shall comply with 29 CFR §§ 1926.500 through 1926.503.
2. There are no certified anchorage points or permanent guardrail systems on any TYAD roof. Most roofs of the depot are more than 20 feet high.
3. Contractors and their employees must be protected from falling off the edge of the roof, regardless of how briefly the employees are at the edge of the roof.
S.10.5 ELECTRICAL SAFETY
Follow the current Tobyhanna Army Depot standard. This standard is based on NFPA 70E.
S.10.6 DEPOT REQUIRED PERMITS/APPROVALS
Permits are required for:
1. Excavation: Contractors must utilize the PA 1 Call system and coordinate with contracting officer representative (COR) for excavations prior to any groundbreaking including digging, drilling and stake driving. See appendix L for permitting details.
2. Trenching: Contractors must obtain approval from the TYAD Safety and Occupational Health Office (SOHO) before any trenching deeper than 5 feet. The contractor must have a trenching plan and the appropriate safety equipment. The contractor is to request approval from the (SOHO) by e-mail through the contracting officer representative.
3. Confined space: Contractors must obtain approval from the TYAD Safety and Occupational Health Office (SOHO) before entering any confined space. The contractor must have a confined space plan and the appropriate safety equipment. The contractor is to request approval from the (SOHO) by e-mail through the contracting officer representative.
4. Burning/fire: Hot work permits must be obtained daily from the Fire Department.
5. Cranes: Use of cranes on the depot: See S.10.13
6. Army Radiation Permits: Non-Army agencies (including other military Services, vendors, and civilian contractors) require an Army Radiation Permit (ARP) to use, store, or possess ionizing radiation sources on TYAD (see 32 CFR 655). Non-Army applicants will apply by letter with supporting documentation to the Depot Commander. The letter should be submitted so that the Depot Commander receives the application at least 30 days before the requested start date of the permit. The ARP application will specify start and stop dates for the ARP and describe the intended use of the radioactive material.
For sealed sources of radiation, i.e. Moisture Soil Density Gauges, the application must include a valid Nuclear Regulatory Commission (NRC) Radioactive Materials License that allows the applicant to use the source as specified in the ARP application, current leak test certificates, operator training records and calibration certificates for any equipment that may be utilized at TYAD.
For machine produced ionizing radiation sources, i.e. X-ray Equipment, the application must include the appropriate state authorization that allows the applicant to use the source as specified in the ARP application along with operator training records and calibration certificates for any equipment that may be utilized at TYAD.
ARPs will not be issued for more than 12 months at a time.
S.10.7 CONFINED SPACES
1. All Confined Spaces at TYAD are considered as Permit-Required Confined Spaces.
2. Contractors must fully comply with all OSHA regulations for Confined Space Operations, including on-site use and availability of a Confined Space Entry Permit / Checklist.
3. The contractor must request access from the TYAD SOHO before entering any confined space area. The contractor is to request approval from the SOHO through the Contracting Officer Representative (COR). The Contractor or COR will also notify the Fire and Emergency Services Branch of the Confined Space Entry.
4. Upon completion, the contractor will notify the SOHO and discuss whether any new hazards were added to the Confined Space and will submit the completed Confined Space Entry Permit / Checklist.
S.10.8 LOCKOUT/TAGOUT PROCEDURE
1. The Contractor shall perform this work in accordance with 29 CFR § 1910.147, The Control of Hazardous Energy.
2. The Contractor shall notify the COR that a lockout/tagout system is going to be used.
3. The contractor is to request the COR to notify them if TYAD is using any lockouts/tag outs in the construction area.
4. The Contractor shall locate and identify all isolating devices.
5. The Contractor shall shut down the equipment normally.
6. The Contractor shall isolate all energy using appropriate methodology.
7. After all work is complete, the Contractor shall remove the energy isolating device and restore the equipment to service.
8. The Contractor shall notify the COR that energy is again restored.
S.10.9 PROTECTION TO THE DRINKING WATER SYSTEM
The contractor will not perform any work on the depot potable water system until prior approval is obtained from the Environmental Branch and the certified operator through the Directorate, Installation Services COR.
S.10.10 PROTECTION OF PERSONNEL
At no time is any depot employee to be put at risk to illness or injury. No construction actions are exempt from this requirement.
1. Where pedestrian and driver safety is endangered, use appropriate traffic barricades. Use anchor barricades to prevent displacement by wind. Notify the COR prior to beginning such work.
2. Where demolition is required, continuously evaluate the condition of the structure being demolished and take action to protect personnel working around the project site. No structural element will be left standing without sufficient support to prevent collapse.
3. Personal Protective Equipment for visitors: three complete sets of personal protective equipment shall be available to visitors for entry to the regulated area. Visitors shall be provided with training equivalent to that provided to Contractor employees in the use of Personal Protective Equipment and the site safety and health requirements.
4. Subcontractors are the responsibility of the prime contractor and must follow the same regulations the prime contractor does.
S.10.11 FIRE AND EMERGENCY SERVICES
Hot Work Permits will be issued by Fire Department upon request. HWP requests must be made at least thirty (30) minutes prior to the expected start time by contacting the fire department.
1. Contractors are required to have fully charged and operable contractor provided fire extinguisher(s) that are appropriate for the type of possible fire. Fire extinguisher shall be immediately available for inspection by the fire department upon an inspection of the work site and remain at the work site.