B08 REVISED Copy of Sprinkler System Totals 2022-2025.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Fire Suppression System Maintenance, Inspection, Testing, & Repairs at Tobyhanna Army Depot
Solicitation number
W25G1V22R0028
Issued by

About this file

This spreadsheet provides an inventory of 242 fire suppression systems located at Tobyhanna Army Depot that require maintenance, inspection, testing, and minor repairs. The solicitation seeks these services for systems across over 100 buildings and structures, including wet pipe, dry pipe, pre-action, and deluge systems as well as related fire pumps. The period of performance is for one base year with four optional one-year periods. The Department of the Army Materiel Command Army Contracting Command at Aberdeen Proving Ground will award a firm-fixed-price contract for these fire protection services at Tobyhanna Army Depot.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BLDG.TYPEInTotal NumberComments
ServiceOf Systems
1A-2WetY1
1A-3WetY1
1A-4WetY1
1A-5WetY1
1A-6WetY1
1A-7WetY1
1A-8WetY1
1A-9WetY1
1A-10WetY1
1A-11WetY1
1A-12WetY1
1B-1-1WetY1
1B-1-2WetY1
1B- 4-EWetY1
1B-5-EWetY1
1B-6-EDryY1
1B-1W-1DryY1
1B-1W-2WetY1
1B-2-WDryY1
1B-7-EWetY1
1B-8-EWetY1
1B-3-WWetY1
1B-4-W-1WetY1
1B-4-W-2WetY1
1B-5-WWetY1
1B-6-WWetY1
1C1-1WetY1No - 5 Year inspection
1C2-1DryY1
1C2-2DryY1
1C-3EDryY1
1C-3WDryY1
1C-4EDryY1
1C-4WDryY1
1C-5EDryY1
1C-5WDryY1
1C-6EDryY1
1C-6WDry
1D-2PA./DelugeY1
1D-3PA./DelugeY1
1D-3 #2PA./DelugeY1
1D-4PA./DelugeY1
1D-TeirfPA./DelugeY1
ASARS 1C5WetY1
ASARS 1C6WetY1
ASARS 4BSWetY1
1E-PaintboothWetY1
1E-PlatingWetY1
1E SandblastWetY1
1E- South Boiler roomWetY1
2-1EWetY1
2-1WWetY1
2-2EWetY1
2-2WWetY1
2-3EWetY1
2-3WWetY1
2-4WWetY1Fire Pump (Electric) Qty-1 No - 5 Year Inspection
2-5EWetY1
2-5WWetY1
2-6EDryY1
2-6E -2WetY1
2-6E -3WetY1
2-6WWetY1
2-6W-2WetY1
3-1WWetY1No - 5 Year inspection
3-2EDryY1
3-2WDryY1
3-3EWetY1
3-3WWetY1
3-4EWetY1
3-4WWetY1
3-5EDryY1
3-5WDryY1
3-6EWetY1No - 5 Year inspection
4-1EDryY1
4-1WDryY1
4-2EWetY1No - 5 Year inspection
4-3EDryY1
4-3WDryY1
4-3 W PrePre ActionY1
4-4EDryY1
4-4WDryY1
4-5EDryY1
4-5WDryY1
4-6EDryY1
4-6WDryY1
5-1EDryY1
5-1E #2DryY1
5-1WDryY1
5-2EDryY1
5-2WDryY1
5-3EDryY1
5-3WDryY1
5-4EDryY1
5-4WDryY1
5-5EWetY1
5-5WWetY1
5-6EWetY1
5-6WWetY1
6-1N-RWetY1
6-1NDryY1
6-1EWetY1
6-1WWetY1
6-2EWetY1
6-2WWetY1
6-3EWetY1
6-3WWetY1
6-4EWetY1
6-4WWetY1
6-5EWetY1
6-5WWetY1
6-6EWetY1
6-6WWetY1
6-6S-RWetY1
7-1EDryY1
7-1WDryY1
7-2EDryY1
7-2WDryY1Fire Pump (Electric) Qty-1
7-3EDryY1
7-3WDryY1
7-4EDryY1
7-4WDryY1
7-5EDryY1
7-5WWetY1
7-6EDryY1
7-6WDryY1
8-1WWetY1No - 5 Year inspection
8-2WWetY1Fire Pumps (Electric) Qty-1 (Diesel) Qty-1 (Both 1500 GPM) No - 5 Year inspection
8-3WWetY1No - 5 Year inspection
8-4WWetY1No - 5 Year inspection
8-5WWetY1No - 5 Year inspection
8-6WWetY1No - 5 Year inspection
9AWetY1
9WWetY1
9EWetY1
9-NW-1WetY1
9-NW-2WetY1
9-NW-3WetY1
9-NW-4WetY1
9-SE-1WetY1
9-SE-2WetY1
9-SE-3WetY1
10-AWetY1
10-BDryY1
10-CDryY1
10-EDryY1
11-A #1 First FloorWetY1
11-A #2 First FloorWetY1
11-A-2nd FloorWet
11-C 2nd Floor Data closetWetY1
11-C Valve HouseWetY1
11-E 2nd Floor Conf. roomWetY1
11-E 3rd floorWetY1
11-E -100-MC-1 Sys. 2 D-wingWetY1
11-E -100-MC-1 Sys. 3 E-wingWetY1
11-E-100-MC1-System 1 C-wingWetY1
11-3rd Floor ElevatorWetY1
12-SEWetY1
12-SWWetY1
12-BWetY1
13-1 Whse.WetY1No - 5 Year inspection
13-2 Whse.WetY1No - 5 Year inspection
13-3 OfficesWetY1No - 5 Year inspection
13AY1Bldg contains fire pumps (1) electric, (1) diesel (Both 1500 GPM)
14WetY1
15WetY1
16WetY1
17WetY1
18-NWetY1
18-SWetY1
19WetY1
20Pre-ActionY1
30Bldg contains (1) Fire Pump (1500 GPM)
30-1WetY1
30-2WetY1
30-3WetY1
30-4WetY1
34WetY1
41-1DryY1
41-2WetY1
42WetY1
45WetY1
54WetN1Contains Inline Pump Out Of Service
55-1WetY1No - 5 Year inspection
55-2WetY1No - 5 Year inspection
55-3WetY1No - 5 Year inspection
55-4WetY1No - 5 Year inspection
55-5WetY1No - 5 Year inspection
56DryY1
58WetY1
66WetY1
69WetY1
72-1WetY1
72-2WetY1
72-3WetY1
72-4WetY1
72-5WetY1
72-6WetY1
72AWetY1
73-1-S BoilerWetY1
73-2 NWWetY1
73-3 SWWetY1
73-4 -C BayWetY1
73-5N Mech.WetY1
73-6-Mezz StWetY1
73-7 Mech - CWetY1
73-8 Mech -CWetY1
73-9-2nd FLWetY1
73-10 Mezz. MWetY1
74-1DryY1
74-2WetY1Contains (1) 2000 GPM Electric Fire Pump
74-3 RacksWetY1
79WetY1No - 5 Year inspection
86WetY1
87DryY1
88Wet
89WetY1
90WetY1
91WetY1
92WetY1
95WetY1No - 5 Year inspection
96WetY1
98-1WetY1
98-2DryY1
220-1WetY1
220-2DryY1
221 Teen CDCDryY1
233WetY1
310WetY1
334 PXWetY1
335 CDCPre-ActionY1
337-1DryY1
337-2WetY1
606WetY1
702WetY1
816WetY1
1101-1 VillaWetY1
1101-2 VillaWetY1
1101-3 VillaWetY1
1101-4 VillaWetY1
1105-1DryY1
1105-2WetY1
3002DryN1OOS
3005-1DryY1
3005-2WetY1Fire Pump OOS

Total 0 240

File details come from the government source that posted it. Updated .