This document contains answers to questions about a federal roof replacement project. The project involves replacing roofs on several buildings at Tobyhanna Army Depot in Pennsylvania. New aluminum edging, parapet wall caps, and coping will be installed. The specified EPDM membrane thickness for Building 334 is 60 mils reinforced. All metal roof products must be compatible and covered under the roof manufacturer's warranty. The wind rating for all roofs is 72 mph. Alternative insulation materials may be used if they meet specified criteria. New insulation will be mechanically fastened and installed over existing insulation to achieve a total R-value of 30. The work includes removing old roof systems down to the gypsum deck and inspecting for wet insulation which will then be replaced. The EcoStorm coverboard thickness is 1/2 inch.
The related federal contract opportunity is a solicitation for the roof replacement work at Tobyhanna Army Depot. Offerors are instructed to read the solicitation, statement of work, wage determination, and submit all required documentation by the specified date for the proposal to be considered responsive. The soliciting agency is the Department of the Army Materiel Command Army Contracting Command located at Aberdeen Proving Ground.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08 Solicitation Amendment 01 W25G1V21R0040.pdf | ||
| B08 Attachment I UPDATED PWS Revision 1.pdf | ||
| B08 Questions and Answers 1-14.pdf | ||
| B08 picture PX1.jpg | JPG image | |
| B08 Questions and Answers 1-13.pdf | ||
| B08 Picture PX2.jpg | JPG image | |
| B08 picture 5-3 DECK REPAIRS.JPG | JPG image | |
| B08 picture 5-3 WEST GROUND.JPG | JPG image | |
| B08 picutre 5-3 METAL TRM.JPG | JPG image | |
| B08 picture PX ISO with .5 perlite.jpg | JPG image | |
| B08 Picture 5-3_2.jpg | JPG image | |
| B08 picture 5-3_1.jpg | JPG image | |
| B08 picture 5-3 ISO.JPG | JPG image | |
| Form SF 42 Bid Bond.pdf | ||
| B08 Questions and Answers 1-2.pdf | ||
| B08 Attachment I PWS.pdf | ||
| B08 Solicitation W25G1V21R0040.pdf | ||
| B08 Attachment II DBA Wage Determination.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Comment/Question Technical Answers/Remarks
Who should we list as Obligee for the bid bond? TYAD or The US Government?
The Oblige will be ACC-APG, Tobyhanna Division, 11 Hap Arnold Blvd., Tobyhanna, AP 18466-5100
Could you confirm that an AIA bid bond is acceptable?
Only an SF-24 form is acceptable, see attachments.
Will the Metal joining the EPDM roof and metal canopy roofs be replaced?
New .050” aluminum with dark bronze kynar finish manufactured to meet ES-1 and FM-90l will replace existing edging will be supplied and installed by the contractor.
Will the metal parapet wall caps be replaced?
New .050” aluminum with dark bronze kynar finish manufactured to meet ES-1 and FM-90 will be supplied and installed by the contractor
5 Can we use non-treated lumber which is acceptable by the manufacturer? Yes
6 Building 334 EPDM spec’d is .090 reinforced.
Is this correct?
The specification should have read 60 mil reinforced membrane
7 Can we use aluminum for all the coping and fascia? If so what gauge? .050 aluminum see #4
What are we to do with the concrete pavers holding the existing membrane on 5-3 down?
The contractor will remove the pavers from the roof, stack them on pallets and place them on the ground. The Government will remove them from the jobsite. If needed, the Government will supply pallets to hold the pavers.
9 Can the existing coping be shop formed from mil finished as per one existing parapet cap? No
10 Is the entire coping, fascia, gutter to be dark bronze? Yes
There is no mention of the insulation or ecostorm coverboard in the spec, it is called for in the SOW but the spec doesn’t have any provision for it.
Both roofs will have the Ecostorm coverboard installed in the system due to it's high recycled content.
12 Is the wind rating 110mph correct? All roofs at TYAD from the past had a 72mph rating
The wind rating for the roofs will be 72mph.
Disregard the 110mph rating.
Please clarify that the metal copings are to be bought through Carlisle and included in the warranty with all ES1/FM certifications
All metal products must be compatible and covered under the roof manufacturers warranty.
In light of the material shortages - specifically Polyiso insulation. Would TYAD consider switching to an alternative insulation (in place of Polyiso) that is more readily available as long as the following criteria are met:
The material may be substituted if it meets these requirements. 1) Adjust thickness to meet the R value in the solicitation. 2) No change to external & internal fire Rating. 3) Density similar to Polyiso
4) Must be warranted by the roof manufacturer as part of the roof system warranty.
how are we fastening the new insulation on building 5?
The insulation board will be mechanically fastened as per manufacturers recommendations to attain a full system warranty
16 is there steel decking below the gypsum that we can fasten into?
No
As per roof plan drawing building bay 3 general note says to remove and replace existing roof system.
1) Are we removing the roof system down to the gypsum substrate?
2) Or only the EPDM membrane to then inspect and if found wet remove current insulation.
We are removing the EPDM leaving the existing insulation. Inspecting and replacing with dry insulation if wet.
Please also clarify SOW Page paragraph 1.4.1 are we installing R30 minimum over existing insulation.
Install new insulation over the existing insulation to total R30. If the existing insulation is R15, contractor will add an additional R15
As per roof plan drawing building 334 general note says to remove and replace existing roof system. See note 15. Same answer
Are we removing the roof system down to the steel decking? Or only the EPDM membrane to then inspect and if found wet remove current insulation. (as per SWO page 2).
See note 16. Same answer
In regards to the Eco storm coverboard to be installed, do you have a thickness? 1/2"