This document is a Quality Assurance Surveillance Plan (QASP) for a cargo door, fire door, and dock equipment maintenance services contract opportunity with the Department of the Army Materiel Command Army Contracting Command at Aberdeen Proving Ground. The QASP outlines performance standards and inspection methods for maintaining doors and equipment in accordance with NFPA 80 standards and safety requirements. It describes roles for the contracting officer, contracting specialist, and contracting officer's representative in monitoring contractor performance through methods such as 100% inspections of deliverables and daily monitoring of materials, installations, and response times. The QASP also addresses payment processing through WAWF-RA, contractor performance reporting via CPARS, and clarifies that no government property is furnished under this contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08 Atch 1 PWS - REVISED 3 2 20.pdf | ||
| W25G1V20R0006 Amendment 0001.pdf | ||
| Questions and Answers (2).pdf | ||
| Questions and Answers #1.pdf | ||
| B08 Atch 3 Door & Dock Locations.xlsx | XLSX spreadsheet | |
| B08 W25G1V20R0006 Solicitation.pdf | ||
| B08 Atch 1 PWS.pdf | ||
| B08 Atch 5 PRAQ.pdf | ||
| B08 Atch 6 Wage Determination.pdf | ||
| B08 Atch 2 Offeror's Proposed Pricing Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W25G1V20R0006 Atch 4
Quality Assurance Surveillance Plan For
Cargo Door, Fire Door, and Dock Equipment Maintenance
1. INTRODUCTION
1.1. This Quality Assurance Surveillance Plan (QASP) has been developed to provide the Contracting Officer’s Representatives (COR) effective and systematic surveillance procedures to monitor contractor performance. It has been developed in accordance with the requirements listed in the performance-based Performance Work Statement (PWS) entitled “Cargo Door, Fire Door, and Dock Equipment Maintenance”. This performance-based plan sets forth the procedures and guidelines the COR will use in evaluating the technical performance of the contractor.
2. PURPOSE
2.1. The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS.
2.2. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.
2.3 This QASP sets forth procedures and guidance that Engineering Branch, Public Works Division, Installation Services Directorate will use in evaluating performance. It does not relieve the Contractor from non-performance of any task or deliverable described in the contract but not depicted in this document.
3.0 POINTS OF CONTACT
3.1 GOVERNMENT
Contracting Officer, Matthew Chase Phone: 570-615-7870 Email: matthew.a.chase.civ@mail.mil
Contract Specialist: Cheryl Saylock Phone: 570-615-7517 E-Mail: cheryl.a.saylock.civ@mail.mil
Contracting Officer Rep: To be determined at time of contract.
Phone:
E-Mail:
Contract Specialist/Contracting Officer (KO). The KO is the Contracting Officer who performs pre-award functions and awards or executes a contract. The PCO may retain post-award functions or may assign them to an Administrative Contracting Officer.
Contracting officer's representative (COR) means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.
The COR is responsible for monitoring, assessing, and communicating the technical performance of the contractor and assisting the contractor.
4. PERFORMANCE MANAGEMENT APPROACH
This contract is Cargo Door, Fire Door, and Dock Equipment Maintenance. Provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Cargo Door, Fire Door, and Dock Equipment Maintenance as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract
5. METHODS OF SURVEILLANCE
Each month the COR will provide input on the monthly status report.
Any documents or data delivered will undergo 100% inspection on an as required basis. The COR will be responsible for seeing that any complaints are resolved in a timely manner.
Coordination between the Government COR and the contractor task project leader will ensure mutual understanding of the requirements. Contractor staffing will be judiciously and responsively implemented to maximize resource utilization to satisfy task requirements. The Government COR through periodic interface with the contractor team members shall conduct a 100% inspection of resources provided to ensure regulatory conformance.
6. PERFORMANCE OBJECTIVES
The technical performance will be evaluated on a real time basis by the COR.
Factors that may be evaluated and monitored are as follows:
- Technical Performance
- Schedule Conformance
- Records Management
SURVEILLANCE ACTIVITY SUMMARY FORM
Contract:
Required Service
Performance Standard
Acceptable Quality Level
(AQL)
Monitoring Method Used
Monitoring Performed by/Date(s)
Incentive
Para 1.5.1
The QCP shall be delivered with the contractor’s proposal for evaluation.
Copies of a comprehensive written QCP shall be submitted to the KO and COR within 5 working days when any changes are made after contract execution.
100% Delivery of the QCP included with the Contractors Proposal & any changes made after contract execution.
KO/COR-
Review
KO/COR-
As required in PWS and
QASP
Contract award; Exercise of option periods, past performance assessments And/or any other incentive that was proposed in the contractor’s solution.
Para 5 through 5.10
Reports detailing compliance with
PWS requirements To include detailed inspection reports with door type, sub type, size, condition and location verification as well as Quality Assurance
100% on time delivery of the monthly detailed report reflects 100% compliance with all requirements of the PWS
COR –
Review for duration of contract.
COR –
As required in
PWS
Exercise of option periods, past performance assessments
And/or any other incentive that was proposed in the contractor’s solution.
5 through 5.10
The contractor shall inspect and adjust all equipment as needed to keep doors operating
Properly and safely.
100% of all materials and workmanship supplied
Review of all materials and installations on a daily bases for duration of contract
COR –
Daily monitoring
Exercise of option periods, past performance assessments
And/or any other incentive that was proposed in the contractor’s solution.
5 through 5.10
The contractor shall provide service or repairs as needed/requested by government. (Up to +5%)
100% of time adequate resources on site
Check in with
Government (COR) or designee
COR –
Daily monitoring
Exercise of option periods, past performance assessments And/or any other incentive that was proposed in the contractor’s solution.
100 Percent Inspection: With this method, performance is inspected/evaluated at each occurrence. This method is often costly but can be necessary due to health, safety and other considerations.
Periodic Inspection: This method, sometimes called “planned sampling,” consists planned sampling at specific dates or time intervals. It may be appropriate for tasks that occur infrequently, and where 100 percent inspection or random testing is not desired.
7.0 INSPECTION
All services provided to Tobyhanna will be inspected as needed for compliance NFPA 80 Standard, Tobyhanna Army Depot Safety Standards, and quality of work, licensure requirements and other regulatory requirements as identified in the PWS.
8.0 WIDE AREA WORK FLOW/CERTIFICATION OF SERVICES
8.1. Payment processing is an important aspect of the COR’s job. Just as the government expects the contractor to meet all contract requirements for quality, quantity and timeliness, the contractor expects no less of the government in meeting its obligation to timely, accurate payment for supplies and services received.
The COR will complete the monthly receiving report by using the Wide Area Work Flow - Receipt and Acceptance (WAWF-RA) electronic form. The COR will be notified by email when the contractor has initiated a 2-in-1 Services document in the WAWF system. Acceptance must be completed within 2 work days of email notification.
9. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS)
9.1. CPARS is a web-enabled application that collects and manages a library of automated contractor report cards. CPARS data can be used to effectively communicate contractor strengths and weaknesses on a given contract during a specific period of time. The CPARS assesses a contractor’s performance and provides a record, both positive and negative, on a given contract during a specific period of time. Each assessment must be based on objective (or measurable subjective) data.
All CPARS information is treated as “For Official Use Only/Source Selection Information” in accordance with FAR 3.104 and the DoD Guide to Collection and Use of Past Performance Information. Access to the CPARS Automated Information System (AIS) is restricted to those individuals with an official need to know.
A copy of the monthly status report shall be provided to the Contracting Officer. Issues and concerns that cannot be resolved at the working level or which impact on contractual requirements shall be reported to the Contracting Officer for resolution and contractual action.
9.2. The COR is designated as Assessing Official Representative for the CPARs assessments.
Each Year, by 30 Oct, the COR shall complete an assessment of the contractor’s performance for the previous fiscal year. The COR shall use the Monthly Evaluations as the basis for the Yearly Assessment.
10. GOVERNMENT-FURNISHED PROPERTY. Government-furnished property (GFP) and Government-furnished equipment (GFE) means property in the possession of, or directly acquired by, the Government and subsequently made available to the contractor. It includes facilities and material. Contractors are ordinarily required to furnish all property necessary to perform Government contracts. However, if contractors possess Government property, the government shall --
• Permit the property to be used only when authorized; and
• Require contractors to be responsible and accountable for, and keep the Government’s official records of Government property in their possession or control
10.1. This contract does not contain Government Furnished Property and therefore no GFP clauses are included.
Quality Assurance Surveillance Plan