Amendment 0001_Solicitation W25G1V-20-R-0004.pdf
PDF 145 KB Posted
- Solicitation number
- W25G1V-20-R-0004
About this file
This document is an amendment to a solicitation for the design and construction of a plastic media blast room at Tobyhanna Army Depot. The amendment extends the response deadline from January 20, 2020 to January 27, 2020. It incorporates questions and answers from a site visit. The required work includes an insulated double-walled blast room with plastic media reclamation system, concrete floor designed for 10,000 pounds per square foot loading, full-recovery pneumatic floor cleaning system, fire suppression system, and matching dust collector enclosure. The payment terms involve final acceptance and completion of the contract. The Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 Attachment 2 Drawing 2.pdf | ||
| Amendment 0001 Attachment 1 Drawing 1.pdf | ||
| Solicitation Docment W25G1V-20-R-0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACC-APG, TOBYHANNA DIVISION
RAY MOLITORIS CCAP-CCT-O
RAYMOND.J.MOLITORIS.CIV@MAIL.MIL
570-615-7579 / FAX 570-615-7525
TOBYHANNA PA 18466-5100
W25G1V928100X3
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Second Page for Description
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jan-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W25G1V20R0004
X 9B. DATED (SEE ITEM 11)
19-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jan-2020
CODE
ACC-APG, TOBYHANNA DIVISION
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466-5100
W25G1V 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W25G1V
FACILITY CODECODE
EMAIL:TEL:
W25G1V20R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
The Purpose of Amendment 0001 to Solicitation W25G1V-20-R-0004 is to:
-Extend the closing date of the Solicitation from: 20 JAN 2020, 4:30PM EST to: 27 JAN 2020, 4:30PM EST.
-Incorporate the following questions and answers that arose from the site visit:
W25G1V-20-R-0004 - Plastic Media Blast Room Questions Received with Government Responses
Question 1: Do you know what the payment terms are for this project?
Government Response 1: Payment will be after final acceptance at the completion of the Contract.
Question 2: Do you have a drawing of the space for where the blast room will be placed?
Government Response 2: Yes, see the two drawings that are attached.
Question 3: What is the required thickness of the concrete?
Government Response 3: According to construction drawings, concrete shall be 8 inches thick.
Question 4: Is there rebar required in the concrete?
Government Response 4: According to construction drawings, #4 Rebar, 12 inch x 12 inch Grid located 4 inches below surface.
Question 5: Do we know the specific type of plastic media to be used in the booth?
Government Response 5: Yes, will start with Type VIII plastic media. May switch to other plastic types as needed.
Question 6: We don’t see any specifications regarding the plastic media reclamation system.
What are the specifications regarding the level of cleanliness of the media to be returned to the system? Do requirements include sieves, magnetic separation, deionization and/or dense particle separation, etc.?
Government Response 6: Solicitation Page 10, Number 26 refers to some general blast supply and reclaim requirements. Solicitation Page 8, section 1.1 states that the contractor shall provide turn-key design of the system. Contractor should explain reclamation system design and what is included in the submitted package.
Question 7: In the Solicitation, Page 9, Numbers 1 & 4, should the blast room be single or double skin?
W25G1V20R0004
Government Response 7: All contractors shall provide a design that will provide reduced noise exposure in the room where the blast booth will be located. If double skin / insulated is your recommendation, then it should be included in the proposal.
Question 8: In the Solicitation, Page 9, Number 7, what does it mean by “energy recovery system”?
Government Response 8: In layman’s terms, Instead of discharging the heat into the exhaust airstream, the energy recovery system draws heat from the exhaust airstream in order to pre-heat the incoming air supply.
Question 9: In the Solicitation, Page 10, Number 17, would the Government consider our Airflex Sweeper System in place of pneumatic system?
Government Response 9: The requirement is for a Full-Recovery Pneumatic Floor.
Question 10: In the Solicitation, Page 10, Number 18, what is the floor grating point load requirements (lbs. per sq. ft.) of fully loaded forklift and/or heaviest item?
Government Response 10: Floor to be designed for 10,000 lbs. /sq. ft. loading.
Question 11: In the Solicitation, Page 10, Number 21, do they want us to provide this?
Enclosure Government Response 11: Yes, Tobyhanna explained these requirements during the site visit. The enclosure shall match the existing dust collector enclosure that is located adjacent to the proposed new dust collector.
Question 12: Will you be extending the solicitation date?
Government Response 12: The Government will be extending the solicitation for 5 days. See above for new closing date.
Question 13: Is a fire suppression system really needed?
Government Response 13: The Statement of Work requires a fire suppression system.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 20-Jan-2020 04:30 PM to 27-Jan-2020 04:30 PM.
(End of Summary of Changes)