DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

Adobe Professional 8.0

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AA

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER See Item 16

D. SYSTEM/ITEM

Antenna Test Range Modernization

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

NSI-MI Technologies, LLC

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

T&E Report

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

SOW Para.11.0; 24.0; 24.4

6. REQUIRING OFFICE

Tobyhanna Army Depot (TYAD)

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

C

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

See Item 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft

Final

Reg Repro

16. REMARKS

16.1 Format of report shall be in contractor's format.

16.2 Content shall be as found in DI-NDTI-80809B.

16.3 The Contractor shall tailor the content of the reports such that the conclusions and recommendations are supported and that the Government is able to evaluate equipment upgrades, modifications and modernizations.

16.4 Government witness and approval of factory inspection, testing and modernization is required as found in SOW Paragraph 11.2 and 11.3.

16.5 The Contractor shall provide the Government reports of equipment inspection and testing NLT forty-five (45) days after receipt of GFE at the Contractor's facility.

16.6 Four (4) copies of the final reports shall be provided to the Government in electronic format via CD/DVD or secure electronic transmittal (See Item 14 for distribution).

Tobyhanna Army Depot 4

Mail Stop 5143

11 Hap Arnold Blvd

Tobyhanna, PA 18466

15. TOTAL 0 4 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

17. PRICE GROUP

Reset

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

0001AA

B. EXHIBIT

A

C. CATEGORY: See Item 16

TDP TM OTHER

D. SYSTEM/ITEM

Antenna Test Range Modernization

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

NSI-MI Technologies, LLC

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of 1 Pages

DD FORM 1423-1 (BACK), FEB 2001

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AB

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER See Item 16

D. SYSTEM/ITEM

Antenna Test Range Modernization

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

A002

Test/Inspection Report

3. SUBTITLE

T&E Report

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

SOW Para. 15.2; 24.0; 24.4

6. REQUIRING OFFICE

Tobyhanna Army Depot (TYAD)

7. DD 250 REQ

SD

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

16.1 Format of report shall be in contractor's format.

16.2 Content shall be as found in DI-NDTI-80809B.

16.3 The Contractor shall tailor the content of the reports such that the conclusions and recommendations are supported and that the Government is able to evaluate the MI Model 55547-50 AZ/EL/AZ positioner upgrades, modifications and modernizations.

16.4 Government witness and approval of factory inspection, testing and modernization is required as found in SOW Paragraph 15.2.1.2.8 and 15.2.1.2.9.

16.5 The Contractor shall provide the Government reports of equipment test and evaluation NLT forty-five (45) days after receipt of GFE at the Contractor's facility.

16.6 Four (4) copies of the final reports shall be provided to the Government in electronic format via CD/DVD or secure electronic transmittal (See Item 14 for distribution).

Tobyhanna Army Depot 4

Mail Stop 5143

(1 Data Item)

A. CONTRACT LINE ITEM NO.

0001AB

B. EXHIBIT

A

C. CATEGORY: See Item 16

TDP TM OTHER

D. SYSTEM/ITEM

Antenna Test Range Modernization

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

NSI-MI Technologies, LLC

16. REMARKS (Continued)

(See DoD 5010.12-M for detailed instructions.)

submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AC

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER See Item 16

D. SYSTEM/ITEM

Antenna Test Range Modernization

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

A003

Test/Inspection Report

3. SUBTITLE

T&E Report

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

SOW Para. 17.0; 24.0; 24.4

6. REQUIRING OFFICE

Tobyhanna Army Depot (TYAD)

7. DD 250 REQ

SD

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

16.1 Format of report shall be in contractor's format.

16.2 Content shall be as found in DI-NDTI-80809B.

16.3 The Contractor shall tailor the content of the reports such that the conclusions and recommendations are supported and that the Government is able to evaluate the results of the "quiet zone" inspection and testing. The Government intends to employ the results of the report to determine antenna range improvements, as necessary.

16.4 Government will witness antenna range inspection, testing and collection of data as required in SOW Paragraph 17.4.

16.5 The Contractor shall provide the Government reports of equipment test and evaluation NLT forty-five (45) days after receipt of GFE at the Contractor's facility.

16.6 Four (4) copies of the final reports shall be provided to the Government in electronic format via CD/DVD or secure electronic transmittal (See Item 14 for distribution).

Tobyhanna Army Depot 4

Mail Stop 5143

(1 Data Item)

A. CONTRACT LINE ITEM NO.

0001AC

B. EXHIBIT

A

C. CATEGORY: See Item 16

TDP TM OTHER

D. SYSTEM/ITEM

Antenna Test Range Modernization

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

NSI-MI Technologies, LLC

16. REMARKS (Continued)

(See DoD 5010.12-M for detailed instructions.)

submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AD

B. EXHIBIT

A

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

A004

Mechanical/Electrical End Item Documentation

3. SUBTITLE

Engineering Documentation

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

See Item 16

6. REQUIRING OFFICE

Tobyhanna Army Depot (TYAD)

7. DD 250 REQ

SD

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

16.1 Paragraphs 12.0; 13.0; 13.2.2; 13.2.10.1; 15.0; 15.1; 18.0; 18.1; 19.0; 20.0; 22.0; 24.0;

24.2.

16.2 Format of delivered documentation shall be in contractor's format or original supplier's format.

16.3 Content shall be as found in DI-MISC-80508B.

16.4 The Contractor shall tailor the content of the reports, instructions, memorandums, procedures, designs, calculations, inspections, schedules, data, specifications, graphs, measurement, tables, lists, descriptions, conclusions and recommendations (Not limited to and including COTS documentation) such that they are supported and that the Government is able to evaluate and apply the information provided. The Government intends to employ the content and results and recommendations of the documentation to determine antenna range improvements, as necessary.

16.5 The Government will examine all documentation provided and provided comment, as needed. Requests for clarification an/or additional information will be made by the Government within ten (10) days of receipt, as necessary.

16.6 The Contractor shall provide the Government those items required in Item 16.3 Remarks upon completion of same. The Contractor shall provide the those items in a timely manner.

16.7 Two(2) copies of each documentation item shall be provided to the Government in electronic format via CD/DVD or secure electronic transmittal (See Item 14 for distribution).

Tobyhanna Army Depot 3

Mail Stop 5143

15. TOTAL 0 3 0

(1 Data Item)

A. CONTRACT LINE ITEM NO.

0001AD

B. EXHIBIT

A

C. CATEGORY: See Item 16

TDP TM OTHER

D. SYSTEM/ITEM

Antenna Test Range Modernization

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

NSI-MI Technologies, LLC

16. REMARKS (Continued)

(See DoD 5010.12-M for detailed instructions.)

submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AE

B. EXHIBIT

A

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

A005

Commercial Drawings/Models and Associated Lists

3. SUBTITLE

Drawings

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81003E

5. CONTRACT REFERENCE

See Item 16

6. REQUIRING OFFICE

Tobyhanna Army Depot (TYAD)

7. DD 250 REQ

LT

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

16.1 Paragraphs 13.0; 13.2.6; 13.2.7; 13.2.13; 15.0; 18.0; 18.1; 22.0; 24.0; 24.3.

16.2 The drawings shall be in Contractor's format and content.

16.3 Content shall be as found in DI-SESS-81003D.

16.4 The Contractor shall tailor the content of the drawings such that the drawings contain sufficient information and technical guidance for antenna test range maintenance and operation, which shall include (but not limited to) the following: electrical wire and cable interconnection, antenna mechanical interface assembly/subassembly dimensions and tolerances, part identification lists, mechanical and electrical connections.

16.5 Submit drawings and supporting lists ninety (90) days prior to installation of antenna test range at TYAD for Government approval.

16.6 Government approval required prior to publication and release of drawings.

16.7 Three (3) copies of the final drawings and supporting lists shall be provided to the Government in hard copy and three (3) copies in electronic format via CD/DVD or secure electronic transmittal (See Item 14 for distribution).

Tobyhanna Army Depot 3

Mail Stop 5143

15. TOTAL 0 3 0

(1 Data Item)

A. CONTRACT LINE ITEM NO.

0001AE

B. EXHIBIT

A

C. CATEGORY: See Item 16

TDP TM OTHER

D. SYSTEM/ITEM

Antenna Test Range Modernization

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

NSI-MI Technologies, LLC

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(See DoD 5010.12-M for detailed instructions.)

submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001AF

B. EXHIBIT

A

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

A006

Training Materials

3. SUBTITLE

Training and Instruction Manuals

4. AUTHORITY (Data Acquisition Document No.)

DI-ILSS-80872

5. CONTRACT REFERENCE

SOW Para. 23.0; 24.0; 24.1

6. REQUIRING OFFICE

Tobyhanna Army Depot (TYAD)

7. DD 250 REQ

LT

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

16.1 Format of report shall be in Contractor's format.

16.2 Content shall be as found in DI-ILSS-80872.

16.3 The Contractor shall tailor the content of the training materials and supporting documentation (Including COTS, warranty, etc.) such that the materials contain sufficient information and technical guidance to the student to support antenna test range operations, measurements and maintenance.

16.4 Submit training material and supporting documentation forty-five (45) days prior to installation of antenna test range at TYAD for Government approval.

16.5 Government approval required prior to publication and release of training materials.

16.6 Six (6) copies of the final training materials and supporting documentation shall be provided to the Government in written copies for student training and four (4) copies in electronic format via CD/DVD or secure electronic transmittal (See Item 14 for distribution).

Tobyhanna Army Depot 6

Mail Stop 5143

15. TOTAL 0 6 0

(1 Data Item)

A. CONTRACT LINE ITEM NO.

0001AF

B. EXHIBIT

A

C. CATEGORY: See Item 16

TDP TM OTHER

D. SYSTEM/ITEM

Antenna Test Range Modernization

E. CONTRACT/PR NO.

W25GIV-19-XXXX

F. CONTRACTOR

NSI-MI Technologies, LLC

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

(See DoD 5010.12-M for detailed instructions.)

submittal dates in Items 12 and 13; Explanation of reproducible copies in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any

DD Form 1423 - CDRL 0001AA W
DD Form 1423 - CDRL 0001AB W
DD Form 1423 - CDRL 0001AC W
DD Form 1423 - CDRL 0001AD W
DD Form 1423 - CDRL 0001AE W
DD Form 1423 - CDRL 0001AF W

File details come from the government source that posted it.