W25G1V-18-R-0011__Attachment_VI_-_Questions_and_Answers.pdf
PDF 117 KB Posted
- Attached to
- On-Call Road Repair
- Solicitation number
- W25G1V-18-R-0011
About this file
Question and Answer Document
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal W25G1V-18-R-0011
Project Title: On-Call Road Repair
Question & Answers
Date: 4/5/2018
Note: Verbiage may have changed from the initial Requests for Information
(RFI)/Questions submitted, however, the context of the questions did not. Similar questions were combined and one answer provided. If you feel as though a(n)
RFI/Question you submitted was not addressed, or was done so without providing a clear and concise answer, please notify the Contract Specialist, Mark Buonomo.
This Question and Answer document shall be incorporated into the solicitation and any resultant contract.
Government Statement: Offeror’s are instructed to complete only the Base Year and
Option Year Worksheets in Attachment II - Pricing Sheet. The proposal summary worksheet is locked, and will automatically fill in using the proposed unit prices for each contract year.
Question #1: Street Sweeping: How many days should we figure? Do you want a daily rate?
Answer #1: There is no specific number of days suggested to perform street sweeping.
However, the following information is provided to assist the offeror: parking lots total
~253,000 square feet; there is ~16 miles worth of roads.
The rate for street sweeping should be per occurrence. Regardless if it takes 1 day or 5 days, please provide one flat rate to perform the entire task.
An amendment will be issued to add a line for additional “occasional street sweeping” on a square foot basis in order to allow street sweeping on a smaller scale, such as cleaning for a special event.
Question #2: Disposal of Spoils: Please explain.
Answer #2: TYAD used to have an area available as landfill, however, these areas are now closed. Therefore, any excavation of pavement, dirt, rock, etc., it must be hauled off post.
There IS an area on site for disposal of millings, however.
Questions and Answers Request for Proposal W25G1V-18-R-0011
Question #3: Emergency Call: Please explain.
Answer #3: Examples include, but are not limited to: an extreme utility repair resulting in a road closure, which needs to be repaired and reopened in order to prevent a work stoppage at TYAD; in regards to street sweeping, though it is scheduled 2x per year, a scheduled TYAD event/ceremony may result in the Government requiring an
Emergency Call for street sweeping on a smaller basis. Offeror’s are to provide a square foot price for this occasional street sweeping.
Question #4: What is the depth for Milling?
Answer #4: That will be determined on a case by case basis, depending on the severity of the surface. Most of the milling will be to remove surface irregularities and will be inform in depth, most instances milling will be ½ to 2 inches in depth.
Question #5: What about excavation for paving?
Answer #5: Excavation for paving would likely be for more severe pavement damage from erosion, or in the case of repaired storm drain that may deeper than a standard repair.
Question #6: What is the bituminous base thickness?
Answer #6: 4 inches.
Question #7: What is the bituminous wearing thickness?
Answer #7: 2 inches.
Question #8: What is the 2A sub-base thickness?
Answer #8: 6 inches minimum.
Question #9: Is a performance/bid bond required?
Answer #9: No.
Question #10: Are proposals to be delivered by hand, including 2 hard copies, or will it be sent through e-mail with the excel sheets attached.
Answer #10: In accordance with the solicitation, proposals must be submitted via direct e-mail only. Only 1 copy is required. The completed excel sheets are required and can be submitted either in Microsoft Excel or in PDF format.
Questions and Answers Request for Proposal W25G1V-18-R-0011
Question #11: The requirements include: Section K, Past Performance References, SF 1442, and the completed Microsoft Excel Pricing sheet. Are there any other documents that are required with proposal submission?
Answer #11: No. Please refer to Solicitation, Section L for proposal submission instructions.
Question #12: Regarding milling, how many milling mobilizations will be necessary?
Answer #12: This information cannot be accurately forecasted. Currently, there are two projects that may require milling, but sometimes other methods may be used.
Question #13: Approximately how many cubic yards will be milled in each mobilization?
Answer #13: This information cannot be accurately forecasted and will be determined on a job to job basis.
Question #14: Do we need to fill out the Solicitation, Offer, and Award paperwork at this time?
Answer #14: In accordance with the Solicitation, Section L, offerors are instructed to submit a completed SF 1442 (Blocks 14 through 20C) with their proposal. All Amendments to the solicitation must be signed, dated, and submitted with proposal.
File details come from the government source that posted it.