About this file

Amendment 0001 posted to answer offeror questions

View the file

Other files

File Type Posted
16-R-0039_AMEND_0002.pdf PDF
A02_-_16R0039Attach3.doc DOC document
A01_-_PWS_Attach_B_-_UPS_Units_Master_List.xlsx XLSX spreadsheet
A02_-_16R0039Attach2.doc DOC document
A04_-_WD_05-2454_Attach_4.txt TXT text file
A01_-_PWS_Attach_A_-_Gen_Master_List.xlsx XLSX spreadsheet
A01_-_PWS_2017rev_16R0039Attach_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

THE PURPOSE OF THIS AMENDMENT 0001 TO COMBINED SYNOPSIS/SOLICITATION W25G1V-16-R-0039 IS TO MAKE A CHANGE TO THE

PERFORMANCE WORK STATEMENT AND TO PROVIDE ANSWERS TO CONTRACTOR QUESTIONS RECEIVED. SEE PAGE 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W25G1V-16-R-0039

X 9B. DATED (SEE ITEM 11)

22-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Sep-2016

CODE

ACC-APG TOBYHANNA BRANCH

CONTRACT OPERATIONS SECTION

ATTN: JANE ALLARDYCE

11 HAP ARNOLD BLVD

TOBYHANNA PA 18466

W25G1V 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W25G1V-16-R-0039

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMEND 0001

1. REFERENCE COMBINED SYNOPSIS/SOLICITATION W25G1V-16-R-0039, ATTACHMENT 1

PERFORMANCE WORK STATEMENT, PARAGRAPH 2.4.2.2, SEMI-ANNUAL SERVICES, DELETE THE

LAST SENTENCE "THE ANNUAL SERVICE DATE MAY COINCIDE WITH THE QUARTERLY

MAINTENANCE VISIT."

CONTACTOR QUESTION RECEIVED WITH THE GOVERNMENT'S RESPONSE:

Q1. I NOTICED THAT UNDER 2.4.2.2 THAT IT REFERENCES QUARTERLY MAINTENANCE

VISITS? IT APPEARS THAT WE ARE CONTINUING WITH SEMI-ANNUAL SERVICES AND NOT DOING

QUARTERLY SERVICE.

A1. CORRECT. "SEMI-ANNUAL" SERVICES ONLY. SEE PARAGRAPH 2.4.2.2 AS PER THIS

AMENDMENT PARAGRAPH 1 ABOVE.

2. REFERENCE COMBINED SYNOPSIS/SOLICITATION ATTACHMENT 1, PARAGRAPH 2.4.2. 1.1 (19), DELETE IN ITS ENTIRETY.

CONTRACTOR QUESTION RECEIVED WITH THE GOVERNMENT'S RESPONSE:

Q2. IT IS ALSO CHANGED TO READ REPLENISH OIL AS NECESSARY? ARE WE NOT

PERFORMING ANNUAL OIL AND FILTER CHANGES OR ARE WE GOING TO RELY ON THE OIL AND

COOLANT TESTS TO TELL US WHEN FLUID CHANGES SHOULD OCCUR? IF THAT IS THE CASE,

SHOULD 2.4.2.1.1(19) BE REMOVED. OUR RECOMMENDATION WOULD BE TO CHANGE OIL, OIL

FILTERS, COOLANT FILTERS AND FUEL FILTERS EVERY OTHER YEAR. MORE FREQUENT

CHANGES COULD OCCUR IF TESTING INDICATES THE NEED AS A REMEDIAL REPAIR. WE

RECOMMEND CHANGING COOLANT ONLY AS INDICATED BY INSPECTION AND TESTING AS A

REMEDIAL REPAIR.

A2. THE OIL AND FILTERS WILL BE CHANGED EVERY OTHER YEAR WHEN THE FLUIDS ARE

DRAWN FOR TESTING. SEE PARAGRAPH 2.4.2.1.1(19) AS PER THIS AMENDMENT PARAGRAPH 2.

3. REFERENCE COMBINED SYNOPSIS/SOLICITATION ATTACHMENT 1, PARAGRAPH 2.4.2.2.1 (32), DELETE IN ITS ENTIRETY.

CONTRACTOR QUESTION RECEIVED WITH THE GOVERNMENT'S RESPONSE:

Q3. SECTION 2.4.2.2.1 MENTIONS UNDER ITEM (32) INSULATION TESTING. MY NOTES

INDICATED THAT A DECISION WAS MADE AT THE WALK THRU FOR THE CURRENT CONTRACT

THAT THIS WOULD ONLY OCCUR IF OTHER FACTORS INDICATED THE NEED TO DO SO AND WAS

NOT TO OCCUR ON A ROUTINE TEST SCHEDULE. THE COSTS INVOLVED TO DO A PROPER

INSULATION TEST USING A MEGGER DID NOT JUSTIFY PERFORMING THE TEST GIVEN THE

ROBUST NATURE OF TODAY'S WINDINGS. TO BE DONE SAFELY ALL ELECTRONIC MUST BE

DISCONNECTED PRIOR TO PERFORMING THE TEST AS THE HIGH VOLTAGE WOULD DAMANGE

THOSE COMPONENTS.

A3. YES, INSULATION TESTING WILL NOT BE PERFORMED ON A ROUTINE SCHEDULE. SEE

PARAGRAPH 2.4.2.2.1 (32) AS PER THIS AMENDMENT PARAGRAPH 3.

4. ADDITIONAL CONTRACTOR QUESTIONS RECEIVED ARE RESTATED WITH THE GOVERNMENT'S

RESPONSE:

Q4. SINCE THE FISCAL YEARS ARE ACROSS ODD AND EVEN YEARS AND USING THE FIRST

AND SECOND YEAR AS AN EXAMPLE: 10/16 -9/17 AND 10/17-9/18, SHOULD OIL AND COOLANT TEST

BE IN FALL 2016; LOAD BANK TESTING IN APRIL 2017; FALL 2016 - NO OIL OR COOLANT TESTS;

SPRING 2018 - NO LOAD BANK TESTING?

A4. OIL AND COOLANT WAS TESTED IN SPRING OF 2016 AND WILL NOT BE DUE AGAIN

UNITL FY18 (OCTOBER 2017); LOAD BANK TESTING WILL BEGIN IN SPRING (APRIL) OF 2017 (FY

17), THEN AGAIN IN FY 19; NO OIL OR COOLANT TESTS WILL BE PERFORMED IN FALL 2016, JUST

NORMAL PREVENTIVE MAINTENANCE; SPRING (APRIL) 2017 LOAD BANK TESTING WILL BE

PERFORMED.

W25G1V-16-R-0039

Q5. CONCERNING THE BATTERY MAINTENANCE, ARE CONDUCTANCE READINGS

ACCEPTABLE IN PLACE OF IMPENDANCE READINGS?

A5. NO, THE GOVERNMENT REQUIRES IMPEDANCE READINGS.

Q6. ARE REPLACEMENT BATTERIES BILLABLE TO TAD, OR DO WE HAVE TO PROVIDE

THEM UNDER THE CONTRACT?

A6. REPLACEMENT BATTERIES ARE BILLABLE TO THE GOVERNMENT.

Q7. THE UPS THAT ARE NOT IN SERVICE, DO WE NEED TO INCLUDE THEM IN THE

MAINTENANCE (EXAMPLE, UNIT 21, BLDG 73)?

A7. NO, THE UPS NOT IN SERVICE DO NOT NEED TO BE INCLUDED IN THE MAINTENANCE.

Q8. FOR THE LIEBERT/EMERSON UNITS, TO PRICE THE BATTERY SERVICE REQUESTED,

ARE THEY STILL FACTORY, PLEASE ADVISE. iF NOT, PLEASE IDENTIFY THE BATTERY TYPES, RUN

TIME, NUMBER OF CABINETS AND IF ANY MODIFICATIONS HAVE OCCURRED IN THE FIELD.

A8. THE UNITS THEMSELVES ARE STILL FACTORY AND BATTERY QUANTITIES ARE

LISTED IN THE SOW. THE BATTERIES HAVE BEEN KEPT UP TO DATE OVER THE YEARS. ALL

SYSTEMS ARE PRESENTLY FULLY OPERATIONAL.

Q9. FOR THE UNIT 21 LOCATED IN BLDG 73, 1ST FLOOR, EMERSON SERIES 610, SN:

CN0724629/LI-06720, SYSTEM NOT IN SERVICE: DOES THE GOVERNMENT STILL WANT THE SAME

SPECIFIED SERVICE PRICED FOR THIS UNIT? WHAT IS THE STATUS OF THE BATTERIES FOR THIS

UNIT, STORAGE ENVIRONMENT, MONTHLY CHARGING, ETC? WHAT SERVICE IS REQUIRED FOR

THE BATTERIES?

A9. NO SERVICE IS REQUIRED FOR THIS UNIT.

5. THE PROPOSAL DUE DATE OF 22 SEPTEMBER 2016 @ 1:00 PM REMAINS UNCHANGED.

6. ALL OTHER TERMS AND CONDITIONS OF THE SOLICITATION REMAIN THE SAME.

File details come from the government source that posted it. Updated .