26-Q-A146 - Solicitation Q_A(1).xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- IDS Inspection Services - Fort Devens, MA
- Solicitation number
- W15QKN-26-Q-A146
About this file
This is a Questions and Answers document for federal contract solicitation W15QKN-26-Q-A146 for IDS Inspection Services at Fort Devens, Massachusetts. The Q&A addresses industry inquiries submitted during the solicitation period and provides clarifications on the Performance Work Statement requirements.
The requirement involves bi-annual inspection and maintenance services for three Intrusion Detection System (IDS) locations: Building 673 (SIPR Cafe SCIF), Building 681 (Police ARMAG weapons vault), and seven separate Ammunition Supply Point Bunker buildings at South Post (weapons vault). All inspections and testing must be completed in one workday per visit. Current IDS systems include DSC NEO models with planned upgrades to ELK systems. The Government will provide system access codes, account numbers, and keys. Personnel require standard vetting and mandatory escort access to all vaults due to sensitive materials. Work outside normal business hours requires written Contracting Officer approval with emergency fees applied. The contractor is not required to perform on federal public holidays. No existing inspection checklist or previous inspection reports are available, as this contract establishes the initial inspection program. All systems are currently operational with no known deficiencies. The equipment list includes multiple components such as control panels, keypads, motion sensors, cellular communicators, batteries, surge protectors, and fiber optic cables across the three locations. The pricing sheet contains a single line item for biannual IDS services and maintenance, with questions regarding how to separately price 24-hour personnel support and program management services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation Number: | W15QKN-26-Q-A146 |
| Requirement: | IDS Inspection Services - Fort Devens, MA 01434 |
| POC: | Javier Vega, Operations Officer |
| Date: | 3-Aug-26 |
Purpose: The purpose of this form is to provide answers to questions submitted by industry during the solicitation period.
| Question: | Answer: | PWS Reference (If Appliacable): |
| Question 1: The pricing sheet only provides 0001 line item for Biannual IDS Services & Maintenance. How are we submitting pricing for personnel support within 24 hours of notification, outside or normal hours to include holidays and for the program manager? | The Contractor’s performance is not required on |
the Federal public holidays. If work is required outside normal working hours it will be as a last resort. Prior to
| performance of services outside the established hours of operation, the Contractor shall request and obtain, in writing, approval from the KO with the understanding that an emergency fee will be applied. | PWS Section 2.1.5.1 | ||
| Question 2: How many above devices are there across the 3 vaults and 3 IDSs? We need to know how much time this may take in order to price. Can you provide a list? | Please see Sheet 2 for list of equipment make and and quantities. | PWS Section 2.1.1.1 | |
| Question 3: Is this implying that the inspection and testing for all in scope can be completed in (1) workday? | Yes. | N/A | |
| Question 4: What is the brand name of the IDSs | the current models we have are DSC NEO and about to be upgraded to ELK. | N/A | |
| Question 5: When were the systems originally installed? | ASP was installed Jan 2025. SIPR was installed Late 2022 early 2023, ARMAG came equipped with the system and arrived approx late 2024. | N/A | |
| Question 6: Make, model, and manufacturer of IDS components currently in operation: Panel Enclosures & Back Plane, Power Distributers, Power Supply, Single Vault Kit, Keypads, Ethernet Interface, Port Expander, Zone Expanders, Output Expanders, Data Bus Hubs, Power Modules, Ribbon cables, Power Transformers, Voltage Output Terminal Board, SIM Card Cellular Communicator, Omni Directional Cellular Antenna and enclosure, Signal Booster, Webooster, Balanced Magnetic Switches, Motion Sensors, Exterior Strobes, and assorted fiber optic cables, cords, and hardware. | Please see Sheet 2 for list of equipment make and and quantities. | N/A | |
| Question 7: Further description of “Vault”: Is this area a storage area, SCIF, or other type of location, if allowed to disclose? | 681 and 646 are weapons vaults. ASP is ammo and explosive storage, 673 is a SCIF. | N/A | |
| Question 8: Personnel access requirements: What type of background check or clearances are needed, if any, to work within the requested areas? Will an escort be needed or provided for the requested services? | All areas require standard vetting prior to entrance to the installation. An escort will be required to all vaults as there are sensitive itmes contained inside. | N/A | |
| Question 9: The PWS states that three Vaults and three IDS systems will be inspected. However, the place of performance includes Building 673, Building 681, and all seven Ammunition Supply Point Bunkers. Please confirm the total number of IDS systems and locations that must be inspected during each semiannual visit. | There are (3) three locations. 681 and 673 are single room vaults. The ASP contains (7) seven separate buildings in the same area. | N/A | |
| Question 10: Will the Government provide the IDS account numbers, system access codes, keys, and other information needed to arm, disarm, test, and reset each system? | Yes. | N/A | |
| Question 11: Is there an existing inspection checklist, equipment inventory, system diagram, or previous inspection report that can be provided? | There is no cureent inspection checklist, equipment inventory is what was listed in SOW. And there is no previous inspection report as this is the reason I am looking to establish one. | N/A | |
| Question 12: Are all IDS systems currently operational, or are there any known deficiencies or communication issues? | All are curently operational with no known issues or concerns. | N/A |
Sheet2
| ASP Equipment List: | 673 Equipment List: | |||
| 12V 12AH Batteries | 14 | DSC PC1832 8 Zone Hybrid Control Panel | 1 | |
| Altronix AL400ULX 4 AMP Power Supply | 2 | DSC PK5500 LCD Keypad | 1 | |
| Altronix PD8-8PWR Distribution | 7 | ELK-TRG 1640 120VAC Input 16.5 VAC 40VA Transformer output power | ||
| supply | 1 | |||
| B-Line 1212SP KeyPad Enclosure | 7 | Two-way Audio DSC PC5950 Audio & Speaker Module | 1 | |
| B-Line WMHNL T-Handle For Enclosure | 7 | Dual Transmission Media Digital Communication System DSC | ||
| TL260R | 1 | |||
| Bosch 360 Degree Motion Sensor | 7 | 3 Position Tamper | ||
| Switch | 1 | |||
| Covers | 7 | 12volt, 7AH | ||
| Battery | 2 | |||
| Ditech In Line Power Surge Protector 4-PIN | 7 | Ditek DTK-1FF Telco Surge | ||
| Suppressor | 1 | |||
| Ditech Plug In Surge Suppressor | 10 | |||
| Ditech Telco Surge Suppressor | 1 | |||
| DSC HS2128 Mother Board | 1 | |||
| DSC HS2LCDENG-N KeyPad | 7 | |||
| DSC HSM2108 Zone Expansion Module | 14 | |||
| DSC LE280RX-AT Cellular Network Card | 1 | |||
| DSC LTE-50 Antenna Kit | 1 | |||
| Duplex Outlet | 7 | |||
| EY Compound Explosion Proof | 1 | |||
| EY Explosion Proof Plugs | 7 | |||
| EY Wadding Explosion Proof | 1 | |||
| Fiber Heads | 12 | |||
| Fiber Optic Patch Cord | 2 | |||
| Gem Box | 7 | |||
| High Security Explosion Proof BMS | 7 | |||
| Hoffman Cabinet Heater | 7 | |||
| Magnasphere HSS-L2D-800 | 7 | |||
| New NEMA Enclosures with Back Plane | 7 | |||
| Single Mode Fiber Optic Media Convertors | 1 | |||
| Weatherproof Tamperproof Strobes for Exterior with Backbox | 7 | |||
| Wilson High Gain Antenna | 1 |
File details come from the government source that posted it. Updated .