Contract Data Requirement List (CDRL).pdf
PDF 274 KB Posted
- Attached to
- Test Stand Safety Platform Federal contract opportunity
- Solicitation number
- W15QKN25QA220
About this file
This document is a Contract Data Requirements List (DD Form 1423-1) for a Test Stand Safety Platform contract with the Department of Defense. The document contains four data items (A001-A004) specifying detailed documentation and training requirements for the contractor. Key deliverables include: (1) Commercial Off-The-Shelf (COTS) Manuals providing technical information on assembly, installation, parts, operation, and maintenance; (2) a Certificate of Compliance certifying that the Test Stand Safety Platform meets all contract requirements; (3) Record of Meeting Minutes from the initial kick-off meeting at Benet Labs, documenting design schedule, fabrication, and installation timelines; and (4) a Post Training and Operations Report covering mandatory Anti-Terrorism (AT) Level 1 training and iWATCH "See Something, Say Something" training. All documents are to be electronically submitted to a Technical Point of Contact (POC) and ACC-NJ, with Distribution Statement D limiting access to the Department of Defense and U.S. DoD contractors for administrative and operational use.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Safety Test Stand Questions and Answers (2).docx | DOCX document | |
| Safety Test Stand Questions and Answers.docx | DOCX document | |
| Solicitation Amendment - W15QKN25QA2200003.pdf | ||
| Solicitation Amendment W15QKN25QA2200003 SF 30.pdf | ||
| Solicitation Amendment W15QKN25QA2200002 SF 30.pdf | ||
| Solicitation Amendment - W15QKN25QA2200002.pdf | ||
| Solicitation Amendment W15QKN25QA2200001 SF 30.pdf | ||
| Solicitation Amendment - W15QKN25QA2200001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages Adobe Professional 8.0
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER General
D. SYSTEM/ITEM
Test Stand Safety Platform
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Off-The-Shelf (COTS) Mauals
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-TMSS-80527C
5. CONTRACT REFERENCE
SOW, Section 2.1.6, 2.1.7
6. REQUIRING OFFICE
FCDD-ACW-BC
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
Once
12. DATE OF FIRST SUBMISSION
w/Delivery
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
Delivery
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
Draft
Final
Reg Repro
16. REMARKS
BLOCK 5:
SOW PARAGRAPHS 2.1.6 & 2.1.7 - The contractor shall provide written Instruction Manuals and Technical Manuals to include technical information on the assembly, installation, parts, operation and maintenance procedures for the test stand safety platform.
BLOCK 9: DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR
ADMINISTRATIVE AND OPERATIONAL USE. OTHER REQUESTS SHALL BE
REFERRED TO CONTRACTING OFFICER REPRESENTATIVE (COR)
Block 14a: ELECTRONIC COPIES OF ALL DATA SUBMITTALS SHALL BE
PROVIDED TO:
TECH POC, REFER TO CONTRACT FOR EMAIL ADDRESS.
ACC-NJ - REFER TO CONTRACT FOR EMAIL ADDRESS.
Tech POC 1
ACC-NJ 1
15. TOTAL 0 2 0
G. PREPARED BY
Agnes Rizzuto
H. DATE
5/28/2025
I. APPROVED BY
Scott Lobdell
J. DATE
5/28/2025
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER General
D. SYSTEM/ITEM
Test Stand Safety Platform
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
CERTIFICATE OF COMPLIANCE
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81356A
5. CONTRACT REFERENCE
SOW, Section 2.1.5
6. REQUIRING OFFICE
FCDD-ACW-BC
Once
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
See BLK 16
13. DATE OF SUBSEQUENT
BLOCK 5: Written certification that the Test Stand Safety Platform and its components are in full compliance with ALL contract requirements.
Agnes Rizzuto
H. DATE
5/28/2025
I. APPROVED BY
Scott Lobdell
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER General
D. SYSTEM/ITEM
Test Stand Safety Platform
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Report, Record of Meeting Minutes
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMIN-81505 TAILORED
5. CONTRACT REFERENCE
SOW, Section 2.1.1 & 3.0
6. REQUIRING OFFICE
FCDD-ACW-BC
Once
12. DATE OF FIRST SUBMISSION
See BLK 16
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
BLOCK 5: Contractor shall record meeting minutes during the kick-off meeting at Benet Labs and provide a copy to ALL meeting attendees. Meeting notes should include: draft agenda of kickoff meeting, design schedule, fabrication of parts, delivery of components and installation schedule. Submission should be 2 weeks after the initial Kickoff Meeting.
Agnes Rizzuto
H. DATE
5/28/2025
I. APPROVED BY
Scott Lobdell
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER ADMIN/MGMT DATA
D. SYSTEM/ITEM
Test Stand Safety Platform
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
POST TRAINING and OPERATIONS REPORT
3. SUBTITLE
MANDATORY TRAINING CERTIFICATION
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81862, Tailored
5. CONTRACT REFERENCE
SOW PAR 14.1 & 14.3
6. REQUIRING OFFICE
FCDD-ACW-BC
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
N/A
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
AS REQUIRED Draft
Final
Reg Repro
16. REMARKS
BLOCK 4 - CONTRACTOR FORMAT ACCEPTABLE.
TAILOR OUT SECTIONS 3.2 - 3.11.
BLOCK 5:
SOW PARAGRAPH 14.1- AT Level 1 Anti Terrorism training The contractor shall complete AT Level 1 training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, and then annually thereafter.
SOW PARAGRAPH 14.3- iWATCH “See Something, Say Something” The contractor (including subcontractors) shall receive/participate in training within 45 calendar days after contract start date and annually thereafter. The contractor shall submit a certificate of completion within 14 calendar days of completion.
BLOCK 9 - DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO
THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY FOR
ADMINISTRATIVE AND OPERATIONAL USE.
BLOCK 14: ELECTRONIC COPIES OF ALL DATA SUBMITTALS SHALL BE
PROVIDED TO:
TECH POC, REFER TO CONTRACT FOR EMAIL ADDRESS.
ACC-NJ - REFER TO CONTRACT FOR EMAIL ADDRESS.
TECH POC 1
ACC-NJ 1
15. TOTAL 0 2 0
G. PREPARED BY
Agnes Rizzuto
H. DATE
05/29/2025
I. APPROVED BY
Scott Lobdell
05/29/2025
| DD1423-1 Security Training_Test Stand Safety Platform.pdf |
| DD1423-1_ Certificate of Compliance.pdf |
| DD1423-1_ Record of Meeting Notes.pdf |
| DD1423-1_ Written Manuals(1).pdf |
File details come from the government source that posted it. Updated .