This is a Statement of Work (SOW) for window replacement at Buildings 646 and 653 at the Devens Reserve Forces Training Area in Devens, MA. The project requires the contractor to remove and replace 32 vinyl replacement windows of varying sizes, with the most common size being 100 1/2" x 66 1/8" (14 units). The work includes abatement of asbestos caulking found on existing windows and disposal of old windows.
The new windows must be vinyl aged bronze in color with low-e insulated glass, single hung, and dual pane. The contractor must submit various documents within 10 business days of Notice to Proceed, including shop drawings, product data, finish samples, structural calculations, test reports, and operations/maintenance documentation. The SOW includes detailed environmental protection requirements, including proper handling of hazardous materials, dust control, water resources protection, and spill prevention measures. The contractor is responsible for all cleanup, restoration of disturbed areas, and proper disposal of materials in accordance with federal, state, and local regulations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W15QKN-24-Q-5171 U0002 Solicitation released 1.23.2025.pdf | ||
| Attachement 0002 KTR Cost Breakout Form.xls | XLS spreadsheet | |
| W15QKN-24-Q-5171 Solicitation Mod P0001 released.pdf | ||
| 24-Q-5171 Attachement 0002 KTR Cost Breakout Form.xls | XLS spreadsheet | |
| W15QKN-24-Q-5171 Solicitation released.pdf | ||
| 24-Q-5171 Attachement 001 Window Instsall - SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK (SOW)
FOR
WINDOW REPLACEMENT, BUILDINGS
646 AND 653
DEVENS RESERVE FORCES TRAINING
AREA
DEVENS, MA 01434
U.S. ARMY GARRISON DEVENS RESERVE
FROCES TRAINING AREA (RFTA)
30 QUEBEC STREET
DEVENS, MA 01434
PROJECT NO. 02 JAN 2025
TABLE OF CONTENTS
PERFORMANCE WORK STATEMENT (PWS)
FURNISH AND INSTALL VINYL REPLACEMENT WINDOWS
DEVENS RESERVE FROCES TRAINING
DEVENS, MA 01434
PROJECT NO.
SECTION TITLE
DIVISION 01 GENERAL REQUIREMENTS
01 11 01 GENERAL REQUIREMENTS
01 57 21 ENVIRONMENTAL PROTECTION (DEVENS RFTA)
DIVISION 2 – EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 8
WINDOWS
SECTION 01 11 01 GENERAL REQUIREMENTS
GENERAL
1.1 PROJECT DESCRIPTION
The Contractor shall provide all labor, materials, equipment, transportation, supervision, and other services require to remove and replace the front windows in Buildings 646 and 653 and the abatement of asbestos caulking found on the windows and disposal of old windows. New windows shall be vinyl aged bronze in color low e insulated glass single hung, dual pane vinyl replacement windows and materials for installation.
WORK COVERED BY THE CONTRACT DOCUMENTS
A. Project Identification: WINDOW REPLACEMENT, BUILDING 646
AND 653
B. Project Location: Devens RFTA, Main Cantonment Area, Devens, MA 01434
Window rough openings are provided below. A site visit is STRONGLY RECOMMENED prior to the submission of bids.
Requirement ROUGH OPENING DIMENSIONS Qty Unit
VINYL REPLACEMENT WINDOW 100 1/2" x 66 1/8" 14 EA
VINYL REPLACEMENT WINDOW 100 3/8" x 66 1/8" 1 EA
VINYL REPLACEMENT WINDOW 100 1/2" x 65 1/2" 1 EA
VINYL REPLACEMENT WINDOW 100 3/8" x 66 3/8" 1 EA
VINYL REPLACEMENT WINDOW 100 1/2" x 66 1/4" 3 EA
VINYL REPLACEMENT WINDOW 100 1/2" x 66" 2 EA
VINYL REPLACEMENT WINDOW 100 1/2" x 65 3/4" 2 EA
VINYL REPLACEMENT WINDOW 100 1/4" x 66 1/8" 1 EA
VINYL REPLACEMENT WINDOW 100 1/8" x 66 1/8" 2 EA
VINYL REPLACEMENT WINDOW 100 1/8" x 66" 1 EA
VINYL REPLACEMENT WINDOW 100 1/4" x 66 1/4" 2 EA
VINYL REPLACEMENT WINDOW 100 1/2" x 66 3/8" 1 EA
VINYL REPLACEMENT WINDOW 100 3/8" x 66 1/4" 1 EA
Project Total 32
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. Within 10 business days following the Notice to Proceed the contractor shall submit the following submittals.
Vinyl Replacement Windows
Shop Drawings, Fabrication Drawings SD-02 G, DPW
Product Data: Windows, Hardware, Fasteners, Window Performance, Mullions, Screens, Weatherstripping, Adhesives
SD-03 G, DPW
Finish Sample, Window Sample SD-04 G, DPW
Structural Calcs for Deflection, Design Analysis SD-05 G, DPW
Test Reports, Minimum Condensation Resistance, Factor Resistance to Forced Entry, Standard Air Blast Test SD-06 G, DPW
Operations and Maintenance Data SD-10 G, DPW
Closeout Documentation
Warranty Management Plan SD-03 G, DPW
Spare Parts Data SD-03 G, DPW
Manufacturer’s Instructions SD-08 G, DPW
Operations and Maintenance Data SD-10 G, DPW
SECTION 01 57 20
ENVIRONMENTAL PROTECTION (DEVENS RFTA)
PART 1 GENERAL
1.1 REFERENCES (NOT USED)
1.2 DEFINITIONS
A. Contractor Generated Hazardous Waste - Contractor generated hazardous waste means materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners, excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.
B. Environmental Pollution and Damage - Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.
C. Environmental Protection - Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.
D. Hazardous Materials - As defined by the Environmental Protection Agency (EPA) or State Hazardous Control Authority.
Hazardous material is any material that is regulated as a hazardous material by the EPA or requires a Material Safety Data Sheet (MSDS), or during end use, treatment, handling, packaging, storage, transpiration, or disposal meets or has components that meet or have potential to meet the definition of a hazardous waste. Such material includes ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos, mercury, and polychlorinated biphenyls (PCBs). Nonetheless, the exposure may occur incident to manufacture, storage, use and demilitarization of these items.
E. Hazardous Waste - Any discarded material, liquid, solid, or gas, which meets the definition of hazardous material or is designated hazardous waste by the Environmental Protection Agency or State Hazardous Control Authority.
F. Land Application for Discharge Water - The term "Land Application" for discharge water implies that the Contractor must discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "Waters of the United States" must occur. Land
Application must be in compliance with all applicable Federal, State, and local laws and regulations.
G. Oily Waste - Those materials which are, or were, mixed with used oil and have become separated from that used oil. Oily wastes also mean’s materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, used oil and may be appropriately tested and discarded in a manner which is in compliance with Federal, State and local requirements.
H. Pesticide - Pesticide is defined as any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.
I. Solid Waste - Garbage, refuse, debris, sludge, or other discharged material, including solid, liquid, semisolid, or contained gaseous materials resulting from domestic, industrial, commercial, mining, or agricultural operations.
J. Surface Discharge - The term implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, c reeks, and/or
"Waters of the United States" and would require a permit to discharge water from the governing agency.
K. Waste Hazardous Material (WHM) - Any waste material which because of its quantity, concentration, or physical, chemical, or infectious characteristics may pose a substantial hazard to human health or the environment and which has been so designated. Used oil not containing any hazardous waste, as defined above, falls under this definition.
L. Waters of the United States - All waters which are under the jurisdiction of the Clean Water Act, as defined in 33 CFR 328.
M. Wetlands - Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, and bogs.
1.3 NOTIFICATION
The Contracting Officer will notify the Contractor in writing of any observed noncompliance with Federal, State or local environmental laws or regulations, and permits. After receipt of such notice, the Contractor will inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted, or equitable adjustments allowed for any such suspensions. This is in addition to any other actions the Contracting Officer may take under the contract, or in accordance with the Federal Acquisition Regulation or Federal Law.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 PROTECTION OF NATURAL RESOURCES
A. Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work.
Confine construction activities to within the limits of the work indicated or specified. If the work is near streams, lakes, or other waterways, conform to the national permitting requirements of the Clean Water Act.
B. Do not disturb fish and wildlife. Do not alter water flows or otherwise significantly disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as indicated or specified.
C. Except in areas to be cleared, do not remove, cut, deface, injure, or destroy trees or shrubs without the Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages unless authorized by the Contracting Officer. Where such use of attached ropes, cables, or guys is authorized, the Contractor will be responsible for any resultant damage.
D. Protect existing trees which are to remain, and which may be injured, bruised, defaced, or otherwise damaged by construction operations. Remove displaced rocks from uncleared areas. By approved excavation, remove trees with 30 percent or more of their root systems destroyed. Remove trees and other landscape features scarred or damaged by equipment operations, and replace with equivalent, undamaged trees and landscape features. Obtain Contracting Officer's approval before replacement.
E. The Contracting Officer's approval is required before any equipment will be permitted to ford live streams. In areas where frequent crossings are required, install temporary culverts or bridges. Obtain Contracting Officer's approval prior to installation. Remove temporary culverts or bridges upon completion of work and repair the area to its original condition unless otherwise required by the Contracting Officer.
3.2 WORK AREA LIMITS
Mark the areas that need not be disturbed under this Contract prior to commencing construction activities. Mark or fence isolated areas within the general work area which are not to be disturbed. Protect monuments and markers before construction operations commence. Where construction operations are to be conducted during darkness, any markers must be visible in the dark. The Contractor's personnel must be knowledgeable of the purpose for marking and/or protecting particular objects.
3.3 LANDSCAPE
Trees, shrubs, vines, grasses, landforms and other landscape features to be preserved as indicated and or defined in the Contract must be clearly identified by marking, fencing, or wrapping with boards, or any other approved techniques. Restore landscape features damaged or destroyed during construction operations outside the limits of the approved work area.
3.4 EROSION AND SEDIMENT CONTROLS
A. If required by the Contract, the Contractor shall be responsible for providing erosion and sediment control measures in accordance with Federal, State, and local laws and regulations.
B. The erosion and sediment controls selected and maintained by the Contractor shall be such that water quality standards are not violated as a result of construction activities.
C. The area of bare soil exposed at any one time by construction operations should be kept to a minimum. Construct or install temporary and permanent erosion and sediment control best management practices (BMPs) as may be indicated in the Contract.
D. Erosion and sediment controls must be provided for onsite borrow and spoil areas to prevent sediment from entering any nearby waters.
E. Temporary excavation and embankments for work areas must be controlled to protect adjacent areas.
F. Remove all temporary measures after the area has been fully stabilized.
3.5 WATER RESOURCES
Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated. For construction activities immediately adjacent to impaired surface waters, the Contractor must be capable of quantifying sediment or pollutant loading to that surface water when required by Federal or State issued Clean Water Act permits.
3.6 WETLANDS
Do not enter, disturb, destroy, or allow discharge of contaminants into any wetlands. The protection of wetlands is the Contractor's responsibility.
Authorization to enter specific wetlands identified will not relieve the Contractor from any obligation to protect other wetlands within, adjacent to, or in the vicinity of the construction site and associated boundaries.
3.7 AIR RESOURCES
Equipment operation, activities, or processes will be in accordance with all Federal and State air emission and performance laws and standards.
3.8 DUST CONTROL
A. Keep dust down at all times, including during nonworking periods. Sprinkle or treat, with dust suppressants, the soil at the site, haul roads, and other areas disturbed by operations.
B. Dry power brooming will not be permitted. Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming.
C. Air blowing will be permitted only for cleaning nonparticulate debris such as steel reinforcing bars.
D. Only wet cutting will be permitted for cutting concrete blocks, concrete, and bituminous concrete. Do not unnecessarily shake bags of cement, concrete mortar, or plaster.
3.9 BURNING
Burning is prohibited and will not be allowed on government property.
3.10 SOLID WASTES
A. Place solid wastes (excluding clearing debris) in containers which are emptied on a regular schedule. Handling, storage, and disposal must be conducted to prevent contamination. Employ segregation measures so that no hazardous or toxic waste will become co-mingled with solid waste.
B. Transport solid waste off Government property and dispose of it in compliance with Federal, State, and local requirements for solid waste disposal.
C. Verify that the selected transporters and disposal facilities have the necessary permits and licenses to operate.
3.11 CHEMICALS AND CHEMICAL WASTES
Dispense chemicals ensuring no spillage to the ground or water.
Perform and document periodic inspections of dispensing areas to identify leakage and initiate corrective action. This documentation will be periodically reviewed by the Government.
Collect chemical waste in corrosion resistant, compatible containers. Collection drums must be monitored and removed to a staging or storage area when contents are within 6 inches of the top. Wastes will be classified, managed, stored, and disposed of in accordance with Federal, State, and local laws and regulations.
3.12 WASTEWATER
A. Wastewater from construction activities, such as onsite material processing, concrete curing, foundation and concrete clean-up, water used in concrete trucks, forms, etc. will not be allowed to enter water ways or to be discharged prior to being treated to remove pollutants. Dispose of the construction related wastewater off-Government property in accordance with all Federal, State, Regional and Local laws and regulations.
B. Water generated from the flushing of lines after disinfection or disinfection, and hydrostatic testing will be land applied in accordance with all Federal, State, and local laws and regulations for land application.
3.13 FUEL AND LUBRICANTS
A. Storage, fueling and lubrication of equipment and motor vehicles must be conducted in a manner that affords the maximum protection against spill and evaporation. Manage and store fuel, lubricants and oil in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded must be stored in marked corrosion-resistant containers and recycled or disposed in accordance all Federal, State, and local laws and regulations.
B. Contractor shall coordinate the disposition of hazardous waste with Fort Devens Environmental Coordinator and the Contracting Officer.
C. Storage of fuel on the project site is not allowed. Fuel must be brought to the project site each day that work is performed.
3.14 BIOLOGICAL RESOURCES
A. Minimize interference with, disturbance to, and damage to fish, wildlife, and plants including their habitat.
B. The protection of threatened and endangered animal and plant species, including their habitat, is the Contractor's responsibility in accordance with Federal, State, Regional, and local laws and regulations.
3.15 PREVIOUSLY USED EQUIPMENT
A. Clean all previously used construction equipment prior to bringing it onto the project site. Ensure that the equipment is free from soil residuals, egg deposits from plant pests, noxious weeds, and plant seeds.
B. Consult with the USDA jurisdictional office for additional cleaning requirements.
3.16 HAZARDOUS WASTE AND HAZARDOUS MATERIALS MINIMIZATION
A. The Contractor shall minimize the use of hazardous materials and the generation of hazardous waste.
B. Where applicable, the Contractor shall substitute non-hazardous materials for hazardous materials, unless specifically required elsewhere in this Contract.
C. In the absence of regulations, users will apply the best available technology or management in the use, handling, and disposal of hazardous wastes and materials.
3.17 HAZARDOUS WASTE AND HAZARDOUS MATERIALS
A. No hazardous material or hazardous waste shall be disposed of on government property. The government is not responsible for disposal of Contractor's waste material brought on the job site and not required in the performance of this Contract.
B. No hazardous material shall be brought onto government property that does not directly relate to requirements for the performance of this Contract.
C. The intent of this provision is to dispose of that waste identified as hazardous material and hazardous waste as defined herein that was generated as part of this Contract and existed within the boundary of the Contract limits and not brought in from offsite by the Contractor.
D. Incidental materials used to support the Contract including, but not limited to aerosol cans, waste paint, cleaning solvents, contaminated brushes, rags, clothing, etc.
are the responsibility of the Contractor.
E. The Contractor is not authorized to discharge any materials to sanitary sewer, storm drain, or to the river or conduct waste treatment or disposal on government property without written approval of the Contracting Officer.
F. The Contractor shall submit 5 copies of Material Safety Data Sheet (MSDS) for all hazardous materials which may be required for use in this Contract.
3.18 CONTRACTOR GENERATED HAZARDOUS WASTES AND HAZARDOUS
MATERIALS
A. Take sufficient measures to prevent spillage of hazardous and toxic materials during dispensing. Segregate hazardous waste from other materials and wastes; protect it from the weather by placing it in a safe covered location and take precautionary measures such as berming or other appropriate measures against accidental spillage.
B. Storage, describing, packaging, labeling, marking, and placarding of hazardous waste and hazardous material in accordance Federal, State, and local laws and regulations is the Contractor's responsibility.
C. Transport Contractor generated hazardous waste off Government property within 60 days in accordance with the Environmental Protection Agency and the Department of Transportation laws and regulations.
D. Dispose of hazardous waste in compliance with Federal, State and local laws and regulations. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and Fort Devens Environmental Coordinator.
E. Cleanup and cleanup costs due to spills are the Contractor's responsibility.
F. The disposition of Contractor generated hazardous waste and excess hazardous materials are the Contractor's responsibility.
3.19 MAINTENANCE OF POLLUTION FACILITIES
Maintain permanent and temporary pollution control facilities and devices for the duration of the contract or for that length of time construction activities create the particular pollutant.
3.20 CONSTRUCTION CLEANUP
A. The Contractor will clean up all areas used for construction in accordance with Contract Clause: "Cleaning Up."
B. Unless otherwise instructed in writing by the Contracting Officer, obliterate all signs of temporary construction facilities such as haul roads, work area, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other vestiges of construction prior to final acceptance of the work.
C. The disturbed area must be graded, filled and the entire area seeded unless otherwise indicated.
3.21 RELEASES/SPILLS OF OIL AND HAZARDOUS SUBSTANCES
A. Exercise due diligence to prevent, contain, and respond to spills of hazardous material, hazardous substances, hazardous waste, sewage, regulated gas, petroleum, lubrication oil, hydraulic hoses and equipment, and other substances regulated by environmental law at Fort Devens or sites operated by Fort Devens.
B. The Contractor shall maintain at all times spill cleanup equipment and materials at the work site.
C. In the event of a spill, take prompt, effective action to stop, contain, curtail, or otherwise limit the amount, duration, and severity of the spill/release.
D. In the event of any releases of oil and hazardous substances, chemicals, or gases during normal working hours, the Contractor shall immediately (within 15 minutes) notify the Fort Devens DPW Environmental Specialist, MORGAN MCGRATH at 978-978- 6095, and the Contracting Officer. Releases outside of normal working hours shall be reported directly to the Department of Defense (DoD) Police at 978-796-3333.
E. If the Contractor's response is inadequate, Fort Devens may respond. If this should occur, the Contractor will be required to reimburse the government for spill response assistance and analysis.
F. The Contractor is responsible for verbal and written notifications to the Massachusetts Department of Environmental Protection (MA DEP) and the Environmental Protection Agency as required by Fort Devens and Federal, State, local regulations.
The Contractor shall provide copies of the written notification and documentation that a verbal notification was made within 20 days from the date the spill occurred.
G. The Contractor shall contain and clean up these spills without cost to the government. If government assistance is requested or required, the Contractor will reimburse the government for such assistance. The Contractor shall reimburse the government for all costs incurred including sample analysis materials, equipment, and clothing generated during any spill cleanup.
H. In the event that any Federal, State, or local agency contacts the Contractor directly for any reason relating to compliance requirements arising out of performance of this Contract, the Contractor shall immediately notify and inform the DPW Environmental Coordinator and the Contracting Officer no later than the close of business on the day the contact was made. If such communication is after normal business hours, notification will be made immediately on the next business day.
The Contractor shall provide the name, telephone number of the agency, name of the person making contact and the substance of any verbal or written communication from such agency. Any and all coordination with regulatory agencies to discuss environmental law requirements will first be made through the Director of Public Works.
END OF SECTION 01 57 20
DIVISION 02 – EXISTING CONDITIONS
02 41 00 DEMOLITION
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.1 PROJECT DESCRIPTION
Perform demolition as required to replace the windows in Building 646, 653 as required by this PWS and the abatement of asbestos caulking and disposal of windows. Other walls or building components required to be removed for performance of work shall be repaired and restored to their as-found condition.
1.1.1 General Requirements
Do not begin demolition until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations inside or outside the building.
The work includes demolition and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer.
In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.
1.2 ITEMS TO REMAIN IN PLACE
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer. Coordinate the work of this section with all other work indicated.
1.2.1 Facilities
Protect electrical and mechanical services and utilities.
Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, or demolition work performed under this contract.
1.3 BURNING
The use of burning at the project site for the disposal of refuse and debris will not be permitted.
1.4 QUALITY ASSURANCE
Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6. Comply with the Environmental Protection Agency requirements specified.
1.4.1 Dust and Debris Control
Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Vacuum and dust the work area daily.
1.5 PROTECTION
1.5.1 Protection of Personnel
Before, during and after the demolition work continuously evaluate the condition of the items being demolished and take immediate action to protect all personnel working in and around the project site. No component will be allowed to be left in place without sufficient bracing, shoring, or support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.
1.6 EXISTING CONDITIONS
Before beginning any demolition work, survey the site and examine the drawings and specifications to determine the extent of the work.
3.1 EXISTING FACILITIES
3.1.1 Masonry
If required, sawcut and remove masonry so as to prevent damage to surfaces to remain, to removed materials being salvaged and to facilitate the installation of new work. Where new masonry adjoins existing, the new work shall abut or tie into the existing construction as specified for the new work. Provide square, straight edges and corners where existing masonry adjoins new work and other locations. Masonry removed in whole blocks shall be salvaged and stored for reuse.
3.1.2 Concrete
Saw concrete along straight lines to a depth of a minimum 2 inch. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete.
3.1.3 Patching
Where removals leave damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces, using on-site materials when available. Where new work is to be applied to existing surfaces, perform removals and patching in a manner to produce surfaces suitable for receiving new work. Finished surfaces of patched area shall be flush with the adjacent existing surface and shall match the existing adjacent surface as closely as possible as to texture and finish. Patching shall include, but is not limited to:
a. Concrete and Masonry: Completely fill holes and depressions, caused by previous physical damage or left as a result of removals in existing masonry walls to remain, with an approved masonry patching material, applied in accordance with the manufacturer's printed instructions.
3.2 DISPOSITION OF MATERIAL
3.2.1 Title to Materials
All materials and equipment removed and not reused, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition and removal procedures, and authorization by the Contracting Officer to begin demolition.
The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.
3.3 CLEANUP
Remove debris and rubbish from basement and similar excavations.
Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.
3.4 DISPOSAL OF REMOVED MATERIALS
3.4.1 Regulation of Removed Materials
Dispose of debris, rubbish, scrap, and other non-salvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified in the Waste Management Plan. Storage of removed materials on the project site is prohibited.
3.4.2 Removal from Government Property
Transport waste materials from Government property for legal disposal.
-- End of Section 02 41 00 –
PROJECT NO. 02 JAN 2025