Attachment 0015- Question and Answers 004.docx

DOCX document 14 KB Posted

Attached to
MK19 Grenade Machine Gun (GMG) Federal contract opportunity
Solicitation number
W15QKN21R0062
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This document contains questions and answers related to a solicitation for the MK19 Grenade Machine Gun. The solicitation seeks the production and delivery of the MK19 40mm Grenade Machine Gun, spare parts kits, and barrel assemblies in accordance with the MK19 MOD 3 technical data package. Prices must be provided separately for the MK19 first article test guns, barrels, and spare parts. Three barrels must be delivered for destructive testing to verify drawing requirements, and the contractor must have sufficient spare parts to support reliability testing of two weapons each to 25,334 rounds.

View the file

Other files for this federal contract opportunity

Other files attached to MK19 Grenade Machine Gun (GMG), newest first.
File Type Posted
Amendment 004.pdf PDF
Amendment 003.pdf PDF
Attachment 0014- Question and Answers 003.docx DOCX document
Amendment 002.pdf PDF
Attachment 0013 - Questions and Answers 002.docx DOCX document
Exhibit D Past Performance Letter Questionnaire.docx DOCX document
Amendment 001.pdf PDF
Attachment 0012- Question and Answers 001.docx DOCX document
Attachment 0010 - AMSTA-AR Form 1350 Technical Data Questionnaire.docx DOCX document
Attachment 0007 Clearance of Technical Information for Public Release.pdf PDF
Attachment 0002 Additional Solicitation Requirements - Copy.docx DOCX document
Attachment 0001 Soliciation Addendum Quality Assurance Requirements - Copy.docx DOCX document
SGFP Data Input Spreadsheet M240L MMG SPARE RECEIVERS.pdf PDF
Attachment 0003 DD1348 40 MM Grenade Rounds.pdf PDF
Exhibit C SPI MK19 SMS PARTS KIT.DOCX DOCX document
Exhibit A MK19 CDRLS.pdf PDF
Attachment 0011 - Non-Disclosure and Non Use Agreement.docx DOCX document
Attachment 0008 MK19 Price Matrix.xlsx XLSX spreadsheet
Attachment 0005 Disclosure of Lobbying Activities.pdf PDF
W15QKN21R0062.pdf PDF
Exhibit B MK19 SPARE PARTS KIT .pdf PDF
Attachment 0009 - DD Form 2345 Military Critical Technical Data Agreement - Copy.pdf PDF
Attachment 0006 - Form 3002 - Clearance of Technical Information for Pub....pdf PDF
Attachment 0004 Government Furnished Property Schedule.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1: Would the USG consider allowing either a) no page limit or b) 20 additional pages bringing max page count to 60 pages? The MK19 GMG is a complex weapon. It will be difficult to provide the required detail prescribed in subfactors 1 through 3 within the allotted page constraints.

Answer 1: We will be keeping the page limit to 40 pages.

Question 2: In Section B of the Solicitation, on page 5, Line Item 0001 is described as “MK19 GMG FIRST ARTICLE TEST OP 1”. In Attachment 8, the Proposal Price Matrix, Line Item 0001 is broken into MK 19 FAT – Rifle and MK19 FAT – Barrel. Is it your intention that a separate price be provided for each, or is one price to be provided for the MK19 GMG First Article Test to include both the gun and the barrels?

Answer 2: It is the USG intention for the for the contractor/vendor to provide the price for each. i.e. MK19 FAT guns, MK19 First Article Test, and Barrels

Question 3:Regarding the Destructive Barrel testing requirement per SOW C3.3.2 and C.3.3.5 for FAT and Production Testing phases. MIL-G-70790 para. 3.5.8.3 provides information to verify barrel degradation through muzzle velocity data capture and comparison. However, MIL-G-70790 does not speak directly to Destructive Barrel Testing. Are the aforementioned barrels allocated for use to support the Reliability demonstration MIL-G-70790 Table II and IV for FAT and Production testing to be considered as destroyed based on MIL-G-70790 para. 3.5.8.3 once the Muzzle Velocity comparison has shown a greater than 10 times the standard deviation? If not, please clarify the requirements for SOW C.3.3.5 Destructive Barrel Testing.

Answer 3 : Per SOW C.3.3.2 contractor/vendor shall deliver 3 Barrels to the USG.

SOW C.3.3.5 The destructive barrel testing is intended for the verification of the requirements stated in drawing 3269422 (Barrel).

The contractor/vendor is responsible for havingto have sufficient spare parts on hand to support FAT and Reliability Testing.

Per SOW C.3.3.2.1 SPARE PARTS The contractor shall have sufficient spare parts on hand to support the First Article Testing, including the reliability firing tests of two (2) weapons each to 25,334 rounds per MIL-G-70790.

The Barrel Life requirement is verified during the FAT and LAT reliability testing.

MIL-G-70790 para. 3.5.8.3 requires each barrel to have a minimum life of 10,000 rounds, asand its verifiedy by muzzle velocity data.

If the barrel does not meet the minimum life, it will be considered to havea failedure.

File details come from the government source that posted it. Updated .