Exhibit C SPI MK19 SMS PARTS KIT.DOCX

DOCX document 271 KB Posted

Attached to
MK19 Grenade Machine Gun (GMG) Federal contract opportunity
Solicitation number
W15QKN21R0062
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This document contains a Special Packaging Instruction (SPI) and related federal contract opportunity solicitation. The SPI provides detailed packaging requirements for a MK19 Grenade Machine Gun (GMG) Spare Parts Kit, including barrier bagging individual items, consolidating items in a fiberboard container, filling void spaces with cushioning material, and closing the container. The related solicitation is from the U.S. Army seeking proposals to manufacture and deliver the MK19 MOD 3 GMG system, spare parts kits, and barrel assemblies in accordance with the technical data package. The single-award IDIQ contract would have a 4-year period of performance and $500,000 minimum value to fulfill foreign military sales of the air-cooled, blow-back operated MK19 40mm grenade machine gun.

View the file

Other files for this federal contract opportunity

Other files attached to MK19 Grenade Machine Gun (GMG), newest first.
File Type Posted
Attachment 0015- Question and Answers 004.docx DOCX document
Amendment 004.pdf PDF
Amendment 003.pdf PDF
Attachment 0014- Question and Answers 003.docx DOCX document
Amendment 002.pdf PDF
Attachment 0013 - Questions and Answers 002.docx DOCX document
Exhibit D Past Performance Letter Questionnaire.docx DOCX document
Amendment 001.pdf PDF
Attachment 0012- Question and Answers 001.docx DOCX document
Exhibit A MK19 CDRLS.pdf PDF
Attachment 0011 - Non-Disclosure and Non Use Agreement.docx DOCX document
Attachment 0008 MK19 Price Matrix.xlsx XLSX spreadsheet
Attachment 0005 Disclosure of Lobbying Activities.pdf PDF
SGFP Data Input Spreadsheet M240L MMG SPARE RECEIVERS.pdf PDF
Attachment 0003 DD1348 40 MM Grenade Rounds.pdf PDF
Attachment 0010 - AMSTA-AR Form 1350 Technical Data Questionnaire.docx DOCX document
Attachment 0007 Clearance of Technical Information for Public Release.pdf PDF
Attachment 0002 Additional Solicitation Requirements - Copy.docx DOCX document
Attachment 0001 Soliciation Addendum Quality Assurance Requirements - Copy.docx DOCX document
W15QKN21R0062.pdf PDF
Exhibit B MK19 SPARE PARTS KIT .pdf PDF
Attachment 0009 - DD Form 2345 Military Critical Technical Data Agreement - Copy.pdf PDF
Attachment 0006 - Form 3002 - Clearance of Technical Information for Pub....pdf PDF
Attachment 0004 Government Furnished Property Schedule.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PACKAGING INSTRUCTION

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va 222024302, and to the Office of Management and Budget, Paperwork Reduction Project(07040188). Washington, DC 20503. Please do not return your form to either of these addresses.

1. PART OR DRAWING NO. NOMENCLATURE
2. CODE IDENT
3. SPI NO.
MK19 SPARE PARTS KIT
19200
SMS PARTS KIT
4. NATIONAL STOCK NO.
5.DATE OF DRAWING/SPI(YYMMDD)
6. REVISION / ERR NO.
210325
· /
7. QUP / UNIT OF ISSUE
8. ICQ
9. UNIT PACK WT. (LB) (0.0)
10. UNIT PACK CU (CU. FT.)(0.000)
11. UNIT PACK SIZE (INCHES)(00.0)
1/EA
-
5.3
0.415
10.5 X 10.5 X 6.5

18.

STEPS

19.

REQD

20.

DESCRIPTION

12. MILITARY PRESERVATION
1

SEE TEXT BELOW IN BLOCK 17 FOR DETAILED

MIL-STD-2073-1, METHOD 10

PACKAGING REQUIREMENTS

13. CLEANING

14. DRYING

15. PACKING

a. LEVEL A

MIL-STD-2073-1

b. LEVEL B

MIL-STD-2073-1

16. MARKING
MIL-STD-129

17. NOTES/DRAWING

SPECIFICATIONS, STANDARDS AND DRAWINGS LISTED HEREIN WHICH ARE IN EFFECT ON THE DATE OF THE SOLICITATION FORM A PART OF THIS PACKAGING INSTRUCTION. THE APPLICABLE GENERAL AND REFERENCED REQUIREMENTS OF SPECIFICATION MIL-STD-2073-1 FORM PART OF THESE INSTRUCTIONS. UNLESS OTHERWISE SPECIFIED, MATERIALS WILL BE MINIMUM SIZE IN ACCORDANCE WITH MIL-STD-2073-1. WEIGHTS AND SIZES ARE ESTIMATED AND MAY VARY SLIGHTLY. INTERMEDIATE PACKAGING AND PACKING WILL BE IN ACCORDANCE WITH SPECIFICATION MIL-STD-2073-1 OR AS OTHERWISE SPECIFIED HEREIN.

TOLERANCES SHALL BE IN ACCORDANCE WITH MATERIAL SPECIFICATIONS. QUALITY PERFORMANCE AND TESTING REQUIREMENTS SHALL BE IN CONFORMANCE WITH MIL-STD-2073-1, OR AS OTHERWISE SPECIFIED.

* UNLESS OTHERWISE SPECIFIED, CLEANING AND DRYING SHALL BE IN ACCORDANCE WITH PARAGRAPH 5.2.1 OF MIL-STD-2073-1.

1. PACKAGE THE SPECIFIED QUANTITY OF THE FOLLOWING ITEMS ON SHEETS 2 TO 6 IN A BARRIER BAG IN ACCORDANCE WITH ARDEC DRAWING 13027484. LABEL EACH BAG WITH THE PART NUMBER, NOMENCLATURE, AND QUANTITY OF ITEMS THEREIN.

2. CONSOLIDATE THE ITEMS FROM STEP 1 ABOVE IN AN ASTM D5118/D5118M, STYLE-RSC, GRADE W5c FIBERBOARD CONTAINER, PLACING THE HEAVIEST, LARGEST ITEMS IN THE CONTAINER FIRST.

3. FILL THE VOID SPACE WITHIN THE CONTAINER WITH SUFFICIENT CRUMPLED KRAFT PAPER, A-A-203; OR CELLULAR PLASTIC FILM CUSHIONING, PPP-C-795, CLASS 1; OR OPEN CELL PLASTIC CUSHIONING, A-A-3129; OR POLYPROPYLENE FOAM CUSHIONING, PPP-C-1797; OR CUSHIONING MATERIAL A-A-1898, GRADE-II, CLASS-B, TYPE I TO PREVENT ITEMS FROM SHIFTING DURING TRANSIT.

4. CLOSE CONTAINER IN ACCORDANCE WITH ASTM D1974/D1974M, SEALING METHOD B.

WSC: 63 ITEM SIZE: 10.0 X 10.0 X 6.0 ITEM WEIGHT: 4.0 APPROVED: BHOGE EUMNATH

DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED.

DD Form 2169, JUN 97 Previous editions are obsolete Page 1 of 6 Pages

SPECIAL PACKAGING INSTRUCTION (Continuation sheet)
Form Approved

Public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va 222024302, and to the Office of Management and Budget, Paperwork Reduction Project(07040188). Washington, DC 20503. Please do not return your form to either of these addresses.

1. PART OR DRAWING NO. NOMENCLATURE
2. CODE IDENT
3. SPI NO.
MK19 SPARE PARTS KIT
19200
SMS PARTS KIT
4. NATIONAL STOCK NO.
5.DATE OF DRAWING/SPI(YYMMDD)
6. REVISION / ERR NO.

210325

17. NOTES / DRAWINGS CONTINUED

DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED.

DD Form 2169, JUN 97 Previous editions are obsolete Page 2 of 6 Pages

SPECIAL PACKAGING INSTRUCTION (Continuation sheet)
Form Approved

Public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va 222024302, and to the Office of Management and Budget, Paperwork Reduction Project(07040188). Washington, DC 20503. Please do not return your form to either of these addresses.

1. PART OR DRAWING NO. NOMENCLATURE
2. CODE IDENT
3. SPI NO.
MK19 SPARE PARTS KIT
19200
SMS PARTS KIT
4. NATIONAL STOCK NO.
5.DATE OF DRAWING/SPI(YYMMDD)
6. REVISION / ERR NO.

210325

17. NOTES / DRAWINGS CONTINUED

DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED.

DD Form 2169, JUN 97 Previous editions are obsolete Page 3 of 6 Pages

SPECIAL PACKAGING INSTRUCTION (Continuation sheet)
Form Approved

Public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va 222024302, and to the Office of Management and Budget, Paperwork Reduction Project(07040188). Washington, DC 20503. Please do not return your form to either of these addresses.

1. PART OR DRAWING NO. NOMENCLATURE
2. CODE IDENT
3. SPI NO.
MK19 SPARE PARTS KIT
19200
SMS PARTS KIT
4. NATIONAL STOCK NO.
5.DATE OF DRAWING/SPI(YYMMDD)
6. REVISION / ERR NO.

210325

17. NOTES / DRAWINGS CONTINUED

DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED.

DD Form 2169, JUN 97 Previous editions are obsolete Page 4 of 6 Pages

SPECIAL PACKAGING INSTRUCTION (Continuation sheet)
Form Approved

Public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va 222024302, and to the Office of Management and Budget, Paperwork Reduction Project(07040188). Washington, DC 20503. Please do not return your form to either of these addresses.

1. PART OR DRAWING NO. NOMENCLATURE
2. CODE IDENT
3. SPI NO.
MK19 SPARE PARTS KIT
19200
SMS PARTS KIT
4. NATIONAL STOCK NO.
5.DATE OF DRAWING/SPI(YYMMDD)
6. REVISION / ERR NO.

210325

17. NOTES / DRAWINGS CONTINUED

DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED.

DD Form 2169, JUN 97 Previous editions are obsolete Page 5 of 6 Pages

SPECIAL PACKAGING INSTRUCTION (Continuation sheet)
Form Approved

Public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va 222024302, and to the Office of Management and Budget, Paperwork Reduction Project(07040188). Washington, DC 20503. Please do not return your form to either of these addresses.

1. PART OR DRAWING NO. NOMENCLATURE
2. CODE IDENT
3. SPI NO.
MK19 SPARE PARTS KIT
19200
SMS PARTS KIT
4. NATIONAL STOCK NO.
5.DATE OF DRAWING/SPI(YYMMDD)
6. REVISION / ERR NO.

210325

17. NOTES / DRAWINGS CONTINUED

DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED.

DD Form 2169, JUN 97 Previous editions are obsolete Page 6 of 6 Pages image5.PNG image1.PNG image2.PNG image3.PNG image4.PNG

File details come from the government source that posted it. Updated .