A005.pdf

PDF 373 KB Posted

Attached to
Asbestos Abatement Services at Ft Devens, MA Federal contract opportunity
Solicitation number
W15QKN-21-Q-5124
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Asbestos Abatement Services at Ft Devens, MA, newest first.
File Type Posted
A004.pdf PDF
W15QKN-20-Q-5124-A0003.pdf PDF
A002.pdf PDF
W15QKN-21-Q-5124 Conformed A001.pdf PDF
A001.pdf PDF
W15QKN-21-Q-5124.pdf PDF
Attachment 0002 - PWS Addendum.docx DOCX document
Attachment 0001 - Asbestos Abatement PWS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011637952

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Page 2 Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Jul-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W15QKN21Q5124

X 9B. DATED (SEE ITEM 11)

08-Jun-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Jul-2021

CODE

US ARMY CONTRACTING COMMAND

5418 S. SCOTT PLAZA

JOINT BASE MDL NJ 08640

W15QKN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W15QKN21Q5124

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

The following have been added by full text:

SITE VISIT Q&A

The following are clarifications made during the site visit on 7/1:

Payments made by contractor to employees will be in accordance with the Wage Determination located in the soliciitation.

Four Buildings on MAIN POST Building 679, Conference Room – There were no questions regarding the small carpeted conference room.

Building 666, Room 315 – This room is a communal kitchen that includes a sink that is surrounded by a “cabinet” unit that touches the floor. We will we pull this unit out in such a manner the abatement work can be done around and underneath.

Building 656, Bay C – All of Bay C is included, which includes the room that the “NEK” occupies where equipment is currently being stored.

Building 689, Bay C – Bay C includes both an upstairs and a downstairs area. Only the upstairs portion is to be abated, the downstairs area is not to be abated. There was a question about the walls around a portion of an office area (that creates a more private work area/cubicle). There was a question whether those walls were to be removed.

No, they are to remain in place.

One Building on SOUTH POST Range PA Conex Box Building – There was a question about the two different colored wall boards (brown and orange). Both colors of wall board contain asbestos and are to be dealt with in the same manner. And there was a question about the work to be done on the interior of this building. The work will be done exactly as stated in the Asbestos Abatement Contract Performance Work Statement.

Q3: On a more detailed review, we noticed that the SOW has a period of performance through Jul 31 2022 but the Solicitation has deliverables dated May 28 2021 and April 8 2021 (both of which have passed).

A3: Deliverables cannot be delivered on dates that have past. Dates in the solicitaion are filler dates until the contract is awarded. Block 10 of the SF1442 bullet 4 specifies “All work is to be completed within 60 days……….”

The following have been deleted:

QUESTIONS AND ANSWERS

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 07-Jul-2021 12:00 PM to 12-Jul-2021 01:00 PM.

(End of Summary of Changes)