Attachment 0001 - Asbestos Abatement PWS.pdf
PDF 12 MB Posted
- Attached to
- Asbestos Abatement Services at Ft Devens, MA Federal contract opportunity
- Solicitation number
- W15QKN-21-Q-5124
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A005.pdf | ||
| A004.pdf | ||
| W15QKN-20-Q-5124-A0003.pdf | ||
| A002.pdf | ||
| W15QKN-21-Q-5124 Conformed A001.pdf | ||
| A001.pdf | ||
| W15QKN-21-Q-5124.pdf | ||
| Attachment 0002 - PWS Addendum.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USAG Fort Devens (DRFTA)
Asbestos Abatement Contract
PERFORMANCE WORK STATEMENT
U.S. ARMY GARRISON FORT DEVENS
30 QUEBEC STREET, BOX 10
DEVENS, MA 01434
Specification No. XXX 12 April 2021
Table of Contents
1.0 GENERAL INFORMATION
1.1 Overview
1.2 Management and Supervision
2.0 DESCRIPTION OF SERVICES
2.1 Building 666 Room 315 Scope
2.2 Range PA Conex Box Classroom Scope
2.3 Building 656 Bay C Scope
2.4 Building 689 Bay C Scope
2.5 Building 679 Room 115 Scope
3.0 REQUIREMENTS
3.1 ACM Abatement Requirements
3.2 General Equipment Requirements
3.3 General Environmental Requirements
3.4 Construction and Demolition Waste Disposal
3.5 General Safety Requirements
3.6 Anti-Terrorism and Operations Security
3.7 Schedule
4.0 TECHNICAL EXHIBITS
TE 1 – Asbestos Inspection and Testing Results TE 2 – Photographs of Abatement Areas TE 3 – As-built Drawings
1.0 General Information.
1.1 Overview. The Contractor shall conduct asbestos containing material (ACM) abatement services at Devens Reserve Forces Training Area (DRFTA). The work shall include the services described below. Additional clarification/direction may be provided by the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR). The Contractor shall provide all labor, equipment, materials, management, coordination, and supervision necessary to conduct the work specified herein. All work shall be performed by qualified and appropriately licensed personnel in accordance with (IAW) all applicable laws and regulations. The contractor shall ensure that all work is performed in such a way that no damage to grounds, structures, or other government property occurs.
1.2 Management and Supervision. The Government and the Contractor understand and agree that the services to be delivered are non-personal services, and both parties recognize and agree that no employer-employee relationships exist between the Government and the Contractor and/or between the Government and the Contractor’s employees. Contactor personnel performing under this contract shall not be placed in a position where they are employed by a Federal Officer or are under the supervision, direction, or evaluation of a Federal Officer, military or civilian. The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances will the Government assign tasks to, or prepare work schedules for, contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against actions that are of the nature of personal services, or give the perception of personal services. If particular actions constitute, or are perceived by the contractor to constitute personal services, it shall be the Contractor's responsibility to notify the Contracting Officer (KO) immediately.
2.0 Description of Services.
2.1 Building 666 Room 315 Scope. The Contractor shall control, remove and dispose of asbestos containing floor tile mastic in Room 315 of Building 666 located on Main Post DRFTA. The contractor shall also remove and dispose of the non-asbestos containing ceramic floor tile and carpet overlying the mastic in this room. This room is located on the third floor of the building and measures 513 square feet (sqft). The subfloor underlying the asbestos mastic is poured concrete. The contractor shall conduct ACM abatement IAW Section 3.1. Building 666 Room 315 has been inspected by a licensed asbestos inspector and all suspected ACM has been tested. The results of that testing is presented in TE-1. Photographs of the room are provided in TE-2. Furniture and appliances shown in photos will be removed by the government prior to the contractor beginning abatement. As-built drawings are provided in TE-3.
2.2 Range PA Conex Box Classroom Scope. The Contractor shall control, remove and dispose of asbestos containing wallboard in the Range PA Conex Box classroom located on South Post DRFTA. The contractor shall also remove and dispose of the non-asbestos containing laminate floor tile, ceiling tile, ceiling insulation, wall insulation and all furniture and appliances in the building. The contractor shall also be responsible for disconnecting electrical power to the structure. The contractor shall conduct ACM abatement IAW Section 3.1. The Range PA Conex Box Classroom has been inspected by a licensed asbestos inspector and all suspected ACM has been tested. The results of that testing is presented in TE-1. Photographs of the classroom are provided in TE-2. As-built drawings are not available for this structure as it consists of three conex boxes welded together.
2.3 Building 656 Bay C Scope. The Contractor shall control, remove and dispose of asbestos containing floor tile in Rooms 127, 128, 129, 131, 133, and 134 of Building 656 Bay C located on Main Post DRFTA. The contractor shall also remove and dispose of the tile mastic and carpet overlying the tile in these rooms. These rooms are located on the ground floor of the building and measure 658 sqft. The subfloor underlying the asbestos mastic is poured concrete. The contractor shall conduct ACM abatement IAW Section 3.1. Building 656 Bay C has been inspected by a licensed asbestos inspector and all suspected ACM has been tested. The results of that testing is presented in TE-1. Photographs of the room are provided in TE-2. Furniture shown in photos will be removed by the government prior to the contractor beginning abatement. As-built Drawings are provided in TE-3.
2.4 Building 689 Bay C Scope. The Contractor shall control, remove and dispose of asbestos containing floor tile mastic in Rooms 139 and 136 of Building 689 located on Main Post DRFTA. The contractor shall also remove and dispose of the non-asbestos containing 1/4 inch concrete layer and carpet overlying the mastic in this room. This room is located on the ground floor of the building and measures 1,515 sqft. The subfloor underlying the asbestos mastic is poured concrete. The contractor shall conduct ACM abatement IAW Section 3.1. Building 689 Bay C has been inspected by a licensed asbestos inspector and all suspected ACM has been tested. The results of that testing is presented in TE-1. Photographs of the room are provided in TE-2. Furniture and appliances shown in photos will be removed by the government prior to the contractor beginning abatement. As-built drawings are provided in TE-3.
2.5 Building 679 Room 115 Scope. The Contractor shall control, remove and dispose of asbestos containing floor tile mastic in Room 115 of Building 679 located on Main Post DRFTA. The contractor shall also remove and dispose of the carpet and asbestos containing floor tile overlying the mastic in this room. This room is located on the ground floor of the building and measures 273 sqft. The subfloor underlying the asbestos mastic is poured concrete. The contractor shall conduct ACM abatement IAW Section 3.1. Building 679 Room 115 has been inspected by a licensed asbestos inspector and all suspected ACM has been tested. The results of that testing is presented in TE-1. Photographs of the room are provided in TE-2. Furniture and appliances shown in photos will be removed by the government prior to the contractor beginning abatement. As-built drawings are provided in TE-3.
3.0 Requirements.
3.1 ACM Abatement Requirements. The contractor shall control, remove, and dispose of all ACM IAW this section.
3.1.1 Pre-abatement Submittals. The following submittals shall be provided to the contracting officer (CO) for government approval at least 14 days prior to the contractor performing any ACM abatement tasks. The contractor is not to begin any ACM abatement tasks without written notice from the CO that all pre-abatement submittals have been approved. All pre-abatement submittals must be signed by a responsible officer of the company.
3.1.1.1 Report of Contractor Personnel Qualifications. The contractor shall submit a written report documenting the qualifications of all personnel that will be assigned to this work. This submittal shall:
• Identify the contractor’s project supervisor, designated competent person, and all workers including subcontractors that will be on site.
• Include copies of all relevant contractor personnel State licenses and certifications.
• Include resumes for the project supervisor and designated competent person.
• Include written certification that all personnel assigned to the work are covered under the contractors medical surveillance program IAW OSHA 1910.1001. The contractor shall not provide any employee medical records but shall certify that all personnel have been found medically fit to perform the tasks to which they will be assigned by a licensed physician.
• Include a copy of the written project site-specific training material that will be used to train onsite employees IAW 29 CFR 1926.1101.
3.1.1.2 Accident Prevention Plan (APP). The contractor shall submit a written comprehensive site-specific Accident Prevention Plan (APP) to include an Asbestos Hazard Abatement Plan (AHAP), and Activity Hazard Analyses (AHAs) for each phase of work. The APP shall be prepared by an American Board of Industrial Hygiene (ABIH) certified Industrial Hygienist. The resume of the Industrial Hygienist and a copy of their ABIH certification shall be included in the APP. The APP shall include:
• Detailed drawings and site layouts to include all worksite containment area(s), local exhaust systems locations, decontamination units and load-out units, other temporary waste storage facilities, and boundaries of each regulated area.
• A detailed air monitoring plan.
• Specifications for all materials and equipment to be used, including brand name, model, capacity, performance characteristics and any other pertinent information.
• Any and all test results and certificates from the manufacturer substantiating compliance with performance requirements of this specification.
• Safety Data Sheets (SDS’s) for all chemicals that will be used.
3.1.1.3 Disposal Facility and Transporter Information. The contractor shall submit an approved non-hazardous special waste profile from the permitted disposal facility that will be receiving the ACM waste. The contractor shall also provide written proof that the transporter hired to haul the ACM waste to the disposal facility meets the DOT requirements of 49 CFR 171, 49 CFR 172, and 49 CFR 173 as well as registration requirements of 49 CFR 107 and all other applicable state or local requirements.
3.1.1.4. State Agency Notifications. The contractor shall submit all required notifications to the Massachusetts Department of Environmental Protection (MassDEP) and to the Massachusetts Department of Labor Standards (MassDLS) at least 10 business days (excluding weekends and holidays) prior to starting any ACM abatement work. The contractor shall provide the CO with copies of these notifications and will inform the CO immediately if either agency responds to these notifications.
3.1.1.5 Federal, State or Local Citations on Previous Abatements. The Contractor shall submit a statement, signed by an officer of the company, containing a record of any citations issued by Federal, State or local regulatory agencies relating to asbestos activities (including projects, dates, and resolutions); a list of penalties incurred through non-compliance with asbestos project specifications, including liquidated damages, overruns in scheduled time limitations and resolutions; and situations in which an asbestos-related contract has been terminated (including projects, dates, and reasons for terminations). If there are none, a negative declaration signed by an officer of the company shall be provided.
3.1.2 Work Procedures. All ACM abatement tasks shall be completed IAW all applicable state and federal laws, regulations and standards. All ACM abatement tasks shall be completed IAW the CO approved pre-abatement submittals detailed in Section 3.1.2.
The contractor shall notify the CO in writing and get written approval to make any changes to qualified personnel, the APP, the disposal facility or the ACM waste transporter.
The designated competent person shall be onsite at all times during the performance of this work. Qualified personnel shall wear the required personal protective equipment (PPE) identified in the APP at all times during the performance of this work. Prior to commencement of work the contractor's designated competent person shall instruct each worker about the hazards and health effects of the specific types of ACM to be abated and the content and requirements of the Contractor's APP to include the AHAP and AHAs and site-specific safety and health precautions. The contractor shall have the APP on hand at all times while on-site.
All ACM abatement work shall be performed in a negative air pressure enclosure.
The contractor shall control entry into regulated areas and only allow qualified personnel to enter. Warning signs and tape printed in English and shall be provided at the regulated boundaries and entrances to regulated areas. Warning labels shall be affixed to all asbestos disposal containers, asbestos materials, scrap, waste debris, and other products contaminated with asbestos.
The contractor shall establish a decontamination area for the decontamination of employees, material and equipment. The contractor shall ensure that employees enter and exit the regulated area through the decontamination area. Power to the Range PA conex will need to be disconnected and the contractor shall implement lock-out tag-out procedures as needed.
Air monitoring shall be performed by an independent ABIN certified Industrial Hygienist and Massachusetts licensed Asbestos Project Manger hired by the contractor IAW the CO approved APP. During the performance of work the contractor also shall submit initial exposure assessments, negative exposure assessments, and air-monitoring results and documentation daily. The contractor shall stop ACM abatement work in the regulated area immediately when the airborne total fiber concentration: (1) equals or exceeds 0.01 f/cc, or the pre-abatement concentration, whichever is greater, outside the regulated area; or (2) equals or exceeds 1.0 f/cc inside the regulated area. The Contractor shall correct the condition to the satisfaction of the CO, including visual inspection and air sampling. Work shall resume only upon written notification by the CO.
Asbestos abatement shall be performed without damage to or contamination of adjacent work or area. Where such work or area is damaged or contaminated, it shall be restored to its original condition or decontaminated by the Contractor at no expense to the Government. When spills occur, work shall stop in all affected areas immediately and the spill shall be cleaned. When satisfactory visual inspection and air sampling analysis results are obtained and have been evaluated by the Contractor's Designated IH and the CO, work shall proceed.
During the performance of work the contractor shall coordinate with the DRFTA Installation Hazardous Waste Manifester (IHWM) to have all ACM waste manifests signed by the IHWM prior to transport. The contractor shall provide copies of final manifests signed by the disposal facility to the IHWM within 45 days of shipment.
When asbestos abatement is complete, ACM waste is removed from the regulated areas, and final clean-up is completed, the contractor shall conduct a visual pre-inspection of the cleaned area in preparation for a final inspection by the COR. Clearance air monitoring is not required for outside work or for soil cleanups. Following completion of ACM abatement work the contractor shall provide a summary, in electronic form, of site activities (bulk samples, asbestos removed, repaired, encased, etc.) for updating the installation’s asbestos management records.
3.1.3 Unexpected Discovery of Asbestos. The asbestos abatement areas identified in section 2.0 have been inspected by a licensed asbestos inspector and all suspected ACM has been tested. The results of that testing is presented in TE-1. However, should the contractor identify any previously untested building components suspected to contain asbestos that are located in areas impacted by the work, the contractor shall notify the COR. The COR will have those materials tested and should they contain ACM a modification shall be made to the contract to include the removal and disposal of those materials.
3.2 General Equipment Requirements.
3.2.1 All trucks and equipment used in the performance of this contract must meet all Massachusetts Department of Transportation (MassDOT) regulations and must be in good working order. All contractor personnel driving trucks must have the appropriate class of Commercial Driver’s License (CDL) necessary to operate that truck. All hoses and lines must be maintained in a condition to prevent the leakage of oil, hydraulic fluids or other hazardous materials.
3.2.2 The Contractor shall not use any equipment with an active hazardous material leak. If a leak or spill occurs, follow the requirements in paragraph 3.2 Environmental Requirements.
3.3 General Environmental Requirements.
3.3.1 Under no circumstances is hazardous waste to be transported onto DRFTA property.
3.3.2 Where hazardous materials, including oils are needed for the operation of equipment, the Contractor will adhere to all applicable federal and State regulations regarding the management and handling of hazardous materials.
3.3.3 Any release of oil (including leaks from hydraulic hoses and equipment), hazardous waste, or hazardous material on DRFTA shall be immediately reported to the Devens Fire Department at 978-772-2117 and the DPW Environmental Division at 978-615-6086. This clause does not relieve the Contractor of any federal or State reporting requirements.
3.3.4 Oil, fuel, and/or hazardous material/waste released to the environment (including leaks from hydraulic hoses and equipment) by the Contractor in the performance of this work shall be the sole responsibility of the Contractor and shall be cleaned up at no expense to the Army. Any release shall be cleaned up without delay to the standards set forth in 40 CFR 260 and 310 CMR 30.00. Any vehicle found to be releasing oil or a hazardous substance shall be immobilized and spill contained immediately upon discovery of the leak.
3.4 Construction and Demolition Waste Disposal.
3.4.1 The contractor shall provide their own construction and demolition waste dumpsters and provide for their disposal. The contractor shall not dispose of any construction or demolition waste generated from this work in Installation owned dumpsters. The contractor shall have all construction and demolition waste dumpsters emptied regularly and shall not allow construction and demolition waste dumpsters to overflow. Following completion of work the contractor shall insure that all construction and demolition waste dumpsters are removed from DRFTA within 3 business days.
3.4.2 The contractor shall also provide all construction and demolition waste weight slips to the COR within 30 days of shipment for inclusion in the Installations solid waste diversion tracking program.
3.5 General Safety Requirements.
3.5.1 All equipment used in the performance of this contract shall have safety design features to prevent injury to the operator and damage to persons or property. The Contractor shall ensure all workers are properly trained and understand how to safely operate the equipment.
3.5.2 All Personal Protective Equipment (PPE) shall conform to the applicable OSHA standards. PPE shall be worn at all times during the performance of work on DRFTA.
3.6 Anti-Terrorism and Operations Security. The Contractor and all associated sub-contractor employees requiring access to the installation shall (1) provide all information required for background checks to meet installation access requirements to be accomplished by the Director of Emergency Services or Security Office, and (2) comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). Should the Force Protection Condition (FPCON) at any individual facility or the installation change, the Government may require changes in contractor security matters or processes.
3.7 Schedule. The contractor shall coordinate scheduling of work with the COR. The contractor shall perform work as soon as possible following contract award.
4.0 Technical Exhibits.
TE 1 – Asbestos Inspection and Testing Results TE 2 – Photographs of Abatement Areas TE 3 – As-built Drawings
TE 1 – Asbestos Inspection and Testing Results
Batch: 58292
165 New Boston St., Ste 227 Woburn, MA 01801
781-932-9600 Web: www.asbestosidentificationlab.com
Email: mikemanning@asbestosidentificationlab.com
Asbestos Identification Laboratory
Dear Anne (Fardy) MacMillan , Thank you Anne (Fardy) MacMillan for your business.
Michael Manning Owner/Director
Asbestos Identification Laboratory has completed the analysis of the samples from your office for the above referenced project.
The information and analysis contained in this report have been generated using the EPA /600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials. Materials or products that contain more than 1% of any kind or combination of asbestos are considered an asbestos containing building material as determined by the EPA. This Polarized Light Microscope (PLM) technique may be performed either by visual estimation or point counting. Point counting provides a determination of the area percentage of asbestos in a sample. If the asbestos is estimated to be less than 10% by visual estimation of friable material, the determination may be repeated using the point counting technique. The results of the point counting supersede visual PLM results. Results in this report only relate to the items tested. This report may not be used by the customer to claim product endorsement by NVLAP or any other U.S. Government Agency.
November 24, 2020
Anne (Fardy) MacMillan Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
Project Name: Fort Devens
Project Number:
Date Sampled: 2020-11-20
Work Received: 2020-11-23
Work Analyzed: 2020-11-23
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
• NVLAP Lab Code: 200919-0
• Massachusetts Certification License: AA000208
• State of Connecticut, Department of Public Health Approved Environmental Laboratory Registration Number: PH-0142
• State of Maine, Department of Environmental Protection Asbestos Analytical Laboratory License Number: LB-0078(Bulk) LA-0087(Air)
• State of Rhode Island and Providence Plantations. Department of Health Certification: AAL-121
• State of Vermont, Department of Health Environmental Health License AL934461
Laboratory results represent the analysis of samples as submitted by the customer. Information regarding sample location, description, area, volume, etc., was provided by the customer. Asbestos Identification Laboratory is not responsible for sample collection activities or analytical method limitations. Unless notified in writing to return samples, Asbestos Identification Laboratory discards customer samples after 30 days. Samples containing subsamples or layers will be analyzed separately when applicable. Reports are kept at Asbestos Identification Laboratory for three years. This report shall not be reproduced, except in full, without the written consent of Asbestos Identification Laboratory.
November 24, 2020
Anne (Fardy) MacMillan Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
Project Name: Fort Devens
Project Number:
Date Sampled: 2020-11-20
Work Received: 2020-11-23
Work Analyzed: 2020-11-23
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
Asbestos %Material Color Non-Asbestos %LocationFieldID
LabID gray Cellulose 2
Non-Fibrous 98 648591
A01A B666 3rd Floor Kitchen R315
Gray Tile None Detected gray Cellulose 2 Non-Fibrous 98
648592
A01B B666 3rd Floor Kitchen R315
Gray Tile None Detected gray Cellulose 2 Non-Fibrous 98
648593
A01C B666 3rd Floor Kitchen R315
Gray Tile None Detected
Detected Chrysotile 5 black Cellulose 2 Non-Fibrous 93
648594
A01A.M B666 3rd Floor Kitchen R315
Associated Black Mastic
648595
A01B.M B666 3rd Floor Kitchen R315
Associated Black Mastic Not Analyzed
648596
A01C.M B666 3rd Floor Kitchen R315
Associated Black Mastic Not Analyzed
Analyzed by: 58292Batch:
Page 1 of 1Tuesday 24 End of Report
Batch: 57276
Woburn, MA 01801
781-932-9600 Web: www.asbestosidentificationlab.com
Email: mikemanning@asbestosidentificationlab.com
Asbestos Identification Laboratory
Dear Anne (Fardy) MacMillan , Thank you Anne (Fardy) MacMillan for your business.
Michael Manning Owner/Director
Asbestos Identification Laboratory has completed the analysis of the samples from your office for the above referenced project.
The information and analysis contained in this report have been generated using the EPA /600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials. Materials or products that contain more than 1% of any kind or combination of asbestos are considered an asbestos containing building material as determined by the EPA. This Polarized Light Microscope (PLM) technique may be performed either by visual estimation or point counting. Point counting provides a determination of the area percentage of asbestos in a sample. If the asbestos is estimated to be less than 10% by visual estimation of friable material, the determination may be repeated using the point counting technique. The results of the point counting supersede visual PLM results. Results in this report only relate to the items tested. This report may not be used by the customer to claim product endorsement by NVLAP or any other U.S. Government Agency.
October 21, 2020
Anne (Fardy) MacMillan Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
Project Name: Fort Devens
Project Number:
Date Sampled: 2020-10-19
Work Received: 2020-10-20
Work Analyzed: 2020-10-20
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
• NVLAP Lab Code: 200919-0
• Massachusetts Certification License: AA000208
• State of Connecticut, Department of Public Health Approved Environmental Laboratory Registration Number: PH-0142
• State of Maine, Department of Environmental Protection Asbestos Analytical Laboratory License Number: LB-0078(Bulk) LA-0087(Air)
• State of Rhode Island and Providence Plantations. Department of Health Certification: AAL-121
• State of Vermont, Department of Health Environmental Health License AL934461
Laboratory results represent the analysis of samples as submitted by the customer. Information regarding sample location, description, area, volume, etc., was provided by the customer. Asbestos Identification Laboratory is not responsible for sample collection activities or analytical method limitations. Unless notified in writing to return samples, Asbestos Identification Laboratory discards customer samples after 30 days. Samples containing subsamples or layers will be analyzed separately when applicable. Reports are kept at Asbestos Identification Laboratory for three years. This report shall not be reproduced, October 21, 2020
Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
Project Name: Fort Devens
Project Number:
Date Sampled: 2020-10-19
Work Received: 2020-10-20
Work Analyzed: 2020-10-20
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
Asbestos %Material Color Non-Asbestos %LocationFieldID
LabID multi Cellulose 30
Non-Fibrous 70 637061
A-01A Connex Box ClassroomLaminate Floor Tile White w/ Tan Spots
None Detected multi Cellulose 40 Non-Fibrous 60
637062
A-01B Connex Box ClassroomLaminate Floor Tile White w/ Tan Spots
None Detected multi Cellulose 40 Non-Fibrous 60
637063
A-01C Connex Box ClassroomLaminate Floor Tile White w/ Tan Spots
None Detected multi Non-Fibrous 100
637064
A-02A Connex Box ClassroomCeiling Insulation Foam Board Dark Brown
None Detected multi Non-Fibrous 100
637065
A-02B Connex Box ClassroomCeiling Insulation Foam Board Dark Brown
None Detected multi Non-Fibrous 100
637066
A-02C Connex Box ClassroomCeiling Insulation Foam Board Dark Brown
None Detected multi Cellulose 50 Non-Fibrous 50
637067
A-03A Connex Box ClassroomCeiling Insulation Board Brown
None Detected multi Cellulose 50 Non-Fibrous 50
637068
A-03B Connex Box ClassroomCeiling Insulation Board Brown
None Detected multi Cellulose 50 Non-Fibrous 50
637069
A-03C Connex Box ClassroomCeiling Insulation Board Brown
None Detected
Detected Chrysotile 20 gray Non-Fibrous 80
637070
A-04A Connex Box ClassroomWallboard Gray
637071
A-04B Connex Box ClassroomWallboard Gray Not Analyzed
637072
A-04C Connex Box ClassroomWallboard Gray Not Analyzed blue Non-Fibrous 100
637073
A-05A Connex Box ClassroomWall Insulation Blue None Detected blue Non-Fibrous 100
637074
A-05B Connex Box ClassroomWall Insulation Blue None Detected
Page 1 of 2Wednesday 21
Asbestos %Material Color Non-Asbestos %LocationFieldID
LabID blue Non-Fibrous 100
637075
A-05C Connex Box ClassroomWall Insulation Blue None Detected clear Non-Fibrous 100
637076
A-06A Connex Box ClassroomCaulking Clear None Detected clear Non-Fibrous 100
637077
A-06B Connex Box ClassroomCaulking Clear None Detected
Analyzed by: 57276Batch:
Page 2 of 2Wednesday 21 End of Report
Batch: 61764
Woburn, MA 01801
781-932-9600 Web: www.asbestosidentificationlab.com
Email: mikemanning@asbestosidentificationlab.com
Asbestos Identification Laboratory
Dear Anne (Fardy) MacMillan , Thank you Anne (Fardy) MacMillan for your business.
Michael Manning Owner/Director
Asbestos Identification Laboratory has completed the analysis of the samples from your office for the above referenced project.
The information and analysis contained in this report have been generated using the EPA /600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials. Materials or products that contain more than 1% of any kind or combination of asbestos are considered an asbestos containing building material as determined by the EPA. This Polarized Light Microscope (PLM) technique may be performed either by visual estimation or point counting. Point counting provides a determination of the area percentage of asbestos in a sample. If the asbestos is estimated to be less than 10% by visual estimation of friable material, the determination may be repeated using the point counting technique. The results of the point counting supersede visual PLM results. Results in this report only relate to the items tested. This report may not be used by the customer to claim product endorsement by NVLAP or any other U.S. Government Agency.
March 15, 2021
Anne (Fardy) MacMillan Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
Project Name: Fort Devens
Project Number:
Date Sampled: 2021-03-10
Work Received: 2021-03-11
Work Analyzed: 2021-03-12
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
• NVLAP Lab Code: 200919-0
• Massachusetts Certification License: AA000208
• State of Connecticut, Department of Public Health Approved Environmental Laboratory Registration Number: PH-0142
• State of Maine, Department of Environmental Protection Asbestos Analytical Laboratory License Number: LB-0078(Bulk) LA-0087(Air)
• State of Rhode Island and Providence Plantations. Department of Health Certification: AAL-121
• State of Vermont, Department of Health Environmental Health License AL934461
Laboratory results represent the analysis of samples as submitted by the customer. Information regarding sample location, description, area, volume, etc., was provided by the customer. Asbestos Identification Laboratory is not responsible for sample collection activities or analytical method limitations. Unless notified in writing to return samples, Asbestos Identification Laboratory discards customer samples after 30 days. Samples containing subsamples or layers will be analyzed separately when applicable. Reports are kept at Asbestos Identification Laboratory for three years. This report shall not be reproduced, March 15, 2021
Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
Project Name: Fort Devens
Project Number:
Date Sampled: 2021-03-10
Work Received: 2021-03-11
Work Analyzed: 2021-03-12
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
Asbestos %Material Color Non-Asbestos %LocationFieldID
LabID Detected Chrysotile 3 brown Non-Fibrous 97
685844
AB-001A Building 656 Bay C R126Red Tile
Detected Chrysotile 3 brown Non-Fibrous 97
685845
AB-001B Building 656 Bay C R126Red Tile
Detected Chrysotile 3 brown Non-Fibrous 97
685846
AB-001C Building 656 Bay C R126Red Tile black Non-Fibrous 100
685847
AB-002A Building 656 Bay C R126Black Mastic None Detected black Non-Fibrous 100
685848
AB-002B Building 656 Bay C R126Black Mastic None Detected black Non-Fibrous 100
685849
AB-002C Building 656 Bay C R126Black Mastic None Detected tan Non-Fibrous 100
685850
AB-003A Building 656 Bay C R129Wall Tile None Detected tan Non-Fibrous 100
685851
AB-003B Building 656 Bay C R129Wall Tile None Detected brown Non-Fibrous 100
685852
AB-004A Building 656 Bay C R136BTan Tile None Detected brown Non-Fibrous 100
685853
AB-004B Building 656 Bay C R137Tan Tile None Detected brown Non-Fibrous 100
685854
AB-004C Building 656 Bay C R136ATan Tile None Detected black Cellulose 5 Non-Fibrous 95
685855
AB-005A Building 656 Bay C R136BBlack Mastic None Detected black Cellulose 5 Non-Fibrous 95
685856
AB-005B Building 656 Bay C R137Black Mastic None Detected black Cellulose 5 Non-Fibrous 95
685857
AB-005C Building 656 Bay C R136ABlack Mastic None Detected
Page 1 of 2Monday 15 March
Asbestos %Material Color Non-Asbestos %LocationFieldID
LabID Detected Chrysotile 2 brown Non-Fibrous 98
685858
AB-006A Building 667 1st FloorMulticolor Tile
Detected Chrysotile 2 brown Non-Fibrous 98
685859
AB-006B Building 667 1st FloorMulticolor Tile tan Non-Fibrous 100
685860
AB-006C Building 667 1st FloorMulticolor Tile None Detected
Detected Chrysotile 10 black Non-Fibrous 90
685861
AB-007A Building 667 1st FloorBlack Mastic
Detected Chrysotile 10 black Non-Fibrous 90
685862
AB-007B Building 667 1st FloorBlack Mastic
Detected Chrysotile 10 black Non-Fibrous 90
685863
AB-007C Building 667 1st FloorBlack Mastic
Detected Chrysotile 3 brown Non-Fibrous 97
685864
AB-008A Building 667 2nd FloorMulticolor Tile
Detected Chrysotile 3 brown Non-Fibrous 97
685865
AB-008B Building 667 2nd FloorMulticolor Tile
Detected Chrysotile 2 brown Non-Fibrous 98
685866
AB-008C Building 667 2nd FloorMulticolor Tile
Detected Chrysotile 10 black Non-Fibrous 90
685867
AB-009A Building 667 2nd FloorBlack Mastic
Detected Chrysotile 10 black Non-Fibrous 90
685868
AB-009B Building 667 2nd FloorBlack Mastic
Detected Chrysotile 10 black Non-Fibrous 90
685869
AB-009C Building 667 2nd FloorBlack Mastic brown Non-Fibrous 100
685870
AB-010A Building 667 3rd FloorMulticolor Tile None Detected
Detected Chrysotile 2 brown Non-Fibrous 98
685871
AB-010B Building 667 3rd FloorMulticolor Tile
Detected Chrysotile 2 brown Non-Fibrous 98
685872
AB-010C Building 667 3rd FloorMulticolor Tile
Detected Chrysotile 10 black Non-Fibrous 90
685873
AB-011A Building 667 3rd FloorBlack Mastic
Detected Chrysotile 10 black Non-Fibrous 90
685874
AB-011B Building 667 3rd FloorBlack Mastic
Detected Chrysotile 10 black Non-Fibrous 90
685875
AB-011C Building 667 3rd FloorBlack Mastic
Analyzed by: 61764Batch:
Page 2 of 2Monday 15 March End of Report
Batch: 42405
Woburn, MA 01801
781-932-9600 Web: www.asbestosidentificationlab.com
Email: mikemanning@asbestosidentificationlab.com
Asbestos Identification Laboratory
Dear Anne (Fardy) MacMillan , Thank you Anne (Fardy) MacMillan for your business.
Michael Manning Owner/Director
Asbestos Identification Laboratory has completed the analysis of the samples from your office for the above referenced project .
The information and analysis contained in this report have been generated using the EPA /600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials. Materials or products that contain more than 1% of any kind or combination of asbestos are considered an asbestos containing building material as determined by the EPA. This Polarized Light Microscope (PLM) technique may be performed either by visual estimation or point counting. Point counting provides a determination of the area percentage of asbestos in a sample. If the asbestos is estimated to be less than 10% by visual estimation of friable material, the determination may be repeated using the point counting technique. The results of the point counting supersede visual PLM results. Results in this report only relate to the items tested. This report may not be used by the customer to claim product endorsement by NVLAP or any other U.S. Government Agency.
Laboratory results represent the analysis of samples as submitted by the customer. Information regarding sample location, description, area, volume, etc., was provided by the customer. Asbestos Identification Laboratory is not responsible for sample collection activities or analytical method limitations. Unless notified in writing to return samples, Asbestos Identification Laboratory discards customer samples after 30 days. Samples containing subsamples or layers will be analyzed separately when applicable. Reports are kept at Asbestos Identification Laboratory for three years. This report shall not be reproduced, except in full, without the written consent of Asbestos Identification Laboratory.
Work Received:
2019-05-08
2019-05-08
Fort Devens 041019
Anne (Fardy) MacMillan Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
2019-05-07
Project Number:
Project Name:
May 09, 2019
Date Sampled:
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
Work Analyzed:
• NVLAP Lab Code: 200919-0
• Massachusetts Certification License: AA000208
• State of Connecticut, Department of Public Health Approved Environmental Laboratory Registration Number: PH-0142
• State of Maine, Department of Environmental Protection Asbestos Analytical Laboratory License Number: LB-0078(Bulk) LA-0087(Air)
• State of Rhode Island and Providence Plantations. Department of Health Certification: AAL-121
• State of Vermont, Department of Health Environmental Health License AL934461
Work Received:
2019-05-08
2019-05-08
Fort Devens 041019
Anne (Fardy) MacMillan Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
2019-05-07
Project Number:
Project Name:
May 09, 2019
Date Sampled:
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
Work Analyzed:
Asbestos % Material Color Non-Asbestos % Location FieldID
LabID Detected Anthophylite 5 multi Cellulose 2 Non-Fibrous 93
472165
A01A Trailer WallInsulation Wallboard
Detected Anthophylite 5 multi Cellulose 2 Non-Fibrous 93
472166
A01B Trailer WallInsulation Wallboard gray Cellulose 5 Non-Fibrous 95
472167
A02A TrailerFloor Tiles None Detected gray Cellulose 5 Non-Fibrous 95
472168
A02B TrailerFloor Tiles None Detected white Fiberglass 2 Cellulose 5 Non-Fibrous 93472169
A03A TrailerCeiling Materials None Detected white Fiberglass 2 Cellulose 5 Non-Fibrous 93472170
A03B TrailerCeiling Materials None Detected tan Non-Fibrous 100
472171
A04A Building #616 Storage Closet
Tan Mastic None Detected tan Non-Fibrous 100
472172
A04B Building #616 Storage Closet
Tan Mastic None Detected multi Non-Fibrous 100
472173
A05A Building #616 Storage Closet
White Tile None Detected multi Non-Fibrous 100
472174
A05B Building #616 Storage Closet
White Tile None Detected multi Non-Fibrous 100
472175
A06A Buildng #656 Conference Room
Black Mastic None Detected multi Non-Fibrous 100
472176
A06B Buildng #656 Conference Room
Black Mastic None Detected
Analyzed by: 42405Batch:
Page 1 of 1Thursday 09 May End of Report
Batch: 62332
Woburn, MA 01801
781-932-9600 Web: www.asbestosidentificationlab.com
Email: mikemanning@asbestosidentificationlab.com
Asbestos Identification Laboratory
Dear Anne (Fardy) MacMillan , Thank you Anne (Fardy) MacMillan for your business.
Michael Manning Owner/Director
Asbestos Identification Laboratory has completed the analysis of the samples from your office for the above referenced project.
The information and analysis contained in this report have been generated using the EPA /600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials. Materials or products that contain more than 1% of any kind or combination of asbestos are considered an asbestos containing building material as determined by the EPA. This Polarized Light Microscope (PLM) technique may be performed either by visual estimation or point counting. Point counting provides a determination of the area percentage of asbestos in a sample. If the asbestos is estimated to be less than 10% by visual estimation of friable material, the determination may be repeated using the point counting technique. The results of the point counting supersede visual PLM results. Results in this report only relate to the items tested. This report may not be used by the customer to claim product endorsement by NVLAP or any other U.S. Government Agency.
March 29, 2021
Anne (Fardy) MacMillan Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
Project Name: Fort Devens
Project Number:
Date Sampled: 2021-03-25
Work Received: 2021-03-26
Work Analyzed: 2021-03-26
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
• NVLAP Lab Code: 200919-0
• Massachusetts Certification License: AA000208
• State of Connecticut, Department of Public Health Approved Environmental Laboratory Registration Number: PH-0142
• State of Maine, Department of Environmental Protection Asbestos Analytical Laboratory License Number: LB-0078(Bulk) LA-0087(Air)
• State of Rhode Island and Providence Plantations. Department of Health Certification: AAL-121
• State of Vermont, Department of Health Environmental Health License AL934461
Laboratory results represent the analysis of samples as submitted by the customer. Information regarding sample location, description, area, volume, etc., was provided by the customer. Asbestos Identification Laboratory is not responsible for sample collection activities or analytical method limitations. Unless notified in writing to return samples, Asbestos Identification Laboratory discards customer samples after 30 days. Samples containing subsamples or layers will be analyzed separately when applicable. Reports are kept at Asbestos Identification Laboratory for three years. This report shall not be reproduced, March 29, 2021
Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
Project Name: Fort Devens
Project Number:
Date Sampled: 2021-03-25
Work Received: 2021-03-26
Work Analyzed: 2021-03-26
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
Asbestos %Material Color Non-Asbestos %LocationFieldID
LabID red Non-Fibrous 100
691859
A-01A B637, R125Red Quarry Tile None Detected red Non-Fibrous 100
691860
A-01B B637, R125Red Quarry Tile None Detected red Non-Fibrous 100
691861
A-01C B637, R125Red Quarry Tile None Detected gray Non-Fibrous 100
691862
A-02A B637, R125Gray Grout None Detected gray Non-Fibrous 100
691863
A-02B B637, R125Gray Grout None Detected gray Non-Fibrous 100
691864
A-02C B637, R125Gray Grout None Detected
Detected Chrysotile 2 brown Non-Fibrous 98
691865
A-03A B679, R115Brown Tile 9"x9"
Detected Chrysotile 2 brown Non-Fibrous 98
691866
A-03B B679, R115Brown Tile 9"x9"
Detected Chrysotile 2 brown Non-Fibrous 98
691867
A-03C B679, R115Brown Tile 9"x9"
Detected Chrysotile 10 black Non-Fibrous 90
691868
A-04A B679, R115Black Mastic
Detected Chrysotile 10 black Non-Fibrous 90
691869
A-04B B679, R115Black Mastic
Detected Chrysotile 10 black Non-Fibrous 90
691870
A-04C B679, R115Black Mastic
Analyzed by: 62332Batch:
Page 1 of 1Monday 29 March End of Report
TE 2 – Photographs of Abatement Areas
Photo 1. Building 666 Room 315.
Photo 2. Building 666 Room 316.
Photo 3. Range PA Classroom.
Photo 4. Range PA Classroom.
Photo 5. Range PA Classroom.
Photo 6. Range PA Classroom.
Photo 7. Building 656 Bay C.
Photo 8. Building 656 Bay C.
Photo 9. Building 656 Bay C.
Photo 10. Building 656 Bay C.
Photo 11. Building 689 Bay C
Photo 12. Building 689 Bay C.
TE 3 – As-built Drawings
TO BE REMOVED
N/A
Room Room Name Flooring Approx.
Sq. Ft.
315 BREAKROOM MASTIC 513
BLDG. 666
3rd FLOOR TOTAL
Room Room Name Flooring Approx.
Sq. Ft.
127 VESTIBULE Asbestos Tile 32 128 OFFICE Carpet Over Asbestos Tile 192 129 HALL Carpet Over Asbestos Tile 35 130 CLOSET Concrete 10 131 OFFICE Carpet Over Asbestos Tile 206 133 VESTIBULE Asbestos Tile 33 134 OFFICE Carpet Over Asbestos Tile 150
BLDG. 656
TOTAL
Room Room Name Flooring Approx.
Sq. Ft.
119 CONFERENCE CARPET ABOVE TILE/MASTIC 273
BLDG. 679
| B667 ACM Inspection and Testing Results.pdf |
| A003_ACM_B670_04082019.pdf |
| A003_ACM_B667_04082019.pdf |
| A001_ACM_SouthPostRecoveryTrailer_05072019.pdf |
| 2019-VanEck-Inspector.pdf |
File details come from the government source that posted it. Updated .