USAG Fort Devens (DRFTA)
Building 666 Room 316 Asbestos Abatement Contract
Specification of Work
U.S. ARMY GARRISON FORT DEVENS
30 QUEBEC STREET, BOX 10
DEVENS, MA 01434
Specification No. XXX 28 September 2020
Table of Contents
1.0 GENERAL INFORMATION
1.1 Overview
1.2 Management and Supervision
2.0 DESCRIPTION OF SERVICES
2.1 Scope
3.0 REQUIREMENTS
3.1 ACM Abatement Requirements
3.2 General Equipment Requirements
3.3 General Environmental Requirements
3.4 Construction and Demolition Waste Disposal
3.5 General Safety Requirements
3.6 Anti-Terrorism and Operations Security
3.7 Schedule
4.0 TECHNICAL EXHIBITS
TE 1 – ACM Inspection and Testing Results
1.0 General Information.
1.1 Overview. The Contractor shall conduct asbestos containing material (ACM) abatement services at Devens Reserve Forces Training Area (DRFTA). The work shall include the services described below. Additional clarification/direction may be provided by the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR). The Contractor shall provide all labor, equipment, materials, management, coordination, and supervision necessary to conduct the work specified herein. All work shall be performed by qualified and appropriately licensed personnel IAW all applicable laws and regulations. The contractor shall ensure that all work is performed in such a way that no damage to grounds, structures, or other government property occurs.
1.2 Management and Supervision. The Government and the Contractor understand and agree that the services to be delivered are non-personal services, and both parties recognize and agree that no employer-employee relationships exist between the Government and the Contractor and/or between the Government and the Contractor’s employees. Contactor personnel performing under this contract shall not be placed in a position where they are employed by a Federal Officer or are under the supervision, direction, or evaluation of a Federal Officer, military or civilian. The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances will the Government assign tasks to, or prepare work schedules for, contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against actions that are of the nature of personal services, or give the perception of personal services. If particular actions constitute, or are perceived by the contractor to constitute personal services, it shall be the Contractor's responsibility to notify the Contracting Officer (KO) immediately.
1.3 Period of Performance. The Contractor shall have 60 Calendar Days from the Notice to Proceed Date to complete ALL TASKS associated with the SOW.
1.4 Place of Performance. All tasks under this SOW shall be performed at the U.S.
Army Garrison Fort Devens located at 30 Quebec Street, Building 666, Room 316, Devens, MA 01434.
2.0 Description of Services.
2.1 Scope. The Contractor shall control, remove and dispose of asbestos containing floor tile mastic, and the non-asbestos containing ceramic floor tile and carpet over the mastic in Room 316 in Building 666 Main Post DRFTA. This room is located on the third floor of the building and measures 462 square feet. The contractor shall conduct ACM abatement in accordance with (IAW) Section 3.1. Building 666 Room 316 has been inspected by a licensed asbestos inspector and all suspected ACM has been tested.
The results of that testing is presented in TE-1.
• Identify the contractor’s project supervisor, designated competent person, and all workers that will be on site.
• Include copies of all relevant contractor personnel licenses and certifications.
• Include resumes for the project supervisor and designated competent person.
• Include written certification that all personnel assigned to the work are covered under the contractors medical surveillance program IAW OSHA 1910.1001. The contractor shall not provide any employee medical records but shall certify that all personnel have been found medically fit to perform the tasks to which they will be assigned by a licensed physician.
• Include a copy of the written project site-specific training material that will be used to train onsite employees IAW 29 CFR 1926.1101.
3.1.1.2 Accident Prevention Plan (APP). The contractor shall submit a written comprehensive site-specific Accident Prevention Plan (APP) to include an Asbestos Hazard Abatement Plan (AHAP), and Activity Hazard Analyses (AHAs) for each phase of work. The APP shall be prepared by an American Board of Industrial Hygiene (ABIH) certified Industrial Hygienist. The resume of the Industrial Hygienist and a copy of their ABIH certification shall be included in the APP. The APP shall include:
• Detailed drawings and site layouts to include all worksite containment area(s), local exhaust systems locations, decontamination units and load-out units, other temporary waste storage facilities, and boundaries of each regulated area.
• A detailed air monitoring plan.
• Specifications for all materials and equipment to be used, including brand name, model, capacity, performance characteristics and any other pertinent information.
• Any and all test results and certificates from the manufacturer substantiating compliance with performance requirements of this specification.
• Safety Data Sheets (SDS’s) for all chemicals that will be used.
3.1.1.3 Disposal Facility and Transporter Information. The contractor shall submit an approved non-hazardous special waste profile from the permitted disposal facility that will be receiving the ACM waste.
3.0 Requirements
3.1 ACM Abatement Requirements. The contractor shall control, remove, and dispose of all ACM IAW this section.
3.1.1 Pre-abatement Submittals. The following submittals shall be provided to the contracting officer (CO) for government approval at least 14 days prior to the contractor performing any ACM abatement tasks. The contractor is not to begin any ACM abatement tasks without written notice from the CO that all pre-abatement submittals have been approved. All pre-abatement submittals must be signed by a responsible officer of the company.
3.1.1.1 Report of Contractor Personnel Qualifications. The contractor shall submit a written report documenting the qualifications of all personnel that will be assigned to this work. This submittal shall:
The contractor shall also provide written proof that the transporter hired to haul the ACM waste to the disposal facility meets the DOT requirements of 49 CFR 171, 49 CFR 172, and 49 CFR 173 as well as registration requirements of 49 CFR 107 and all other applicable state or local requirements.
3.1.1.4. State Agency Notifications. The contractor shall submit all required notifications to the Massachusetts Department of Environmental Protection (MassDEP) and to the Massachusetts Department of Labor Standards (MassDLS) at least 10 business days (excluding weekends and holidays) prior to starting any ACM abatement work. The contractor shall provide the CO with copies of these notifications and will inform the CO immediately if either agency responds to these notifications.
3.1.1.5 Federal, State or Local Citations on Previous Abatements. The Contractor shall submit a statement, signed by an officer of the company, containing a record of any citations issued by Federal, State or local regulatory agencies relating to asbestos activities (including projects, dates, and resolutions); a list of penalties incurred through non-compliance with asbestos project specifications, including liquidated damages, overruns in scheduled time limitations and resolutions; and situations in which an asbestos-related contract has been terminated (including projects, dates, and reasons for terminations). If there are none, a negative declaration signed by an officer of the company shall be provided.
3.1.2 Work Procedures. All ACM abatement tasks shall be completed IAW all applicable state and federal laws, regulations and standards. All ACM abatement tasks shall be completed IAW the CO approved pre-abatement submittals detailed in Section 3.1.2. The contractor shall notify the CO in writing and get written approval to make any changes to qualified personnel, the APP, the disposal facility or the ACM waste transporter.
The designated competent person shall be onsite at all times during the performance of this work. Qualified personnel shall wear the required personal protective equipment (PPE) identified in the APP at all times during the performance of this work. Prior to commencement of work the contractor's designated competent person shall instruct each worker about the hazards and health effects of the specific types of ACM to be abated and the content and requirements of the Contractor's APP to include the AHAP and AHAs and site-specific safety and health precautions. The contractor shall have the APP on hand at all times while on-site.
All ACM abatement work shall be performed in a negative air pressure enclosure. The contractor shall control entry into regulated areas and only allow qualified personnel to enter. Warning signs and tape printed in English and shall be provided at the regulated boundaries and entrances to regulated areas. Warning labels shall be affixed to all asbestos disposal containers, asbestos materials, scrap, waste debris, and other products contaminated with asbestos.
The contractor shall establish a decontamination area for the decontamination of employees, material and equipment. The contractor shall ensure that employees enter and exit the regulated area through the decontamination area. Power to building 3419 has been disconnected however the contractor shall independently confirm that and use lock-out tag-out procedures as needed.
Air monitoring shall be performed by an independent ABIN certified Industrial Hygienist hired by the contractor IAW the CO approved APP. During the performance of work the contractor also shall submit initial exposure assessments, negative exposure assessments, and air-monitoring results and documentation daily. The contractor shall stop ACM abatement work in the regulated area immediately when the airborne total fiber concentration: (1) equals or exceeds 0.01 f/cc, or the pre-abatement concentration, whichever is greater, outside the regulated area; or (2) equals or exceeds 1.0 f/cc inside the regulated area. The Contractor shall correct the condition to the satisfaction of the CO, including visual inspection and air sampling. Work shall resume only upon written notification by the CO.
Asbestos abatement shall be performed without damage to or contamination of adjacent work or area. Where such work or area is damaged or contaminated, it shall be restored to its original condition or decontaminated by the Contractor at no expense to the Government. When spills occur, work shall stop in all affected areas immediately and the spill shall be cleaned. When satisfactory visual inspection and air sampling analysis results are obtained and have been evaluated by the Contractor's Designated IH and the CO, work shall proceed.
During the performance of work the contractor shall submit coordinate with the DRFTA Installation Hazardous Waste Manifester (IHWM) to have all ACM waste manifests signed by the IHWM prior to transport. The contractor shall provide copies of final manifests signed by the disposal facility to the IHWM within 45 days of shipment.
When asbestos abatement is complete, ACM waste is removed from the regulated areas, and final clean-up is completed, the contractor shall conduct a visual pre-inspection of the cleaned area in preparation for a final inspection by the COR. Clearance air monitoring is not required for outside work or for soil cleanups. Following completion of ACM abatement work the contractor shall provide a summary, in electronic form, of site activities (bulk samples, asbestos removed, repaired, encased, etc.) for updating the installation’s asbestos management records.
3.1.3 Unexpected Discovery of Asbestos. Building 666 Room 316 has been inspected by a licensed asbestos inspector and all suspected ACM has been tested.
The results of that testing is presented in TE-1. However, should the contractor identify any previously untested building components suspected to contain asbestos that are located in areas impacted by the work, the contractor shall notify the COR. The COR will have those materials tested and should they contain ACM a modification shall be made to the contract to include the removal and disposal of those materials.
3.2 General Equipment Requirements.
3.2.1 All trucks and equipment used in the performance of this contract must meet all Massachusetts Department of Transportation (MassDOT) regulations and must be in good working order. All contractor personnel driving trucks must have the appropriate class of Commercial Driver’s License (CDL) necessary to operate that truck. All hoses and lines must be maintained in a condition to prevent the leakage of oil, hydraulic fluids or other hazardous materials.
3.2.2 The Contractor shall not use any equipment with an active hazardous material leak. If a leak or spill occurs, follow the requirements in paragraph 3.2 Environmental Requirements.
3.3 General Environmental Requirements.
3.3.1 Under no circumstances is hazardous waste to be transported onto DRFTA property.
3.3.2 Where hazardous materials, including oils are needed for the operation of equipment, the Contractor will adhere to all applicable federal and State regulations regarding the management and handling of hazardous materials.
3.3.3 Any release of oil (including leaks from hydraulic hoses and equipment), hazardous waste, or hazardous material on DRFTA shall be immediately reported to the Devens Fire Department at 978-772-2117 and the DPW Environmental Division at 978-615-6086. This clause does not relieve the Contractor of any federal or State reporting requirements.
3.3.4 Oil, fuel, and/or hazardous material/waste released to the environment (including leaks from hydraulic hoses and equipment) by the Contractor in the performance of this work shall be the sole responsibility of the Contractor and shall be cleaned up at no expense to the Army. Any release shall be cleaned up without delay to the standards set forth in 40 CFR 260 and 310 CMR 30.00. Any vehicle found to be releasing oil or a hazardous substance shall be immobilized and spill contained immediately upon discovery of the leak.
3.4 Construction and Demolition Waste Disposal.
3.4.1 The contractor shall provide their own construction and demolition waste dumpsters and provide for their disposal. The contractor shall not dispose of any construction or demolition waste generated from this work in Installation owned dumpsters. The contractor shall have all construction and demolition waste dumpsters emptied regularly and shall not allow construction and demolition waste dumpsters to overflow. Following completion of work the contractor shall insure that all construction and demolition waste dumpsters are removed from DRFTA within 3 business days.
3.4.2 The contractor shall also provide all construction and demolition waste weight slips to the COR within 30 days of shipment for inclusion in the Installations solid waste diversion tracking program.
3.5 General Safety Requirements.
3.5.1 All equipment used in the performance of this contract shall have safety design features to prevent injury to the operator and damage to persons or property.
The Contractor shall ensure all workers are properly trained and understand how to safely operate the equipment. 3.5.2 All Personal Protective Equipment (PPE) shall conform to the applicable OSHA standards. PPE shall be worn at all times during the performance of work on USAG Fort Devens.
3.6 Anti-Terrorism and Operations Security.
3.6.1 Contractor and all associated sub-contractor employees requiring access to the installation shall (1) provide all information required for background checks to meet installation access requirements to be accomplished by the Director of Emergency Services or Security Office, and (2) comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/ AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). Should the Force Protection Condition (FPCON) at any individual facility or the installation change, the Government may require changes in contractor security matters or processes.
3.6.2 Anti-terrorism (AT) Level I training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable.
The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.
3.6.3 Iwatch Training. The contractor and all associated sub-contractors shall brief all employees on the local Iwatch program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.
TE 1 – ACM Inspection and Testing Results
3.7 Schedule
3.7.1 The contractor shall coordinate scheduling of work with the COR. The contractor shall perform work as soon as possible following contract award.
4.0 Technical Exhibits.
TE 1 – ACM Inspection and Testing Results
Batch: 48737
165 New Boston St., Ste 227 Woburn, MA 01801
781-932-9600 Web: www.asbestosidentificationlab.com
Email: mikemanning@asbestosidentificationlab.com
Asbestos Identification Laboratory
Dear Anne (Fardy) MacMillan , Thank you Anne (Fardy) MacMillan for your business.
Michael Manning Owner/Director
Asbestos Identification Laboratory has completed the analysis of the samples from your office for the above referenced project.
The information and analysis contained in this report have been generated using the EPA /600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials. Materials or products that contain more than 1% of any kind or combination of asbestos are considered an asbestos containing building material as determined by the EPA. This Polarized Light Microscope (PLM) technique may be performed either by visual estimation or point counting. Point counting provides a determination of the area percentage of asbestos in a sample. If the asbestos is estimated to be less than 10% by visual estimation of friable material, the determination may be repeated using the point counting technique. The results of the point counting supersede visual PLM results. Results in this report only relate to the items tested. This report may not be used by the customer to claim product endorsement by NVLAP or any other U.S. Government Agency.
November 27, 2019
Anne (Fardy) MacMillan Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
Project Name: Fort Devens 041019
Project Number:
Date Sampled: 2019-11-26
Work Received: 2019-11-26
Work Analyzed: 2019-11-27
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
• NVLAP Lab Code: 200919-0
• Massachusetts Certification License: AA000208
• State of Connecticut, Department of Public Health Approved Environmental Laboratory Registration Number: PH-0142
• State of Maine, Department of Environmental Protection Asbestos Analytical Laboratory License Number: LB-0078(Bulk) LA-0087(Air)
• State of Rhode Island and Providence Plantations. Department of Health Certification: AAL-121
• State of Vermont, Department of Health Environmental Health License AL934461
Laboratory results represent the analysis of samples as submitted by the customer. Information regarding sample location, description, area, volume, etc., was provided by the customer. Asbestos Identification Laboratory is not responsible for sample collection activities or analytical method limitations. Unless notified in writing to return samples, Asbestos Identification Laboratory discards customer samples after 30 days. Samples containing subsamples or layers will be analyzed separately when applicable. Reports are kept at Asbestos Identification Laboratory for three years. This report shall not be reproduced, except in full, without the written consent of Asbestos Identification Laboratory.
November 27, 2019
Anne (Fardy) MacMillan Bluestone Environmental Group 675 Lancaster Avenue Berwyn, PA 19312
Project Name: Fort Devens 041019
Project Number:
Date Sampled: 2019-11-26
Work Received: 2019-11-26
Work Analyzed: 2019-11-27
Analysis Method: BULK PLM ANALYSIS EPA/600/R-93/116
Asbestos %Material Color Non-Asbestos %LocationFieldID
LabID tan Non-Fibrous 100
539385
A-01A Building 685, Cardio FloorTan Floor Tile None Detected tan Non-Fibrous 100
539386
A-01B Building 685, Cardio Fl.Tan Floor Tile None Detected blue Non-Fibrous 100
539387
A-02A Building 685, Cardio Fl.Blue Floor Tile None Detected blue Non-Fibrous 100
539388
A-02B Building 685, Cardio Fl.Blue Floor Tile None Detected black Cellulose 10 Non-Fibrous 90
539389
A-03A Building 685, Cardio Fl.Black Mastic None Detected black Cellulose 10 Non-Fibrous 90
539390
A-03B Building 685, Cardio Fl.Black Mastic None Detected gray Non-Fibrous 100
539391
A-04A Building 666, Rm. 316Gray Tile None Detected gray Non-Fibrous 100
539392
A-04B Building 666, Rm. 316Gray Tile None Detected
Detected Chrysotile 10 black Non-Fibrous 90