Questions and Response.docx
DOCX document 12 KB Posted
- Solicitation number
- W15QKN-20-R-5068
About this file
This document contains questions and responses regarding solicitation number W15QKN-20-R-5068 from the Department of the Army Materiel Command Contracting Command Picatinny Arsenal. The solicitation seeks quotes for the installation of snow melting systems and gate operators at multiple facilities in Pennsylvania, including the installation of snow melting systems for automatic gates in Conneaut Lake, Farrell, and New Castle, and the installation of gate operators and a snow melting system in Fairview. Bidders will be responsible for trenching from buildings to gate operators and inside buildings to local breaker panels to upsize existing conduits to accommodate larger gauge wire for the snow melting systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W15QKN-20-R-5068-0001.pdf | ||
| Revised SOW 8-26-2020 - 3 PA Locations-CSS 12285.docx | DOCX document | |
| W15QKN-20-R-5068 (corrected).pdf | ||
| SOW-Install snow melting system for gates 3 PA Locations - CSS 12285.docx | DOCX document | |
| Contractor Cost Breakdown Form.xls | XLS spreadsheet | |
| SOW-Fairview-PA209-Gate Operator and Snow Melt-CSS 12277.docx | DOCX document | |
| Davis Bacon WD PA20200097 7-24-20 (Farrell).docx | DOCX document | |
| Solicitation W15QKN-20-R-5068.pdf | ||
| Davis Bacon WD PA20200049 7-24-20 (Conneaut Lake).docx | DOCX document | |
| PA209-Fairview-A2-CSS 12277-Pics-Gate Operator and Snow Melt.pptx | PPTX presentation | |
| Davis Bacon WD PA20200058 7-24-20 (New Castle).docx | DOCX document | |
| Davis Bacon WD PA20200088 7-24-20 (Fairview).docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question & Responses Solicitation # W15QKN-20-R-5068
Snow Melt System & Gate Operator Installation Project PA Multi-Facility: New Castle, Conneaut Lake, Fairview & Farrell, PA USARCs
Q1: As per Site Surveys of all related Facilities (Fairview, Farrell, Conneaut Lake & New Castle, PA USARCs) will the contractor be responsible for trenching from Buildings to Gate Operators to upsize existing conduits to accommodate larger gauge wire to feed Snowmelt System?
A1. Specification of Work Paragraph 11.3.1.11. “Contractor shall utilize existing conduits feeding existing gate operator to feed new heat trace snow melt system” .
Q2: Additionally, Will contractor be responsible for Conduit inside the Buildings to local Breaker Panels for same reason as mentioned above?
A2. Yes