Contractor Cost Breakdown Form.xls
XLS spreadsheet 185 KB Posted
- Solicitation number
- W15QKN-20-R-5068
About this file
This document contains a contractor cost breakdown form template and details of a federal contract opportunity for installation of snow melting systems and gate operators. The cost breakdown form template includes sheets to itemize labor, equipment, materials, and costs by crew for a project. The federal contract opportunity is solicitation number W15QKN-20-R-5068 from the Department of the Army Materiel Command Contracting Command Picatinny Arsenal for installation of snow melting systems for automatic gates at multiple locations in Pennsylvania as well as installation of gate operators and additional snow melting systems at one location. Quotes are being accepted until the response date listed in the requirement documents attached.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W15QKN-20-R-5068-0001.pdf | ||
| Revised SOW 8-26-2020 - 3 PA Locations-CSS 12285.docx | DOCX document | |
| Questions and Response.docx | DOCX document | |
| W15QKN-20-R-5068 (corrected).pdf | ||
| SOW-Install snow melting system for gates 3 PA Locations - CSS 12285.docx | DOCX document | |
| SOW-Fairview-PA209-Gate Operator and Snow Melt-CSS 12277.docx | DOCX document | |
| Davis Bacon WD PA20200097 7-24-20 (Farrell).docx | DOCX document | |
| Solicitation W15QKN-20-R-5068.pdf | ||
| Davis Bacon WD PA20200049 7-24-20 (Conneaut Lake).docx | DOCX document | |
| PA209-Fairview-A2-CSS 12277-Pics-Gate Operator and Snow Melt.pptx | PPTX presentation | |
| Davis Bacon WD PA20200058 7-24-20 (New Castle).docx | DOCX document | |
| Davis Bacon WD PA20200088 7-24-20 (Fairview).docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| ID | Sort | Type | Description (to include labor,equipment, material type and grade) | Quantity | Unit Measure | Labor in Manhours | Equipment | Material | Total Cost | ||||||||
| Crew (skill set) | Labor Hours | Total Hrs | City Cost Index | Unit Cost* | Total Labor Cost* | Unit Cost | Total Equipment Cost | City Cost Index | Unit Cost | Total Material Cost | |||||||
| Totals | |||||||||||||||||
| GENERAL CONTRACTOR | |||||||||||||||||
| OVERHEAD | $ - 0 | ||||||||||||||||
| $ - 0 | |||||||||||||||||
| PROFIT | $ - 0 | ||||||||||||||||
| $ - 0 | |||||||||||||||||
| BOND | $ - 0 | ||||||||||||||||
| G & A | $ - 0 | ||||||||||||||||
| GRAND TOTAL | $ - 0 | ||||||||||||||||
| Unit Cost* | Cost for one labor hour of the specified crew | ||||||||||||||||
| Total Labor Cost* | "=Unit Cost x Total Hours" |