Attachment_0002_-_CAC_Reader_Point_of_Entry.pdf
PDF 344 KB Posted
- Attached to
- Construction - USARC Renovations Federal contract opportunity
- Solicitation number
- W15QKN-19-R-1044
About this file
CAC Reader Points of Entry
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_0001_-_Site_Map.pdf | ||
| SOW_Draft_-_RFI.pdf | ||
| RFI_-_USARC_Renovations.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3,280 SF
159 SF
137 SF
85 SF
LOCKERS
86 SF
120 SF
AID
FIRST
340 SF
648 SF
153 SF
708 SF
215 SF
VAULT
ARMS
PASSAGE ROOM
BOILER
UTILITY
179 SF 351 SF 225 SF
OFFICE
335 SF
OFFICE
354 SF
CORRIDOR
722 SF
CORRIDOR
556 SF516 SF651 SF
ADMINISTRATIVE SPACE CLASSROOM SIPR CAFE
507 SF
257 SF
LOBBY
336 SF
OFFICE
535 SF 229 SF
OFFICE OFFICE
112 102 104
108 110
105103101
109111113117
LATRINE
WOMEN’S
115A
169 SF
(FIRST FLOOR GROSS TOTAL 13,685 SF)
(BUILDING GROSS TOTAL 28,294 SF)
DPW - CAD/ GIS BRANCH
RES AMB JMB 1 OF 5
SHEET:DATE:FIELD VERIFIED:CHECKED:DRAWN:
99th REGIONAL SUPPORT COMMAND
29AUG16
SALEM, VA
1915 ROANOKE BOULEVARD
VA051 (51815)/ USARC BUILDING
FIRST FLOOR PLAN
VA051 (51815)
SALEM, VA
PFC CLOYSE E. HALL USARC
ASSEMBLY HALL
0 64’32’16’
GRAPHIC SCALE
SHOWERS
LATRINE &
MEN’S
UP
STAIRS
110 SF
STAIRS
107 SF
UP
227 SF
55 SF
116A
78 SF
116B
39 SF
116C
CORRIDOR
KITCHEN
SCULL.
121 SF
STOR.
FOOD
OFFICE
OFFICE
OFFICE
FOYER
RETENTION
S-3 OPS
SUPPLY
S-4
OFFICE
267 SF
172 SF
84 SF
CAC Entry Points
402 SF
OFFICE
387 SF
OFFICE
349 SF
OFFICE
158 SF
OFFICE
852 SF
408 SF
525 SF
OFFICE
114 SF
824 SF409 SF
318 SF
148 SF
STAIRS
123 SF OFFICE
122 SF
371 SF
CORRIDOR
HALL
STORAGE
UNIT
OFFICE
130 SF
CORRIDOR
2,068 SF
RIFLE RANGE
110 SF
44 SF
CLASSROOM
582 SF
CLASSROOM
SHOWERS
LATRINE &
MEN’S
DPW - CAD/ GIS BRANCH
RES AMB JMB 2 OF 5
SHEET:DATE:FIELD VERIFIED:CHECKED:DRAWN:
99th REGIONAL SUPPORT COMMAND
29AUG16
SALEM, VA
1915 ROANOKE BOULEVARD
VA051 (51815)/ USARC BUILDING
(SECOND FLOOR GROSS TOTAL 13,685 SF)
215 213 211
207B
207A
206A
(BUILDING GROSS TOTAL 28,294 SF)
0 64’32’16’
GRAPHIC SCALE
DN DN
STAIRS
111 SF
OFFICE
SECOND FLOOR PLAN
VA051 (51815)
SALEM, VA
PFC CLOYSE E. HALL USARC
COMPUTER LAB
J.C.
STORAGE
SUPPLY
580 SF
214A
OFFICE
COMMAND
BELOWBELOW
OPEN TO OPEN TO
BELOWBELOW
OPEN TO OPEN TO
BELOW
ROOF
DPW - CAD/ GIS BRANCH
SHEET:DATE:FIELD VERIFIED:CHECKED:
99th REGIONAL SUPPORT COMMAND
DRAWN:
RES AMB JMB
MAIN FLOOR PLAN
VA051 (51815)
SALEM, VA
PFC CLOYSE E. HALL USARC
SALEM, VA
1915 ROANOKE BOULEVARD
VA051 (51815)/ OMS BUILDING
29AUG16
(BUILDING GROSS TOTAL 6,903 SF)
143 SF
LATRINE
MEN’S
143 SF
203 SF 203 SF145 SF
LATRINE
WOMEN’S
ROOM
BREAK
OFFICE OFFICE
115 SF
OFFICE
144 SF 144 SF
STORAGE STORAGE
4,936 SF
0 10’ 20’
GRAPHIC SCALE
5’
SHEET:DATE:FIELD VERIFIED:CHECKED:
99th REGIONAL SUPPORT COMMAND
DRAWN:
RES AMB JMB 29AUG16
1,296 SF
(BUILDING GROSS TOTAL 1,384 SF)
SALEM, VA
1915 ROANOKE BOULEVARD
VA051 (51815)/ STORAGE BUILDING
0 10’ 20’
GRAPHIC SCALE
5’
MAIN FLOOR PLAN
VA051 (51815)
SALEM, VA
PFC CLOYSE E. HALL USARC
SHEET:DATE:FIELD VERIFIED:CHECKED:
99th REGIONAL SUPPORT COMMAND
DRAWN:
RES AMB JMB 29AUG16
1,296 SF
(BUILDING GROSS TOTAL 1,384 SF)
SALEM, VA
1915 ROANOKE BOULEVARD
VA051 (51815)/ STORAGE BUILDING
0 10’ 20’
GRAPHIC SCALE
5’
MAIN FLOOR PLAN
VA051 (51815)
SALEM, VA
PFC CLOYSE E. HALL USARC
| VA051_FP_01-FirstFloor_Aug2016 |
| VA051_FP_02-SecondFloor_Aug2016 |
| VA051_FP_03-OMSFloorPlan_Aug2016 |
| VA051_FP_04-StorageBuilding_Aug2016 |
| VA051_FP_05-StorageBuilding_Aug2016 |
File details come from the government source that posted it.