W15QKN-19-R-0022_-_Amendment_0001.pdf

PDF 15 KB Posted

Attached to
Cartridge, 12 Gauge, Breaching M1030
Solicitation number
W15QKN-19-R-0022
Issued by

About this file

Amendment 0001: The purpose of Amendment 0001 to W15QKN-19-R-0022 is to address the following questions that have been submitted by industry in response to this solicitation.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

W15QKN

ARMY CONTRACTING COMMAND - NJ

PICATINNY ARSENAL, NJ 07806-5000

TYLER FULPER

EMAIL: TYLER.W.FULPER.CIV@MAIL.MIL

W15QKN-19-R-0022

2019FEB04

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 2

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: TYLER FULPER

Buyer Office Symbol/Telephone Number: ACC-NJ-MC/(973)724-1871

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

Amendment 0001______________

1. The purpose of Amendment 0001 to W15QKN-19-R-0022 is to address the following questions that have been submitted by industry in response to this solicitation:

Question 1: Regarding the solicitation for the breaching load and had a question reference the zinc specification. Does the projectile__________ need to be pure zinc?

Answer 1: The specification does not dictate the material use for the cartridge and it is at the discretion of the contractor.________

Question 2: Reading through the solicitation, I noticed that it is indicated on page 12, para 3.1: the cartridges to be delivered under__________ this contract shall be of a design that has been qualified or approved by the U.S. Government IAW MIL-PRF-32300 w/Amendment 1. Does that mean that we need to be a qualified source in order to be considered for this solicitation or can we become a qualified source after the participation?

Answer 2: Per the Statement of Work (SOW) paragraph 3.1, it states in part, "Contractors (and/or subcontractors) with designs that have________ not been previously qualified shall provide all test data and related supporting documentation to the U.S. Government for review to verify compliance IAW MIL-PRF-32300A W/AMENDMENT 1." Further, reference L.4.1.1 and M.4.1 of the solicitation which discusses previously qualified/approved designs and not previously qualified/approved designs.

Question 3: Major 102 is listed as Low primer charge weight, with an inspection method of SME, and note 2/ One hundred percent of the__________ entire lot shall be inspected for these defects. The Table also references the Requirement paragraph 3.4.2, which deals with the dimensional requirements of the cartridge per drawing 12990872. Drawing 12990872 does not provide any information about the primer weight. Please provide clarification regarding what is to be measured and the criteria.

Answer 3: It's the contractor's responsibility to establish the primer charge weight characteristic on its Technical Data Package (TDP)________ while meeting and maintaining optimal cartridge performance IAW specifications. Refer to cartridge specification paragraph 6.9 regarding product baseline.

Question 4: In prior versions of the PRF, the low primer charge weight was a critical characteristic, requiring a 100% visual__________ inspection. Please advise if the current requirement is in error.

Answer 4: MIL-PRF-32300A/w Amd 1 is the latest correct version. Low primer charge weight is a major which required 100% SME inspection.________

Question 5: Critical characteristic Primer above Flush and Low Propellant Weight has a requirement paragraph 3.4.2 that refers to__________ drawing 12990872, but the drawing does not provide any information about the primer height or propellant weight. Please provide clarification on what is to be measured and the criteria.

Answer 5: It's the contractor's responsibility to establish the Primer above Flush and Low Propellant Weight on its Technical Data________

Package (TDP) while meeting and maintaining optimal cartridge performance IAW specifications. Refer to cartridge specification paragraph

6.9 regarding product baseline.

2. PLEASE NOTE: All offerors are required to sign this amendment (SF-30) and return two (2) copies to the issuing office with their proposal submission.

3. All other terms and conditions of this solicitation remain unchanged.

*** END OF NARRATIVE A0002 ***

2 2

W15QKN-19-R-0022

SECTION A

File details come from the government source that posted it.