3-10 TYPICAL SECTIONS
§3.2.4.3 11/20/98
Table 3-3 Conventional Pavement Thickness Guide
Design Hour One-way Traffic
Subbase Course
(all Pavements)
Portland Cement
Concrete Pavement
Traffic Makeup
Hot Mix Asphalt Pavement
Base Course
Top* Courses
Over 500 Vehicles
300 mm 225 mm Heavy† 200 mm 65 mm**
225 mm Normal ‡ 150 mm
300 to 500 300 mm 225 mm Heavy† 150 mm 65 mm**
200 mm Normal ‡ 100 mm
200 to 300 300 mm Not Applicable All 75 mm 65 mm**
Under 200 Vehicles
300 mm Not Applicable
All 75 mm 25 or 40 mm
*This includes the thickness of both Binder and Top courses.
**Where Heavy Duty or Rut Avoidance mixes are used (see Appendix), lift thickness limits will yield a minimum combined thickness of 80 mm. SUPERPAVE materials require a minimum combined thickness of 80 mm (or 90 mm if ESALs exceed 3 million).
† Heavy traffic is defined as being made up of more than 10% trucks and assumes at least half of the trucks are at or near the legal maximum weight.
‡ Normal traffic is defined as being made up of less than 10% trucks and assumes at least half are at or below the legal maximum weight.