19Q1207_P0003_Amendment.docx

DOCX document 29 KB Posted

Attached to
DOOR REPLACEMENT Federal contract opportunity
Solicitation number
W15QKN-19-Q-1207
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

Please see attachment

View the file

Other files for this federal contract opportunity

Other files attached to DOOR REPLACEMENT, newest first.
File Type Posted
19Q1207_P0002_Solicitation.docx DOCX document
19Q1153_Door_Solicitation_Admendment.docx DOCX document
SOW_and_Map.pdf PDF
19Q1153_Doora_Replacement_Solicitation_Devens.docx DOCX document
Overhead_Doors_SOW.pdf PDF
SOW_Replace_Doors_Bldgs_642_656_&_657.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W15QKN19Q1207

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT P0003

The purpose of P0003 is to answer the following questions. Please note the closing date remains to be Tuesday, 11 June 2019 at 11am.

Buildings 642A, 656, 657 Question and Answers

Question: Are the doors are painted will they be 1 solid color or 2?

Answer: DRFTA DPW Response: All doors are to be painted one color

Question: Are the doors only being replaced or are both the doors and frames being replaced?

Answer: DRFTA DPW Response: See Specifications

Question: Do all doors have internal rods?

Answer: DRFTA DPW Response: See Specifications

Question: Will the Government allow the CTR to punch final communications/electrical connection? Answer: DRFTA DPW Response: Final electrical connection is to be made by the CTR, communications connections will be made by the Government

Buildings 603, 617, 3413, 4233 Overhead Doors Question and Answers

Question: What are the wind loading requirements?

Answer: DRFTA DPW Response: See Specifications

Question: Is there a lead paint report available?

Answer: DRFTA DPW Response: A comprehensive lead-based paint survey has not been conducted.

Question: In cases where unpowered doors are being replaced with powered doors is the Contractor responsible for bringing over power?

Answer: DRFTA DPW Response: Yes the Contractor responsible for bringing over power.

Question: There are discrepancies between door dimensions in the SOW and dimensions measured in the field?

Answer: DRFTA DPW Response: Measurements in the SOW were taken from drawings and may differ from what is actually present, the Contractor is responsible for the field verification of each door opening prior to ordering.

Question: What are the hours of operation?

Answer: DRFTA DPW Response: See Specifications

Question: Who is responsible for obtaining any hot work permits?

Answer: DRFTA DPW Response: The contractor is responsible for obtaining hot work permits from the Devens Fire Department

Question: Accident Prevention Plan?

Answer: DRFTA DPW Response: The Contractor shall provide a comprehensive APP and Risk Assessment Form in accordance with OSHA and EM 385-1-1

Question: Are the doors to be blast proof? Fire proof?

Answer: DRFTA DPW Response: There is no requirement for blast proof doors, however the motor operators must be explosion proof as per UL 674. There is a requirement that the doors be fire rated in accordance with NFPA 80.

(End of Summary of Changes) image1.wmf