PRICE WORKSHEET TO BE COMPLETED WITH BID
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOLICITATION_AMENDMENT_TO_EXTEND_DUE_DATE_OF_PROPOSALS.docx | DOCX document | |
| QUESTIONS_AND_ANSWERS_2.docx | DOCX document | |
| QUESTIONS_AND_ANSWERS_1.docx | DOCX document | |
| SOLICITATION_W15QKN-19-Q-1169_TANK_SYSTEM_SHOREHAM,_NY.docx | DOCX document | |
| 04-09-19_REVISED_SITE_PLAN_IDENTIFYING_STORAGE_TANKS.dgn.pdf | ||
| FINAL_SOW_NY058-CW2_KERRY_P._HEIN_USARC_-_B8_-_CSS-6292_-_SOW_-_REPAIRS_TO_THE_TAN.._.doc | DOC document | |
| 04-09-19_REVISED_SITE_PLAN_IDENTIFYING_STORAGE_TANKS.dgn.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| REPAIRS TO TANK SYSTEM | PRICE WORKSHEET | ||||||||||
| CW2 KERRY P. HEIN USARC | |||||||||||
| NY058 CSS6292 | |||||||||||
| SHOREHAM, NY 11786-2104 | |||||||||||
| ID | Sort | Type | Quantity | Unit Measure | Material | ||||||
| Total Hrs | City Cost Index | Cost | City Cost Index | Bare Material Cost | Total | ||||||
| Remove sludge, water and remaining product from tank bottom with vacuum truck - tank 13 -3000 to 5000 gal tank | 1.00 | Ea | 152.7% | 100.30% | |||||||
| Transfer liquids - Tank 13 to Tanks 15 & 15 - 25% capacity | 500.00 | Gal | 152.7% | 100.30% | |||||||
| Dispose of sludge off site - 10% tank capacity (est) | 200.00 | Gal | 152.7% | 100.30% | |||||||
| Valve, Ball, brnze/brass 3/4" threaded (for 1" hole) | 3.00 | Ea | 152.7% | 100.30% | |||||||
| Clear brush by hand | 40.00 | SY | 152.7% | 100.30% | |||||||
| Prep for paint, existing exterior metal surface | 1,200.00 | SF | 152.7% | 100.30% | |||||||
| Exterior epoxy primer | 1,200.00 | SF | 152.7% | 100.30% | |||||||
| Exterior Epoxy intermediate and top coat | 2,400.00 | SF | 152.7% | 100.30% | |||||||
| Valve, ball, bronze/brass 2" | 2.00 | Ea | 152.7% | 100.30% | |||||||
| Remote tank monitoring system - head unit & magnorestrictive level probes per tank | 2.00 | Ea | 152.7% | 100.30% | |||||||
| Manhole, prescast with iron racks and pulling irons, c.i. frame 4'x6'x7' deep | 1.00 | Ea | 152.7% | 100.30% | |||||||
| Excavating - bulk bank measure | 13.00 | BCY | 152.7% | 100.30% | |||||||
| Excavating - minimum labor/equipment charge | 1.00 | Job | 152.7% | 100.30% | |||||||
| General Purpose Laborer - Average | 3.00 | WK | 152.7% | 100.30% | |||||||
| Project Manager - Average | 1.00 | WK | 152.7% | 100.30% | |||||||
| Cleanup Daily | 4.00 | MSF | 152.7% | 100.30% | |||||||
| Cleanup Final 1% | 1.00 | Job | 152.7% | 100.30% | |||||||
| 152.7% | 100.30% | ||||||||||
| 152.7% | 100.30% | ||||||||||
| 152.7% | 100.30% | ||||||||||
| Totals | |||||||||||
| COST | |||||||||||
| OVERHEAD | |||||||||||
| PROFIT | |||||||||||
| G&A | |||||||||||
| GRAND TOTAL |