W15QKN-19-Q-1153~_Amendment_0001.pdf

PDF 379 KB Posted

Attached to
Water Treatment Services in Conneaut Lake, PA (118) - W15QKN-19-Q-1153
Solicitation number
W15QKN-19-Q-1153
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
Updated_W15QKN-19-Q-1153.pdf PDF
Disinfection_Residual_Rule_(DRR)_Site_Sample_Plan.doc DOC document
W15QKN-19-Q-1153.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011324263

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0001 is to:

1.) Extend the Solicitation Due Date/Time FROM: 02 August 2019 at 10 A.M. EST; TO: 07 August 2019 at 10 A.M. EST

2.) Incorporate revisions w ithin the Performance Work Statement (PWS) and incoporated eight new Contract Line Item Numbers (CLINS) for the base year and each of the four option years for the different types of w ater testing in accordance w ith the PWS. (See Summary of Changes Below )

3.) Please fill out the attached conformed solicitation copy titled, Updated W15QKN-19-Q-1153, instead of the initial solicitation that w as posted.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 65

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W15QKN19Q1153

X 9B. DATED (SEE ITEM 11)

19-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Aug-2019

CODE

US ARMY CONTRACTING COMMAND

5418 S. SCOTT PLAZA

JOINT BASE MDL NJ 08640

W15QKN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W15QKN19Q1153

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

FOR

WATER TREATMENT

AT

ECS/AMSA 103

6467 MIKEWOOD BLVD

CONNEAUT LAKE, PA 16316

Revision 29 July 2019

SECTION C-1

GENERAL

C.1 Performance Work Statement (PWS): The contractor shall provide all labor, equipment, tools, materials, supervision and other items or services necessary to perform water treatment services. The water treatment services shall be performed as specified and be subject to the terms and conditions of the resulting contract.

C.1.1 The work shall be performed in accordance with these specifications and the requirements set forth by the manufactures instructions. The Contractor shall perform the tasks as indicated in paragraphs C.5.1.1 through C.5.1.7 There shall be no exceptions to or deviations from any part of the contract or from any approved work without prior written approval of the Contracting Officer (KO). The Contractor shall familiarize himself/herself as to the exact nature of the work and the water treatment/distribution system to be serviced. The Contractor must perform to the standards in the resulting contract.

C.1.1.1 The Contractor shall become familiar with all details of the work, verify all dimensions in the field, and shall advise the KO of any discrepancy before performing the work.

C.1.1.2 The Contractor will be Department of Environmental Protection (DEP) certified water operator. The Contractor shall be a certified water operator for a non-transient, non-community water supplier for classes D with sub-classification of 7 and 8. The Contractor will provide a copy of the certification to the KO and a copy to the Facility Operation Specialist prior to any work commencing.

C.1.1.3 The contactor must be a registered lab with the PA Bureau of Labs (BOL) and must be able to upload chlorine sample results to the PA DEP online Drinking Water Reporting System.

C.1.2 WORK SCHEDULE:

C.1.2.1 The work shall be performed between 8:15 Am and 4:30 PM (Monday through Friday), federal holidays excluded. The work will be performed weekly. When a scheduled workday falls on a federal holiday, that work will be performed on the weekday either immediately following or preceding the holiday, as approved by the Facility Operation Specialist.

C.1.2.2 No work shall be performed during non-duty hours, weekends, or when the Government has no force on duty available for inspection of the Contractor’s work unless prior approval with the Facility Operations Specialist and the Facility Coordinator has been obtained.

C.1.3 ADMINISTRATION DATA:

C.1.3.1 Regular Schedule: Contractor shall provide, if necessary, a written schedule to the KO for approval indicating the dates the work will be performed. Unless the contractor is otherwise notified by the KO, the schedule is approved as submitted and no changes will be allowed without written approval from the KO or COR.

C.1.4 INTERFERENCE WITH BUSINESS:

C.1.4.1 The work shall be performed in such manner that there will be minimal interruption in, or interference with Government operations.

C.1.5 PROTECTION OF PROPERTY:

C.1.5.1 The contractor shall be held responsible of the cost of any repairs caused by negligence or abuse on his/her part or on the part of his/her employees.

C.1.6 SAFETY:

C.1.6.1 The contractor shall instruct employees in appropriate safety measures as specified by the applicable provisions of Occupational Safety and Health Act of 1979, PL 91-596 (84 STAT 1590). The contractor’s employees shall not create safety hazards.

C.1.7 FIRE PROTECTION AND PREVENTION:

C.1.7.1 The contractor shall comply with all fire protection measures IAW National Fire Protection Association.

C.1.8 ENERGY CONSERVATION:

C.1.8.1 The contractor shall instruct employees in utility conservation. The contractor shall operate under conditions, which preclude the waste of utilities, which shall include, but are not limited to, the following and other like items:

C.1.8.1.2 Equipment controls for heating, ventilation and air conditioning systems shall not be adjusted by the contractor or the contractor’s employees.

C.1.8.1.3 Water faucets and valves shall be turned off after use.

C.1.8.1.4 Any faulty switches, faucets or other utility controls shall be reported to the facility coordinator.

C.1.9 QUALITY ASSURANCE: The Government will monitor the contractor’s performance under this contract.

SECTION C-2

DEFINITIONS

C.2 DEFINITIONS:

C.2.1 CONTRACTING OFFICER (KO): The KO is the only person with authority to enter into, amend, modify, or take any other action with respect to the contract requirements on behalf of the Government.

C.2.2 CONTRACTING OFFICER’S REPRESENTATIVE (COR): The COR is responsible for administration of the Government contract only. The COR is not authorized to modify any part of these requirements or sign any form (s) obligating expenditure of Government funds.

C.2.3 QUALITY ASSURANCE: Those actions taken by the Government to check goods or services to determine that they meet the requirements of the contract.

C.2.4 QUALITY CONTROL: Those actions taken by a contractor to control the production of goods or services so that they meet the requirements of the contract.

C.2.5 FACILITY COORDINATOR: A person at the facility who is responsible of the overall daily operations of the facility. This person may be military or civilian. The facility coordinator is not authorized to modify any part of these requirements or sign any form (s) obligating expenditure of Government funds.

C.2.6 FACILITY OPERATIONS SPECIALIST: A person responsible for the maintenance and repair of the facility including the service contracts. The POC for the contractor regarding issues of the contract.

SECTION C-3

GOVERNMENT FURNISHED PROPERTY AND SERVICES

C.3 GENERAL:

C.3.1 The Government will provide the facilities, materials, equipment and services listed below:

C.3.1.1 Locked Storage space for supplies and equipment will be provided to the contractor for the contractor’s exclusive use in the storage of equipment and articles essential to performance.

The contractor shall make no alternations to the space without written permission from the facility coordinator and shall vacate the space upon written notice from the KO and shall restore the space to its original condition without charge to the government. Storage space shall be maintained by the contractor in a neat, clean and sanitary manner.

C.3.1.2 Utilities such as water, sewage, electric power and light will be supplied to the contractor for what is essential to perform required tasks. Energy conservation practices shall be employed by the contractor in servicing the building.

SECTION C-4

CONTRACTOR FURNISHED ITEMS

C.4 GENERAL:

C.4.1 The contractor shall furnish all necessary supplies, repair parts, materials, tools support equipment and vehicles necessary to perform all work required by this contract. The contractor shall be an authorized maintenance, repair and dealer of (LMI) digital liquid pumps. The contractor shall also know how to operate and maintain LMI programmable dividers.

C.4.2 EQUIPMENT:

C.4.2.1 The contractor shall provide and operate all necessary equipment. Such equipment shall be of the size and type adequate for the required purpose.

SECTION C-5

SPECIFIC TASKS

C.5 SCOPE OF WORK: Operational and Maintenance of Non Transient Public Water System 6201170

C.5.1.1 TEST AND DOCUMENT WATER QAULITY PARAMETERS: This shall be accomplished by testing the chlorine residual weekly as outlined in the Disinfection Residual Rule (DRR) site sample plan in attachment, and polyphosphate residual twice monthly. The following areas will be tested for free chlorine residual: Hydro room, break room sink, warehouse break room sink. The free chlorine residual parameter shall be between .2 ppm and .4 ppm. The chlorine residual readings for each location shall be recorded in the O&M water treatment binder. The following areas will be tested for polyphosphate twice monthly: Break room sink, warehouse break room sink. The polyphosphate residual readings shall be recorded in the O&M water treatment binder.

C.5.1.2 ADJUST CHEMICAL FEED PUMPS: The chemical feed pumps shall be adjusted in order to obtain water stabilization IAW the water parameters. Adjust the chemical feed pump for the Sodium Hypochlorite so that the parameter reading for the chlorine residual is between .2 and .4 ppm. Adjust the chemical feed pump for the polyphosphate so that the parameter reading for the lead residual is not above the Maximum Contaminant Level (MCL) of .015 ppm and the copper residual reading is not above the Maximum Contaminant Level (MCL) of 1.3 ppm.

C.5.1.3 SODIUM HYPOCHLORITE AND POLYPHOSPHATE CONTAINERS: The chemical containers will be checked twice monthly. Chemical containers shall have a sufficient amount of the chemical inside the container until the next scheduled service. All containers shall have the original label affixed to the outside of the container. If a smaller secondary container is used, all of the information contained on the original label must also be also be on the secondary container. The contractor shall also supply current Safety Data Sheets (SDS’s) for the sodium hypochlorite and the polyphosphate.

C.5.1.4 HOLDING TANK: The treated water located in the holding tank shall be flushed twice monthly to ensure all foreign material is out of holding tank.

C.5.1.5 PREVENTIVE MAINTENANCE: This work shall be accomplished monthly on the two chemical feed pumps. The following items will be checked IAW the manufacturers instructions.

a. Liquifram seal rings:

b. Valve balls

c. Injection check valve spring

d. injection supply line as needed The above items shall be replaced yearly IAW the manufacturers instructions. The COR will be notified if and when the above items need replacement.

C.5.1.6 REPORTS: Provide reports on a monthly basis to the COR. They shall include water testing results from the certified testing laboratory. Any adjustment made to the chemical feed pumps, and the amount of chemicals added to the containers as well as negative findings will be included on this monthly report.

C.5.1.7 CLEAN-UP: All areas shall be cleaned and free from dirt, dust, or any other foreign material.

C.5.1.8 Contractor shall perform the following sampling and prepare for analysis the following water testing parameters at ECS 103 Conneaut Lake, PA at the prescribed yearly monitoring schedules found in section D.

a. Total Coliform

b. Chlorine Residual

c. Nitrate

d. Nitrite

e. IOC’s

f. SOC's

g. VOC’s

h. Lead and Copper

i. HAA5’s

j. TTHM’s

k. Asbestos

C.5.1.9 Contractor shall collect the samples using only EPA Approved sampling techniques.

a. All samples shall be collected from the systems designated location according to the PA DEP Monitoring Schedule for PWS# 6201170. See below for appropriate monitoring schedule in section D. It is the contractor’s responsibility to verify that the water sampling locations specified in this Performance Work Statement are correct and IAW with the DRR Site Sampling Plan.

C.5.1.10 The contractor shall only use a Pennsylvania Certified Laboratory for analysis of the samples.

a. The Laboratory shall be certified in the analysis of Drinking Water parameters of the following: Microbiology, Basic Drinking Water Category, Metals (trace and inorganic non metals), Volatile and Semi-Volatile Organic Compounds, Asbestos for Potable Water, & Synthetic Organic Compounds (see attached schedule in section D).

b. Contractor shall provide a copy of the Pennsylvania Certification from the testing Laboratory, to the COR, prior to sampling.

c. Contractor shall ensure that the Laboratory will report all samples electronically to the PA DEP using an established PA DEP DWELR account.

d. All samples must be reported electronically by the 10th of the following month that the samples analyses were completed via the PA DWELR System.

e. Reporting via paper copies to the PA DEP is not permitted.

f. Contractor will acquire fresh sampling bottles/ containers & preservatives from the designated Laboratory prior to each sampling event.

g. If lab error occurs because the contractor utilized improper sampling method, improper sample bottles or expired preservatives then a resample will occur, at the contractor’s expense.

h. Contractor shall provide their own coolers and ice for proper chilling and transport of samples. It is the contractor’s responsibility to ensure that all samples are transported to the Laboratory and samples analyzed within the samples designated holding time.

i. Any samples rejected by the Laboratory, for any reason, will be resampled immediately by the contractor, at the contractor’s expense.

C.5.1.11 Total Coliform

a. Total Coliform Samples will ONLY be analyzed by the Membrane Filtration (MF) method, 9222, as defined by the most accredited version of Standard Methods for the Examination of Water and Wastewater.

i. Alternative methods are NOT permitted.

b. Samples will be collected monthly based on Calendar Year.

c. Samples (1) must be collected from the DISTRIBUTION System, also outlined in the Total Coliform Site sampling plan

1. Sample will only be collected from sampling locations that can be properly sterilized.

2. The water MUST be flushed for several minutes prior to sampling.

3. Samples are NOT PERMITTED to be taken from a hose or other distribution source that is prone to contamination.

d. Samples shall be identified to the lab as follows on the Chain Of Custody: PA118-

TC/CL2-YYYYDDMM

e. Samples shall be sampled at the beginning of each month to allow for resample (i.e.

earlier in the month), should a holding time be exceeded or laboratory error occurs.

C.5.1.12 Nitrate and Nitrite (NO2/NO3)

a. Samples MUST be collected during the 3rd Calendar Quarter

b. Samples (1 of each) MUST be collected from the systems ENTRY POINT 101.

c. Samples shall be identified to the lab as follows on the Chain Of Custody : PA118-

NO2/NO3-YYYYDDMM

d. Samples shall be sampled within the designated quarter to allow for resample (i.e.

earlier in the quarter), should a holding time be exceeded or laboratory error occurs.

C.5.1.13 Inorganic Chemicals (IOC’s)

a. Samples MUST be collected any time during the appropriate Calendar Years found in Section D

b. Samples (1set each) MUST be collected from the systems ENTRY POINT 101

c. Samples shall be identified to the lab as follows on the Chain Of Custody : PA118IOC-

YYYYDDMM

d. Samples shall be sampled within the designated time frame to allow for resample (i.e.

C.5.1.14 Asbestos

Section D

b. Samples (1 each) MUST be collected from the systems ENTRY POINT 101

c. Samples shall be identified to the lab as follows on the Chain Of Custody : PA118- Asbestos-YYYYDDMM

C.5.1.15 Free Chlorine

a. Samples MUST be collected weekly, for a total of 52 samples, during the appropriate Calendar Years found in Section D, also outlined in the DRR site sampling plan

b. Samples (1) MUST be collected from the systems DISTRIBUTION SYSTEM

c. ALL Free Chlorine samples must be reported using the SDWA-1 format as outlined in the Disinfection Requirements Rule

C.5.1.16 Synthetic Organic Chemicals (SOC’s)

a. Samples MUST be collected during the 2nd quarter of the appropriate Calendar Years found in Section D

b. Samples (1) MUST be collected from the systems ENTRY POINT 101

c. Samples shall be identified to the lab as follows on the Chain Of Custody : PA118-

SOC-YYYYDDMM

C.5.1.17 Volatile Organic Chemicals (VOC’s)

Section D

b. Samples (1) MUST be collected from the systems ENTRY POINT 101

c. Samples shall be identified to the lab as follows on the Chain Of Custody : PA118-

VOC-YYYYDDMM

C.5.1.18Lead and Copper

a. Samples MUST be collected between 6/1 through 9/30 during the appropriate Calendar Years found in Section D, also outlined in the Lead & Copper site sampling plan.

b. Five (5) total samples must be collected from the DISTRIBUTION System.

c. Samples shall be identified to the lab as follows on the Chain Of Custody : PA118-

LCR-YYYYDDMM

C.5.1.19 Haloacetic acids (HAA5’s) and Trihalomethanes (TTHM’s)

a. Samples MUST be collected between 8/8 through 8/14 during the appropriate Calendar Years found in Section D

b. Samples (1 of each) MUST be collected from the DISTRIBUTION System.

Specifically at sample site location 734.

c. Samples shall be identified to the lab as follows on the Chain Of Custody : PA118-

DDBP-YYYYDDMM

C.5.1.20 The contractor shall develop and submit to the COR for review and signature prior to submitting to the DEP any sampling plans that are required by regulation, 25 Code PA Chapter 109 (i.e Total Coliform and Chlorine Residual Sampling Plan, Disinfection Requirements Rule Sampling Siting Plan, Lead and Copper sample site location plan, etc).. At no time shall the DRR sampling Site Plan be submitted to DEP without the COR review and signature.

C.5.2.1 If an MCL violation occurs, the contractor will contact the COR immediately upon notification from the laboratory or the PA DEP.

a. If an MCL is exceeded, for any parameter, follow up samples will be determined by the COR.

C.5.2.2 The contractor will provide the COR with results immediately upon receipt and no later than 5 working days, via email.

D. Yearly Monitoring Schedules- The contractor shall verify with the COR at the beginning of each calendar to verify there have been no changes to the yearly monitoring plan from DEP.

2018 MONTORING (included for reference purposes only)

SYST

EM

NAM

E

CONTAMINA

NT

CONTAMI

NANT

CODE

CONTAMI

NANT

GROUP

MONITORING/RE

PORTING

FREQUENCY

CURRENT OR NEXT

SAMPLING PERIOD

SAMPLE

LOCATI

ON

NO.

OF

SAMP

LES

ECS

TOTAL

CHLORINE

1000 DDBP MONTHLY, IF

USED

EACH MONTH DISTRIB

UTION

ECS

FREE

CHLORINE

1013 DDBP WEEKLY EACH WEEK

BEGININNG MAY

DISTRIB

UTION

ECS

LEAD/COPPE

R GROUP

CONTAMINA

NT

5000 LCR THREE YEARS 06/01/2019

THROUGH

09/30/2019

DISTRIB

UTION

ECS

TOTAL

COLIFORM

PRESENCE

3100 TCR MONTHLY EACH MONTH DISTRIB

UTION

ECS

HALOACETIC

ACIDS (FIVE)

2456 DDBP THREE YEARS AUGUST11 IN

DISTRIB

UTION

ECS

TRIHALOMET

HANES

2950 DDBP THREE YEARS AUGUST11 IN

DISTRIB

UTION

ECS

REGULATED

IOCS

IOC1 IOC THREE YEARS 01/01/2018

THROUGH

12/31/2018

ENTRY

POINT

ECS

ASBESTOS 1094 IOC NINE YEARS 01/01/2020

THROUGH

12/31/2022

ENTRY

POINT

ECS

NITRATE 1040 NTRT ANNUAL DURING QUARTER

WITH HIGHEST

HISTORICAL RESULT

ENTRY

POINT

ECS

NITRITE 1041 NTRT ANNUAL DURING QUARTER

WITH HIGHEST

HISTORICAL RESULT

ENTRY

POINT

ECS

REGULATED

SOCS

SOC1 SOC THREE YEARS REQUIRED DURING

SECOND QUARTER

OF 2019

ENTRY

POINT

ECS

VINYL

CHLORIDE

2976 VOC REQUIRED IF 2‐

CARBON

COMPOUND

DETECTED

ENTRY

POINT

ECS

REGULATED

VOCS

VOC1 VOC THREE YEARS 01/01/2019

THROUGH

12/31/2019

ENTRY

POINT

2019 MONITORING (included for reference purposes only)

SYSTE

M

NAM

E

CONTAMINA

NT

CONTAMI

NANT

CODE

CONTAMI

NANT

GROUP

MONITORING/RE

PORTING

FREQUENCY

CURRENT OR

NEXT

SAMPLING

PERIOD

SAMPLE

LOCATION

NO.

OF

SAMP

LES

ECS

TOTAL

CHLORINE

1000 DDBP MONTHLY, IF

USED

EACH MONTH DISTRIBUTI

ON

ECS

FREE

CHLORINE

1013 DDBP Weekly EACH WEEK

BEGINNING

5/1/2019

DISTRIBUTI

ON

ECS

LEAD/COPPE

R GROUP

CONTAMINA

NT

5000 LCR THREE YEARS 06/01/2019

THROUGH

09/30/2019

DISTRIBUTI

ON

ECS

TOTAL

COLIFORM

PRESENCE

3100 TCR MONTHLY EACH MONTH DISTRIBUTI

ON

HALOACETIC

ACIDS (FIVE)

2456 DDBP THREE YEARS AUGUST11

IN 2019

DISTRIBUTI

ON 734

ECS

TRIHALOMET

HANES

2950 DDBP THREE YEARS AUGUST11

IN 2019

DISTRIBUTI

ON 734

ECS

NITRATE 1040 NTRT ANNUAL DURING

QUARTER

WITH

HIGHEST

HISTORICAL

RESULT

ENTRY

POINT 101

ECS

NITRITE 1041 NTRT ANNUAL DURING

QUARTER

WITH

HIGHEST

HISTORICAL

RESULT

ENTRY

POINT 101

ECS

REGULATED

SOCS

SOC1 SOC THREE YEARS REQUIRED

DURING

SECOND

QUARTER OF

ENTRY

POINT 101

ECS

VINYL

CHLORIDE

2976 VOC REQUIRED IF 2‐

CARBON

POINT 101

ECS

REGULATED

VOCS

VOC1 VOC THREE YEARS 01/01/2019

THROUGH

12/31/2019

ENTRY

2020 MONITORING (included for reference purposes only)

SYSTE

M

NAM

E

CONTAMINA

NT

CONTAMI

NANT

CODE

CONTAMI

NANT

GROUP

MONITORING/RE

PORTING

FREQUENCY

CURRENT OR

NEXT

SAMPLING

PERIOD

SAMPLE

LOCATION

NO.

OF

SAMP

LES

ECS

TOTAL

CHLORINE

1000 DDBP MONTHLY, IF

USED

EACH MONTH DISTRIBUT

ION

ECS

FREE

CHLORINE

1013 DDBP Weekly WEEKLY DISTRIBUT

ION

ECS

TOTAL

COLIFORM

PRESENCE

3100 TCR MONTHLY EACH MONTH DISTRIBUT

ION

ECS

NITRATE 1040 NTRT ANNUAL DURING

QUARTER WITH

HIGHEST

HISTORICAL

RESULT

ENTRY

POINT 101

ECS

NITRITE 1041 NTRT ANNUAL DURING

QUARTER WITH

ENTRY

HIGHEST

HISTORICAL

RESULT

2021 MONTIORING (included for reference purposes only)

EM

NAM

E

CONTAMINA

NT

CONTAMI

NANT

CODE

CONTAMI

NANT

GROUP

MONITORING/RE

PORTING

FREQUENCY

CURRENT OR

NEXT

SAMPLING

PERIOD

SAMPLE

LOCATION

NO.

OF

SAMP

LES

ECS

TOTAL

CHLORINE

1000 DDBP MONTHLY, IF

USED

EACH MONTH DISTRIBUT

ION

ECS

FREE

CHLORINE

1013 DDBP Weekly EACH WEEK DISTRIBUT

ION

ECS

TOTAL

COLIFORM

PRESENCE

3100 TCR MONTHLY EACH MONTH DISTRIBUT

ION

ECS

REGULATED

IOCS

IOC1 IOC THREE YEARS 01/01/2021

THROUGH

12/31/2021

ENTRY

POINT 101

ECS

ASBESTOS 1094 IOC NINE YEARS 01/01/2021

THROUGH

12/31/2021

ENTRY

POINT 101

ECS

NITRATE 1040 NTRT ANNUAL DURING

QUARTER WITH

HIGHEST

HISTORICAL

RESULT

ENTRY

POINT 101

ECS

NITRITE 1041 NTRT ANNUAL DURING

QUARTER WITH

HIGHEST

HISTORICAL

RESULT

ENTRY

2022 MONITORING (included for reference purposes only)

EM

NAM

E

CONTAMINA

NT

CONTAMI

NANT

CODE

CONTAMI

NANT

GROUP

MONITORING/RE

PORTING

FREQUENCY

CURRENT OR

NEXT

SAMPLING

PERIOD

SAMPLE

LOCATION

NO.

OF

SAMP

LES

ECS

TOTAL

CHLORINE

1000 DDBP MONTHLY, IF

USED

EACH MONTH DISTRIBUT

ION

ECS

FREE

CHLORINE

1013 DDBP Weekly EACH WEEK DISTRIBUT

ION

ECS

LEAD/COPPE

R GROUP

CONTAMINA

NT

5000 LCR THREE YEARS 06/01/2022

THROUGH

09/30/2022

DISTRIBUT

ION

TOTAL

COLIFORM

PRESENCE

3100 TCR MONTHLY EACH MONTH DISTRIBUT

ION

ECS

HALOACETIC

ACIDS (FIVE)

2456 DDBP THREE YEARS AUGUST11 IN

DISTRIBUT

ION 734

ECS

TRIHALOMET

HANES

2950 DDBP THREE YEARS AUGUST11 IN

DISTRIBUT

ION 734

ECS

NITRATE 1040 NTRT ANNUAL DURING

QUARTER WITH

HIGHEST

HISTORICAL

RESULT

ENTRY

POINT 101

ECS

NITRITE 1041 NTRT ANNUAL DURING

QUARTER WITH

HIGHEST

HISTORICAL

RESULT

ENTRY

POINT 101

ECS

REGULATED

SOCS

SOC1 SOC THREE YEARS REQUIRED

DURING

SECOND

QUARTER OF

ENTRY

POINT 101

ECS

VINYL

CHLORIDE

2976 VOC REQUIRED IF 2‐

CARBON

ECS

REGULATED

VOCS

VOC1 VOC THREE YEARS 01/01/2022

THROUGH

12/31/2022

ENTRY

2023 MONITORING (included for reference purposes only)

EM

NAM

E

CONTAMINA

NT

CONTAMI

NANT

CODE

CONTAMI

NANT

GROUP

MONITORING/RE

PORTING

FREQUENCY

CURRENT OR

NEXT

SAMPLING

PERIOD

SAMPLE

LOCATION

NO.

OF

SAMP

LES

ECS

TOTAL

CHLORINE

1000 DDBP MONTHLY, IF

USED

EACH MONTH DISTRIBUTI

ON

ECS

FREE

CHLORINE

1013 DDBP Weekly EACH WEEK DISTRIBUTI

ON

ECS

TOTAL

COLIFORM

PRESENCE

3100 TCR MONTHLY EACH MONTH DISTRIBUTI

ON

ECS

NITRATE 1040 NTRT ANNUAL DURING

QUARTER

WITH HIGHEST

HISTORICAL

RESULT

ENTRY

POINT 101

ECS

NITRITE 1041 NTRT ANNUAL DURING

QUARTER

WITH HIGHEST

ENTRY

HISTORICAL

RESULT

2024 MONTIORING (included for reference purposes only)

EM

NAM

E

CONTAMINA

NT

CONTAMI

NANT

CODE

CONTAMI

NANT

GROUP

MONITORING/RE

PORTING

FREQUENCY

CURRENT OR

NEXT

SAMPLING

PERIOD

SAMPLE

LOCATION

NO.

OF

SAMP

LES

ECS

TOTAL

CHLORINE

1000 DDBP MONTHLY, IF

USED

EACH MONTH DISTRIBUT

ION

ECS

FREE

CHLORINE

1013 DDBP Weekly EACH WEEK DISTRIBUT

ION

ECS

TOTAL

COLIFORM

PRESENCE

3100 TCR MONTHLY EACH MONTH DISTRIBUT

ION

ECS

REGULATED

IOCS

IOC1 IOC THREE YEARS 01/01/2024

THROUGH

12/31/2024

ENTRY

POINT 101

ECS

ASBESTOS 1094 IOC NINE YEARS 01/01/2024

THROUGH

12/31/2024

ENTRY

POINT 101

ECS

NITRATE 1040 NTRT ANNUAL DURING

QUARTER WITH

HIGHEST

HISTORICAL

RESULT

ENTRY

POINT 101

ECS

NITRITE 1041 NTRT ANNUAL DURING

QUARTER WITH

HIGHEST

HISTORICAL

RESULT

ENTRY

E. THIS CONCLUDES THIS SCOPE WORK.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 02-Aug-2019 10:00 AM to 07-Aug-

2019 10:00 AM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN description has changed from Base - Test Chlorine Residual Level to Base - Free Chlorine Testing.

The CLIN extended description has changed from:

WATER TREATMENT (2X EACH MONTH) TEST CHLORINE RESIDUAL LEVEL. THIS SHALL BE

ACCOMPLISHED 2X PER MONTH. THE FOLLOWING AREAS WILL BE TESTED FOR CHLORINE

RESIDUAL: HYDRO ROOM, MALE BATHROOM SINK, BREAK ROOM SINK, WAREHOUSE BREAK

ROOM SINK, WAREHOUSE BATHROOM SINK. CHLORINE RESIDUAL PARAMETER SHALL BETWEEN

.2PPM AND .4PPM. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT

LAKE, PA 16316-6661.

To:

WATER TREATMENT (WEEKLY) FOR WEEKLY SAMPLING AND ANALYSIS OF FREE CHLORINE IAW

THE PERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 40.00 from 12.00 to 52.00.

The unit of issue has changed from Months to Each.

CLIN 0002

The CLIN extended description has changed from:

WATER TREATMENT (2X EACH MONTH) TEST POLYPHOSPHATE LEVEL. THIS SHALL BE

ACCOMPLISHED 2X PER MONTH. THE FOLLOWING AREAS WILL BE TESTED FOR POLYPHOSPHATE

RESIDUAL: HYDRO ROOM, MALE BATHROOM SINK, BREAK ROOM SINK, WAREHOUSE BREAK

ROOM SINK, WAREHOUSE BATHROOM SINK. POLYPHOSPHATE RESIDUAL PARAMETER SHALL

BETWEEN .2PPM AND .4PPM. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD BOULEVARD,

CONNEAUT LAKE, PA 16316-6661.

WATER TREATMENT (2X EACH MONTH) TEST POLYPHOSPHATE LEVEL. THIS SHALL BE

ACCOMPLISHED 2X PER MONTH IAW THE PERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT

LAKE (PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 12.00 from 12.00 to 24.00.

CLIN 0003

WATER TREATMENT (2X EACH MONTH) ADJUST CHEMICAL FEED PUMPS. CHEMICAL FEED PUMPS

SHALL BE ADJUSTED TO OBTAIN WATER STABILIZATION IAW THE WATER PARAMETERS. SHALL

BE ACCOMPLISHED 2X PER MONTH. ADJUST CHEMICAL FEED PUMP FOR THE SODIUM

HYPOCHLORITE SO THAT THE PARAMETER READING FOR THE CHLORINE RESIDUAL IS BETWEEN

.2 AND .4 PPM. ADJUST THE CHEMICAL FEED PUMP FOR THE POLYPHOSPHATE SO THAT THE

PARAMETER READING FOR THE LEAD RESIDUAL IS NOT ABOVE THE MAXIMUM

CONTAMINATION LEVEL (MCL) OF 1.3PPM. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

WATER TREATMENT (1X EACH MONTH) ADJUST CHEMICAL FEED PUMPS. CHEMICAL FEED PUMPS

SHALL BE ADJUSTED TO OBTAIN WATER STABILIZATION IAW THE WATER PARAMETERS. SHALL

BE ACCOMPLISHED ON A MONTHLY BASIS. ADJUST CHEMICAL FEED PUMP FOR THE SODIUM

HYPOCHLORITE SO THAT THE PARAMETER READING FOR THE CHLORINE RESIDUAL IS BETWEEN

.2 AND .4 PPM. ADJUST THE CHEMICAL FEED PUMP FOR THE POLYPHOSPHATE SO THAT THE

PARAMETER READING FOR THE LEAD RESIDUAL IS NOT ABOVE THE MAXIMUM

CONTAMINATION LEVEL (MCL) OF 1.3PPM. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 0004

WATER TREATMENT (1X EACH MONTH) CHEMICAL LEVELS MAINTAINED. THE CHEMICAL

CONTAINERS WILL BE CHECKED MONTHLY. CHEMICAL CONTAINERS SHALL HAVE A SUFFICIENT

AMOUNT OF THE CHEMICAL INSIDE THE CONTAINER UNTIL THE NEXT SCHEDULED SERVICE. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

WATER TREATMENT (2X EACH MONTH) CHEMICAL LEVELS MAINTAINED. THE CHEMICAL

CONTAINERS WILL BE CHECKED 2X EACH MONTH. CHEMICAL CONTAINERS SHALL HAVE A

SUFFICIENT AMOUNT OF THE CHEMICAL INSIDE THE CONTAINER UNTIL THE NEXT SCHEDULED

SERVICE. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 0005

CLIN 0006

The CLIN description has changed from Base - Water Treatment Reports to Base - Monthly Water Treatment Reports.

CLIN 0007

CLIN 0008

WATER TREATMENT (4X EACH YEAR) QUARTERLY SAMPLING AND ANALYSIS OF TOTAL

COLIFORM IAW THE PERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467

MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

WATER TREATMENT (1X EACH MONTH) FOR MONTHLY SAMPLING AND ANALYSIS OF TOTAL

COLIFORM IAW THE PERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467

MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 8.00 from 4.00 to 12.00.

CLIN 0009

The CLIN description has changed from Base - Nitrate/Nitrite Sample to Base - Nitrate Testing.

The CLIN extended description has changed from:

WATER TREATMENT (1X EACH YEAR) YEARLY SAMPLING AND ANALYSIS OF NITRATE/NITRITE

IAW THE PERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT LAKE (PA1 18), 6467 MIKEWOOD

WATER TREATMENT (1X EACH YEAR) YEARLY SAMPLING AND ANALYSIS OF NITRATE IAW THE

PERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT LAKE (PA1 18), 6467 MIKEWOOD

CLIN 0010

This CLIN has been renumbered to CLIN 0016.

The CLIN extended description has changed from:

WATER TREATMENT (4X EACH YEAR) QUARTERLY SAMPLING AND ANALYSIS OF CHLORINE

RESIDUAL IAW THE PERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467

WATER TREATMENT (2X EACH MONTH) SAMPLING AND ANALYSIS OF CHLORINE RESIDUAL IAW

THE PERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

The pricing detail quantity has increased by 20.00 from 4.00 to 24.00.

CLIN 0011

This CLIN has been renumbered to CLIN 0017.

CLIN 1001

The CLIN description has changed from OY1 - Test Chlorine Residual Level to OY1 - Free Chlorine Testing.

The CLIN extended description has changed from:

WATER TREATMENT (2X EACH MONTH) TEST CHLORINE RESIDUAL LEVEL. THIS SHALL BE

ACCOMPLISHED 2X PER MONTH. THE FOLLOWING AREAS WILL BE TESTED FOR CHLORINE

RESIDUAL: HYDRO ROOM, MALE BATHROOM SINK, BREAK ROOM SINK, WAREHOUSE BREAK

ROOM SINK, WAREHOUSE BATHROOM SINK. CHLORINE RESIDUAL PARAMETER SHALL BETWEEN

WATER TREATMENT (WEEKLY) FOR WEEKLY SAMPLING AND ANALYSIS OF FREE CHLORINE IAW

THE PERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 40.00 from 12.00 to 52.00.

The option status has changed from No Status to Option.

CLIN 1002

WATER TREATMENT (2X EACH MONTH) TEST POLYPHOSPHATE LEVEL. THIS SHALL BE

ACCOMPLISHED 2X PER MONTH. THE FOLLOWING AREAS WILL BE TESTED FOR POLYPHOSPHATE

RESIDUAL: HYDRO ROOM, MALE BATHROOM SINK, BREAK ROOM SINK, WAREHOUSE BREAK

ROOM SINK, WAREHOUSE BATHROOM SINK. POLYPHOSPHATE RESIDUAL PARAMETER SHALL

CONNEAUT LAKE, PA 16316-6661

ACCOMPLISHED 2X PER MONTH IAW THE PERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT

LAKE (PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 12.00 from 12.00 to 24.00.

CLIN 1003

WATER TREATMENT (2X EACH MONTH) ADJUST CHEMICAL FEED PUMPS. CHEMICAL FEED PUMPS

SHALL BE ADJUSTED TO OBTAIN WATER STABILIZATION IAW THE WATER PARAMETERS. SHALL

BE ACCOMPLISHED 2X PER MONTH. ADJUST CHEMICAL FEED PUMP FOR THE SODIUM

HYPOCHLORITE SO THAT THE PARAMETER READING FOR THE CHLORINE RESIDUAL IS BETWEEN

.2 AND .4 PPM. ADJUST THE CHEMICAL FEED PUMP FOR THE POLYPHOSPHATE SO THAT THE

PARAMETER READING FOR THE LEAD RESIDUAL IS NOT ABOVE THE MAXIMUM

WATER TREATMENT (1X EACH MONTH) ADJUST CHEMICAL FEED PUMPS. CHEMICAL FEED PUMPS

SHALL BE ADJUSTED TO OBTAIN WATER STABILIZATION IAW THE WATER PARAMETERS. SHALL

BE ACCOMPLISHED ON A MONTHLY BASIS. ADJUST CHEMICAL FEED PUMP FOR THE SODIUM

HYPOCHLORITE SO THAT THE PARAMETER READING FOR THE CHLORINE RESIDUAL IS BETWEEN

.2 AND .4 PPM. ADJUST THE CHEMICAL FEED PUMP FOR THE POLYPHOSPHATE SO THAT THE

PARAMETER READING FOR THE LEAD RESIDUAL IS NOT ABOVE THE MAXIMUM

CONTAMINATION LEVEL (MCL) OF 1.3PPM. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 1004

WATER TREATMENT (1X EACH MONTH) CHEMICAL LEVELS MAINTAINED. THE CHEMICAL

CONTAINERS WILL BE CHECKED MONTHLY. CHEMICAL CONTAINERS SHALL HAVE A SUFFICIENT

WATER TREATMENT (2X EACH MONTH) CHEMICAL LEVELS MAINTAINED. THE CHEMICAL

CONTAINERS WILL BE CHECKED 2X EACH MONTH. CHEMICAL CONTAINERS SHALL HAVE A

SUFFICIENT AMOUNT OF THE CHEMICAL INSIDE THE CONTAINER UNTIL THE NEXT SCHEDULED

SERVICE. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 12.00 from 12.00 to 24.00.

CLIN 1005

WATER TREATMENT (1X EACH MONTH) PREVENTATIVE MAINTENANCE ON PUMPS.THIS WORK

SHALL BE ACCOMPLISHED MONTHLY ON THE TWO CHEMICAL FEED PUMPS. THE FOLLOWING

ITEMS WILL BE CHECKED IAW THE MANUFACTURERS INSTRUCTIONS. LIQUIFRAM SEAL REANDS;

VALVE BALLS; INJECTION CHECK VALVE SPRING. THE ABOT ITEMS SHALL BE REPLACED

YEARLY IAW THE MANUFACTURERS INSTRUCTION. THE FACILITY OPERATION SPECIALIST WILL

BE NOTIFIED IF AN WHEN THE ABOVE ITEMS NEED REPLACEMENT. ECS 103/CONNEAUT LAKE

(PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

WATER TREATMENT (1X EACH MONTH) PREVENTATIVEMAINTENANCE ON PUMPS.THIS WORK

SHALL BE ACCOMPLISHEDMONTHLY ON THE TWO CHEMICAL FEED PUMPS. THE

FOLLOWINGITEMS WILL BE CHECKED IAW THE MANUFACTURERSINSTRUCTIONS. LIQUIFRAM

SEAL REANDS; VALVE BALLS; INJECTIONCHECK VALVE SPRING. THE ABOT ITEMS SHALL BE

REPLACEDYEARLY IAW THE MANUFACTURERS INSTRUCTION. THE FACILITYOPERATION

SPECIALIST WILL BE NOTIFIED IF AN WHEN THE ABOVEITEMS NEED REPLACEMENT. ECS

103/CONNEAUT LAKE (PA118), 6467MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 1006

The CLIN description has changed from OY1 - Water Treatment Reports to OY1 - Monthly Water Treatment Reports.

The CLIN extended description has changed from:

WATER TREATMENT (1X EACH MONTH) REPORTS. THIS SHALL BE ACCOMPLISHED ON A

MONTHLY BASIS THEY SHALL INCLUDE WATER TESTING RESULTS. ANY ADJUSTMENTS MADE TO

THE CHEMICAL FEED PUMPS AND THE MAOUNT OF CHEMICAL ADDED TO THE CONTAINERS AS

WELL AS NEGATIVE FINDINGS WILL BE INCLUDED ON THIS MONTHLY REPORT. ECS

WATER TREATMENT (1X EACH MONTH) REPORTS. THIS SHALL BEACCOMPLISHED ON A

MONTHLY BASIS THEY SHALL INCLUDEWATER TESTING RESULTS. ANY ADJUSTMENTS MADE TO

THECHEMICAL FEED PUMPS AND THE MAOUNT OF CHEMICAL ADDED TOTHE CONTAINERS AS

WELL AS NEGATIVE FINDINGS WILL BEINCLUDED ON THIS MONTHLY REPORT. ECS

103/CONNEAUT LAKE(PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 1007

WATER TREATMENT (2X EACH MONTH) FLUSH HOLDING TANK. THE TREATED WATER LOCATED

IN THE HOLDING TANK SHALL BE FLUSHED TWICE MONTHLY TO ENSURE ALL FOREIGN

MATERIAL IS OUT OF THE HOLDING TANK. ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

WATER TREATMENT (2X EACH MONTH) FLUSH HOLDING TANK. THETREATED WATER LOCATED

IN THE HOLDING TANK SHALL BEFLUSHED TWICE MONTHLY TO ENSURE ALL FOREIGN

MATERIAL ISOUT OF THE HOLDING TANK. ECS 103/CONNEAUT LAKE (PA118), 6467MIKEWOOD

BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 12.00 from 12.00 to 24.00.

CLIN 1008

WATER TREATMENT (4X EACH YEAR) QUARTERLY SAMPLING AND ANALYSIS OF TOTAL

WATER TREATMENT (1X EACH MONTH) FOR MONTHLY SAMPLINGAND ANALYSIS OF TOTAL

COLIFORM IAW THE PERFORMANCE WORKSTATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467

MIKEWOODBOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 1009

The CLIN description has changed from OY1 - Nitrate/Nitrite Sample to OY1 - Nitrate Testing.

The CLIN extended description has changed from:

WATER TREATMENT (1X EACH YEAR) YEARLY SAMPLING AND ANALYSIS OF NITRATE/NITRITE

WATER TREATMENT (1X EACH YEAR) YEARLY SAMPLING ANDANALYSIS OF NITRATE IAW THE

PERFORMANCE WORK STATEMENT.ECS 103/CONNEAUT LAKE (PA1 18), 6467 MIKEWOOD

BOULEVARD,CONNEAUT LAKE, PA 16316-6661.

CLIN 1010

This CLIN has been renumbered to CLIN 1011.

The CLIN extended description has changed from:

WATER TREATMENT (4X EACH YEAR) QUARTERLY SAMPLING AND ANALYSIS OF CHLORINE

WATER TREATMENT (2X EACH MONTH) SAMPLING AND ANALYSIS OFCHLORINE RESIDUAL IAW

THE PERFORMANCE WORK STATEMENT.ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

BOULEVARD,CONNEAUT LAKE, PA 16316-6661.

CLIN 1011

This CLIN has been renumbered to CLIN 1012.

CLIN 2001

The CLIN description has changed from OY2 - Test Chlorine Residual Level to OY2 - Free Chlorine Testing.

The CLIN extended description has changed from:

WATER TREATMENT (2X EACH MONTH) TEST CHLORINE RESIDUAL LEVEL. THIS SHALL BE

ACCOMPLISHED 2X PER MONTH. THE FOLLOWING AREAS WILL BE TESTED FOR CHLORINE

RESIDUAL: HYDRO ROOM, MALE BATHROOM SINK, BREAK ROOM SINK, WAREHOUSE BREAK

ROOM SINK, WAREHOUSE BATHROOM SINK. CHLORINE RESIDUAL PARAMETER SHALL BETWEEN

WATER TREATMENT (WEEKLY) FOR WEEKLY SAMPLING ANDANALYSIS OF FREE CHLORINE IAW

THE PERFORMANCE WORKSTATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467

MIKEWOODBOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 40.00 from 12.00 to 52.00.

CLIN 2002

ACCOMPLISHED 2X PER MONTH. THE FOLLOWING AREAS WILL BE TESTED FOR POLYPHOSPHATE

RESIDUAL: HYDRO ROOM, MALE BATHROOM SINK, BREAK ROOM SINK, WAREHOUSE BREAK

ROOM SINK, WAREHOUSE BATHROOM SINK. POLYPHOSPHATE RESIDUAL PARAMETER SHALL

WATER TREATMENT (2X EACH MONTH) TEST POLYPHOSPHATELEVEL. THIS SHALL BE

ACCOMPLISHED 2X PER MONTH IAW THEPERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT

LAKE(PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 12.00 from 12.00 to 24.00.

CLIN 2003

WATER TREATMENT (2X EACH MONTH) ADJUST CHEMICAL FEED PUMPS. CHEMICAL FEED PUMPS

SHALL BE ADJUSTED TO OBTAIN WATER STABILIZATION IAW THE WATER PARAMETERS. SHALL

BE ACCOMPLISHED 2X PER MONTH. ADJUST CHEMICAL FEED PUMP FOR THE SODIUM

HYPOCHLORITE SO THAT THE PARAMETER READING FOR THE CHLORINE RESIDUAL IS BETWEEN

.2 AND .4 PPM. ADJUST THE CHEMICAL FEED PUMP FOR THE POLYPHOSPHATE SO THAT THE

PARAMETER READING FOR THE LEAD RESIDUAL IS NOT ABOVE THE MAXIMUM

WATER TREATMENT (1X EACH MONTH) ADJUST CHEMICAL FEEDPUMPS. CHEMICAL FEED PUMPS

SHALL BE ADJUSTED TO OBTAINWATER STABILIZATION IAW THE WATER PARAMETERS. SHALL

BEACCOMPLISHED ON A MONTHLY BASIS. ADJUST CHEMICAL FEEDPUMP FOR THE SODIUM

HYPOCHLORITE SO THAT THE PARAMETERREADING FOR THE CHLORINE RESIDUAL IS BETWEEN

.2 AND .4 PPM.ADJUST THE CHEMICAL FEED PUMP FOR THE POLYPHOSPHATE SOTHAT THE

PARAMETER READING FOR THE LEAD RESIDUAL IS NOTABOVE THE MAXIMUM CONTAMINATION

LEVEL (MCL) OF 1.3PPM.ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

BOULEVARD,CONNEAUT LAKE, PA 16316-6661.

CLIN 2004

WATER TREATMENT (1X EACH MONTH) CHEMICAL LEVELS MAINTAINED. THE CHEMICAL

CONTAINERS WILL BE CHECKED MONTHLY. CHEMICAL CONTAINERS SHALL HAVE A SUFFICIENT

WATER TREATMENT (2X EACH MONTH) CHEMICAL LEVELSMAINTAINED. THE CHEMICAL

CONTAINERS WILL BE CHECKED 2XEACH MONTH. CHEMICAL CONTAINERS SHALL HAVE A

SUFFICIENTAMOUNT OF THE CHEMICAL INSIDE THE CONTAINER UNTIL THENEXT SCHEDULED

SERVICE. ECS 103/CONNEAUT LAKE (PA118), 6467MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 12.00 from 12.00 to 24.00.

CLIN 2005

WATER TREATMENT (1X EACH MONTH) PREVENTATIVE MAINTENANCE ON PUMPS.THIS WORK

SHALL BE ACCOMPLISHED MONTHLY ON THE TWO CHEMICAL FEED PUMPS. THE FOLLOWING

ITEMS WILL BE CHECKED IAW THE MANUFACTURERS INSTRUCTIONS. LIQUIFRAM SEAL REANDS;

VALVE BALLS; INJECTION CHECK VALVE SPRING. THE ABOT ITEMS SHALL BE REPLACED

YEARLY IAW THE MANUFACTURERS INSTRUCTION. THE FACILITY OPERATION SPECIALIST WILL

SHALL BE ACCOMPLISHEDMONTHLY ON THE TWO CHEMICAL FEED PUMPS. THE

FOLLOWINGITEMS WILL BE CHECKED IAW THE MANUFACTURERSINSTRUCTIONS. LIQUIFRAM

SEAL REANDS; VALVE BALLS; INJECTIONCHECK VALVE SPRING. THE ABOT ITEMS SHALL BE

REPLACEDYEARLY IAW THE MANUFACTURERS INSTRUCTION. THE FACILITYOPERATION

SPECIALIST WILL BE NOTIFIED IF AN WHEN THE ABOVEITEMS NEED REPLACEMENT. ECS

103/CONNEAUT LAKE (PA118), 6467MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 2006

The CLIN description has changed from OY2 - Water Treatment Reports to OY2 - Monthly Water Treatment Reports.

The CLIN extended description has changed from:

WATER TREATMENT (1X EACH MONTH) REPORTS. THIS SHALL BE ACCOMPLISHED ON A

MONTHLY BASIS THEY SHALL INCLUDE WATER TESTING RESULTS. ANY ADJUSTMENTS MADE TO

THE CHEMICAL FEED PUMPS AND THE MAOUNT OF CHEMICAL ADDED TO THE CONTAINERS AS

MONTHLY BASIS THEY SHALL INCLUDEWATER TESTING RESULTS. ANY ADJUSTMENTS MADE TO

THECHEMICAL FEED PUMPS AND THE MAOUNT OF CHEMICAL ADDED TOTHE CONTAINERS AS

WELL AS NEGATIVE FINDINGS WILL BEINCLUDED ON THIS MONTHLY REPORT. ECS

103/CONNEAUT LAKE(PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 2007

WATER TREATMENT (2X EACH MONTH) FLUSH HOLDING TANK. THE TREATED WATER LOCATED

IN THE HOLDING TANK SHALL BE FLUSHED TWICE MONTHLY TO ENSURE ALL FOREIGN

IN THE HOLDING TANK SHALL BEFLUSHED TWICE MONTHLY TO ENSURE ALL FOREIGN

MATERIAL ISOUT OF THE HOLDING TANK. ECS 103/CONNEAUT LAKE (PA118), 6467MIKEWOOD

BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 12.00 from 12.00 to 24.00.

CLIN 2008

WATER TREATMENT (4X EACH YEAR) QUARTERLY SAMPLING AND ANALYSIS OF TOTAL

COLIFORM IAW THE PERFORMANCE WORKSTATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467

MIKEWOODBOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 2009

The CLIN description has changed from OY2 - Nitrate/Nitrite Sample to OY2 - Nitrate Testing.

The CLIN extended description has changed from:

WATER TREATMENT (1X EACH YEAR) YEARLY SAMPLING AND ANALYSIS OF NITRATE/NITRITE

PERFORMANCE WORK STATEMENT.ECS 103/CONNEAUT LAKE (PA1 18), 6467 MIKEWOOD

BOULEVARD,CONNEAUT LAKE, PA 16316-6661.

CLIN 2010

This CLIN has been renumbered to CLIN 2014.

The CLIN extended description has changed from:

WATER TREATMENT (4X EACH YEAR) QUARTERLY SAMPLING AND ANALYSIS OF CHLORINE

THE PERFORMANCE WORK STATEMENT.ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

BOULEVARD,CONNEAUT LAKE, PA 16316-6661.

CLIN 2011

This CLIN has been renumbered to CLIN 2015.

CLIN 3001

The CLIN description has changed from OY3 - Test Chlorine Residual Level to OY3 - Free Chlorine Testing.

The CLIN extended description has changed from:

WATER TREATMENT (2X EACH MONTH) TEST CHLORINE RESIDUAL LEVEL. THIS SHALL BE

ACCOMPLISHED 2X PER MONTH. THE FOLLOWING AREAS WILL BE TESTED FOR CHLORINE

RESIDUAL: HYDRO ROOM, MALE BATHROOM SINK, BREAK ROOM SINK, WAREHOUSE BREAK

ROOM SINK, WAREHOUSE BATHROOM SINK. CHLORINE RESIDUAL PARAMETER SHALL BETWEEN

THE PERFORMANCE WORKSTATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467

MIKEWOODBOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 40.00 from 12.00 to 52.00.

CLIN 3002

WATER TREATMENT (2X EACH MONTH) TEST POLYPHOSPHATE LEVEL. THIS SHALL BE

ACCOMPLISHED 2X PER MONTH. THE FOLLOWING AREAS WILL BE TESTED FOR POLYPHOSPHATE

RESIDUAL: HYDRO ROOM, MALE BATHROOM SINK, BREAK ROOM SINK, WAREHOUSE BREAK

ROOM SINK, WAREHOUSE BATHROOM SINK. POLYPHOSPHATE RESIDUAL PARAMETER SHALL

ACCOMPLISHED 2X PER MONTH IAW THEPERFORMANCE WORK STATEMENT. ECS 103/CONNEAUT

LAKE(PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 12.00 from 12.00 to 24.00.

CLIN 3003

WATER TREATMENT (2X EACH MONTH) ADJUST CHEMICAL FEED PUMPS. CHEMICAL FEED PUMPS

SHALL BE ADJUSTED TO OBTAIN WATER STABILIZATION IAW THE WATER PARAMETERS. SHALL

BE ACCOMPLISHED 2X PER MONTH. ADJUST CHEMICAL FEED PUMP FOR THE SODIUM

HYPOCHLORITE SO THAT THE PARAMETER READING FOR THE CHLORINE RESIDUAL IS BETWEEN

.2 AND .4 PPM. ADJUST THE CHEMICAL FEED PUMP FOR THE POLYPHOSPHATE SO THAT THE

PARAMETER READING FOR THE LEAD RESIDUAL IS NOT ABOVE THE MAXIMUM

SHALL BE ADJUSTED TO OBTAINWATER STABILIZATION IAW THE WATER PARAMETERS. SHALL

BEACCOMPLISHED ON A MONTHLY BASIS. ADJUST CHEMICAL FEEDPUMP FOR THE SODIUM

HYPOCHLORITE SO THAT THE PARAMETERREADING FOR THE CHLORINE RESIDUAL IS BETWEEN

.2 AND .4 PPM.ADJUST THE CHEMICAL FEED PUMP FOR THE POLYPHOSPHATE SOTHAT THE

PARAMETER READING FOR THE LEAD RESIDUAL IS NOTABOVE THE MAXIMUM CONTAMINATION

LEVEL (MCL) OF 1.3PPM.ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

BOULEVARD,CONNEAUT LAKE, PA 16316-6661.

CLIN 3004

WATER TREATMENT (1X EACH MONTH) CHEMICAL LEVELS MAINTAINED. THE CHEMICAL

CONTAINERS WILL BE CHECKED MONTHLY. CHEMICAL CONTAINERS SHALL HAVE A SUFFICIENT

CONTAINERS WILL BE CHECKED 2XEACH MONTH. CHEMICAL CONTAINERS SHALL HAVE A

SUFFICIENTAMOUNT OF THE CHEMICAL INSIDE THE CONTAINER UNTIL THENEXT SCHEDULED

SERVICE. ECS 103/CONNEAUT LAKE (PA118), 6467MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 12.00 from 12.00 to 24.00.

CLIN 3005

WATER TREATMENT (1X EACH MONTH) PREVENTATIVE MAINTENANCE ON PUMPS.THIS WORK

SHALL BE ACCOMPLISHED MONTHLY ON THE TWO CHEMICAL FEED PUMPS. THE FOLLOWING

ITEMS WILL BE CHECKED IAW THE MANUFACTURERS INSTRUCTIONS. LIQUIFRAM SEAL REANDS;

VALVE BALLS; INJECTION CHECK VALVE SPRING. THE ABOT ITEMS SHALL BE REPLACED

YEARLY IAW THE MANUFACTURERS INSTRUCTION. THE FACILITY OPERATION SPECIALIST WILL

SHALL BE ACCOMPLISHEDMONTHLY ON THE TWO CHEMICAL FEED PUMPS. THE

FOLLOWINGITEMS WILL BE CHECKED IAW THE MANUFACTURERSINSTRUCTIONS. LIQUIFRAM

SEAL REANDS; VALVE BALLS; INJECTIONCHECK VALVE SPRING. THE ABOT ITEMS SHALL BE

REPLACEDYEARLY IAW THE MANUFACTURERS INSTRUCTION. THE FACILITYOPERATION

SPECIALIST WILL BE NOTIFIED IF AN WHEN THE ABOVEITEMS NEED REPLACEMENT. ECS

103/CONNEAUT LAKE (PA118), 6467MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 3006

The CLIN description has changed from OY3 - Water Treatment Reports to OY3 - Monthly Water Treatment Reports.

The CLIN extended description has changed from:

WATER TREATMENT (1X EACH MONTH) REPORTS. THIS SHALL BE ACCOMPLISHED ON A

MONTHLY BASIS THEY SHALL INCLUDE WATER TESTING RESULTS. ANY ADJUSTMENTS MADE TO

THE CHEMICAL FEED PUMPS AND THE MAOUNT OF CHEMICAL ADDED TO THE CONTAINERS AS

MONTHLY BASIS THEY SHALL INCLUDEWATER TESTING RESULTS. ANY ADJUSTMENTS MADE TO

THECHEMICAL FEED PUMPS AND THE MAOUNT OF CHEMICAL ADDED TOTHE CONTAINERS AS

WELL AS NEGATIVE FINDINGS WILL BEINCLUDED ON THIS MONTHLY REPORT. ECS

103/CONNEAUT LAKE(PA118), 6467 MIKEWOOD BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 3007

WATER TREATMENT (2X EACH MONTH) FLUSH HOLDING TANK. THE TREATED WATER LOCATED

IN THE HOLDING TANK SHALL BE FLUSHED TWICE MONTHLY TO ENSURE ALL FOREIGN

IN THE HOLDING TANK SHALL BEFLUSHED TWICE MONTHLY TO ENSURE ALL FOREIGN

MATERIAL ISOUT OF THE HOLDING TANK. ECS 103/CONNEAUT LAKE (PA118), 6467MIKEWOOD

BOULEVARD, CONNEAUT LAKE, PA 16316-6661.

The pricing detail quantity has increased by 12.00 from 12.00 to 24.00.

CLIN 3008

WATER TREATMENT (4X EACH YEAR) QUARTERLY SAMPLING AND ANALYSIS OF TOTAL

COLIFORM IAW THE PERFORMANCE WORKSTATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467

MIKEWOODBOULEVARD, CONNEAUT LAKE, PA 16316-6661.

CLIN 3009

The CLIN description has changed from OY3 - Nitrate/Nitrite Sample to OY3 - Nitrate Testing.

The CLIN extended description has changed from:

WATER TREATMENT (1X EACH YEAR) YEARLY SAMPLING AND ANALYSIS OF NITRATE/NITRITE

PERFORMANCE WORK STATEMENT.ECS 103/CONNEAUT LAKE (PA1 18), 6467 MIKEWOOD

BOULEVARD,CONNEAUT LAKE, PA 16316-6661.

CLIN 3010

This CLIN has been renumbered to CLIN 3016.

The CLIN extended description has changed from:

WATER TREATMENT (4X EACH YEAR) QUARTERLY SAMPLING AND ANALYSIS OF CHLORINE

THE PERFORMANCE WORK STATEMENT.ECS 103/CONNEAUT LAKE (PA118), 6467 MIKEWOOD

BOULEVARD,CONNEAUT LAKE, PA 16316-6661.

CLIN 3011

This CLIN has been renumbered to CLIN 3017.

CLIN 4001

The CLIN description has changed from OY4 - Test Chlorine Residual Level to OY4 - Free Chlorine Testing.

The CLIN extended description has changed from:

WATER TREATMENT (2X EACH MONTH) TEST CHLORINE RESIDUAL LEVEL. THIS SHALL BE

ACCOMPLISHED 2X PER MONTH. THE FOLLOWING AREAS WILL BE TESTED FOR CHLORINE

RESIDUAL: HYDRO ROOM, MALE BATHROOM SINK, BREAK ROOM SINK, WAREHOUSE BREAK

ROOM SINK, WAREHOUSE BATHROOM SINK. CHLORINE RESIDUAL PARAMETER SHALL BETWEEN

THE PERFORMANCE WORKSTATEMENT. ECS 103/CONNEAUT LAKE (PA118), 6467

MIKEWOODBOULEVARD,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.