U.S. Army Reserve Center (USARC) 99th Regional Readiness Command (RRC)

FINAL

Asbestos Survey and Other

Environmental Findings Report VA049 – COL Ernest H Dervishian USARC

Richmond, Virginia

October 2006

Contract No. W912DR-05-D-0022

Prepared For:

U.S. ARMY CORPS OF ENGINEERS

BALTIMORE DISTRICT

Baltimore, Maryland

Prepared by:

Weston Solutions, Inc.

1400 Weston Way P.O. Box 2653 West Chester, Pennsylvania 19380

FINAL

ASBESTOS SURVEY AND

OTHER ENVIRONMENTAL FINDINGS REPORT

99TH REGIONAL READINESS COMMAND

VA049 – COL ERNEST H DERVISHIAN USARC

RICHMOND, VIRGINIA

Contract No. W912DR-05-D-0022

Prepared for:

U.S. ARMY CORPS OF ENGINEERS

BALTIMORE DISTRICT

Baltimore, Maryland

Prepared by:

WESTON SOLUTIONS, INC.

West Chester, Pennsylvania

October 2006

W.O. No. 03886.110.018

TABLE OF CONTENTS

Section Page

EXECUTIVE SUMMARY

1. SCOPE OF SERVICES

1.1 PROJECT SCOPE AND OBJECTIVES

1.2 APPROACH

1.3 INFORMATION SOURCES

1.4 LIMITATIONS

2. PROPERTY DESCRIPTION

2.1 CURRENT USE

2.2 PROPERTY HISTORY

2.2.1 Prior Uses

2.2.2 Improvements

2.2.3 Previous Environmental Assessments

2.3 ADJACENT PROPERTIES

3. SITE RECONNAISSANCE

3.1 ASBESTOS

3.1.1 Survey Methodology

3.1.2 Survey Results

3.2 LEAD

3.2.1 Survey Methodology

3.2.2 Survey Results

3.3 RADON

3.4 TRANSFORMERS

3.5 STORAGE TANKS

3.5.1 Above Ground Storage Tanks

3.5.2 Under Ground Storage Tanks

3.5.3 Oil/Water Separators

3.6 CHEMICALS AND HAZARDOUS SUBSTANCES

3.7 MISCELLANEOUS FINDINGS

3.7.1 Wells

3.7.2 Pits, Ponds, Lagoons

3.7.3 Mounds or Depressions

3.7.4 Vegetation/Wooded Areas

3.7.5 Environmentally Impacted Soil or Vegetation

3.7.6 Lighting

VA049_RICHMOND_FINAL 10/10/2006 iii

TABLE OF CONTENTS (CONTINUED)

Section Page

4. SUMMARY AND CONCLUSIONS

5. REFERENCES

VA049_RICHMOND_FINAL 10/10/2006 iv

LIST OF APPENDICES

APPENDIX A Photographs

APPENDIX B Field Documentation Sheets

APPENDIX C ACM Laboratory Data Packages

LIST OF TABLES

Title Page

Table 1 Building Corner GPS Coordinate Data

Table 2 ACM Inspection Results

Table 3 LBP Inspection Results

LIST OF FIGURES

Title Page

Figure 1 Site Location Map

Figure 2 Facility Layout

Figure 3 Building 00001-1st Floor

Figure 4 Building 00001-2nd Floor

VA049_RICHMOND_FINAL 10/10/2006 v

LIST OF ACRONYMS

ACM asbestos-containing material

AHERA Asbestos Hazard Emergency Response Act

AST aboveground storage tank

E2FA Engineering and Environmental Facility Assessment Report

FMS Facility Maintenance Specialist

FOS Facility Operations Specialist ft feet

GPS global positioning system

HUD Housing and Urban Development

IATL International Asbestos Testing Laboratories

ID identification

J2 J2 Engineering, Inc.

LBP lead-based paint

LCP lead-containing paint

LF linear feet mg/cm2 milligrams per square centimeters

NAD No Asbestos Detected

OMS Operational Maintenance Shop

OWS oil/water separator

PC point count

PCB polychlorinated biphenyl pCi/L picocuries/liter

PLM Polarized Light Microscopy

QA quality assurance

QC quality control

RRC Regional Readiness Command

SF square feet

USAR U.S. Army Reserve

USARC U.S. Army Reserve Center

USEPA U.S. Environmental Protection Agency

UST underground storage tank

VFT vinyl floor tile

WESTON Weston Solutions, Inc.

XRF X-Ray Fluorescence

VA049_RICHMOND_FINAL 10/10/2006 vi

Asbestos Survey and Other Environmental Findings Report 99th Regional Readiness Command

VA049 - COL Ernest H Dervishian USARC

EXECUTIVE SUMMARY

Weston Solutions, Inc. (WESTON) has prepared Asbestos Survey and Other Environmental

Findings Reports for the 99th Regional Readiness Command (RRC) for the purposes of environmental compliance and planning, and to baseline the environmental condition of each property for future real estate actions at 54 U.S. Army Reserve Centers (USARC) in Delaware, Maryland, Pennsylvania, Virginia, and West Virginia. This report has been prepared for the

COL Ernest H Dervishian USARC in Richmond, VA, hereafter referred to as the “Property.”

WESTON personnel inspected the Property, including all interior and exterior building areas, and site perimeters. A detailed photographic record of the Property was kept, along with a summary of present, or most recent, use of the target Property as observed during the site reconnaissance. Environmentally significant features and conditions were also noted, including storage tanks, radon, asbestos-containing material (ACM), lead-based paint (LBP) and lead dust, and polychlorinated biphenyls (PCBs). During the site reconnaissance, a review of reasonably available historical data and other information was conducted (historical environmental reports, surveys, inspections, etc.) to support the site reconnaissance. Personnel from J2 Engineering, Inc.

(J2) performed the ACM and LBP surveys to evaluate the presence or absence of ACM, LBP, and/or lead dust at the Property. Findings made during the site reconnaissance at the Property included the following:

Finding Category Finding

Asbestos Building 00001; Vibration damper on ceiling duct; 50 linear feet (LF) Asbestos Building 00001; Door Caulking; 200 LF

Lead Building 00001; Room 229; Wall; Yellow Lead Building 00001; Room 104; Floor; Column; Blue Lead Building 00001; Room 145/Kitchen; Wall; Wall; Green Lead Building 00001; Room 120; Floor; Column; Grey Lead Building 00001; Room 145/Kitchen; Wall; Baseboard; Grey Lead Building 00001; Room 229; Stairs; Sink; White Tanks Oil/Water Separator (OWS); Oil and water Tanks Above Ground Storage Tank (AST); Propane

Hazardous Substances Building 00001; Stairwell Area; Paint Thinner; Shelf

Hazardous Substances Building 00001; Room 223/Boiler Room; Oil; Shelf

VA049_RICHMOND_FINAL 10/10/2006 1

VA049 - COL Ernest H Dervishian USARC

Finding Category Finding

Hazardous Substances

Building 00001; Room 223/Boiler Room; Fluorescent Bulbs; Floor; Broken fluorescent bulbs were found on the floor inside the boiler room. The Facility Maintenance Specialist (FMS) was informed during the time of the inspection.

Hazardous Substances Building 00001; Room 230; Cleaning Supplies; Counter top

Hazardous Substances Building 00002; Outside; Oil; Locked Hazardous Storage Shed

VA049_RICHMOND_FINAL 10/10/2006 2

VA049 - COL Ernest H Dervishian USARC

1. SCOPE OF SERVICES

1.1 PROJECT SCOPE AND OBJECTIVES

Weston Solutions, Inc. (WESTON) has prepared Asbestos Survey and Other Environmental

Findings Reports for the 99th Regional Readiness Command (RRC) for the purposes of environmental compliance and planning, and to baseline the environmental condition of property for future real estate actions at 54 U.S. Army Reserve Centers (USARC) in Delaware, Maryland, Pennsylvania, Virginia, and West Virginia. This report has been prepared for the COL Ernest H

Dervishian USARC in Richmond, VA, hereafter referred to as the “Property.”

1.2 APPROACH

The following tasks were performed to meet the objectives of the project:

• Site reconnaissance – WESTON personnel inspected the Property, including all interior and exterior building areas, and site perimeters. A detailed photographic record of the Property was kept, along with a summary of present, or most recent, use of the Property as observed during the site reconnaissance. Environmentally significant features and conditions were also noted, including storage tanks, radon, asbestos-containing material (ACM), lead-based paint (LBP) and lead dust, and polychlorinated biphenyls (PCBs). Global positioning system (GPS) coordinate data were collected for each building corner at the Property.

• Records review – During the site reconnaissance, a review of reasonably available historical data and other information was conducted (historical environmental reports, surveys, inspections, etc.) to support the site reconnaissance.

• Interviews – Persons knowledgeable about Property operations and history were interviewed.

• ACM survey – Personnel from J2 Engineering, Inc. (J2) performed an ACM survey to determine the presence or absence of ACM at the Property.

• LBP survey – Personnel from J2 performed a LBP survey to determine the presence or potential for LBP and/or lead dust at the Property.

VA049_RICHMOND_FINAL 10/10/2006 3

VA049 - COL Ernest H Dervishian USARC

The following personnel conducted the site reconnaissance on 18 May 2006: Charles Rapone

(WESTON) and Denise Popeo (J2). Michelle Brown, Environmental Manager, provided access to the Property.

1.3 INFORMATION SOURCES

All documents provided by the 99th RRC for the Property and reviewed as part of this project are discussed in Section 2.2.3 and listed in Section 5. Information about the Property and the surrounding area was obtained from the site reconnaissance as well as interviews with:

• Michelle Brown, Environmental Manager

1.4 LIMITATIONS

Although this study attempts to identify the potential sources of contamination for the Property, it is possible that some sources of contamination have escaped detection due to the limitations of the study, the inaccuracy of available data sources, the presence of undetected and unreported environmental events, and/or the limited knowledge of interviewed personnel.

VA049_RICHMOND_FINAL 10/10/2006 4

VA049 - COL Ernest H Dervishian USARC

2. PROPERTY DESCRIPTION

The Property is located in Richmond, VA, as shown in Figure 1, and encompasses 7.42 acres.

The mailing address for the facility is as follows:

COL Ernest H Dervishian USARC (VA049) 6700 Strathmore Road Richmond, VA 23237-1127

2.1 CURRENT USE

The U.S. Army Reserve (USAR) provides organizational and limited direct support maintenance, and technical assistance for Army Reserve units located in the region. The COL Ernest H

Dervishian USARC is currently headquarters to the 80th Division Band, the 3-319th Logistic

Detachment, and B Company 7th Battalion 80th Division,.

There are three buildings on the 7.42-acre Property, as shown in Figure 2:

• Administration Building USARC (MB) (00001) - Approximately 48,097 square feet (SF); two-story; brick masonry.

• Operational Maintenance Shop (OMS) (MB) (00002) - Approximately 5,474 SF; one-story; brick masonry.

• Classroom Training USARC (AB) (0001A) - Approximately 2,304 SF; one-story;

brick masonry.

A fence topped with barbed wire restricts entry to Building 00002.

2.2 PROPERTY HISTORY

2.2.1 Prior Uses

The Property was originally constructed in 1973. The Property has been used exclusively by the

99th RRC for administrative, operational and maintenance purposes. The Property is used as a motor repair facility. The Property has not been used as a gasoline station, commercial printing facility, dry cleaner facility, photo developing laboratory, junkyard or landfill, or waste treatment plant in the past.

VA049_RICHMOND_FINAL 10/10/2006 5

VA049 - COL Ernest H Dervishian USARC

2.2.2 Improvements

According to Michelle Brown, the following major improvements have been made to the

Property:

• Administration Building USARC (MB) (00001) - Building 00001 was constructed in 1973. The drill hall was renovated and converted into a learning center in 1999. The ceiling and windows were replaced in 2000. The boiler was replaced from 1998-2000.

• Operational Maintenance Shop OMS (MB) (00002) - The OMS was constructed in 1973. Renovations were completed in February 2006 and included new doors and windows, new dry wall for the office, and new paint, lights and ceiling.

• Classroom Training USARC (AB) (0001A) - Building 0001A was constructed in 1996.

2.2.3 Previous Environmental Assessments

The following environmental assessments and/or reports were reviewed during data collection:

• A lead based paint survey was conducted in December 1995. No maintenance or repair was required at the center based on results of the survey.

• An assessment was conducted as part of the USAR environmental review program using the Environmental Compliance Assessment Army Reserve Protocol. This protocol makes use of environmental assessments to ensure compliance with all applicable Federal, state, local, DOD and Army environmental regulations.

• In May 2003, lead abatement activities were conducted at the Property in the former firing range. No lead dust surfaces remain in the range at levels that exceed the project clearance level.

• Virginia Power has determined that the transformers at the Property do not contain polychlorinated biphenyls (PCBs).

• An evaluation of the Oil/Water Separator (OWS), washrack, grease racks, neutralization pit, floor drains and storm water discharges associated with OMS activities was conducted at the Property.

• An Engineering and Environmental Facility Assessment Report (E2FA) was conducted in December 2003 and included an Environmental Compliance Assessment, Real Property Maintenance Accountability, and a structural certification for the Arms Vault.

VA049_RICHMOND_FINAL 10/10/2006 6

VA049 - COL Ernest H Dervishian USARC

• Radon testing was conducted from April 1991 to March 1992 and results indicated that radon levels were below the 4 picocuries per liter (pCi/L) action level.

• An assessment was preformed to develop the information required for the subsequent preparation of the Remediation/Renovation Specifications.

• A study was conducted to explore and help define the limits and extent of previously discovered petroleum contamination resulting from an apparently leaking underground storage tank (UST) at the Property.

2.3 ADJACENT PROPERTIES

During site reconnaissance, the team made the following observations regarding adjacent properties to the Property:

• North - An elementary school borders the Property to the north.

• South - The Defense General Supply Center borders the Property to the south.

• East - Strathmore Road and residential housing border the Property to the east.

• West - The Defense General Supply Center borders the Property to the west.

VA049_RICHMOND_FINAL 10/10/2006 7

VA049 - COL Ernest H Dervishian USARC

3. SITE RECONNAISSANCE

Personnel from WESTON, J2, and the 99th RRC conducted the site reconnaissance at the COL

Ernest H Dervishian USARC on 18 May 2006. Photographs were taken of each building on the

Property, adjacent properties, ACM and LBP sampling locations, and other environmental findings. Photographs are provided in Appendix A. GPS coordinate data were collected at each building corner, as shown on Figure 2. GPS coordinate data for each building’s corners are included in Table 1. GPS coordinate data were collected using a hand-held Garman Etrex GPS unit. Access to the Property is restricted. Buildings 00002 and 0001A had a restricted entrance and required escort by the appropriate personnel. The following areas were locked or inaccessible and were therefore not included in the survey: Administration Building USARC

(MB) (00001) - Rooms 111, 112, 113, 107, 3A, 7A, 9A, and 152; Operational Maintenance Shop

OMS (MB) (00002); Classroom Training USARC (AB) (0001A). At the time of the inspection, the OMS facility operator was not available to allow access to the OMS. The weather was sunny at the time of the site reconnaissance. The following subsections describe the survey results and findings of the site reconnaissance at the Property.

3.1 ASBESTOS

3.1.1 Survey Methodology

An ACM survey was performed in accordance with the U.S. Environmental Protection Agency’s

(USEPA) requirements for implementation of the Asbestos Hazard Emergency Response Act

(AHERA). Additional information regarding ACM survey methodology is provided in the

Sampling and Analysis Plan (J2, 2005).

Materials identified as ACM were categorized based on guidance from the 99th RRC. The ACM categories specified by the 99th RRC and used for this survey were as follows:

VA049_RICHMOND_FINAL 10/10/2006 8

VA049 - COL Ernest H Dervishian USARC

Category Type of Material Condition 1A Friable thermal system insulation ACM Damaged 1B Friable thermal system insulation ACM Significantly damaged 2 Friable surfacing material Damaged 3 Friable surfacing material Significantly damaged

4A Friable miscellaneous material Damaged 4B Friable miscellaneous material Significantly damaged 5 Friable ACBM (undamaged) Potential for damage 6 Friable ACBM (undamaged) Potential for significant damage 7 Friable ACBM or friable suspected ACBM

(undamaged) N/A

8 Non-friable ACM or suspected ACM N/A

The technique used at the Property for sampling the suspected asbestos and ACM materials was designed to minimize potential fiber release and possible contamination of surrounding areas. All representative materials sampled were collected in accordance with the AHERA Guidance for

Controlling Asbestos Containing Material in Buildings (USEPA, 1985).

During sampling activities, each suspect ACM was touched by the inspector to determine its friability and physical condition. A friable material is defined as a material that can be crumbled, or reduced to powder by hand pressure. The friability of a material directly corresponds to the potential of ACM to release airborne fibers, where high friability indicates a high potential for release. Sample information was documented on the Asbestos Bulk Survey Form. This form is provided in Appendix B.

Once the suspect ACM was identified, a core sample of the material was collected and placed in a labeled airtight bag. A chain of custody form was completed for the samples collected and delivered with the samples to AmeriSci of Midlothian, VA, for analysis. Polarized Light

Microscopy (PLM) was used to analyze samples according to USEPA Method 600/M4-82-020, incorporating visual estimates of identified material percentages.

Asbestos samples collected from the site were identified using a site-specific alphanumeric identification (ID) comprised of four components, as follows:

VA049_RICHMOND_FINAL 10/10/2006 9

VA049 - COL Ernest H Dervishian USARC

1. Facility ID (example: VA049 = COL Ernest H Dervishian USARC)

2. Building ID (example: 00001 = Administration Building)

3. Room Number

4. Sequential Sample Number

For example, the sample identification code VA049-00001-104-15 refers to the 15th ACM sample collected at VA049, in the Administration Building in Room 104.

Roofing materials and inaccessible rooms and ceiling areas were not inspected. Photographs were taken to document sampling points (see Appendix A) and two or more permanent reference points were included within the photograph to facilitate future location of the sampling point.

3.1.2 Survey Results

A total of nine ACM samples were collected on 18 May 2006 and analyzed to determine asbestos content. Figures 3 and 4 show all asbestos sampling points, and photographs of each sample location are provided in Appendix A.

The results of sampling indicate that ACM is present at the Property. Specifically, the following materials and quantities were identified as ACM: vibration damper on ceiling duct in Building

00001 (50 linear feet [LF]); door caulking on exit doors in Building 00001 (200 LF).

Table 2 summarizes the results of the ACM survey. Laboratory data packages are provided in

Appendix C.

3.2 LEAD

3.2.1 Survey Methodology

An X-Ray Fluorescence (XRF) survey for LBP was conducted using guidelines set forth in

Chapter 7 of the Housing and Urban Development (HUD) Standards and USEPA Regulation 40

CFR 745, Subpart D. A review of available existing building records, such as specifications, floor plan sketches and any other available documentation was performed prior to arriving at the

VA049_RICHMOND_FINAL 10/10/2006 10

VA049 - COL Ernest H Dervishian USARC site. A visual walk-through of the building’s exterior and interior was performed and an inventory of all accessible and/or exposed painted surfaces was developed throughout each building. Additional information regarding LBP survey methodology is provided in the

Sampling and Analysis Plan (J2, 2005).

The LBP testing criteria established for this project requires testing of all painted building surfaces and suspect components with an XRF lead detection instrument. The NITON Model

309 XRF was used for this project. All warm-up time and calibration tests were performed in accordance with the manufacturer’s specifications. The calibration consisted of conducting four initial tests that contain known concentrations of lead ranging from 0.0 to 5.0 milligrams per square centimeter (mg/cm2) at the beginning of the testing day, and recalibrating every four hours of use and at the end of the testing day. Any discrepancies in calibration are noted in the

Daily Field Quality Control (QC) Logs provided in Appendix B.

Suspect painted surfaces were tested on all homogeneous painted components (i.e., painted baseboards, walls, doors, doorframes). Any changes in paint color or textures were sampled and documented accordingly. LBP samples collected from the site were identified using a site-specific alphanumeric designation comprising five components, as follows:

1. Facility ID (example: VA049 = COL Ernest H Dervishian USARC)

2. Building ID (example: 00001 = Administration Building)

3. Room Number

4. Sequential Sample Number

5. Room Wall ID: A = Wall on same side as the building’s main entrance B = Wall adjacent to Wall A in a clockwise direction C = Wall opposite Wall A D = Wall adjacent to Wall A in a counterclockwise direction

For example, the sample identification code VA049-00001-120-01D refers to the first LBP sample collected at VA049. This sample was collected from Room 120 of the Administration

Building from the wall adjacent to Wall A in a counterclockwise direction.

VA049_RICHMOND_FINAL 10/10/2006 11

VA049 - COL Ernest H Dervishian USARC

Positive results are defined as detected concentrations that are equal to or greater than 0.5 mg/cm2. According to the manufacturer, the accuracy of the NITON XL-309 is ± 0.1 mg/cm2.

Roofing materials and inaccessible rooms and ceiling areas were not inspected. Photographs were taken to document sampling points (see Appendix A) and two or more permanent reference points were included within the photograph to facilitate future location of the sampling point.

3.2.2 Survey Results

A total of 32 LBP samples, including calibration samples, were collected and analyzed on 18 May

2006. Figures 3 and 4 show all LBP sampling points, and photographs of each sampling location are provided in Appendix A.

The results of XRF sampling indicate that LBP is present at the Property. Specifically, the following LBP and locations were identified: the green glazed block wall in Building 00001; the grey ceramic baseboard in Building 00001; the blue metal column in Building 00001; the grey metal column in Building 00001; the white porcelain sink in Building 00001; and the yellow glazed block wall in Building 00001.

Table 3 summarizes the results of the LBP survey.

3.3 RADON

According to the USEPA Radon Zone for Chesterfield County, the COL Ernest H Dervishian

USARC Facility is classified as being in Zone 1, defined as having an indoor average level greater than 4 pCi/L. No documentation was available indicating that a radon survey had been performed at the site.

3.4 TRANSFORMERS

Polychlorinated biphenyls (PCBs) were produced in the United States from 1929 to 1976, primarily for use as insulating material in electrical equipment such as transformers and lighting ballasts. Although PCBs are no longer being manufactured, electrical transformers, hydraulic equipment, and lighting ballasts containing PCBs may still be in service.

VA049_RICHMOND_FINAL 10/10/2006 12

james.p.partyka Highlight

VA049 - COL Ernest H Dervishian USARC

Zero transformers are located on the Property:

3.5 STORAGE TANKS

A visual inspection was performed to locate any aboveground storage tanks (ASTs) or underground storage tanks (USTs) on the Property.

3.5.1 Above Ground Storage Tanks

Based on the visual inspection, there is one ASTs were found on-site during the site investigation.

• 35 ft north of Building 00002 - No additional documentation was available to indicate storage tank specifications and/or current status.

3.5.2 Under Ground Storage Tanks

Evidence of USTs, including vent pipes, fill pipes, concrete pads, and access ways were investigated. Based on visual observations, there are no USTs currently located on the Property.

3.5.3 Oil/Water Separators

An oil/water separator (OWS) system exists on the property, and is located 50 ft north of

Building 00002.

3.6 CHEMICALS AND HAZARDOUS SUBSTANCES

During site reconnaissance of the Property, a visual inspection was conducted to identify any chemicals, hazardous substances, and/or petroleum products stored on the Property. The following findings were observed during the site visit:

• Administration Building - Stairwell: paint thinner was stored in a shelf.

• Administration Building - Room 223/Boiler Room: oil was stored on a shelf.

• Administration Building - Room 223/Boiler Room: fluorescent bulbs were found broken on the floor.

VA049_RICHMOND_FINAL 10/10/2006 13

VA049 - COL Ernest H Dervishian USARC

• Administration Building - Room 230: cleaning supplies were stored on a counter top.

• OMS - Outside: oil was stored in a locked hazardous storage shed.

3.7 MISCELLANEOUS FINDINGS

3.7.1 Wells

There were no drinking water or irrigation supply wells located on the property at the time of the site visit. All water was reported to be provided through the public water supply.

3.7.2 Pits, Ponds, Lagoons

A visual inspection for pits, ponds, and lagoons, particularly those used in connection with waste disposal or waste treatment, was conducted. There was no visual evidence that the area was currently being used for or had previously been used for waste disposal.

3.7.3 Mounds or Depressions

A visual inspection was conducted to identify filled or graded areas, mounds, or depressions indicative of trash or other solid waste disposal. No mounds or depressions were observed.

3.7.4 Vegetation/Wooded Areas

The Property is landscaped with grassy areas and decorative shrubs. Parking areas, driveways, walkways, and building footprints occupy the remainder of the Property.

3.7.5 Environmentally Impacted Soil or Vegetation

No stained or discolored soil or distressed vegetation was noted during site reconnaissance of the

Property.

VA049_RICHMOND_FINAL 10/10/2006 14

VA049 - COL Ernest H Dervishian USARC

3.7.6 Lighting

Fluorescent lighting is used throughout the buildings on the Property. All light ballasts were in good condition at the time of the site inspection (i.e., no obvious leaking of dielectric fluid was observed from the light ballasts).

Broken fluorescent bulbs were found on the floor inside the boiler room during the inspection. A photograph with a description of the finding is documented in Appendix A.

VA049_RICHMOND_FINAL 10/10/2006 15

VA049 - COL Ernest H Dervishian USARC

4. SUMMARY AND CONCLUSIONS

This Asbestos and Other Environmental Findings Report was completed for the COL Ernest H

Dervishian USARC. The following tasks were performed to meet the objectives of the project:

• Site reconnaissance - A physical inspection of the Property and facilities thereon was conducted, including all interior and exterior building areas, and site perimeters. A detailed photographic record of the Property was kept, along with a summary of present, or most recent, use of the Property as observed during the site reconnaissance. Environmentally significant features and conditions were noted, including storage tanks, radon, ACM, LBP and lead dust, and PCBs. GPS coordinate data were collected for each building corner at the Property.

• Records review – A review of reasonably available historical data (historical environmental reports, surveys, inspections, etc.), and other information was conducted to support the site reconnaissance.

• Interviews – Persons knowledgeable about Property operations and history were interviewed.

• ACM survey – Personnel from J2 performed an ACM survey to determine the presence or absence of ACM at the facility.

• LBP survey – Personnel from J2 performed a LBP survey to determine the presence or potential for LBP and/or lead dust at the facility.

Findings made during the site reconnaissance at the COL Ernest H Dervishian USARC included the following:

Finding Category Finding

Asbestos Building 00001; Vibration damper on ceiling duct; 50 LF Asbestos Building 00001; Door Caulking; 200 LF

Lead Building 00001; Room 229; Wall; Yellow Lead Building 00001; Room 104; Floor; Column; Blue Lead Building 00001; Room 145/Kitchen; Wall; Green Lead Building 00001; Room 120; Floor; Column; Grey Lead Building 00001; Room 145/Kitchen; Wall; Baseboard; Grey Lead Building 00001; Room 229; Stairs; Sink; White Tanks OWS; Oil and water Tanks AST; Propane

Hazardous Substances Building 00001; Room Stairwell; Paint Thinner; Shelf

VA049_RICHMOND_FINAL 10/10/2006 16

VA049 - COL Ernest H Dervishian USARC

Finding Category Finding

Hazardous Substances Building 00001; Room 223/Boiler Room; Oil; Shelf

Hazardous Substances

Building 00001; Room 223/Boiler Room; Fluorescent Bulbs; Floor; Broken fluorescent bulbs were found on the floor inside the boiler room. The FMS was informed during the time of the inspection.

Hazardous Substances Building 00001; Room 230; Cleaning Supplies; Counter top

Hazardous Substances Building 00002; Outside; Oil; Locked Hazardous Storage Shed

VA049_RICHMOND_FINAL 10/10/2006 17

VA049 - COL Ernest H Dervishian USARC

5. REFERENCES

416th Engineer Command, 1992. Environmental Compliance Assessment- Draft Report of

Findings. 28 June 1992.

Department of the Army, 1995. Memorandum: Lead Paint Survey Report. 20 December 1995.

Environmental Restoration Co., 1992. Site Characterization Study. 9 November 1992.

EPA Method 600/M4-82-020.

EPA Regulation 40 CFR 745, Subpart D.

EPA, 1985. Guidance for Controlling Asbestos Containing Material in Buildings.

HUD Standards, Chapter 7.

J2, 2005. Sampling and Analysis Plan.

Versar, Inc., 1993. Assessment Report Dervishian Army Reserve Center Indoor Firing Range.

November 1993.

WESTON, 2005. Scope of Work.

VA049_RICHMOND_FINAL 10/10/2006 18

TABLES

Table 1 Building Corner GPS Coordinate Data

Bldg No. Corner Northing Easting Accuracy 00001 #1 0283178 4145872 18m 00001 #2 0283186 4145912 13m 00001 #3 0283155 4145969 12m 00001 #4 0283123 4145894 22m 00001 Flagpole 0283174 4145867 12m

Notes:

1. Building Corner Numbers are identified on Figure 2.

2. Accuracy defined by Garmin instrument.

Table 2 ACM Inspection Results

Sample No. Date Bldg.

No.

Material (Type)

Functional Space

Estimated Quantity

99th RRC Asbestos Category

Type & % Asbestos

VA049-00001-

A1 5/18/200600001 Vibration damper on ceiling duct Room 120 D 50 LF Category 5 (Friable ACBM) 5% Chrysotile

VA049-00001-

A6 5/18/200600001 Caulk assoc with Red boiler Room 233 Mechanical 5 LF No Asbestos Detected

(NAD)

VA049-00001-

A5 5/18/200600001 Caulk assoc with Red boiler Room 233 Mechanical 5 LF No Asbestos Detected

(NAD)

VA049-00001-

A3 5/18/200600001 Vibration damper assoc. w/ Air

Heating Unit (AHU) Room 233 Mechanical 65 LF No Asbestos Detected

(NAD)

VA049-00001-

A8 5/18/200600001 Door Caulking Exit Doors 200 LF No Asbestos Detected

(NAD)

VA049-00001-

A4 5/18/200600001 Vibration damper assoc. w/

AHU Room 233 Mechanical 65 LF No Asbestos Detected

(NAD)

VA049-00001-

A2 5/18/200600001 Vibration damper on ceiling duct Room 120 D 50 LF No Asbestos Detected

(NAD)

VA049-00001-

A7 5/18/200600001 Door Caulking Exit Doors 200 LF Category 8 (Non-Friable

ACM) 5% Chrysotile

VA049-00001-

A9 5/18/200600001 Door Caulking Exit Doors 200 LF Category 8 (Non-Friable

ACM) 10% Chrysotile

Table 3 LBP Inspection Results

Sample No. Date Bldg. No. Room Source Substrate Feature Condition Color Result Pbc Error VA049-00001-2019-A 5/18/2006 00001 Room 106 Window Soapstone Stool Intact Black NEG 0 .03 VA049-00001-2029-D 5/18/2006 00001 Room 229 Floor Ceramic Tile Intact Yellow NEG 0 .08 VA049-00001-2016-A 5/18/2006 00001 Room 117 Door Wood Door Intact Blue NEG 0 .09 2032 5/18/2006 Calibrate POS 1.11 .12 VA049-00001-2028-D 5/18/2006 00001 Room 229 Wall Glazed Black Wall Intact Yellow POS 2.91 .77 VA049-00001-2018-A 5/18/2006 00001 Room 104 Floor Metal Column Intact Blue POS 6.85 2.65 VA049-00001-2010-D 5/18/2006 00001 Room 233 Floor Concrete Floor Intact Yellow NEG 0 .02 VA049-00001-2014-A 5/18/2006 00001 Room 145/Kitch Wall Glazed Black Wall Intact Green POS 3 1.1 VA049-00001-2024-B 5/18/2006 00001 Hall 102 Stairs Metal Stringer Intact Blue NEG .08 .35 VA049-00001-2020-A 5/18/2006 00001 Room 120 Floor Metal Column Intact Grey POS 15.5 6.89 VA049-00001-2009-D 5/18/2006 00001 Room 233 Floor Concrete Floor Intact Yellow NEG 0 .04 VA049-00001-2025-B 5/18/2006 00001 Hall 102 Stairs Metal Tread Intact Black NEG 0 .02 2013 5/18/2006 00001 Calibrate POS 1.08 .08 VA049-00001-2015-A 5/18/2006 00001 Room 145/Kitch Wall Ceramic Baseboard Intact Grey POS 3.15 .94 VA049-00001-2026-B 5/18/2006 00001 Hall 102 Stairs Metal Rail cap Intact Blue NEG .12 .42 2030 5/18/2006 Calibrate POS 1.08 .08 2011 5/18/2006 00001 Calibrate POS 1.08 .14 VA049-00001-2006-C 5/18/2006 00001 Room 169 Stairs Metal Stringer Intact Grey NEG .11 .3 2001 5/18/2006 Shutter Ca ... NA 2004 5/18/2006 Calibrate POS 1.26 .19 VA049-00001-2008-C 5/18/2006 00001 Room 169 Stairs Metal Rail cap Intact Grey NEG .05 .34 VA049-00001-2005-C 5/18/2006 00001 Room 169 Floor Metal Columns Intact Grey NEG .06 .17 VA049-00001-2021-A 5/18/2006 00001 Bath 156 Floor Ceramic Tile Intact Beige NEG 0 .02 2012 5/18/2006 00001 Calibrate POS 1.06 .08 VA049-00001-2007-C 5/18/2006 00001 Room 169 Stairs Metal Riser Intact Grey NEG .01 .02 VA049-00001-2022-A 5/18/2006 00001 Bath 156 Wall Ceramic Tile Intact Beige NEG .12 .64 VA049-00001-2027-D 5/18/2006 00001 Room 229 Stairs Porcelain Sink Intact White POS 25.52 10.14 VA049-00001-2017-A 5/18/2006 00001 Room 117 Door Metal Jamb Intact Blue NEG .02 .04 2031 5/18/2006 Calibrate POS 1.1 .09 2002 5/18/2006 Calibrate POS 1.08 .15 2003 5/18/2006 Calibrate POS 1.17 .17 VA049-00001-2023-A 5/18/2006 00001 Bath 156 Wall Ceramic Tile Intact Red NEG 0 .07

FIGURES

New York

Pennsylvania

Virginia

West Virginia

Maryland

New Jersey

Delaware

North Carolina

Ohio

Figure 1 Site Location Map µ

T:\RRC\MXD\EBR_Sites.mxd

VA048

VA049

APPENDIX A

PHOTOGRAPHS

Building #: 00001 Date: 5/18/2006 2:16:35 PM Side of Building: North Facing: Towards North Towards

Building #: 00001 Date: 5/18/2006 2:16:35 PM Side of Building: North Facing: Away An elementary school borders the Property to the north.

Date: 5/18/2006 2:16:36 PM Side of Building: East Facing: Away Strathmore Road and residential housing border the Property to the east.

Building #: 00001 Date: 5/18/2006 2:16:36 PM Side of Building: East Facing: Towards East Towards

Date: 5/18/2006 11:43:04

AM

Side of Building: South Facing: Towards South Towards

Building #: 00001 Date: 5/18/2006 11:43:05

AM

Side of Building: South Facing: Away The Defense General Supply Center borders the Property to the south.

Date: 5/18/2006 2:16:34 PM Side of Building: West Facing: Away The Defense General Supply Center borders the Property to the west.

Building #: 00001 Date: 5/18/2006 2:16:34 PM Side of Building: West Facing: Towards West Towards

Date: 5/18/2006 11:43:08

AM

Cover

Building #: 0001A Date: 5/18/2006 2:16:37 PM

Classroom

Building #: 00002 Date: 5/18/2006 2:16:39 PM

OWS

Date: 5/18/2006 2:16:38 PM

AST

Date: 5/18/2006 11:43:03

VA049 003

Date: 5/18/2006 11:42:59

VA049 00001-oil

Date: 5/18/2006 11:43:00

Broken fluorescent bulbs were found on the floor inside the boiler room.

Building #: 00001 Date: 5/18/2006 11:43:08

VA049-00001-Cleaning Supplies

Date: 5/18/2006 2:16:38 PM

Hazardous Storage

Date: 5/18/2006 1:31:00 PM LBP Sample

VA049-00001-2019-A

Window Black

Date: 5/18/2006 1:49:00 PM LBP Sample

VA049-00001-2029-D

Floor Yellow

Building #: 00001 Date: 5/18/2006 1:26:00 PM LBP Sample

VA049-00001-2016-A

Door Blue

Date: 5/18/2006 1:49:00 PM LBP Sample

VA049-00001-2028-D

Wall Yellow

Building #: 00001 Date: 5/18/2006 1:29:00 PM LBP Sample

VA049-00001-2018-A

Floor

Date: 5/18/2006 11:56:00

AM

LBP Sample

VA049-00001-2010-D

Floor Yellow

Building #: 00001 Date: 5/18/2006 1:23:00 PM LBP Sample

VA049-00001-2014-A

Wall Green

Date: 5/18/2006 1:44:00 PM LBP Sample

VA049-00001-2024-B

Stairs Blue

Building #: 00001 Date: 5/18/2006 1:33:00 PM LBP Sample

VA049-00001-2020-A

Grey

Date: 5/18/2006 11:56:00

AM

LBP Sample

VA049-00001-2009-D

Floor Yellow

Building #: 00001 Date: 5/18/2006 1:44:00 PM LBP Sample

VA049-00001-2025-B

Stairs Black

Date: 5/18/2006 1:23:00 PM LBP Sample

VA049-00001-2015-A

Wall Grey

Building #: 00001 Date: 5/18/2006 1:44:00 PM LBP Sample

VA049-00001-2026-B

Date: 5/18/2006 11:53:00

AM

LBP Sample

VA049-00001-2006-C

Stairs Grey

Building #: 00001 Date: 5/18/2006 11:53:00

AM

LBP Sample

VA049-00001-2008-C

Grey

Date: 5/18/2006 11:50:00

AM

LBP Sample

VA049-00001-2005-C

Floor Grey

Building #: 00001 Date: 5/18/2006 1:40:00 PM LBP Sample

VA049-00001-2021-A

Beige

Date: 5/18/2006 11:53:00

AM

LBP Sample

VA049-00001-2007-C

Stairs Grey

Building #: 00001 Date: 5/18/2006 1:40:00 PM LBP Sample

VA049-00001-2022-A

Wall Beige

Date: 5/18/2006 1:47:00 PM LBP Sample

VA049-00001-2027-D

Stairs White

Building #: 00001 Date: 5/18/2006 1:26:00 PM LBP Sample

VA049-00001-2017-A

Door

Date: 5/18/2006 1:40:00 PM LBP Sample

VA049-00001-2023-A

Wall Red

Building #: 00001 Date: 5/18/2006 12:00:00

PM

ACM Sample

VA049_00001_A3

Vibration damper assoc.

w/ AHU

Date: 5/18/2006 11:21:00

AM

ACM Sample

VA049_00001_A2

Vibration damper on ceiling duct

Building #: 00001 Date: 5/18/2006 2:08:00 PM ACM Sample

VA049_00001_A5

Caulk associated with Red boiler

Date: 5/18/2006 2:18:00 PM ACM Sample

VA049_00001_A7

Door Caulking

Building #: 00001 Date: 5/18/2006 2:25:00 PM ACM Sample

VA049_00001_A8

Door Caulking

Date: 5/18/2006 12:00:00

PM

ACM Sample

VA049_00001_A4

Vibration damper assoc.

w/ AHU

Building #: 00001 Date: 5/18/2006 2:29:00 PM ACM Sample

VA049_00001_A9

Door Caulking

Date: 5/18/2006 11:19:00

AM

ACM Sample

VA049_00001_A1

Vibration damper on ceiling duct

Building #: 00001 Date: 5/18/2006 2:08:00 PM ACM Sample

VA049_00001_A6

Caulk associated with Red boiler

APPENDIX B

FIELD DOCUMENTATION SHEETS

DAILY QUALITY CONTROL REPORT Page: 1 of 2

Date: 18 May 2006 Day

1.1 COE Project Manager: F. Lyons-Gary Weather

1.2 Project: 99th RRC Temp

Job No.:J05-111

Wind Contract No.:

Humidity

SUB-CONTRACTORS ON SITE:

None

EQUIPMENT ON SITE: Niton XRF Serial #XL309-U3783NR6237 Chisels, Mallet, Flashlights, Screw drivers

WORK PERFORMED (INCLUDING SAMPLING):

Lead XRF shots Physical Assessment

M T W TH

X

F S S

Bright Sun

Clear

Overcast Rain

Snow

To 32°

32-50°

50-70°

70-85°

85°-up

Still

Moderate

High

Dry

Moderate

Humid

Report No.

VA049

Daily Quality Control Report (Continued)

DAILY QUALITY CONTROL REPORT Page: 2 of 2

Project: ___99th RRC___________ Date:____18 May 2006___

Job No.:______J05-111_____________

Report No.:_____VA049 Richmond

QUALITY CONTROL ACTIVITIES (INCLUDING FIELD CALIBRATIONS):

Shutter Calibration XRF Field Calibrations: Calibration In Reading Result Pbc Error Date 2001 Pos 1.08 0.15 5/18/06 2002 Pos 1.17 0.17 2003 Pos 1.26 0.19

Calibration Out 2030 Pos 1.08 0.08 5/18/06 2031 Pos 1.10 0.09 2032 Pos 1.11 0.12

HEALTH AND SAFETY LEVELS AND ACTIVITIES:

Work Boots, Work clothes or Tyvek (if necessary); Respirator, Gloves

PROBLEMS ENCOUNTERED/CORRECTION ACTION TAKEN:

SPECIAL NOTES:

Limited access to ceilings. Asbestos survey 1992 identified roofing materials, pipe wrap. Floor tile/mastic, Training bldg built 1996. All floors replaced. Drill hall complete renov. 1999. Ceiling tile 2000. Boiler 1998 -2000. New windows, doors. XRF test 1995.

TOMMORROW’S EXPECTATIONS:

By: Denise A. Popeo 5/18/06 QA Check by:__________________________ (Signature and Date) (Signature and Date)

APPENDIX C

ACM LABORATORY DATA PACKAGES

COVER
TITLE PAGE
TABLE OF CONTENTS
EXECUTIVE SUMMARY
1. SCOPE OF SERVICES
1.1 PROJECT SCOPE AND OBJECTIVES
1.2 APPROACH
1.3 INFORMATION SOURCES
1.4 LIMITATIONS
2. PROPERTY DESCRIPTION
2.1 CURRENT USE
2.2 PROPERTY HISTORY
2.2.1 Prior Uses
2.2.2 Improvements
2.2.3 Previous Environmental Assessments

2.3 ADJACENT PROPERTIES

3. SITE RECONNAISSANCE
3.1 ASBESTOS
3.1.1 Survey Methodology
3.1.2 Survey Results
3.2 LEAD
3.2.1 Survey Methodology
3.2.2 Survey Results
3.3 RADON
3.4 TRANSFORMERS
3.5 STORAGE TANKS
3.5.1 Above Ground Storage Tanks
3.5.2 Under Ground Storage Tanks
3.5.3 Oil/Water Separators
3.6 CHEMICALS AND HAZARDOUS SUBSTANCES
3.7 MISCELLANEOUS FINDINGS
3.7.1 Wells
3.7.2 Pits, Ponds, Lagoons
3.7.3 Mounds or Depressions
3.7.4 Vegetation/Wooded Areas
3.7.5 Environmentally Impacted Soil or Vegetation
3.7.6 Lighting
4. SUMMARY AND CONCLUSIONS
5. REFERENCES
APPENDICES
APPENDIX A - PHOTOGRAPHS
APPENDIX B - FIELD DOCUMENTATION SHEETS
APPENDIX C - ACM LABORATORY DATA PACKAGES
TABLES
TABLE 1 - BUILDING CORNER GPS COORDINATE DATA
TABLE 2 - ACM INSPECTION RESULTS
TABLE 3 - LBP INSPECTION RESULTS
FIGURES
FIGURE 1 - SITE LOCATION MAP
FIGURE 2 - FACILITY LAYOUT
FIGURE 3 - BUILDING 00001-1ST FLOOR
FIGURE 4 - BUILDING 00001-2ND FLOOR

ACRONYMS

File details come from the government source that posted it.