Sheet1

HQ 99th READINESS DIVISION (DIV-R) - COST WORKSHEET
MA004 CSS# 12698
REPAIR FIRE ALARM SYSTEM
Barnes Building
495 Summer St
Boston, MA 02210
Line Item Number (SOW)DescriptionQuantityUnit MeasureLaborTOTAL
MATERIALCity Cost IndexCity Cost Index
11.8.1. INTERIOR INSTALL AND SERVICE
11.8.1.1Conduit, electric metallic tubing (EMT), 3/4" diameter100.00LF139.1%[$$]1.01
Fire alarm communications conductors and cables, fire alamr FEP teflon, #18, 2 pair4.00CLF139.1%[$$]1.01
Cabinets, wiring trough JIC, clamp cover, 6" x 6", 36" long2.00EA139.1%[$$]1.01
11.8.2. EXTERIOR DEMO
Equipment mobilization, equipment hauled, on 50-ton towed capacity trailer4.00EA139.1%[$$]1.01
11.8.3.1aSelective demolition - remove existing catch basin or manhole, masonry5.00EA139.1%[$$]1.01
11.8.3.1bSelective demolition, saw cutting, asphalt, up to 3" deep500.00LF139.1%[$$]1.01
Demolish, remove pavement and curb, bituminous driveways60.00SY139.1%[$$]1.01
Excavating, trench, sand & gravel with no sheeting or dewatering included, 4' to 6' deep, 1/2 CY excavator115.00BCY139.1%[$$]1.01
11.8.3.1cElectrical demolition, lighting, explosionproof, metal halide, 400 W8.00EA139.1%[$$]1.01
Lifting and hoisting equipment rental, crawler mounted, lattice boom, 100 toncapacity, 60' boom1.00WEEK139.1%[$$]1.01
11.8.3.1dSelective demolition, saw cutting, asphalt, up to 3" deep100.00LF139.1%[$$]1.01
Demolish, remove pavement and curb, bituminous driveways12.00SY139.1%[$$]1.01
Excavating, trench, sand & gravel with no sheeting or dewatering included, 4' to 6' deep, 1/2 CY excavator23.00BCY139.1%[$$]1.01
Selective demolition, reclamation station, usual charge20.00TON139.1%[$$]1.01
SECTION SUBTOTALS
11.8.4. EXTERIOR INSTALL AND SERVICE
11.8.4.1aCatch basins, frames & grates, 3 piece cover & frame, 1200 lb for heavy equipment (projected new)5.00EA139.1%[$$]1.01
11.8.4.1cBackfill, structural, dozer or F.E. loader, from existing stockpile, no compaction, 105 HP, 50' haul, sand and gravel115.00LCY139.1%[$$]1.01
11.8.4.1dFinish grading, minimum labor/equipment charge, machine grading1.00EA139.1%[$$]1.01
11.8.4.1eAsphaltic concrete paving, no ashpalt hauling included, 6" stone base, 2" binder course, 2" topping500.00SF139.1%[$$]1.01
Hauling, 18 CY truck, 8 wheels, 20 min wait/ld/uld/ 35 MPH, cycle 10 miles185.00LCY139.1%[$$]1.01
11.8.4.2aSite maintenance, road & walk maintenance, sweep drives & parking areas with power vaccuum11.00MSF139.1%[$$]1.01
11.8.4.2bPavement parking markings, lines on pvmt, parking stall, thermoplastic, white, 4" wide370.00EA139.1%[$$]1.01
Pavement parking markings, handicap symbol8.00EA139.1%[$$]1.01
11.8.4.3aRepair of all existing fencing components80.00HR139.1%[$$]1.01
11.8.4.4aParking LED lighting, square pole mounting, 223 lamp watts8.00EA139.1%[$$]1.01
Energy saving lighting devices, photoelectric control, S.P.S.T. 208 V/277 V8.00EA139.1%[$$]1.01
Lifting and hoisting equipment rental, crawler mounted, lattice boom, 100 toncapacity, 60' boom1.00WEEK139.1%[$$]1.01
Hauling, 18 CY truck, 8 wheels, 20 min wait/ld/uld/ 35 MPH, cycle 10 miles37.00LCY139.1%[$$]1.01
SECTION SUBTOTALS
OVERHEAD
PROFIT
BOND
TOTAL