AIE_Statement_of_Work.pdf

PDF 1 MB Posted

Attached to
The U. S. Army Accessions Information Environment (AIE)
Solicitation number
W15QKN-18-Z-02FA
Issued by

About this file

This Statement of Work outlines requirements for a System Integrator to manage, analyze, design, configure, test, integrate, train, deploy, and deliver the U.S. Army Accessions Information Environment solution. Key requirements include developing and implementing program management, systems engineering management, solution configuration and development through business process reengineering and multiple waves, test and evaluation, system security, organizational change management, training, deployment, legacy data access and migration, capability support, and solution delivery plans and associated documentation. The period of performance is up to three years with the first phase not to exceed one year and the second phase up to two years if needed. The place of performance is at contractor and government facilities. The contractor shall meet requirements for personnel security, operations security, cybersecurity, and handling of personally identifiable and protected health information. The contractor shall also develop plans for risk management framework compliance, software assurance, vulnerability management, continuity of operations, and security.

Attachment 07 - AIE Statement of Work

View the file

Other files

File Type Posted
Attach07-AIE_Request_for_White_Paper_-_Update_30_August_2018.pdf PDF
AIE_-_Industry_Questions_-_USG_Responses.xlsx XLSX spreadsheet
Attach07-AIE_Request_for_White_Paper_-_Update_15_August_2018.pdf PDF
AIE_Instructions_and_Evaluation_Criteria_-_Update_-_20_August_2018.pdf PDF
Attach07-AIE_Request_for_White_Paper.pdf PDF
Attach05-AIE-Capability-Framework.xlsx XLSX spreadsheet
Attach04-AIE_Offeror_Questionnaire.xlsx XLSX spreadsheet
Attach03-AIE-SID.pdf PDF
Attach06-AIE-Data-Usage-Agreement.pdf PDF
Attach01-AIE-RTM.pdf PDF
AIE_Instructions_and_Evaluation_Criteria.pdf PDF
Attach02-AIE-CONOPS.pdf PDF
AIE_Notional_Capabilities_Over_Time_(DRAFT)_-_30_MAY_2018.pptx PPTX presentation
AIE_Requirements_Traceability_Matrix_(RTM)_-_v1-0_-_7_MAY_2018_(Final).pdf PDF
AIE_Statement_of_Work_(SOW)_-_DRAFT_-_22_MAY_2018_-_v03.pdf PDF
AIE_Instructions_and_Evaluation_Criteria_-DRAFT_-_30_MAY_2018.pdf PDF
Step_1_-_AIE_Offeror_Self-Certification_Questionnaire_-_30_MAY_2018.xlsx XLSX spreadsheet
Step_2_-_AIE_RTM_and_Proposed_Solution_Questionnaire_-_14_MAY_2018.xlsx XLSX spreadsheet
AIE_Notional_Schedule_-_DRAFT.pdf PDF
AIE_Concept_of_Operations_(CONOPS)_-_v1-0_-_7_MAY_2018_(Final).pdf PDF
AIE_Supporting_Information_Document_(SID)_-_v1-0_-_7_MAY_2018_(Final).pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIE Statement of Work Distribution Statement A: Approved for Public Release, Distribution is Unlimited

25 JUN 2018

Accessions Information

Environment (AIE)

Statement of Work

Solicitation Number: W15QKN-18-Z-02FA

24 July 2018

Army Contracting Command – New Jersey, Innovative Concepts Contracting Center (ACC-NJ-IC) Attn: Michael S. Klein Agreements Officer Building 10, Phipps Road, Picatinny Arsenal, NJ 07806-5000 michael.s.klein15.civ@mail.mil 973.724.4262

AIE Statement of Work Distribution Statement A:

Approved for Public Release, Distribution is Unlimited i

Table of Contents

1.0 Introduction

1.1 Background

1.2 Program Objectives

1.3 Scope

2.0 General Requirements

2.1 Period of Performance

2.2 Place of Performance

2.3 Contract Administration and Management

2.4 Business Relations

2.4.1 Quality Surveillance

2.5 Security

2.5.1 Personnel Security

2.5.2 OPSEC Standard Operating Procedure / Plan and Certification

2.5.3 Information Technology (IT) Sensitive Duties

2.5.4 Non-US Citizens in IT Positions

2.5.5 Facilities

2.5.6 Sensitive Data Access and Release

2.6 Contractor Personnel

2.6.1 Identification

2.7 Government Furnished Equipment, Information, and Data

2.7.1 Government Furnished Equipment (GFE)

2.7.2 Government Furnished Information (GFI)

2.7.3 Government Furnished Data (GFD)

3.0 Functional and Non-functional Requirements

4.0 Performance Requirements

4.1 Task 1: Program Management

4.1.1 Contractor Acquired Software

4.1.2 Commercial Software Licenses

4.2 Task 2: Systems Engineering Management

4.2.1 Configuration Management

Distribution is Unlimited ii

4.3 Task 3: Solution Configuration and Development

4.4 Task 4: Test and Evaluation

4.4.1 Test Management

4.4.2 System Integration Testing

4.4.3 Government Developmental Test / User Acceptance Test (DT/UAT) Support 17

4.4.4 Government Operational Assessment (OA) / Test (OT) Support

4.5 Task 5: System Security

4.5.1 Risk Management Framework Compliance

4.5.2 Patch and Vulnerability Management

4.5.3 Continuity of Operations / Disaster Recovery

4.6 Task 6: Organizational Change Management

4.7 Task 7: Training

4.8 Task 8: Deployment

4.9 Task 9: Legacy Data Access and Migration

4.9.1 Legacy Data Access Migration Plan

4.9.2 Legacy Data Access and Migration Implementation

4.10 Task 10: Capability Support

4.11 Task 11: Solution Delivery

4.12 Task 12: Transition [OPTIONAL]

5.0 Special Requirements

5.1 Section 508 Accessibility Standards

5.2 Non-Developmental Items and Commercial Processes

5.3 Travel

6.0 Deliverables and Delivery Schedule

7.0 References

Acronyms

Distribution is Unlimited iii

List of Tables

Table 1. Notional Capabilities Over Time

Table 2. AIE Top-level System Requirements

Table 3. AIE Deliverables

Distribution is Unlimited

1.0 Introduction

1.1 Background

The Army Accessions Enterprise is data-driven, analytics-enabled, Soldier workforce-centric, and customer-focused. It provides the Army’s strength through its four (4) missions: (1) enlist Soldiers, (2) commission Officers, (3) fulfill In-Service requirements, and (4) support and sustain. The enterprise serves the Army well, but requires modernization, and rejuvenation to meet emerging requirements and ensure continued success. A number of factors contribute to the critical imperative to transform the enterprise. Some are societal phenomena such as the declining number of qualified men and women or diminishing interest in service. Others are attributable to the Army’s failure to invest in technology and research. Regardless, the need for modernization is urgent.

The AIE is a program of record established to confront the challenges facing the Accessions Enterprise. AIE will implement new business practices and modern technology. It will be a fully integrated enterprise level capability enabling transparency, efficiency and effectiveness of the accessions workforce to acquire best-qualified talent to meet all Army manning requirements.

AIE has not been designated a National Security System (NSS).

At a minimum, AIE will displace the following systems:

Army Recruiting Information Support System (ARISS)

Cadet Command Information Management Module (CCIMM)

Integrated Knowledge Resources Online for Me (IKROME)

Army Referral System- Sergeant Major of the Army Recruiting Team (ARS- SMART) (partial)

Army Career Explorer (ACE) (partial)

Future Soldier Program (FSP)

Data and analytics drive the Accessions Enterprise. Therefore, the AIE will be built on a foundation of data, information technology architectures and standards, infrastructure, and analytical tools to achieve a modern end-state using configurable, commercial off the shelf (COTS) software. The envisioned end-state is a net-centric enterprise solution characterized by standardized architecture and data formats; maximized authoritative data discovery and sharing; fully integrated capabilities; intuitive ability to access, visualize, assess, and understand data; integrated and automated business processes;

and single source data entry.

Refer to the AIE Requirements Traceability Matrix (RTM) (see Attach01-AIE-RTM.pdf) for a complete list of AIE requirements to be met.

Refer to the AIE Concept of Operations (CONOPS) (see Attach02-AIE-CONOPS.pdf) for a more detailed description of the current state of Army recruiting and accessions

Distribution is Unlimited capability and the requirements for the AIE capability, to include: scope, operational environment, operational activities, interfaces, end-to-end use cases, performance measures, and support functions.

Refer to the AIE Supporting Information Document (SID) (see Attach03-AIE-SID.pdf) for a description of current recruiting and accessions business processes as well as definitions/descriptions for terms and phases in blue font in the RTM.

1.2 Program Objectives

AIE will support global operations with over 28,000 core users operating around the clock seven (7) days a week. Mobility, reliability, secure connectivity, and data access are paramount AIE attributes. The enterprise workforce must be able to perform tasks using any device, anytime, anywhere, while maintaining secure connectivity with the

AIE.

The primary technical objective is for the AIE to employ modern technology that enables solutions for the recruiting and accessioning workforce and commanders at multiple echelons across the breadth and depth of the Accessions Enterprise. It will collect, store, secure, and allow role-based access to sensitive data, including Personally Identifiable Information (PII) and Protected Health Information (PHI). AIE will provide timely access for studies, analyses, reporting, and decision support.

Specifically, the Army seeks to acquire a secure, interoperable, configurable, mature, COTS-based, out-of-the-box, minimally-customized solution that will (1) maximize the adoption of standardized products and business processes of the procured COTS-based solution, (2) operate in a commercial cloud hosting environment on a commercial network, (3) perform operational workflow data exchange with Government systems of record, (4) provide a common operating picture, (5) optimize knowledge management / information sharing, and (6) implement a single source record that enable single data entry. The AIE solution will have proven maturity to scale user and data growth, insert technology, perform continuous upgrades, and provide long-term sustainment.

AIE will deliver and maintain reliable, secure and timely access to systems of record, enable task accomplishment irrespective of workforce location, and respond to emerging demands for support. The AIE will enhance workforce effectiveness and efficiency by achieving the following system objectives:

Secure, Interoperable Solution: The ability to capture, store, and maintain data in accordance with cybersecurity requirements; ability to exchange and utilize data from other systems

Mobility: Users perform authorized roles anytime and anywhere with no degradation from buffering or other performance degradations

Connectivity, to include remote user: perform authorized roles with mobile devices while maintaining connection and full functionality with the enterprise

Data Access, Accuracy, and Timeliness: ability to retrieve authoritative data, maintain its integrity in an urgent manner responsive to specific requirements for the data

Distribution is Unlimited

Device-agnostic, Real-time Access from Multiple Domains: regardless of OS, version, or device without buffering from multiple Army and Department of Defense (DoD) systems of record

Interface to Systems of Record: enabling the secure exchange of data between and among systems while maintaining integrity and access for authorized users

Common Operating Picture: ability to view authoritative data through multiple views defined by role and echelon

Knowledge Management: collaborative management of information within the enterprise to achieve enterprise goals

Leadership End-to-end Enterprise Visibility: ability for longitudinal and vertical analysis at echelon, aggregates and disaggregates data to meet requirements

Single Source Record: one authoritative record for each individual that captures each transaction during the individual record’s lifecycle

Network Modernization: improving visibility, bandwidth, and management, analogous of providing roadways for high-speed traffic.

Automated Business Processes: building automation into workflows to enhance effectiveness and efficiency.

These objectives shall result in a completely functional and authorized accessions and recruiting system, provisioned in Federal Risk and Management Program (FedRAMP+) compliant cloud environment (to include security and privacy controls per the AIE requirements), with user licenses, and mobile and offline capabilities for the Army perform its mission.

It is anticipated that capability will be configured, developed, and delivered in a phased approach (e.g., via waves) as depicted in the notional timeline in Table 1. A wave is a defined set of capability, traced to specific requirements, that meets identified objectives and expected outcomes. Each wave will be assessed by the Government to determine if the solution meets the target requirements and operates as expected in the hosting environment.

The Government anticipates that the first wave will consist of establishing the infrastructure and providing an initial set of capability sufficient to exercise a set of business processes. The Government anticipates that the second wave will implement complete scenarios to the extent that the Government can determine if the proposed solution provides an enduring capability for Army recruiting and accessioning.

The Contractor will be required to propose a schedule consisting of waves defined by the Contractor and traced to the AIE requirements.

Distribution is Unlimited

Table 1. Notional Capabilities Over Time

1.3 Scope

This Statement of Work (SOW) establishes the requirements for a System Integrator to

(a) manage, (b) analyze, (c) design, (d) configure / develop, (e) test, (f) integrate,

(g) authenticate and authorize, (h) train and deploy, and (i) deliver the AIE solution that meets the requirements in the AIE RTM (see Attach01-AIE-RTM.pdf for a complete list of AIE requirements). These services will be acquired across the following tasks:

Task 1: Program Management

Task 2: Systems Engineering Management

Task 3: Solution Configuration and Development, to include Business Process Reengineering (BPR)

Task 4: Test and Evaluation

Task 5: System Authentication and Authorization

Task 6: Organizational Change Management

Task 7: Training

Task 8: Deployment

Task 9: Legacy Data Access and Migration

Task 10: Capability Support

Task 11: Solution Delivery

Task 12: Transition

Distribution is Unlimited

2.0 General Requirements

2.1 Period of Performance

The period of performance is depicted below:

Prototype Phase 1: Begins date of award and concludes at the completion of the first full wave of capability (e.g., Wave 1 in the Government notional capabilities over time) when the Government will determine if the proposed solution provides an enduring capability for Army recruiting and accessioning;

not to exceed a one-year duration

Prototype Phase 2 (if required): Begins 1st day following Base Period and concludes when all AIE requirements are met; not to exceed a two-year duration

The period of performance is not to exceed three (3) years.

2.2 Place of Performance

The place of performance will be at the Contractor facility and at Government facilities as needed, to include Fort Knox, Kentucky and the program office in Arlington, Virginia.

2.3 Contract Administration and Management

The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement.

The Contractor shall have a single point of contact between the Government and Contractor personnel assigned to this Agreement.

2.4 Business Relations

The Contractor shall successfully define, plan, integrate, and coordinate all activity needed to execute the requirements within this SOW.

2.4.1 Quality Surveillance

During program reviews, the Contractor, Agreements Officer, and Product Manager will discuss contract performance, resolve issues, discuss customer complaints, and provide positive interaction and feedback to all parties. This process will provide a list of any unresolved deficiencies to the Contractor quality assurance representative.

2.5 Security

The security level of this program is unclassified.

2.5.1 Personnel Security

Regardless of location and function, all personnel working on this effort must be able to secure a Common Access Card (CAC). Before CAC issuance, the Contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with

Distribution is Unlimited

Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The Contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

The Contractor shall execute all required activities for the purpose of credentialing its staff to permit access to AIE PMO resources including, badging, security/IA awareness training, and credentialing for access to IT assets as required by the Product Manager, Army, and DoD Cybersecurity and Security policy.

The Contractor and all associated subcontractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

2.5.2 OPSEC Standard Operating Procedure / Plan and Certification

The Contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within ninety (90) calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

The Contractor shall identify an individual who will be an OPSEC Coordinator. The Contractor shall ensure this individual becomes OPSEC Level II certified per AR 530-1.

[A006 OPSEC SOP/Plan]

2.5.3 Information Technology (IT) Sensitive Duties

Contractor personnel performing Information Technology (IT) sensitive duties are subject to investigative and assignment requirements. Army Regulation (AR) 25-2, Department of Defense Directive (DoDD) 8570.01, and DoD 8570.01-M requires DoD civilian, DoD consultants, and Contractor personnel performing work on sensitive Automated Information Systems (AISs) to be assigned to positions that are designated at one of three sensitivity levels (IT-I, IT-II, or IT-III). These designations equate to critical sensitive and non-critical sensitive positions.

Distribution is Unlimited

For these sensitivity levels, the Contractor shall

Ensure individuals meet the background investigation and adjudication requirements called for in AR 25-2 and AR 380-67

Ensure individuals assigned to these sensitive positions have completed the appropriate access request forms

Forward employee investigation information to the designated Government Representative before assignment of these individuals on the modification/change order and ensure a visit request with that investigation information is provided yearly

Ensure personnel have the proper security clearances, have read and signed the User Agreement, and have completed information technology security training prior to being granted access to networks and/or systems

2.5.4 Non-US Citizens in IT Positions

Performance by non-U.S. citizens in IT positions shall be minimized. However, compelling reasons may exist to grant access to DoD IT resources in circumstances in which a non-U.S. citizen has a unique or unusual skill or expertise that is urgently needed for a specific DoD requirement and for which a suitable U.S. citizen is not available. Access to Sensitive information by a non-U.S. citizen who is not a DoD employee will only be permitted in accordance with applicable disclosure policies (e.g., National Disclosure Policy 1, DoDD 5230.9, DoDD 5230.25) and U.S statutes (e.g., the Arms Export Control Act, 22 United States Code (USC) 39).

2.5.5 Facilities

When access to Government facilities and networks are provided, Contractor personnel shall comply with all pertinent Government regulations regarding appropriate use of facilities/equipment.

2.5.6 Sensitive Data Access and Release

The Contractor shall protect access and release of Personally Identifiable Information (PII) and Protected Health Information (PHI). All Contractor personnel with access to PII and PHI data shall complete all required annual Privacy Act and Health Insurance Portability and Accountability Act (HIPAA) training conducted online through Army Records Management & Declassification Agency (RMDA) https://www.rmda.army.mil/privacy/RMDA-PO-Training.html to meet the above requirements.

2.6 Contractor Personnel

Contractor clearances, special training, and certifications identified in this SOW shall be active and current as of contract award and shall be actively maintained throughout the performance of this contract.

Distribution is Unlimited

2.6.1 Identification

Contractor personnel attending meetings, are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

2.7 Government Furnished Equipment, Information, and Data

2.7.1 Government Furnished Equipment (GFE)

The Government will provide the most recent versions of applicable Government equipment requested by the Contractor for use in performing the tasks herein.

The Contractor's property control records shall provide the following basic information for every item of Government property in the Contractor's possession; regardless of value:

(1) The name, description, and National Stock Number (if furnished by the Government or available in the property control system)

(2) Quantity received, issued, and on hand

(3) Unit price (and unit of measure)

(4) Contract number or equivalent code designation

(5) Location

(6) Disposition

(7) Posting reference and date of transaction

Upon completion of this contract, the Contractor shall return all non-expendable Government issued items to the Agreements Officer Representative (AOR).

2.7.2 Government Furnished Information (GFI)

The Government will provide the most recent versions of available information requested by the Contractor for use in performing the tasks herein. The Government provided information shall not be shared with other Government or commercial agencies without the approval of the AOR or Product Manager.

2.7.3 Government Furnished Data (GFD)

The Government will provide Army data to the Contractor for use in performing the tasks identified herein. The terms and conditions of the AIE Offeror Data Use Agreement signed during the solicitation process apply.

Distribution is Unlimited

3.0 Functional and Non-functional Requirements

The Contractor shall deliver an AIE solution that meets the top-level system requirements (functional and non-functional) in Table 2, and the associated sub-requirements for each, as defined in the AIE Requirements Traceability Matrix (RTM) (see Attach01-AIE-RTM.pdf for a complete list of AIE requirements).

Table 2. AIE Top-level System Requirements

Reqt # Requirement

1.00 The system shall provide a multi-tenant environment from which continuous upgrades are issued based on best business practices or changes in law, policy, regulations, directives (LPRD).

2.00 The system shall provide the capability to perform record management.

3.00 The system shall provide an adaptive and talent-aware personnel management capability for future applicants and current workforce.

4.00 The system shall enable, track and report Prospecting Activities.

5.00 The system shall provide the capability to conduct and capture Marketing Activities.

6.00 The system shall enable a Common Operating Picture capability.

7.00 The system shall provide a publicly-accessible learning management capability.

8.00 The system shall provide the capability to perform Future Applicant Management Support Services.

9.00 The system shall provide the capability to develop a prospecting plan.

10.00 The system shall provide the capability to implement system changes based on changes to applicable laws, policies, regulations, and directives (LPRDs).

11.00 The system shall provide the capability to perform data analytics.

12.00 The system shall provide the capability to interface with Systems of Record (SOR) and commercial systems.

13.00 The system shall provide the capability to automate business process workflows via a visual display in a low programming environment.

14.00 The system shall provide the capability to interface with public facing Web Portal(s).

15.00 The system shall provide the capability to implement a Digital Interview Platform.

16.00 The system shall provide the capability to perform document management.

17.00 The system shall provide the capability to send alerts and notifications.

18.00 The system shall provide the capability to digitally assemble pre-defined Accessions Packets for all defined Accessions Paths informed by the authoritative policy.

19.00 The system shall provide data validation.

20.00 The system shall provide the capability to manage force structure and request requirement and authorization changes (e.g., face, space, and location).

21.00 The system shall provide the capability for mission support.

22.00 The system shall provide procurement program management capabilities (e.g., ROTC, Cadet, Future Applicant).

23.00 The system shall provide an application-based, operating system-agnostic capability.

24.00 The system shall provide access to multiple domains including NIPR, ARNET, GuardNet, .edu, .com, .gov, .org, and .net.

25.00 The system shall comply with Interoperability of Information Technology (IT) IAW DoDI 8330.01.

Distribution is Unlimited

Reqt # Requirement

26.00 The system shall support compliance with DA and DoD requirements in a commercial cloud configuration, and the National Institute of Standards and Technology Special Publication 800-145, September 2011.

27.00 The software vendor shall provide affordable and efficient system support.

28.00 The system shall provide a mission availability rate of 98%.

29.00 The system shall have at least a 98% probability of operating over a 72 hour period without an Essential Function Failure (EFF).

30.00 The system shall comply with Information Assurance Requirements IAW DoDD 8500.01E and Army Regulation 25-2.

31.00 The system shall protect Personally Identifiable Information (PII) and Protected Health Information (PHI) IAW DoDD 5400.11, DoD Privacy Program, and DoDI

8580.02 Security of Individually Identifiable Health Information in DoD Health Care Programs.

32.00 The system shall maximize single data entry.

33.00 The system shall provide a backup and disaster recovery capability.

34.00 The system shall record and maintain data, and present it in the form of reports in a timely manner.

4.0 Performance Requirements

4.1 Task 1: Program Management

Program Management activities shall span all contract tasks. This includes the management and oversight of all activities performed by Contractor personnel, including subcontractors, to satisfy the requirements identified in this SOW.

The Contractor shall develop and maintain the following products:

Program Management Plan (PMP) [A001 PMP] that

‒ describes the processes and procedures associated with how the program will be managed and executed, and ensures accurate and timely schedule and performance information throughout the life cycle of the program, to include performance measures and metrics

‒ describes the risk management process and procedures to be implemented

‒ describes the documentation management process and procedures to be implemented

Contractor Work Breakdown Structure (CWBS) and associated dictionary, which identifies all the Contractor activities to the lowest level of detail necessary to deliver the AIE solution [A002 CWBS].

Integrated Schedule that provides a comprehensive solution roadmap to include major milestones, program reviews, incremental software builds (e.g., waves), test events, training, deployment to designated locations and sustainment

Distribution is Unlimited activities, and any other roadmap topics/items. The integrated schedule shall be aligned with the CWBS [A003 IMS].

The Contractor shall execute quality assurance and quality control of all AIE products, and artifacts prior to delivery to the Government.

The Contractor shall develop Program Status Reports (PSR) in support of all tasks on the contract and provide those to the AIE Program Management Office (PMO) on a monthly basis, to include the quality assurance and control performed on any deliverables during that month [A004 Program Status Reports, Meeting Material and Minutes].

The Contractor shall conduct a Monthly Project Management Review (PMR), with every third PMR being a Quarterly Project Review (QPR). [A004 Program Status Reports, Meeting Material and Minutes].

4.1.1 Contractor Acquired Software

The Contractor shall maintain software integrity within the licensing agreement of the producer until such software is delivered to the Government, or otherwise disposed of in accordance with Government direction.

4.1.2 Commercial Software Licenses

The Contractor shall provide solution license management and renewal, to include documenting, tracking, and maintaining a log of all product licenses, and preparing a schedule to ensure licenses are assigned, unassigned, and renewed per the deployment plan such that there is not a gap in user access.

License management requirements include:

a) License Type – All software shall be issued under enterprise licenses.

b) License Use – All software shall, as a minimum, be licensed for use on a single computer or for use on any computer at a particular site.

c) License Issue – All software license(s) shall be issued in the name of the U.S.

Government.

d) Perpetual Agreement – Perpetual license(s) (also referred to as a nonexclusive, paid-up, worldwide license) shall be provided.

e) Documentation – All Software documentation shall be identical to that provided to a customer in the general public in the course of a private sale. The Government’s right to software documentation shall be no less than the rights provided with the associated software.

f) Applicability Terms – The license shall apply to any software changes or new builds.

g) License Maintenance – All necessary commercial, Open Source, and third party software agreements to include licenses, warranties, and/or commercial maintenance agreements for use on all AIE software as appropriate shall be acquired and maintained.

Distribution is Unlimited

h) License Transfer – All necessary commercial, Open Source, and Third (3rd) Party software agreements to include licenses, warranties, and/or commercial maintenance agreements for use on all AIE software shall be transferred as appropriate.

4.2 Task 2: Systems Engineering Management

The Contractor shall develop and implement a Systems Engineering Management Plan (SEMP) [B001 SEMP]. The SEMP shall describe the system/software engineering methodology or framework to deliver the AIE solution. The Government does not have a preferred methodology or framework.

The Contractor shall perform management activities to oversee and support the BPR, analysis, design, configuration / development, test, and integration of the AIE solution, including conducting meetings and technical reviews, and providing the appropriate documentation.

The Contractor shall manage the development of solution-specific architecture viewpoints; maintain DoD Architecture Framework (DoDAF) architecture viewpoints to ensure the architecture remains consistent with current solution configurations and designs; and ensure compliance with the prevailing release of the DoD Business Enterprise Architecture (BEA).

The Contractor shall define performance metrics, (e.g., Technical Performance Measures) in accordance with the AIE RTM (see Attach01-AIE-RTM.pdf for a complete list of AIE requirements), collect performance data, perform analysis, and prepare and submit performance reports [B002 System Performance Report].

The Contractor shall conduct the necessary technical reviews (e.g., System Requirements Review, Preliminary Design Review, Critical Design Review, Test Readiness Reviews) to assess and validate the system requirements, system and software design / configuration, and test readiness [B003 Technical Review Package].

The Contractor shall meet Government-approved entry and exit criteria for each planned review.

The Contractor shall ensure that the solution complies with Army Regulation (AR) 73-1 Test and Evaluation Policy, and AR 602-2, Human Systems Integration in the System Acquisition.

4.2.1 Configuration Management

The Contractor shall develop and implement a Contractor Configuration Management Plan (CMP) [B004 Contractor CMP].

The Contractor shall provide administrative and technical support to monthly AIE change management forums (e.g., Configuration Control Board (CCB).

Distribution is Unlimited

The Contractor shall be responsible for processing and documenting all changes made as a result of a change proposal or system upgrade as well as resulting from any process or procedural changes.

The Contractor shall coordinate and execute a System Change Request Impact Assessment for any System Change Request.

The Contractor shall develop a Configuration Management Status Report (CMSR)

[B005 CMSR].

The Contractor shall be responsible for system upgrades to software, and databases required to maintain throughput, response times, and quality of service to end users as directed by the AIE CCB and in accordance with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-53, Revision 4 configuration management (CM) control requirements for a Moderate Confidentiality, Moderate Integrity, and Moderate Availability system.

The Contractor shall participate in AIE CCB meetings upon Government request.

The Contractor shall maintain a CM repository identifying the system configurations that identifies the state of the system.

4.2.1.1 Release Management

For AIE, a release is defined as a single cohesive entity consisting of the set of software, configuration, processes, and documentation associated with the development, test, and deployment of one or more required capabilities.

The Contractor shall develop a Capability Release Plan [B006 Capability Release Plan].

The Contractor shall execute release management procedures in accordance with the Software Release Plan. The Contractor shall refine, document, and maintain the currency of its release management processes and procedures in the Contractor CMP.

The Contractor shall post all release documentation to the CM repository.

The Contractor shall provide the following deliverables for software releases and upgrades:

Contractor Requirements Traceability Matrix (CRTM) [B007 CRTM]

Architecture Products [B008 Architecture Viewpoints]

Interface Description Document (IDD), to include interface agreements [B009

IDD]

Software Version Description (SVD), to include Software Release Notes [B010

SVD]

Configuration Status Accounting Information [B011 Configuration Status Accounting Information]

Distribution is Unlimited

4.2.1.2 Requirements Management

The Contractor shall receive and log all AIE requirements per the requirements management process defined in the Government-approved SEMP.

The Contractor shall maintain a CRTM that traces the AIE requirements throughout the system life cycle [B007 CRTM].

The CRTM shall include traceability of data elements in the AIE single source record to the authoritative data source (e.g., System of Record data element).

The Contractor shall track system requirements and maintain version control over such documents in an application development life cycle management tool, per the Government-approved CMP.

The Contractor shall provide requirements status with metrics at scheduled program management reviews.

4.3 Task 3: Solution Configuration and Development

The Contractor shall implement the system/software engineering methodology or framework to deliver the AIE solution as described in the Government-approved SEMP.

The Contractor shall analyze, design, configure / develop, unit test, and integration test the complete AIE solution. The Contractor shall implement the following development phases:

Analyze with BPR – The Contractor shall analyze the AIE requirements contained in the AIE RTM (see Attach01-AIE-RTM.pdf for a complete list of AIE requirements) and shall decompose/derive requirements to the software level;

and update requirements document(s), to include the CRTM. In addition, the Contractor shall perform BPR, in collaboration with the Government, to (1) review existing business processes implemented by AIE stakeholders along with the AIE requirements to determine how to converge stakeholder business processes in to a common set of AIE business processes, and (2) optimize business process workflows within the AIE solution. The following analyze/BPR products shall be developed:

‒ AIE CRTM [B007 CRTM] with decomposed requirements, to include at the software and interface specification level

‒ Architecture Artifacts (e.g., Operational Views) as defined in the SEMP [B008 Architecture Viewpoints and Plan]

‒ Initial Build Plan [CDRL B012 Build Plan]

‒ System Requirements Review (SRR) Package [B003 Technical Review Package]

Distribution is Unlimited

Design – The Contractor shall conduct design activities; develop design artifacts;

identify system constraints, limitations, and implementation dependencies, and define/refine system interface agreements. System interface agreements will be developed in collaboration with the Government and the Government will be the primary interface to system partners. The Contractor shall manage the System interface agreements per the Government-approved CMP. The following design products shall be developed/updated for each build:

‒ Architecture Artifacts (e.g., Operational Views) as defined in the SEMP [B008 Architecture Viewpoints]

‒ Security Design Document [B013 Security Design Document]

‒ Data Protection Plan [B014 Data Protection Plan]

‒ Interface Description Document (IDD), to include interface agreements

[B009 IDD]

‒ Authorization and Authentication updates / changes, to include changes to Interim Authority to Operate (IATO) and Authority To Operate (ATO)

‒ Updated Build Plan [B012 Build Plan]

‒ Design Review Package [B003 Technical Review Package]

Configure / Build & Unit Test – The Contractor shall configure / develop functionality based on Government-approved design products as required in order to meet AIE capability requirements. The Contractor shall perform unit testing to ensure all requirements have been met and that the system is ready for independent Government developmental test and operational assessment/test.

Software Integration Test – The Contractor shall perform software integration testing to verify individual software modules, when combined, meet functional, performance, and reliability requirements.

The Contractor shall conduct and report analyses of test failures to assist in isolating causes of failures during testing.

The Contractor shall provide Government access to Contractor data, tests, and results to support all independent system evaluations at the request of the Government.

The Contractor shall host the AIE solution in a commercial cloud environment on a commercial network.

4.4 Task 4: Test and Evaluation

Test and Evaluation includes the verification and validation of the ability of the system to achieve the Key Performance Parameters (KPPs), Key System Attributes (KSAs), and Additional Performance Attributes (APAs) as defined in the AIE RTM (see Attach01- AIE-RTM.pdf for a complete list of AIE requirements) and traced in the CRTM.

Planning must ensure that adequate resources (e.g., test articles, test facilities, specialized tools, funding, and manpower) are available and that duplicative or redundant testing is minimized. Documentation must provide the objective evidence that the stated requirements are tested and evaluated in the applicable context of the

Distribution is Unlimited supporting referenced guidance (e.g., plans, procedures, scripts, readiness reviews, result reports, corrective actions, risk identification and mitigation, and requirements traceability).

All Government directed testing will be conducted in accordance with Army Regulation (AR) 73-1, Test and Evaluation Policy, and Department of Army Pamphlet 73-1, Test and Evaluation in Support of Systems Acquisition.

4.4.1 Test Management

The Contractor shall clearly define T&E roles and responsibilities within their organization.

The Contractor shall identify, prepare, coordinate, plan, conduct, execute, review, support and document T&E events (e.g., performance, stress, regression, interface, network, backup, restore, connectivity, security, survivability, vulnerability, integration, functional, acceptance, interoperability, reliability, availability, maintainability) to ensure that both the system’s individual components and the complete solution meet requirements.

The Contractor shall include all test planning and reporting, test event based reviews, and test events in the IMS.

The Contractor shall develop and implement a System Test Plan [B015 System Test Plan] that encompasses all T&E activities (Contractor and Government), to include test procedures.

The Contractor shall support collaborative planning and provide resources required for Government DT/UAT and OA/OT test events.

The Contractor shall provide Test Reports following the execution of each Contractor-led test event [B016 Test Reports].

The Contractor shall maintain a Failure Reporting, Analysis, and Corrective Action System (FRACAS).

The Contractors shall provide Government access to the FRACAS.

The Contractor shall track all system defects and flaws in the FRACAS.

The Contractor shall record all analyses in the FRACAS.

The Contractor shall conduct analyses of test failures and record results in the FRACAS to assist in isolating causes of failures during testing.

The Contractor shall provide Government access to Contractor data, tests, and results to support all independent system evaluations at the request of the Government.

The Contractor shall be responsible for analyzing and reporting the data used to demonstrate compliance with the requirements to the Government.

Distribution is Unlimited

4.4.2 System Integration Testing

The Contractor shall incorporate holistic system and operating environment tests as necessary prior to deploying new capabilities or functionality. This includes end-to-end regression testing of impacted business processes, testing of impacted interfaces with partner systems, and testing of cross-process integration points and reports.

The Contractor shall support interoperability testing.

4.4.3 Government Developmental Test / User Acceptance Test (DT/UAT) Support

The Contractor shall participate in the Government DT/UAT for each release upon Government request.

The Contractor shall support data construction and maintenance in support of DT/UAT activities.

The Contractor shall support the DT/UAT Test Readiness Review (DTRR) prior to DT/UAT being performed [B003 Technical Review Package].

4.4.4 Government Operational Assessment (OA) / Test (OT) Support

The Contractor shall support Operational Test Readiness Reviews (OTRRs) for each release prior to the OA/OT being performed [B003 Technical Review Package].

The Contractor shall support OA/OT events as deemed necessary by the Government.

The Contractor shall support data construction and maintenance in support of OA/OT activities.

4.5 Task 5: System Security

The Contractor shall perform the activities necessary to meet the AIE cybersecurity requirements in the AIE RTM (see Attach01-AIE-RTM.pdf for a complete list of AIE requirements), which include compliance with FedRAMP+ and DoD Cloud Computing Security Requirements Guide (SRG) cloud security information impact level (IL) 4 security controls. In accordance with DoDI 8510.01 and Committee on National Security Systems Instruction (CNSSI) 1253, the AIE baseline security categorization is Moderate Confidentiality, Moderate Integrity, and Moderate Availability. Additional PII and PHI security and privacy controls per CNSSI 1253F, Attachment 6, Privacy Overlay may be required once the AIE solution is determined.

The Contractor shall provide access to operational data (found in systems, services, devices, logs, or databases) in support of RMF, security audit, and cybersecurity activities.

4.5.1 Risk Management Framework Compliance

The Contractor shall perform the activities necessary to implement the Risk Management Framework (RMF) as defined in the Department of Defense Instruction (DoDI) 8510.01, to include:

Distribution is Unlimited

a) Assessment and Authentication (A&A) / Cybersecurity Compliance - Support the RMF process and activities (e.g., Security Risk Assessment, Plan of Action and Milestones (POA&M)) to facilitate the security A&A of the system according to all relevant cybersecurity standards/directives/policies (e.g., DoDI 8510.01, NIST SP 800-30 Rev 1) and the associated security controls as defined in DoDI 8500.01 to ensure AIE is fully accredited throughout the program lifecycle. This includes updating the DoD Enterprise Mission Assurance Support Service (eMASS) system as required, providing supporting cyber security documentation for upload as artifacts in eMASS, mitigating all security risks and vulnerabilities found during A&A and continuous monitoring and scanning activities. All vulnerabilities must be mitigated in accordance with DoDI 8510.01 based on the Category Level. The Contractor shall support the implementation of DoD/Army-directed Cybersecurity mandates such as information operations conditions (INFOCONs), Information Assurance Vulnerability Alerts and Bulletins (IAVA/Bs) and all applicable vendor released security updates, fixes, patches and bundles for the COTS solution throughout the program lifecycle. The Contractor shall develop system documentation required for the Security Authorization Package [B017 Risk Management Framework (RMF) Package].

b) Program Protection – The Contractor shall develop and update the mission Critical Functional Analysis (CFA), vulnerabilities assessments, risk assessments, identification and counter measurement implementations, demonstration of visibility into supply chain and Software Assurance for critical components, and update of CFA results and Program Protection risks and mitigations at each Technical Review (assuming the system does not contain Critical Program Information (CPI). The Contractor shall develop and implement a Program Protection Implementation Plan (PPIP) that describes the Contractor's implementation of the Government Program Protection Plan (PPP). [B018 Critical Functional Analysis]. [B019 Program Protection Implementation Plan (PPIP)]

c) Software Assurance – The Contractor shall provide a plan to achieve and demonstrate the level of confidence that the software is reliable and functions as intended, and that the software is free from security vulnerabilities and malicious code, either intentionally or unintentionally designed or inserted as part of the software, throughout the lifecycle. At a minimum, the plan shall include countermeasures to prevent, detect, respond, and report to Government vulnerabilities in software; continuous monitoring; and adheres to secure coding standards. The Contractor shall develop, document, and update Software Assurance Countermeasures Table 5.3.3-1 from Attachment 0006 DASD Systems Engineering, Program Protection Plan Outline & Guidance, v.1.0, tailored for Defense Business Systems (DBS) June 13, 2013, which summarizes the planned and current state of a program's software assurance activities in accordance with the table description provided in the Defense Acquisition Guidebook section 13.7.3. The Contractor shall verify all software code against the Common Weakness Enumerations (CWE), Common Vulnerabilities and

Distribution is Unlimited

Exposures (CVE), and Common Attack Pattern Enumeration and Classification (CAPEC) [B020 Software Assurance Plan].

The Contractor shall support the AIE PMO in preparation for the system evaluation by the Security Control Assessor (SCA).

The Contractor shall support the AIE PMO Privacy Impact Assessment (PIA) [B033 Studies and Analyses Report].

The Contractor shall support the AIE PMO security and privacy controls analysis to determine applicable CNSSI 1253F, Attachment 6, Privacy Overlays [B033 Studies and Analyses Report].

The Contractor shall perform all requisite activities to obtain and maintain an ATO and a Certificate of Networthiness for AIE in accordance AR 25-1 and AR 25-2.

4.5.2 Patch and Vulnerability Management

The Contractor shall remediate all vulnerabilities and security deficiencies.

The Contractor shall review all security and functionality patches and updates, identify software updates that are relevant, identify security impacts and security shortfalls, and test and deploy those validated for implementation.

The Contractor shall ensure the system and installed applications have current patches, security updates, and configuration settings.

The Contractor shall alert, in writing, Product Manager AIE, of security issues or updates to the applications on systems in use [B021 Vulnerability Alerts].

The Contractor provide monthly Vulnerability Scan Results [B022 Vulnerability Scan Results].

The Contractor shall design, develop and implement secure software and configurations through applying applicable DoD Security Technical Implementation Guides (STIGs), checklists, vendor security guidance, industry best practices, and applicable vendor product security patches as provided in the DISA Information Assurance Support Environment (IASE) web site.

The Contractor shall provide a STIG Compliance Status Report [B023 STIG Compliance Status Report].

4.5.3 Continuity of Operations / Disaster Recovery

The Contractor shall meet AIE Continuity of Operations (COOP) requirements to enable recovery of AIE capabilities and reestablishment of all system interfaces per the recovery requirements in the AIE RTM (see Attach01-AIE-RTM.pdf for a complete list of AIE requirements).

The Contractor shall develop, test, implement, and maintain a Disaster Recovery Plan (DRP) in accordance with the NIST SP 800-53, Revision 4 contingency planning (CP) control requirements for a Moderate Confidentiality, Moderate Integrity, and Moderate Availability system [B024 Disaster Recovery Plan].

Distribution is Unlimited

The Contractor shall verify AIE products, to include open source products, against the Approved Product List (APL) and/or submit APL approval and waiver requests as required by Product Manager AIE, Army, and DoD Cybersecurity policy. The use of open source software must comply with DoD and Army directives regarding open source software, namely in accordance with DoD Memorandum, Clarifying Guidance Regarding Open Source Software, dated 16 October 2009, and AR 25-2.

The Contractor shall provide a Security Information Special Outage (INFOSPOT) Report [B025 INFOSPOT Report].

The Contractor shall provide an IAVA Compliance Status [B026 Information Assurance Vulnerability Alerts (IAVAs) Compliance Status].

4.6 Task 6: Organizational Change Management

The Contractor shall support the Government in preparation of materials and roadshow trips to a minimum of twenty (20) CONUS locations for stakeholder engagement and assimilation at the AIE capability.

The Contractor shall develop a Change Management Plan in collaboration with the Government, consisting of communications mechanisms, processes, procedures, integrated plan, and schedule associated with the adoption of the AIE solution [B027 Organizational Change Management Plan].

4.7 Task 7: Training

The Contractor shall develop, deliver, manage,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .