AIE_Instructions_and_Evaluation_Criteria_-DRAFT_-_30_MAY_2018.pdf
PDF 895 KB Posted
- Solicitation number
- W15QKN-18-Z-02FA
About this file
This document provides instructions and evaluation criteria for a Prototype Project Opportunity Notice issued by the U.S. Army for the Accessions Information Environment program. The Army seeks to modernize its recruiting and accessions capabilities through an integrated enterprise system.
The solicitation involves a six-step evaluation process culminating in an Other Transaction agreement award. Step one requires offeror self-certification. Step two involves a request for white papers and traceability matrices. Step three consists of an information exchange and vendor demonstration. Step four is a government-defined demonstration. Step five requests prototype proposals covering technical, price, management, and experience factors. Step six concludes with agreement award.
Offerors must meet eligibility and capability requirements at each step for an upward invitation to proceed. Evaluations apply ratings and weight technical, cost, schedule and risk factors. The Army intends to select a single offeror to deliver the Accessions Information Environment prototype.
AIE Draft Instructions and Evaluation Criteria
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIE Instructions and Evaluation Criteria for Industry Response Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
Version .02 30 May 2018
Accessions Information Environment (AIE)
Instructions and Evaluation
Criteria for Industry Response to Prototype Project Opportunity
Notice (PPON) Solicitation Number: W15QKN-18-Z-02FA
Army Contracting Command – New Jersey Innovative Concepts Contracting Center Attn: Mr. Michael S. Klein Agreements Officer Building 10, Phipps Road, Picatinny Arsenal, NJ 07806-5000 Phone: (973) 724-4262 michael.s.klein15.civ@mail.mil
30 May 2018 for Industry Response
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited i
Table of Contents
1.0 GENERAL INSTRUCTIONS for Prototype Proposal Opportunity Notice (PPON) for the Accessions Information Environment (AIE)
1.1 Administrative Details
1.2 Administrative Instructions to Offerors
1.2.1 Step 1: Offeror Self-Certification
1.2.2 Step 2: Request for White Paper (RWP) Upward Invitation
1.2.3 Step 3: Information Exchange and Offeror-defined Demonstration Upward Invitation
1.2.4 Step 4: Government-defined Demonstration Upward Invitation
1.2.5 Step 5: Request for Prototype Proposal (RPP) Upward Invitation
1.2.6 Step 6: Agreement Award
1.3 Response for Each Step
1.4 Unclassified Process
1.5 Response Submissions
1.5.1 Response Validity
1.5.2 Official Transmissions and Communications
1.5.3 Government Points of Contact
1.6 Questions/Comments
1.7 Government Reading Room
2.0 Step 1 – Offeror Self-Certification – Details
2.1 Step 1 Instructions
2.2 Step 1 Evaluation Criteria
2.3 Basis of Selection (BoS) for Upward Invitation to Step 2
3.0 Step 2 – Request for White Paper – Details
3.1 Step 2 Instructions
3.2 Step 2 Evaluation Criteria
3.3 Basis of Selection (BoS) for Upward Invitation to Step 3
4.0 Step 3 – Information Exchange and Offeror-defined Demonstration – Details . 10
4.1 Step 3 Instructions
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited ii
4.2 Step 3 Evaluation Criteria
4.3 Basis of Selection (BoS) for Upward Invitation to Step 4
5.0 Step 4 – Government-defined Demonstration – Details
5.1 Step 4 Instructions
5.2 Step 4 Evaluation Criteria
5.3 Basis of Selection (BoS) for Upward Invitation to Step 4
6.0 Step 5 – Request for Prototype Proposal – Details
6.1 Step 5 Instructions
6.2 Prototype Proposal – Technical
6.3 Prototype Proposal – Price
6.4 Prototype Proposal – Program Management
6.5 Prototype Proposal – Demonstrated Experience
6.6 Basis of Selection (BoS) for OT Agreement Award (Step 5)
7.0 Agreement Award
8.0 Other Special Requirements
Step 1 – Offeror Self-Certification – Scorecard
Step 2 – Request for White Paper – Scorecard
Step 3 – Information Exchange and Vendor-defined Demonstration – Scorecard
Step 4 – Government-defined Demonstration – Scorecard
Step 5 – Request for Prototype Proposal – Ratings
List of Figures
Figure 1. OT Acquisition Process
List of Tables
Table 1. Comment and Question Format
Table 2. Offeror Response to Step 1
Table 3. Offeror Response to Step 2
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited iii
Table 4. Offeror Response to Step 3
Table 5. Offeror Response to Step 4
Table 6. Offeror Response to Step 5
Table 7. Step 1 Scorecard
Table 8. Composite-weighted Scorecard for Self-Certification
Table 9. Step 2 Scorecard
Table 10. Composite-weighted Scorecard for Detailed Technical Responses
Table 11. Step 3 Ratings
Table 12. Step 3 Scorecard
Table 13. Step 4 Ratings
Table 14. Step 4 Scorecard
Table 15. Step 5 Combined Technical / Risk Rating
Table 16. Step 5 Combined Management / Risk Rating
Table 17. Step 5 Demonstrated Experience Relevancy Rating
Table 18. Step 5 Demonstrated Experience Confidence Rating
Table 19. Step 5 Prototype Proposal Scorecard
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
1.0 GENERAL INSTRUCTIONS for Prototype Proposal Opportunity
Notice (PPON) for the Accessions Information Environment (AIE)
1.1 Administrative Details
1.2 Administrative Instructions to Offerors
The Other Transaction (OT) acquisition process for this PPON includes six (6) Steps.
Step six (6) will result in Agreement Award. Only those Offerors that receive an Upward Invitation at the end of a Step will be eligible to proceed to the next Step. The Upward Invitation is determined by a set of Basis of Selection (BoS) criteria accompanied by Evaluation Scorecards. An overview of the AIE OT Acquisition process is depicted in Figure 1.
Figure 1. OT Acquisition Process
1.2.1 Step 1: Offeror Self-Certification
Each Offeror shall complete and submit an Offeror Self-Certification Questionnaire. The Questionnaire consists of information on proposed Team Composition, a set of Yes/No responses to questions per the Instructions tab of the Offeror Self-Certification Questionnaire, and an OTA Eligibility description.
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
1.2.2 Step 2: Request for White Paper (RWP) Upward Invitation Each Offeror invited to this step shall:
• Complete and submit a Requirements Traceability Matrix (RTM) and Proposed Solution Questionnaire, which includes an RTM Questions tab, and an Offeror’s Proposed Solution tab. Instructions tabs will be provided for each.
• Prepare and submit a White Paper Response to the Request for White Paper.
The White Paper will include details on the Technical approach, proposed solution, a Rough Order Magnitude (ROM) cost estimate, Proposed Schedule, and updated Team Composition.
1.2.3 Step 3: Information Exchange and Offeror-defined Demonstration Upward Invitation Each Offeror invited to this step shall provide additional information regarding the proposed solution as well as demonstrate the proposed solution. Formats for these are Offeror’s choice. Time will be limited to two (2) hours. Offeror will be given thirty (30) minutes prior to start time for setup, and twenty (20) minutes post stop time to package materials and depart.
1.2.4 Step 4: Government-defined Demonstration Upward Invitation Each Offeror invited to this step shall demonstrate the proposed solution implementing Government-defined demonstrations, on Government-issued devices, using Government-provided data. Time will be limited to three (3) hours. Offeror will be given thirty (30) minutes prior to start time for setup, and twenty (20) minutes post stop time to package materials and depart.
1.2.5 Step 5: Request for Prototype Proposal (RPP) Upward Invitation Each Offeror invited to this step shall submit a Prototype Proposal, with Technical, Price, Program Management, and Demonstrated Experience Volumes in response to the AIE RPP. The AIE Statement of Work (SOW) will be provided with the RPP. In addition, the Offeror will be provided the OT Agreement Terms and Conditions for review and comment.
1.2.6 Step 6: Agreement Award
The Government will award the OT Agreement to a single Offeror.
1.3 Response for Each Step
Each Offeror shall submit only one (1) electronic response (with multiple files as applicable) that addresses the Government Requirements and Instructions for that Step.
The Offeror bears responsibility for submitting Step requirements by the specified date/time referenced in the PPON posted to FedBizOpps or the Upward Invitation
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
(whichever is most recent). Offerors are solely responsible for all expenses associated with responding to this PPON.
Response files shall be submitted in electronic (searchable) formats as specified in the instructions for each Step. Self-extracting .exe files, hyperlinks, and .zip files are not acceptable. Use of separate files to permit rapid location of all portions, including factors, exhibits, annexes, and attachments is acceptable.
1.4 Unclassified Process
For the proposal process, no information classified as “Confidential”, “Secret”, or “Top Secret” shall be submitted or included in any written responses (i.e., Questionnaires, RWP, RPP) or Information Exchange, or Solution Demonstration(s).
Any data provided / used for execution of activities within a Step (e.g., Army data for Government-defined scenarios) will be fictitious.
1.5 Response Submissions
Offerors shall submit electronic response files through the Aviation and Missile Research, Development and Engineering Center (AMRDEC) Safe Access File Exchange (SAFE) website. Access to SAFE is available through the website at:
https://safe.amrdec.army.mil/safe/Welcome.aspx
Submission steps include the following:
(1) Instructions for GUEST and CAC (Common Access Card) users are provided at the website. SAFE is accessible to anyone as a GUEST with a valid commercial e-mail address. SAFE supports file sizes up to 2 gigabytes (GB) for uploading.
Per the AMRDEC instructions: "You may add up to 25 files per package, so long as the file size does not exceed 2GB."
(2) Upload all response files using the naming convention identified in each step; in place of any blank spaces in the filename, use underscore “_” or dash “-”
(3) Once at the AMRDEC site, manually enter the below email address to submit response files to:
Agreements Officer (AO): michael.s.klein15.civ@mail.mil Agreements Specialist (AS): chante.m.frederick.civ@mail.mil
(4) After successfully uploading the proposal file(s), the SAFE site will send an e-mail to the GUEST user or CAC user: “Subject: VERIFICATION IS REQUIRED - AMRDEC Safe Access File Exchange Submittal Notice - VERIFICATION IS REQUIRED”. Follow the instructions in that note to VERIFY the senders e-mail.
The package will only be sent after the VERIFICATION step, which provides a LINK and PASSWORD to VERIFY and “send” the package to the Points of Contact.
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
(5) After submitting through SAFE, send a separate notification e-mail stating that a response submission was made to the Points of Contact (Agreements Officer and Agreements Specialist) listed above with the following Subject:
“Vendor Name Notification Submitted PPON: W15QKN-18-Z-02FA”
The body of the note shall be short and include the Offeror Point of Contact.
Response submissions that are uploaded to the SAFE site will be assigned a date/time (in Central Time) by the SAFE system. The Government will consider a response on time or late based on the Offerors last file “UPLOAD” date/time. The Government highly recommends that Offeror ensure the “UPLOAD” time is before the PPON submission date and time (Eastern Time).
1.5.1 Response Validity
All Offerors must allow their responses to be valid for a minimum of 365 days from the date submitted.
1.5.2 Official Transmissions and Communications
Any Government Amendments will be issued via FedBizOpps.
1.5.3 Government Points of Contact
The Agreements Officer (AO) and Agreements Specialist (AS) are the SOLE points of contact for this agreement:
Agreements Officer Mr. Michael S. Klein US Army Contacting Command - New Jersey Innovative Concepts Contracting Center Building 10, Phipps Road Picatinny Arsenal, NJ 07806-5000 Phone: (973) 724-4262 michael.s.klein15.civ@mail.mil
Agreements Specialist Ms. Chanté M. Fredrick.civ@mail.mil US Army Contracting Command - New Jersey, Information Technology Contracting Center 5418 South Scott Plaza Joint Base MDL, NJ 08640 Phone: (609) 562-7028 chante.m.fredrick.civ@mail.mil
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
1.6 Questions/Comments
Any questions and/or comments submitted regarding this solicitation shall refer to specific text of the solicitation in the following format:
E-mail Subject: VendorName_Q-Cmts_PPON_W15QKN-18-Z-02FA.
Format the Questions/Comments in MS Excel (compatible with MS Excel 2013) file as an attachment with file naming convention:
VendorName_Q-Cmnts_PPON_W15QKN-18-Z-02FA.xls.
Format the MS Excel file with all Questions/Comments as depicted in Table 1 with column headings at the top of each page when printing:
Table 1. Comment and Question Format
Offeror Company Name:
Offeror POC Name, E-mail, Phone #
Item # Government File Name or Attachment # Page # Para # /
Line Question / Comment Rationale
Questions / Comments and Answers. The AO and AS will field written questions to ensure that all inquiries have been addressed in advance of the response suspense date / time. Only one set of questions will be accepted from each Offeror. The Government may respond with a compilation of frequently asked questions and/or a revised document (e.g., Statement of Work) as time permits. Government responses will not include Offeror identification to ensure the widest distribution possible for all Offerors. See the FedBizOpps announcement page for the suspense date / time for any questions and / or comments. Offerors may submit questions for Steps 1 and 2 only.
1.7 Government Reading Room
The Government will establish a reading room to provide supplementary products deemed pertinent to this solicitation. Instructions to request access to the Reading Room will be included in the FedBizOpps announcement.
2.0 Step 1 – Offeror Self-Certification – Details
2.1 Step 1 Instructions
These instructions provide details for Step 1 only in response to the AIE Offeror Self- Certification Questionnaire. Offerors shall submit the files and attachments defined in Table 2 per the instructions described in paragraph 1.5.
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
Table 2. Offeror Response to Step 1
# Response Item Response File Name Page Limit
1. Offeror Cover
Letter AIE_VendorName_Letter_W15QKN-18-Z-02FA.pdf (Offeror letterhead and format for response submission)
1 Page
2. Attachment 001 Offeror Self- Certification Questionnaire
AIE_Attch_001_VendorName_Self-Certification_W15QKN-18-Z- 02FA.xlsx, to include completed OT Eligibility and Questions Worksheet (Return Government posted file, completed and signed)
Return in Govt Format
No additional information, no written responses (no expansive text), and no cost information shall be submitted in the Step 1 response. Any such information transmitted will not be accepted.
The Offeror shall follow the instructions within the attachment to prepare the Step 1 response, which addresses OT Eligibility, solution type implementation, and COTS product composition to realize the solution.
2.2 Step 1 Evaluation Criteria
The following criteria will be evaluated for Step 1:
• Programmatic ‒ OT Eligibility: Completed and signed per the embedded instructions in the
Offeror Self-Certification Questionnaire (Attachment 001) OT Eligibility tab;
will be used as Go/No Go criteria for Upward Invitation to Step 2
• Technical / Performance: Completed Questions Worksheet tab per the embedded instructions in the Offeror Self-Certification Questionnaire (Attachment 001)
‒ Yes/No responses to a pre-determined set of Questions identified as “Must Have” capability will be used as Go/No Go criteria for Upward Invitation to Step 2
‒ Comparison of scores of all Offeror submissions associated with the COTS-based Solution Composition will be used as selection criteria for Upward Invitation to Step 2
‒ Comparison of Total Composite-weighted Capability scores of all Y/N responses for all Offeror submissions will be used as selection criteria for Upward Invitation to Step 2
NOTE: The Government will use a form similar to Appendix A, Step 1 – Offeror Self- Certification – Scorecard, in addition to other notes, to support the Step 1 Evaluation.
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
2.3 Basis of Selection (BoS) for Upward Invitation to Step 2
The following Order of Importance will be used as the Step 1 BoS for Upward Invitation to Step 2:
• OT Eligibility Go/No Go Results
• “Must Have” Go/No Go Results
• Relative COTS-based Solution Composition Score
• Relative Total Composite-weighted Capability Score Offerors that are determined to be most successful at addressing the above elements will receive an Upward Invitation to Step 2 to submit a RWP, and RTM and Solution Questionnaire.
Offerors not selected for Upward Invitation to Step 2 will be notified in writing.
3.0 Step 2 – Request for White Paper – Details
3.1 Step 2 Instructions
These instructions provide details for Step 2 only in response to the AIE Request for White Paper, and supplemental RTM and Proposed Solution Questionnaire. Offerors shall submit the files and attachments defined in Table 3 per the instructions described in paragraph 1.5.
Table 3. Offeror Response to Step 2
# Response Item Response File Name Page Limit
1. Offeror Cover
Letter AIE_VendorName_Letter_W15QKN-18-Z-02FA.pdf (Offeror letterhead and format for response submission)
1 Page
2. Attachment 002 AIE RTM and Proposed Solution Questionnaire
AIE_Attch_002_VendorName_RTM_Solution_W15QKN-18-Z- 02FA.xlsx (Return Government posted file, completed and signed)
Return in Govt Format
3. White Paper AIE_VendorName_RWP_Response_W15QKN-18-Z-02FA.pdf 25 pages
Offerors shall submit the responses in accordance with the date and time referenced in the PPON posted to FedBizOpps. The Offeror bears responsibility for submitting its offer by the specified date/time. Offerors are solely responsible for all expenses associated with responding to this PPON. All Offerors must allow their responses to be valid for a minimum of 365 days from the date submitted.
The following general formatting requirements apply to the written White Paper:
• Page limit for each Volume as noted in Table 6 (cover sheet not counted; Offeror Point of Contact, Legal Binding Signature and Date sheet not counted)
• 1 Page = when printed, 1 single-sided sheet, 8.5 by 11 inches
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
• Font = Arial 11 (or larger) single-spaced
• Font in figures and tables = Arial 9 (or larger), but shall be clearly legible
• Margins on all sides (top, bottom, left, and right) shall be at least 1 inch
• Headers and footers within the margins must contain the proposal type
(Technical, Price, Management, or Experience), and solicitation number, and may contain administrative data
3.2 Step 2 Evaluation Criteria
The following criteria will be evaluated for Step 2:
• Cost / Price Affordability based on ROM submission
• Schedule Reasonableness
• Programmatic ‒ OT Eligibility: Completed and signed per the embedded instructions in the
Offeror RTM and Proposed Solution Questionnaire (Attachment 002) OT Eligibility tab. Will be used as Go/No Go criteria for Upward Invitation to Step 3
‒ Solution Availability Comparison of completed Proposed Solution Tab per the embedded instructions in the Offeror RTM and Proposed Solution Questionnaire (Attachment 002)
‒ RWP response for Demonstrated Experience
• Technical / Performance:
‒ Technical / Performance Viability based on RWP Response and comparison of scores of all Offeror submissions associated with these areas will be used as selection criteria for Upward Invitation to Step 2 Proposed Solution Viability and alignment with AIE requirements Technical Approach Soundness and Viability Hosting Approach and Viability User Experience Capability Mobility Capability Interoperability Capability Cybersecurity Capability Data Capability
‒ Composite-weighted score of detailed technical responses to the following pre-selected questions from the Offeror Self-Certification Questionnaire;
the question number should be referenced where the response is located in the Offeror white paper; how these details are captured and referenced is at the discretion of the Offeror; Comparison of composite-weighted
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited scores for detailed technical responses of all Offeror submissions will be used as selection criteria for Upward Invitation to Step 3 User Capabilities: CP01, CP02, CP05, CD01, CD02, CD03, PM01, PM03, PM04, PM05, PM06, FO02, FO03, FO07, FO08, FO09, FO10, DA01, DA02, DA03, DA04, DA05, DA06, DA07, DA08, MS02, MS03, MS04, MS05, MS06, MS13, MS14, MS15, MO01, MO02, MO03, MR01, MR02, MR03, MR04, MR06, MR07, MR09, RM01, RM02, RM04, RM05, RM09, PA02, PA04, PA05, PA06, PA07, PA08, PA10, PA12, LM04, DM02, DM03, DM04, DM05, DM06, DM07, DM08, DM09, US01, US02
Applications and Services: AC02, AN01, AN02, AW01, AW05, AW08, DV01, DV03, DV08, DV09, BR02, SM02, SM04, WP06, WP07, WP10, WP11, WP12, WP13, WS03, WS04, WS09, SE07, IN01, IN02, IN03, DE02
Infrastructure: DC01, DC02, D03, DC04, DC08, DC09, NW01, NM05, MN02, IS01, IS02, IS13, TR01, TR02, SC01
Life Cycle Considerations: LC01, LC02, LC06, LC07, LC16, LC20, LC24, LC25
Completed RTM Worksheet tab per the embedded instructions in the Offeror RTM and Proposed Solution Questionnaire (Attachment 002); Comparison of weighted total scores of all Offeror submissions associated with the COTS-based Solution Composition will be used as selection criteria for Upward Invitation to Step 3
NOTE: The Government will use a form similar to Appendix B, Step 2 – Request for White Paper – Scorecard, in addition to other notes, to support the Step 2 Evaluation.
3.3 Basis of Selection (BoS) for Upward Invitation to Step 3
The following Order of Importance will be used as the Step 2 BoS for Upward Invitation to Step 3:
• OT Eligibility Go/No Go Results
• Solution Availability
• Technical / Performance ‒ RWP Response ‒ Relative COTS-based Solution Composition Score from RTM Worksheet responses ‒ Relative Total Composite-weighted Score for detailed technical responses to identified questions
• Schedule Reasonableness
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
• Demonstrated Experience
• Cost / Price Affordability Offerors that are determined to be most successful at addressing the above elements will receive an Upward Invitation to Step 3 to conduct Information Exchange and Offeror-defined Demonstration.
Offerors not selected for Upward Invitation to Step 3 will be notified in writing.
4.0 Step 3 – Information Exchange and Offeror-defined
Demonstration – Details
4.1 Step 3 Instructions
These instructions provide details for Step 3 only in response to the Offeror conducting Information Exchange and Offer-defined Demonstration. Offerors shall submit the files and attachments defined in Table 4 per the instructions described in paragraph 1.5.
Table 4. Offeror Response to Step 3
# Response Item Response File Name Page Limit 1 Offeror
Acknowledgement Letter
AIE_VendorName_Step3Letter_W15QKN-18-Z-02FA.pdf (Offeror letterhead and format for response submission)
2 pages
2 Information Exchange Materials (Optional)
AIE_VendorName_Information_Exchange_W15QKN-18-Z- 02FA.pdf (Offeror format)
No limit
3 Offeror Demonstration
No file submission, only a “Live” Demonstration Not Applicable
4 Vulnerability Assessment Summary Report
AIE_VendorName_Vulnerability_Results_W15QKN-18-Z- 02FA.pdf (Offeror format)
2 pages maximum for each product
The Offeror shall submit a Letter acknowledging the Upward Invitation. It shall include a list of Offeror team members participating in the Information Exchange and Offeror-defined Demonstration, to include name, company affiliation, and AIE Role, as well a reference to any materials being provided.
The Offeror shall provide information regarding the proposed solution (optional) as well as demonstrate the proposed solution. Formats for these are Offeror’s choice. Time will be limited to two (2) hours total for Step 3. The allocation of time between the Information Exchange and the Solution Demonstration is at the discretion of the Offeror.
Cost shall not be addressed in Step 3. Any such information conveyed will not be acknowledged.
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
The following terms will be adhered to:
• Who: Up to four (4) personnel. Offeror attendees / presenters shall not be temporary proposal consultants or business development staff and must be current employees for the Prime Offeror or designated Team Member. The Offeror team shall be composed of the designated company personnel proposed as providing direct support to the AIE project effort. Only the proposed names in the Cover Letter may attend. Substitutions to submitted names should be directed to the Solicitation AO and AS. Once started, there will be no substitutions. Departures are permitted only for emergency events.
• Location: Step 3 will be held at a location to be designated in the Upward Invitation. This is an in-person event; there will be no capability available for Teleconference or Video Conference. Residential grade/speed commercial internet is available with a Wi-Fi connection. The room will have at least two (2) large monitors, with HDMI connections and cables long enough to reach the conference table (standard HDMI). How these monitors are used is at the discretion of the Offeror. Once confirmed, additional facility details and room information will be posted on www.fbo.gov or that detailed information will be included with the Upward Invitation. For planning purposes, Step 3 will be held in the Northern Virginia area (e.g., Arlington, McLean).
• Date / Time: Offerors will be scheduled randomly and the Government will provide a date / time reservation (via an e-mail from the Agreements Officer) to each Offeror.
• How / Details: Two (2) hour limit for the combined Information Exchange and Solution Demonstration. The Government will control the start and stop time.
Offeror will be given thirty (30) minutes prior to start time for setup, and twenty
(20) minutes post stop time to package materials and depart. It is the Offeror’s responsibility to allow sufficient time to clear building security. A Government laptop and separate monitor will be used to display the Offeror Information Exchange Presentation submitted per the Step 3 Upward Invitation instructions.
Once submitted, it cannot be changed. A Government representative will control the presentation at the direction of the Offeror.
• Information Exchange and Solution Demonstration: The Offeror is responsible for allocation of time between the Information Exchange and the Solution Demonstration. The Offeror is responsible for preforming both activities as they deem necessary. The Information Exchange is not a discussion. The Government will listen to the presentation but will not interact (no questions) with the presenters. The Solution Demonstration shall not contain gimmicks, embedded sound, music, videos, simulations or animations (unless the element is a feature in the released software, such as a “Show Me” or “Help Tool”). The Offeror shall not pass any paper to the Government during this session (no slides, handouts, marketing materials or brochures). The content presented is at the discretion of the Offeror. The only statements from the Government
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited envisioned include: Time Starts, Repeat [a statement not heard] and Time Stops.
The Offeror will submit a Vulnerability Assessment Summary Report that includes the results of a Vulnerability Scan for each product within the proposed solution. The report shall include remediation plans and expected completion for each positive finding.
4.2 Step 3 Evaluation Criteria
The Government will weigh the relative benefits and risks of the information provided in the Information Exchange and what was observed during the Offeror-defined Demonstration.
The following criteria will be evaluated:
• Device Configurations and Applications
• User Interface / Display / Visualization
• User Experience / Ease of Use
• Access Control
• Configurability
• Business Rules
• Data Validation
• Data Ingest
• Data Analytics
• Alerts and Notifications
• Dynamic Search
• Infrastructure
• Record Management
• Prospecting
• Processing
• Interviewing
• Vulnerability Assessment
NOTE: The Government will use a form similar to Appendix C, Step 3 – Information Exchange and Vendor-defined Demonstration – Scorecard, in addition to other notes, to support the Step 3 Evaluation.
4.3 Basis of Selection (BoS) for Upward Invitation to Step 4
The following Order of Importance will be used as the Step 3 BoS for Upward Invitation to Step 4:
• Offeror-defined Demonstration based on the evaluation criteria rated in equal order of importance
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
• Offeror Information Exchange based on the evaluation criteria rated in equal order of importance
Offerors that are determined to be most successful at addressing the above elements will receive an Upward Invitation to Step 4 to conduct a Government-defined Demonstration.
Offerors not selected for Upward Invitation to Step 4 will be notified in writing.
5.0 Step 4 – Government-defined Demonstration – Details
5.1 Step 4 Instructions
These instructions provide details for Step 4 only in response to the Offeror conducting a Government-defined Demonstration. Offerors shall submit the files and attachments defined in Table 5 per the instructions described in paragraph 1.5.
Table 5. Offeror Response to Step 4
# Response Item Response File Name Page Limit 1 Offeror
Acknowledgement Letter
AIE_VendorName_Step4Letter_W15QKN-18-Z-02FA.pdf (Offeror letterhead and format)
2 pages
2 Offeror Demonstration
No file submission, only a “Live” Demonstration Not Applicable
3 Army Data Usage Agreement
AIE_VendorName_DataUseAgrmnt_W15QKN-18-Z-02FA.pdf (Return signed Government provided Data Usage Agreement)
Govt Format
The Offeror shall submit a Letter acknowledging the Upward Invitation. It will include a list of Offeror team members participating in the Demonstration, to include name, company affiliation, and AIE role. With the acknowledgement letter, the Offeror shall submit the signed Army Data Usage Agreement (included in the Upward Invitation) with no edits, comments, or exceptions. Any acknowledgement received that does not include the signed Data Usage Agreement will be considered incomplete and the Offeror will not be permitted to proceed with Step 4.
The Offeror shall conduct a demonstration of the proposed solution using Government-defined scenarios and Government-provided data using Government-provided devices.
Demonstration format is Offeror’s choice. The Upward Invitation for Step 4 will include details about how, when, and where the Offeror will be issued, and will sign for, Government data, Government-configured devices (e.g., laptop, tablet, smartphone), and Government-defined scenario descriptions to be included in the demonstration.
The Offeror demonstration will be conducted approximately 80 hours (i.e., 3.33 days) after the Offeror signs for the aforementioned items.
The Demonstration time will be limited to three (3) hours total for Step 4, to include time (amount at their discretion) for the Government to ask adhoc questions relative to what is being demonstrated for clarity and complete understanding.
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
Cost shall not be addressed in Step 4. Any such information conveyed will not be acknowledged.
The following terms will be adhered to:
• Who: Up to four (4) personnel. Offeror attendees / presenters shall not be temporary proposal consultants or business development staff and must be current employees for the Prime Offeror or designated Team Member. The Offeror team shall be composed of the designated company personnel proposed as providing direct support to the AIE project effort. Only the proposed names in the Cover Letter may attend. Substitutions to submitted names should be directed to the Solicitation AO and AS. Once started, there will be no substitutions. Departures are permitted only for emergency events.
• Location: Step 4 will be held at a location to be designated in the Upward Invitation. This is an in-person event; there will be no capability available for Teleconference or Video Conference. Residential grade/speed commercial internet is available with a Wi-Fi connection. The room will have at least two (2) large monitors, with HDMI connections and cables long enough to reach the conference table (standard HDMI). How these monitors are used is at the discretion of the Offeror. Once confirmed, additional facility details and room information will be posted on www.fbo.gov or that detailed information will be included with the Upward Invitation. For planning purposes, Step 4 will be held in the Northern Virginia area (e.g., Arlington, McLean).
• Date / Time: Offerors will be scheduled randomly and the Government will provide a date / time reservation (via an e-mail from the Agreements Officer) to each Offeror.
• How / Details: Three (3) hour limit for the Government-defined Demonstration.
The Government will control the start and stop time. Offeror will be given thirty
(30) minutes prior to start time for setup, and twenty (20) minutes post stop time to package materials and depart. It is the Offeror’s responsibility to allow sufficient time to clear building security.
• Government-defined Demonstration: The Offeror’s Demonstration shall implement the Government-defined scenarios. During and throughout the Demonstration, the Offeror shall clearly identify the Software (application) being implemented. The Offeror shall allocate time (amount at their discretion) and shall be prepared to respond to adhoc questions during the Demonstration that may expand upon the Government-defined scenarios to ensure clarity and complete understanding. The Demonstration shall not contain gimmicks, embedded sound, music, videos, simulations or animations (unless the element is a feature in the released software, such as a “Show Me” or “Help Tool”). The Offeror shall not pass any paper to the Government during this session (no slides, handouts, marketing materials or brochures). The manner in which the Demonstration is presented is at the discretion of the Offeror.
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
5.2 Step 4 Evaluation Criteria
The Government will weigh the relative benefits and risks of what was observed during the Government-defined Demonstration.
The following criteria will be evaluated as demonstrated on each Government-issued device:
• Scenario Implementation Results, to include Device Performance
• Operational Capability criteria from Step 3 to the extent applicable
• Responses to ad hoc questions
NOTE: The Government will use a form similar to Appendix D, Step 4 – Government-defined Demonstration – Scorecard, in addition to other notes, to support the Step 4 Evaluation.
5.3 Basis of Selection (BoS) for Upward Invitation to Step 4
The following Order of Importance will be used as the Step 4 BoS for Upward Invitation to Step 5:
• Scenario Implementation Results
• Operational Capability provided on Mobile device, with each element rated in equal order of importance
• Operational Capability provided on other devices, with each element rated in equal order of importance
• Responses to adhoc questions
Offerors that are determined to be most successful at addressing the above elements will receive an Upward Invitation to Step 5 to submit a Prototype Proposal.
Offerors not selected for Upward Invitation to Step 5 will be notified in writing.
6.0 Step 5 – Request for Prototype Proposal – Details
6.1 Step 5 Instructions
These instructions provide details for Step 5 only in response to the Offeror submitting a Prototype Proposal. Offerors shall submit the files and attachments defined in Table 6 per the instructions described in paragraph 1.5..
Table 6. Offeror Response to Step 5
# Response Item Response File Name Page Limit 1 Offeror Cover
Letter AIE_VendorName_Step4Letter_W15QKN-18-Z-02FA.pdf (Offeror letterhead and format)
2 pages
2 Prototype Proposal – Technical
AIE_VendorName_Technical_W15QKN-18-Z-02FA.pdf (Offeror letterhead and format)
25 pages
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
# Response Item Response File Name Page Limit 3 Prototype
Proposal – Price AIE_VendorName_Price_W15QKN-18-Z-02FA.xls (Offeror letterhead and format)
No Limit
4 Prototype Proposal – Program Management
AIE_VendorName_Management_W15QKN-18-Z-02FA.pdf (Offeror letterhead and format)
5 pages
5 Prototype Proposal – Demonstrated Experience
AIE_VendorName_Experience_W15QKN-18-Z-02FA.pdf (Offeror letterhead and format)
10 pages
6 Terms and Conditions Comments
AIE_VendorName_TandC_Comments_W15QKN-18-Z-02FA.xls (Offeror letterhead and format)
No limit
The following general formatting requirements apply to the written Prototype Proposal for all but the Price:
• Page limit for each Volume as noted in Table 6 (cover sheet not counted; Offeror Point of Contact, Legal Binding Signature and Date sheet not counted)
• 1 Page = when printed, 1 single-sided sheet, 8.5 by 11 inches
• Font = Arial 11 (or larger) single-spaced
• Font in figures and tables = Arial 9 (or larger), but shall be clearly legible
• Margins on all sides (top, bottom, left, and right) shall be at least 1 inch
• Headers and footers within the margins must contain the proposal type
(Technical, Price, Management, or Experience), and solicitation number, and may contain administrative data
6.2 Prototype Proposal – Technical
The Technical response shall provide the Offeror’s proposed technical solution and approach for meeting the performance and capability requirements specified in the SOW. Price information and classified information shall not be included.
The Technical response shall include team members, the role(s) of each member, the respective company of each team member, the proposed COTS software product names, the capability provided by the product, the rationale for the product and traceability to the requirements in the RTM.
At a minimum, the following topics shall be addressed while responding to the AIE Statement of Work:
• Technical Approach
• Hosting Approach
• Cybersecurity Approach
• Data Management Approach
• Schedule Realism
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
The Government will weigh the relative benefits and risks of the Technical Proposal.
The following criteria will be evaluated:
• Technical Approach ‒ Extent to which the Technical Approach, including the rationale for team selection, and the description of the proposed solution is considered sound, realistic, achievable, and presents an integrated approach to meet the requirements of the SOW
‒ Extent to which the solution meets the required performance parameters identified in the AIE Requirements Traceability Matrix (RTM)
‒ Extent to which the solution solves the overall AIE problem with low risk while providing benefit(s) to the Army
• Hosting Approach ‒ Extent to which the Hosting is realistic, achievable, and presents an integrated approach to meet the requirements of the SOW ‒ Extent to which the proposed solution can scale to solve the overall AIE problem with low risk and provides benefit(s) to the Army
• Cybersecurity Approach ‒ Extent to which the proposed approach and hosting facility meets cybersecurity requirements of the SOW ‒ Extent to which the proposed approach meets the data protection requirements of the SOW
• Data Management Approach ‒ Extent to which the proposed data management approach ensures continued data access and storage availability ‒ Extent to which the data management approach allows for data growth
• Schedule Realism ‒ Extent to which the proposed tasks and technical requirements can be successfully completed within the proposed schedule ‒ Extent to which the proposed tasks and technical requirements can be successfully completed within the identified constraints
6.3 Prototype Proposal – Price
The Price Proposal shall provide sufficient information to substantiate that the overall proposed price is realistic, affordable, and complete for the proposed work. It should provide enough information to ensure that a complete and fair evaluation of the reasonableness and realism of the price can be conducted and reflect the best price for the project. The Offeror shall perform a price analysis on all team members and shall confirm to the Government that their proposed costs are found to be fair and reasonable. This analysis shall be provided as part of the submitted proposal.
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
The Offeror shall include a narrative for each Cost Element. At a minimum, the following shall be included as a total and broken down by team member:
• Management Labor
• Engineering Labor
• Infrastructure Labor
• Capability Development Labor
• Capability Integration Labor
• Capability Test and Evaluation Labor
• Training Labor
• Business Process Reengineering Labor
• Change Management Labor
• Operations and Support Labor
‒ System and Software Maintenance ‒ Help Desk
• Materiel / Equipment
• Software Licenses (List by License) – all products / tools
• Hosting and Management Services
• Other Direct Costs
• Travel
• Indirect Costs
• Profit / Fee
• Proposed Cost Share (as applicable)
Further breakout of price is acceptable.
The Price Narrative details shall address following:
(a) Labor Rates (Separate for Prime / Subcontractor). Include the basis for which the estimated total labor hours were calculated. (i.e,. Labor Category position titles and estimated rates and hours for those individuals)
(b) Material / Equipment. Provide a list of the materials/equipment required to meet the solution as described in the written proposal and the estimated cost.
(c) Software License Cost. Provide an itemized list of each license and the cost.
Describe the license cost model (e.g., term, subscription, per user, enterprise agreement, recurring maintenance) and project license costs for up to ten (10) years
(d) Hosting (including managed services). Provide a narrative of the services provided.
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
(e) Other Direct Costs. Provide a narrative for Other Direct Costs and provide data as appropriate supporting how the estimate was calculated. This should include a breakout of any estimated costs that do not fit into the cost categories above.
(f) Travel. Provide details for the travel required for the proposed effort broken out by participant (i.e., Offeror, team member, consultant). Provide the location, number of people, number of trips, per diem, airfare, rental car and any other incidental costs proposed as necessary in performance of this requirement.
Travel costs shall be in accordance with Joint Travel Regulations (JTR).
(g) Indirect Costs. Provide an estimate of the indirect costs and provide data to support your indirect cost rates by one of the following methods:
• Provide a copy of certification from a Federal agency indicating these indirect rates are approved by the Federal agency; or
• Provide a letter from your Administrative Contracting Officer, in lieu of a rate certificate, stating these indirect rates are approved by a Federal agency; or
• If you do not have approved rates, provide detailed supporting data to include pools of expenses and allocation bases for the base year and out years, if applicable for:
i. indirect rates and all pricing factors that were used
ii. methodology used for determining the rates (e.g., current experience in your organization or the history base used)
iii. all forecasted rates, by year, applied to derive the proposed rates should be based on assumptions and or facts; if computer usage is determined by a rate, identify the basis and rational used to derive the rate
(h) Profit/Fee. Fee/Profit is allowable for the effort being conducted when cost share is not being contributed by the contractor.
Proposed Price will be evaluated as follows:
• Extent to which the Proposed Price for the effort described in the SOW conveys an understanding of the problem, is realistic, reasonable, and complete for the proposed work
• Extent to which the Proposed Price is affordable to the Army NOTE: For the Price Evaluation, the Agreements Officer, may, at his/her discretion, contact the Offeror for any clarification(s) or to inform the Offeror of any price inconsistencies and request corrections.
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
6.4 Prototype Proposal – Program Management
The Program Management response shall provide the Offeror’s proposed management approach for meeting the performance and capability requirements specified in the SOW. Price information and classified information shall not be included.
Program Management will be evaluated as follows:
• Extent to which the proposed management approach, to include planning, organizing, directing, coordinating, and controlling task execution, is considered proven, mature, complete, and feasible, and presents an integrated approach to meet the requirements of the SOW
• Extent to which the approach to personnel management (e.g., qualifications, retention, skill mix) is proven, complete, and feasible as related to the requirements in the SOW and represents a clear understanding of the work to be performed
• Extent to which the Offeror’s proposed approach to Licenses provides the Government the ability to operate and maintain the proposed solution
6.5 Prototype Proposal – Demonstrated Experience
The Demonstrated Experience response shall provide the Offeror’s demonstrated experience relative to the performance and capability requirements specified in the SOW. Relevant performance means work efforts that are currently or have been performed that are the same or similar in scope, magnitude (dollar value), and complexity of the AIE SOW. Project references shall be provided for each Offeror team member. The Offeror shall explain what aspects of the demonstrated experience are relevant to the AIE SOW. Price information and classified information shall not be included.
For each Offeror team member, the Offeror shall identify every relevant contract it was awarded that experienced any performance problems related to deliverables or services; and every recent government contract that was terminated for cause or default within the past three (3) years of issuance of the AIE PPON. If there are not any contracts for any team member that meet the criteria, the Offeror shall so state.
Demonstrated Performance will be evaluated as follows:
• Extent to which recent Demonstrated Experience for the Offeror and Team members gives the Government confidence that the Offeror will meet the requirements of the SOW
• Extent to which the Offeror and Team members have experience relevant to the overall technical, general, and reporting requirements stated in the SOW
6.6 Basis of Selection (BoS) for OT Agreement Award (Step 5)
The Government intends to select a single Offeror. Award will be made the Offeror who is most competitive and provides the best solution to meet Government requirements
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited based on the Prototype Proposal and Price, with acceptable risk. Comments submitted regarding the OT Agreement Terms and Conditions will be addressed during this Step.
The Government considers the order of importance or weight of the evaluation items to be:
• Offeror’s Final Technical Approach is the 1st most important
• Offeror Program Management Approach is 2nd most important
• Offeror’s Demonstrated Experience is 3rd most important
• Offeror’s Final Price is 4th most important
Offerors not selected for Award will be notified in writing.
NOTE: The Government will use ratings similar to Appendix E, Step 5 – Request for Prototype Proposal – Ratings, in addition to other notes, to support the Step 5 Evaluation.
7.0 Agreement Award
The Government will award the Agreement to the selected Offeror. If the Government is unable to complete negotiations and come to an agreement on terms with the selected Offeror, the Government reserves the right to select an alternate Offeror.
The Agreement Award announcement will be posted to FedBizOpps.
8.0 Other Special Requirements
Offerors are advised that research findings and technology developments arising from the resulting Agreement may constitute a significant enhancement to the national defense, and to the economic vitality of the United States. As such, in the conduct of all work under the subsequent Technology Prototype Project Agreement(s), the recipient will comply strictly with the International Traffic in Arms Regulation (22 CFR 120-130), the National Industrial Security Program Operating Manual (DoD 5220.22-M) and the Department of Commerce Export Regulation (15 CFR 730-774).
Distribution Statement A:
Approved for Public Release, Distribution is Unlimited
Step 1 – Offeror Self-Certification – Scorecard
All Offerors submitting a response to the Offeror Self-Certification Questionnaire will be evaluated using the scorecard in Table 7.
Table 7. Step 1 Scorecard
Criteria Rating
OT Eligibility Go: OT Eligibility Form completed, signed, and submitted
No Go: OT Eligibility Form not completed, signed, or submitted
Responses to pre-determined “Must Have” Criteria
Go: all Yes responses to pre-determined questions
No Go: at least one No response to pre-determined questions
Weighted Total Score for COTS-based Solution per the Attachment 001 Questions Worksheet tab
Weighted score based on
• % of Capability met Out of the Box (OOTB) – most preferred
• % of Capability met by Configuration – next preferred
• % of Capability met by Plug-In / 3rd Party – next preferred
• % of Capability met by customization – least preferred
Number of COTS products within the proposed solution – lower number is more preferred
Composite-weighted Score of Yes/No responses to all Questions
Composite-weighted score based on
• Score of Yes / No responses for each Group; a Yes response will be scored higher than a No response
• Weight assigned to each Group
A snapshot of the distribution of questions and weighting factor groups is depicted in Table 8.
Table 8. Composite-weighted Scorecard for Self-Certification
Group Category Total Questions
Must Have
Yes / No Only
Total "Must Have" and
Yes/No Only Step 1 Score
Weight Factor
User Capabilities
Common Operating Picture 5 5 Configurable Dashboards 6 6 Personnel Management 6 6 Force Structure 11 11 Data Analytics 8 8 Mission Support 15 15 Mobility 5 5 Digital…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .