| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| W15QKN-18-Q-1108.pdf | ||
| Attachement_1-_Pricing_Itemized_Breakdown_Temp.xlsx | XLSX spreadsheet | |
| Draft_SOW__MARTINSBURG_WV.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011177053
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate additional questions and answ ers. The solicitation response deadline remains the same - TUESDAY JULY 3 2018 at 2:00 PM EST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W15QKN18Q1108
X 9B. DATED (SEE ITEM 11)
29-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jun-2018
CODE
US ARMY CONTRACTING COMMAND
5418 S. SCOTT PLAZA
JOINT BASE MDL NJ 08640
W15QKN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W15QKN18Q1108
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
1. Amendment 0004 is issued to incorporate additional questions and answers. The solicitaiton response deadline remains the same: TUESDAY JULY 3rd 2018 at 2:00 pm EST.
2. All quotes shall be submitted to the following points of contact:
Newton Maloba - Contract Specialist newton.j.maloba.civ@mail.mil Karyn Bohli - Contract Specialist karyn.a.bohli.civ@mail.mil Mark Scheper - Contracting Officer mark.l.scheper.civ@mail.mil
QUESTIONS AND ANSWERS:
1. Sections 11.3.1.1 and 11.3.2.1 states demo and replacing 3” gas line; The existing gas line is 2” schedule 40 threaded pipe. Do we replace with 2” or 3” size of gas line?
A: 2 inch gas line.
2. Type of new gas line material? Steel or Plastic?
A: Plastic
3. Is there a detail on the gas line ditch replacement? Size and depth?
A: IAW WV gas company standard from the provider
4. Is there a detail on the gas line in the ditch? Depth and material around new piping?
A: IAW WV gas company standard from the provider
5. Do we repair the gas line inside the Training Center that is disconnected?
A: Yes, system should be fully functional when project is complete.
6. Do you know if the main gas line is OK or does it have any leaks?
A: No known leaks
W15QKN18Q1108
7. Sections 11.3.4.8 and 11.3.6.5 states to confirm no leaks in the gas line, Water supply and hot water piping and correct any leaks. Are we to go thru both buildings and repair any and all leaks in all piping systems?
A: Just the feeds for the OMS building
8. Is Distech Controls the Building Management and BAS Controller for the Building?
A: Yes
9. Do you have a contact for Distech Controls?
A: No
10. Does the existing Hot water piping system have glycol in the system? If so, do we replace the piping system with glycol? What percentage of glycol?
A: No Glycol is used.
11. Does the existing flue piping replace thru the roof complete or can we tie in to the existing flue piping in each room?
A: You can tie into existing flue
12. During the walk thru meeting we noticed that 3 doors needed replaced.
Do we include 3 doors or just the 2 doors in the SOW? Do the door frames get replaced?
A: Follow the SOW for 2 doors. Door frames do not get replaced.
13. The SOW states that the flooring material is non-asbestos. Is the mastic non-asbestos?
A: Yes the mastic is non-asbestos
(End of Summary of Changes)