WDE

WBS CodeElement name
1Waveform Development Environment (WDE) Ecosystem
1.1WDE Ecosystem Task
1.1.1Development Task
1.1.1.1Waveform Test Equipment
1.1.1.1.1WDE Ecosystem WTE Operating Environment
1.1.1.2Software Support Tools
1.1.1.3Software Based Radio Emulator
1.1.1.3.1WDE Ecosystem Software-based Radio Emulator Operating Environment
1.1.2Enhancement Task
1.1.2.1Waveform Test Equipment
1.1.2.1.1WDE Ecosystem WTE Operating Environment
1.1.2.2Software Support Tools
1.1.2.3Software Based Radio Emulator
1.1.2.3.1WDE Ecosystem Software-based Radio Emulator Operating Environment
1.1.3Maintenance Task
1.1.3.1Waveform Test Equipment
1.1.3.1.1WDE Ecosystem WTE Operating Environment
1.1.3.2Software Support Tools
1.1.3.3Software Based Radio Emulator
1.1.3.3.1WDE Ecosystem Software-based Radio Emulator Operating Environment
1.1.4Product Improvement Task
1.1.4.1Waveform Test Equipment
1.1.4.1.1WDE Ecosystem WTE Operating Environment
1.1.4.2Software Support Tools
1.1.4.3Software Based Radio Emulator
1.1.4.3.1WDE Ecosystem Software-based Radio Emulator Operating Environment
1.1.5Procurement Task
1.1.5.1Waveform Test Equipment
1.1.5.1.1WDE Ecosystem WTE Operating Environment
1.1.5.2Software Support Tools
1.1.5.3Software Based Radio Emulator
1.1.5.3.1WDE Ecosystem Software-based Radio Emulator Operating Environment
1.2Technical Support and Integration Support
1.2.1Technical Support
1.2.2Problem Report Investigation and Proposal Development Support
1.2.3Porting Support
1.2.3.1Waveform Porting Report
1.2.4Field Service Representative support
1.2.5Modeling and Simulation (M&S) Technical Support
1.3System Engineering
1.3.1Systems Requirements Review (SRR)
1.3.2Preliminary Design Review (PDR)
1.3.3Critical Design Review (CDR)
1.3.4External Product/Process Teams (IPT)
1.3.5Technical Interchange Meetings (TIM)
1.3.6Software Requirements Specification (SRS)
1.3.7Requirements Traceability Matrix (RTM)
1.3.8Waveform Porting Plan
1.3.9Mission Critical Analysis
1.3.10Safety Assessment Report (SAR)
1.3.11System Performance Specification
1.3.12System Segment Specification (SSS)
1.4Program Management
1.4.1Program Management Reviews (PMRs)
1.4.2Integrated Baseline Review (IBR)
1.4.3Contract Performance Report (CPR)
1.4.4Integrated Master Schedule (IMS)
1.4.5Software Development Plan (SDP)
1.4.6Configuration Management Plan (CMP)
1.4.7Cost and Software Data Reporting (CSDR)
1.4.8Record of Meeting Report
1.4.9Presentation Material
1.4.10Program Protection Planning Support
1.4.10.1Program Protection Implementation Plan (PPIP)
1.5Test and Evaluation
1.5.1Test Bench/Vector Delivery
1.5.2Physical Configuration Audits (PCA)
1.5.3Functional Configuration Audits (FCA)
1.5.4Hardware Test Plan
1.5.5Hardware Test Procedures
1.5.6Test Readiness Review (TRR)
1.5.7Formal Qualification Testing (FQT)
1.5.8Formal Verification Test (FVT)
1.5.9First Article Test (FAT)
1.5.10Acceptance Test and Report
1.5.11Contractor Development Testing (CDT)
1.5.12Software Test Plan (STP)
1.5.13Software Test Description (STD)
1.5.14Software Test Report (STR)
1.5.15Security Verification Test (SVT)
1.5.16Test and Evaluation Support
1.5.17Support to the JTNC Test & Evaluation Laboratory (JTEL)
1.5.18Independent Validation and Verification Support
1.5.19Support to Joint Interoperability Test Center (JITC)
1.6Training, Laboratory, and Field Support
1.6.1Capability Training
1.6.2Modeling and Simulation (M&S) Training
1.6.3Training Support Package
1.7Engineering Data
1.7.1Information Packages
1.7.2Software Product Specification (SPrS)
1.7.3Software Design Description (SDD)
1.7.4Interface Design Description (Application Programming Interface, API)
1.7.5Software Version Description (SVD)
1.7.6Waveform Design Specification (WDS)
1.7.7Management Information Base (MIB) Specification
1.7.8Data Dictionary
1.7.9Waveform Software Security Report (WSSR)
1.7.10Modeling & Simulation (M&S) Models
1.7.11Physical Layer Modeling and Simulation (M&S) Models
1.7.12Engineering Drawings (Envelope)
1.7.13Interface Control Drawings
1.7.14Bill of Materials
1.8Modeling and Simulation (M&S)
1.8.1Modeling & Simulation Plan (MSP)
1.8.2Modeling & Simulation (M&S) Maintenance
1.8.3Model Validation Plan (MVP)
1.8.4Model Usage Manual (MUM)
1.9Certifications and Qualifications
1.9.1Information Assurance (IA) Self-Assessment Report
1.9.2SCA & API Self-Assessment Report
1.9.3National Security Agency (NSA) Certification
1.9.4Joint Interoperability Test Command (JITC) Waveform Standards Conformance Test Assessment
1.9.5JITC Interoperability Assessment
1.9.6Spectrum Documentation
1.9.7WDE Ecosystem Certification and Requirements
1.1Operational/Site Activation
1.10.1System Assembly, Installation and Checkout on Site
1.10.2Contractor Technical Support
1.10.3Sustainment/Interim Contractor Support
1.11Initial Spares and Repair Parts

SRW

WBS CodeElement name
2SRW
2.1Waveform Task
2.1.1Development Task
2.1.1.1WDE Ecosystem Utilization
2.1.2Enhancement Task
2.1.2.1WDE Ecosystem Utilization
2.1.3Maintenance Task
2.1.3.1WDE Ecosystem Utilization
2.1.4Product Improvement Task
2.1.4.1WDE Ecosystem Utilization
2.1.5Procurement Task
2.1.5.1WDE Ecosystem Utilization
2.2Technical Support and Integration Support
2.2.1Technical Support
2.2.2Problem Report Investigation and Proposal Development Support
2.2.3Porting Support
2.2.3.1Waveform Porting Report
2.2.4Field Service Representative support
2.2.5Modeling and Simulation (M&S) Technical Support
2.3System Engineering
2.3.1Systems Requirements Review (SRR)
2.3.2Preliminary Design Review (PDR)
2.3.3Critical Design Review (CDR)
2.3.4External Product/Process Teams (IPT)
2.3.5Technical Interchange Meetings (TIM)
2.3.6Software Requirements Specification (SRS)
2.3.7Requirements Traceability Matrix (RTM)
2.3.8Waveform Porting Plan
2.3.9Mission Critical Analysis
2.3.10Safety Assessment Report (SAR)
2.3.11System Performance Specification
2.3.12System Segment Specification (SSS)
2.4Program Management
2.4.1Program Management Reviews (PMRs)
2.4.2Integrated Baseline Review (IBR)
2.4.3Contract Performance Report (CPR)
2.4.4Integrated Master Schedule (IMS)
2.4.5Software Development Plan (SDP)
2.4.6Configuration Management Plan (CMP)
2.4.7Cost and Software Data Reporting (CSDR)
2.4.8Record of Meeting Report
2.4.9Presentation Material
2.4.10Program Protection Planning Support
2.4.10.1
2.5Test and Evaluation
2.5.1Test Bench/Vector Delivery
2.5.2Physical Configuration Audits (PCA)
2.5.3Functional Configuration Audits (FCA)
2.5.4Hardware Test Plan
2.5.5Hardware Test Procedures
2.5.6Test Readiness Review (TRR)
2.5.7Formal Qualification Testing (FQT)
2.5.8Formal Verification Test (FVT)
2.5.9First Article Test (FAT)
2.5.10Acceptance Test and Report
2.5.11Contractor Development Testing (CDT)
2.5.12Software Test Plan (STP)
2.5.13Software Test Description (STD)
2.5.14Software Test Report (STR)
2.5.15Security Verification Test (SVT)
2.5.16Test and Evaluation Support
2.5.17Support to the JTNC Test & Evaluation Laboratory (JTEL)
2.5.18Independent Validation and Verification Support
2.5.19Support to Joint Interoperability Test Center (JITC)
2.6Training, Laboratory, and Field Support
2.6.1Capability Training
2.6.2Modeling and Simulation (M&S) Training
2.6.3Training Support Package
2.7Engineering Data
2.7.1Information Packages
2.7.2Software Product Specification (SPrS)
2.7.3Software Design Description (SDD)
2.7.4Interface Design Description (Application Programming Interface, API)
2.7.5Software Version Description (SVD)
2.7.6Waveform Design Specification (WDS)
2.7.7Management Information Base (MIB) Specification
2.7.8Data Dictionary
2.7.9Waveform Software Security Report (WSSR)
2.7.10Modeling & Simulation (M&S) Models
2.7.11Physical Layer Modeling and Simulation (M&S) Models
2.7.12Engineering Drawings (Envelope)
2.7.13Interface Control Drawings
2.7.14Bill of Materials
2.8Modeling and Simulation (M&S)
2.8.1Modeling & Simulation Plan (MSP)
2.8.2Modeling & Simulation (M&S) Maintenance
2.8.3Model Validation Plan (MVP)
2.8.4Model Usage Manual (MUM)
2.9Certifications and Qualifications
2.9.1Information Assurance (IA) Self-Assessment Report
2.9.2SCA & API Self-Assessment Report
2.9.3National Security Agency (NSA) Certification
2.9.4Joint Interoperability Test Command (JITC) Waveform Standards Conformance Test Assessment
2.9.5JITC Interoperability Assessment
2.9.6Spectrum Documentation
2.9.7WDE Ecosystem Certification and Requirements
1.1Operational/Site Activation
1.10.1System Assembly, Installation and Checkout on Site
1.10.2Contractor Technical Support
1.10.3Sustainment/Interim Contractor Support
1.11Initial Spares and Repair Parts

WNW

WBS CodeElement name
3WNW
3.1Waveform Task
3.1.1Development Task
3.1.1.1WDE Ecosystem Utilization
3.1.2Enhancement Task
3.1.2.1WDE Ecosystem Utilization
3.1.3Maintenance Task
3.1.3.1WDE Ecosystem Utilization
3.1.4Product Improvement Task
3.1.4.1WDE Ecosystem Utilization
3.1.5Procurement Task
3.1.5.1WDE Ecosystem Utilization
3.2Technical Support and Integration Support
3.2.1Technical Support
3.2.2Problem Report Investigation and Proposal Development Support
3.2.3Porting Support
3.2.3.1Waveform Porting Report
3.2.4Field Service Representative support
3.2.5Modeling and Simulation (M&S) Technical Support
3.3System Engineering
3.3.1Systems Requirements Review (SRR)
3.3.2Preliminary Design Review (PDR)
3.3.3Critical Design Review (CDR)
3.3.4External Product/Process Teams (IPT)
3.3.5Technical Interchange Meetings (TIM)
3.3.6Software Requirements Specification (SRS)
3.3.7Requirements Traceability Matrix (RTM)
3.3.8Waveform Porting Plan
3.3.9Mission Critical Analysis
3.3.10Safety Assessment Report (SAR)
3.3.11System Performance Specification
3.3.12System Segment Specification (SSS)
3.4Program Management
3.4.1Program Management Reviews (PMRs)
3.4.2Integrated Baseline Review (IBR)
3.4.3Contract Performance Report (CPR)
3.4.4Integrated Master Schedule (IMS)
3.4.5Software Development Plan (SDP)
3.4.6Configuration Management Plan (CMP)
3.4.7Cost and Software Data Reporting (CSDR)
3.4.8Record of Meeting Report
3.4.9Presentation Material
3.4.10Program Protection Planning Support
3.4.10.1Program Protection Implementation Plan (PPIP)
3.5Test and Evaluation
3.5.1Test Bench/Vector Delivery
3.5.2Physical Configuration Audits (PCA)
3.5.3Functional Configuration Audits (FCA)
3.5.4Hardware Test Plan
3.5.5Hardware Test Procedures
3.5.6Test Readiness Review (TRR)
3.5.7Formal Qualification Testing (FQT)
3.5.8Formal Verification Test (FVT)
3.5.9First Article Test (FAT)
3.5.10Acceptance Test and Report
3.5.11Contractor Development Testing (CDT)
3.5.12Software Test Plan (STP)
3.5.13Software Test Description (STD)
3.5.14Software Test Report (STR)
3.5.15Security Verification Test (SVT)
3.5.16Test and Evaluation Support
3.5.17Support to the JTNC Test & Evaluation Laboratory (JTEL)
3.5.18Independent Validation and Verification Support
3.5.19Support to Joint Interoperability Test Center (JITC)
3.6Training, Laboratory, and Field Support
3.6.1Capability Training
3.6.2Modeling and Simulation (M&S) Training
3.6.3Training Support Package
3.7Engineering Data
3.7.1Information Packages
3.7.2Software Product Specification (SPrS)
3.7.3Software Design Description (SDD)
3.7.4Interface Design Description (Application Programming Interface, API)
3.7.5Software Version Description (SVD)
3.7.6Waveform Design Specification (WDS)
3.7.7Management Information Base (MIB) Specification
3.7.8Data Dictionary
3.7.9Waveform Software Security Report (WSSR)
3.7.10Modeling & Simulation (M&S) Models
3.7.11Physical Layer Modeling and Simulation (M&S) Models
3.7.12Engineering Drawings (Envelope)
3.7.13Interface Control Drawings
3.7.14Bill of Materials
3.8Modeling and Simulation (M&S)
3.8.1Modeling & Simulation Plan (MSP)
3.8.2Modeling & Simulation (M&S) Maintenance
3.8.3Model Validation Plan (MVP)
3.8.4Model Usage Manual (MUM)
3.9Certifications and Qualifications
3.9.1Information Assurance (IA) Self-Assessment Report
3.9.2SCA & API Self-Assessment Report
3.9.3National Security Agency (NSA) Certification
3.9.4Joint Interoperability Test Command (JITC) Waveform Standards Conformance Test Assessment
3.9.5JITC Interoperability Assessment
3.9.6Spectrum Documentation
3.9.7WDE Ecosystem Certification and Requirements
1.1Operational/Site Activation
1.10.1System Assembly, Installation and Checkout on Site
1.10.2Contractor Technical Support
1.10.3Sustainment/Interim Contractor Support
1.11Initial Spares and Repair Parts

eOTAM

WBS CodeElement name
4eOTAM
4.1Network Service Task
4.1.1Development Task
4.1.1.1WDE Ecosystem Utilization
4.1.2Enhancement Task
4.1.2.1WDE Ecosystem Utilization
4.1.3Maintenance Task
4.1.3.1WDE Ecosystem Utilization
4.1.4Product Improvement Task
4.1.4.1WDE Ecosystem Utilization
4.1.5Procurement Task
4.1.5.1WDE Ecosystem Utilization
4.2Technical Support and Integration Support
4.2.1Technical Support
4.2.2Problem Report Investigation and Proposal Development Support
4.2.3Porting Support
4.2.3.1Waveform Porting Report
4.2.4Field Service Representative support
4.2.5Modeling and Simulation (M&S) Technical Support
4.3System Engineering
4.3.1Systems Requirements Review (SRR)
4.3.2Preliminary Design Review (PDR)
4.3.3Critical Design Review (CDR)
4.3.4External Product/Process Teams (IPT)
4.3.5Technical Interchange Meetings (TIM)
4.3.6Software Requirements Specification (SRS)
4.3.7Requirements Traceability Matrix (RTM)
4.3.8Waveform Porting Plan
4.3.9Mission Critical Analysis
4.3.10Safety Assessment Report (SAR)
4.3.11System Performance Specification
4.3.12System Segment Specification (SSS)
4.4Program Management
4.4.1Program Management Reviews (PMRs)
4.4.2Integrated Baseline Review (IBR)
4.4.3Contract Performance Report (CPR)
4.4.4Integrated Master Schedule (IMS)
4.4.5Software Development Plan (SDP)
4.4.6Configuration Management Plan (CMP)
4.4.7Cost and Software Data Reporting (CSDR)
4.4.8Record of Meeting Report
4.4.9Presentation Material
4.4.10Program Protection Planning Support
4.4.10.1Program Protection Implementation Plan (PPIP)
4.5Test and Evaluation
4.5.1Test Bench/Vector Delivery
4.5.2Physical Configuration Audits (PCA)
4.5.3Functional Configuration Audits (FCA)
4.5.4Hwardware Test Plan
4.5.5Hardware Test Procedures
4.5.6Test Readiness Review (TRR)
4.5.7Formal Qualification Testing (FQT)
4.5.8Formal Verification Test (FVT)
4.5.9First Article Test (FAT)
4.5.10Acceptance Test and Report
4.5.11Contractor Development Testing (CDT)
4.5.12Software Test Plan (STP)
4.5.13Software Test Description (STD)
4.5.14Software Test Report (STR)
4.5.15Security Verification Test (SVT)
4.5.16Test and Evaluation Support
4.5.17Support to the JTNC Test & Evaluation Laboratory (JTEL)
4.5.18Independent Validation and Verification Support
4.5.19Support to Joint Interoperability Test Center (JITC)
4.6Training, Laboratory, and Field Support
4.6.1Capability Training
4.6.2Modeling and Simulation (M&S) Training
4.6.3Training Support Package
4.7Engineering Data
4.7.1Information Packages
4.7.2Software Product Specification (SPrS)
4.7.3Software Design Description (SDD)
4.7.4Interface Design Description (Application Programming Interface, API)
4.7.5Software Version Description (SVD)
4.7.6Waveform Design Specification (WDS)
4.7.7Management Information Base (MIB) Specification
4.7.8Data Dictionary
4.7.9Waveform Software Security Report (WSSR)
4.7.10Modeling & Simulation (M&S) Models
4.7.11Physical Layer Modeling and Simulation (M&S) Models
4.7.12Engineering Drawings (Envelope)
4.7.13Interface Control Drawings
4.7.14Bill of Materials
4.8Modeling and Simulation (M&S)
4.8.1Modeling & Simulation Plan (MSP)
4.8.2Modeling & Simulation (M&S) Maintenance
4.8.3Model Validation Plan (MVP)
4.8.4Model Usage Manual (MUM)
4.9Certifications and Qualifications
4.9.1Information Assurance (IA) Self-Assessment Report
4.9.2SCA & API Self-Assessment Report
4.9.3National Security Agency (NSA) Certification
4.9.4Joint Interoperability Test Command (JITC) Waveform Standards Conformance Test Assessment
4.9.5JITC Interoperability Assessment
4.9.6Spectrum Documentation
4.9.7WDE Ecosystem Certification and Requirements
1.1Operational/Site Activation
1.10.1System Assembly, Installation and Checkout on Site
1.10.2Contractor Technical Support
1.10.3Sustainment/Interim Contractor Support
1.11Initial Spares and Repair Parts

SINCGARS

WBS CodeElement name
5SINCGARS
5.1Waveform Task
5.1.1Development Task
5.1.1.1WDE Ecosystem Utilization
5.1.2Enhancement Task
5.1.2.1WDE Ecosystem Utilization
5.1.3Maintenance Task
5.1.3.1WDE Ecosystem Utilization
5.1.4Product Improvement Task
5.1.4.1WDE Ecosystem Utilization
5.1.5Procurement Task
5.1.5.1WDE Ecosystem Utilization
5.2Technical Support and Integration Support
5.2.1Technical Support
5.2.2Problem Report Investigation and Proposal Development Support
5.2.3Porting Support
5.2.3.1Waveform Porting Report
5.2.4Field Service Representative support
5.2.5Modeling and Simulation (M&S) Technical Support
5.3System Engineering
5.3.1Systems Requirements Review (SRR)
5.3.2Preliminary Design Review (PDR)
5.3.3Critical Design Review (CDR)
5.3.4External Product/Process Teams (IPT)
5.3.5Technical Interchange Meetings (TIM)
5.3.6Software Requirements Specification (SRS)
5.3.7Requirements Traceability Matrix (RTM)
5.3.8Waveform Porting Plan
5.3.9Mission Critical Analysis
5.3.10Safety Assessment Report (SAR)
5.3.11System Performance Specification
5.3.12System Segment Specification (SSS)
5.4Program Management
5.4.1Program Management Reviews (PMRs)
5.4.2Integrated Baseline Review (IBR)
5.4.3Contract Performance Report (CPR)
5.4.4Integrated Master Schedule (IMS)
5.4.5Software Development Plan (SDP)
5.4.6Configuration Management Plan (CMP)
5.4.7Cost and Software Data Reporting (CSDR)
5.4.8Record of Meeting Report
5.4.9Presentation Material
5.4.10Program Protection Planning Support
5.4.10.1Program Protection Implementation Plan (PPIP)
5.5Test and Evaluation
5.5.1Test Bench/Vector Delivery
5.5.2Physical Configuration Audits (PCA)
5.5.3Functional Configuration Audits (FCA)
5.5.4Hardware Test Plan
5.5.5Hardware Test Procedures
5.5.6Test Readiness Review (TRR)
5.5.7Formal Qualification Testing (FQT)
5.5.8Formal Verification Test (FVT)
5.5.9First Article Test (FAT)
5.5.10Acceptance Test and Report
5.5.11Contractor Development Testing (CDT)
5.5.12Software Test Plan (STP)
5.5.13Software Test Description (STD)
5.5.14Software Test Report (STR)
5.5.15Security Verification Test (SVT)
5.5.16Test and Evaluation Support
5.5.17Support to the JTNC Test & Evaluation Laboratory (JTEL)
5.5.18Independent Validation and Verification Support
5.5.19Support to Joint Interoperability Test Center (JITC)
5.6Training, Laboratory, and Field Support
5.6.1Capability Training
5.6.2Modeling and Simulation (M&S) Training
5.6.3Training Support Package
5.7Engineering Data
5.7.1Information Packages
5.7.2Software Product Specification (SPrS)
5.7.3Software Design Description (SDD)
5.7.4Interface Design Description (Application Programming Interface, API)
5.7.5Software Version Description (SVD)
5.7.6Waveform Design Specification (WDS)
5.7.7Management Information Base (MIB) Specification
5.7.8Data Dictionary
5.7.9Waveform Software Security Report (WSSR)
5.7.10Modeling & Simulation (M&S) Models
5.7.11Physical Layer Modeling and Simulation (M&S) Models
5.7.12Engineering Drawings (Envelope)
5.7.13Interface Control Drawings
5.7.14Bill of Materials
5.8Modeling and Simulation (M&S)
5.8.1Modeling & Simulation Plan (MSP)
5.8.2Modeling & Simulation (M&S) Maintenance
5.8.3Model Validation Plan (MVP)
5.8.4Model Usage Manual (MUM)
5.9Certifications and Qualifications
5.9.1Information Assurance (IA) Self-Assessment Report
5.9.2SCA & API Self-Assessment Report
5.9.3National Security Agency (NSA) Certification
5.9.4Joint Interoperability Test Command (JITC) Waveform Standards Conformance Test Assessment
5.9.5JITC Interoperability Assessment
5.9.6Spectrum Documentation
5.9.7WDE Ecosystem Certification and Requirements
1.1Operational/Site Activation
1.10.1System Assembly, Installation and Checkout on Site
1.10.2Contractor Technical Support
1.10.3Sustainment/Interim Contractor Support
1.11Initial Spares and Repair Parts