Draft WBS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A01_-_SwISS_Intent_to_Bid_Questionnaire.docx | DOCX document | |
| Change_2_-__DRAFT_Attachment_L003_Labor_category_Descriptions_PdM_WF_SwISS.xlsx | XLSX spreadsheet | |
| DRAFT_Attachment_L003_Labor_category_Descriptions_PdM_WF_SwISS.XLSX | XLSX spreadsheet | |
| Q A_of_PdM_WF_RFI3_Comment_Resolution_Matrix__FEDBIZOPS_v4.xlsx | XLSX spreadsheet | |
| DRAFT_PWS_PdM_WF_SwISS_20161116.docx | DOCX document | |
| PdM_WF_SwISS_Industry_Day_Attendees_Master_List_-_2016OCT04.xlsx | XLSX spreadsheet | |
| DRAFT_Section_LandM_PdM_WF_SwISS_20161115.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WDE
| WBS Code | Element name | ||||
| 1 | Waveform Development Environment (WDE) Ecosystem | ||||
| 1.1 | WDE Ecosystem Task | ||||
| 1.1.1 | Development Task | ||||
| 1.1.1.1 | Waveform Test Equipment | ||||
| 1.1.1.1.1 | WDE Ecosystem WTE Operating Environment | ||||
| 1.1.1.2 | Software Support Tools | ||||
| 1.1.1.3 | Software Based Radio Emulator | ||||
| 1.1.1.3.1 | WDE Ecosystem Software-based Radio Emulator Operating Environment | ||||
| 1.1.2 | Enhancement Task | ||||
| 1.1.2.1 | Waveform Test Equipment | ||||
| 1.1.2.1.1 | WDE Ecosystem WTE Operating Environment | ||||
| 1.1.2.2 | Software Support Tools | ||||
| 1.1.2.3 | Software Based Radio Emulator | ||||
| 1.1.2.3.1 | WDE Ecosystem Software-based Radio Emulator Operating Environment | ||||
| 1.1.3 | Maintenance Task | ||||
| 1.1.3.1 | Waveform Test Equipment | ||||
| 1.1.3.1.1 | WDE Ecosystem WTE Operating Environment | ||||
| 1.1.3.2 | Software Support Tools | ||||
| 1.1.3.3 | Software Based Radio Emulator | ||||
| 1.1.3.3.1 | WDE Ecosystem Software-based Radio Emulator Operating Environment | ||||
| 1.1.4 | Product Improvement Task | ||||
| 1.1.4.1 | Waveform Test Equipment | ||||
| 1.1.4.1.1 | WDE Ecosystem WTE Operating Environment | ||||
| 1.1.4.2 | Software Support Tools | ||||
| 1.1.4.3 | Software Based Radio Emulator | ||||
| 1.1.4.3.1 | WDE Ecosystem Software-based Radio Emulator Operating Environment | ||||
| 1.1.5 | Procurement Task | ||||
| 1.1.5.1 | Waveform Test Equipment | ||||
| 1.1.5.1.1 | WDE Ecosystem WTE Operating Environment | ||||
| 1.1.5.2 | Software Support Tools | ||||
| 1.1.5.3 | Software Based Radio Emulator | ||||
| 1.1.5.3.1 | WDE Ecosystem Software-based Radio Emulator Operating Environment | ||||
| 1.2 | Technical Support and Integration Support | ||||
| 1.2.1 | Technical Support | ||||
| 1.2.2 | Problem Report Investigation and Proposal Development Support | ||||
| 1.2.3 | Porting Support | ||||
| 1.2.3.1 | Waveform Porting Report | ||||
| 1.2.4 | Field Service Representative support | ||||
| 1.2.5 | Modeling and Simulation (M&S) Technical Support | ||||
| 1.3 | System Engineering | ||||
| 1.3.1 | Systems Requirements Review (SRR) | ||||
| 1.3.2 | Preliminary Design Review (PDR) | ||||
| 1.3.3 | Critical Design Review (CDR) | ||||
| 1.3.4 | External Product/Process Teams (IPT) | ||||
| 1.3.5 | Technical Interchange Meetings (TIM) | ||||
| 1.3.6 | Software Requirements Specification (SRS) | ||||
| 1.3.7 | Requirements Traceability Matrix (RTM) | ||||
| 1.3.8 | Waveform Porting Plan | ||||
| 1.3.9 | Mission Critical Analysis | ||||
| 1.3.10 | Safety Assessment Report (SAR) | ||||
| 1.3.11 | System Performance Specification | ||||
| 1.3.12 | System Segment Specification (SSS) | ||||
| 1.4 | Program Management | ||||
| 1.4.1 | Program Management Reviews (PMRs) | ||||
| 1.4.2 | Integrated Baseline Review (IBR) | ||||
| 1.4.3 | Contract Performance Report (CPR) | ||||
| 1.4.4 | Integrated Master Schedule (IMS) | ||||
| 1.4.5 | Software Development Plan (SDP) | ||||
| 1.4.6 | Configuration Management Plan (CMP) | ||||
| 1.4.7 | Cost and Software Data Reporting (CSDR) | ||||
| 1.4.8 | Record of Meeting Report | ||||
| 1.4.9 | Presentation Material | ||||
| 1.4.10 | Program Protection Planning Support | ||||
| 1.4.10.1 | Program Protection Implementation Plan (PPIP) | ||||
| 1.5 | Test and Evaluation | ||||
| 1.5.1 | Test Bench/Vector Delivery | ||||
| 1.5.2 | Physical Configuration Audits (PCA) | ||||
| 1.5.3 | Functional Configuration Audits (FCA) | ||||
| 1.5.4 | Hardware Test Plan | ||||
| 1.5.5 | Hardware Test Procedures | ||||
| 1.5.6 | Test Readiness Review (TRR) | ||||
| 1.5.7 | Formal Qualification Testing (FQT) | ||||
| 1.5.8 | Formal Verification Test (FVT) | ||||
| 1.5.9 | First Article Test (FAT) | ||||
| 1.5.10 | Acceptance Test and Report | ||||
| 1.5.11 | Contractor Development Testing (CDT) | ||||
| 1.5.12 | Software Test Plan (STP) | ||||
| 1.5.13 | Software Test Description (STD) | ||||
| 1.5.14 | Software Test Report (STR) | ||||
| 1.5.15 | Security Verification Test (SVT) | ||||
| 1.5.16 | Test and Evaluation Support | ||||
| 1.5.17 | Support to the JTNC Test & Evaluation Laboratory (JTEL) | ||||
| 1.5.18 | Independent Validation and Verification Support | ||||
| 1.5.19 | Support to Joint Interoperability Test Center (JITC) | ||||
| 1.6 | Training, Laboratory, and Field Support | ||||
| 1.6.1 | Capability Training | ||||
| 1.6.2 | Modeling and Simulation (M&S) Training | ||||
| 1.6.3 | Training Support Package | ||||
| 1.7 | Engineering Data | ||||
| 1.7.1 | Information Packages | ||||
| 1.7.2 | Software Product Specification (SPrS) | ||||
| 1.7.3 | Software Design Description (SDD) | ||||
| 1.7.4 | Interface Design Description (Application Programming Interface, API) | ||||
| 1.7.5 | Software Version Description (SVD) | ||||
| 1.7.6 | Waveform Design Specification (WDS) | ||||
| 1.7.7 | Management Information Base (MIB) Specification | ||||
| 1.7.8 | Data Dictionary | ||||
| 1.7.9 | Waveform Software Security Report (WSSR) | ||||
| 1.7.10 | Modeling & Simulation (M&S) Models | ||||
| 1.7.11 | Physical Layer Modeling and Simulation (M&S) Models | ||||
| 1.7.12 | Engineering Drawings (Envelope) | ||||
| 1.7.13 | Interface Control Drawings | ||||
| 1.7.14 | Bill of Materials | ||||
| 1.8 | Modeling and Simulation (M&S) | ||||
| 1.8.1 | Modeling & Simulation Plan (MSP) | ||||
| 1.8.2 | Modeling & Simulation (M&S) Maintenance | ||||
| 1.8.3 | Model Validation Plan (MVP) | ||||
| 1.8.4 | Model Usage Manual (MUM) | ||||
| 1.9 | Certifications and Qualifications | ||||
| 1.9.1 | Information Assurance (IA) Self-Assessment Report | ||||
| 1.9.2 | SCA & API Self-Assessment Report | ||||
| 1.9.3 | National Security Agency (NSA) Certification | ||||
| 1.9.4 | Joint Interoperability Test Command (JITC) Waveform Standards Conformance Test Assessment | ||||
| 1.9.5 | JITC Interoperability Assessment | ||||
| 1.9.6 | Spectrum Documentation | ||||
| 1.9.7 | WDE Ecosystem Certification and Requirements |
| 1.1 | Operational/Site Activation |
| 1.10.1 | System Assembly, Installation and Checkout on Site |
| 1.10.2 | Contractor Technical Support |
| 1.10.3 | Sustainment/Interim Contractor Support |
| 1.11 | Initial Spares and Repair Parts |
SRW
| WBS Code | Element name | |||
| 2 | SRW | |||
| 2.1 | Waveform Task | |||
| 2.1.1 | Development Task | |||
| 2.1.1.1 | WDE Ecosystem Utilization | |||
| 2.1.2 | Enhancement Task | |||
| 2.1.2.1 | WDE Ecosystem Utilization | |||
| 2.1.3 | Maintenance Task | |||
| 2.1.3.1 | WDE Ecosystem Utilization | |||
| 2.1.4 | Product Improvement Task | |||
| 2.1.4.1 | WDE Ecosystem Utilization | |||
| 2.1.5 | Procurement Task | |||
| 2.1.5.1 | WDE Ecosystem Utilization | |||
| 2.2 | Technical Support and Integration Support | |||
| 2.2.1 | Technical Support | |||
| 2.2.2 | Problem Report Investigation and Proposal Development Support | |||
| 2.2.3 | Porting Support | |||
| 2.2.3.1 | Waveform Porting Report | |||
| 2.2.4 | Field Service Representative support | |||
| 2.2.5 | Modeling and Simulation (M&S) Technical Support | |||
| 2.3 | System Engineering | |||
| 2.3.1 | Systems Requirements Review (SRR) | |||
| 2.3.2 | Preliminary Design Review (PDR) | |||
| 2.3.3 | Critical Design Review (CDR) | |||
| 2.3.4 | External Product/Process Teams (IPT) | |||
| 2.3.5 | Technical Interchange Meetings (TIM) | |||
| 2.3.6 | Software Requirements Specification (SRS) | |||
| 2.3.7 | Requirements Traceability Matrix (RTM) | |||
| 2.3.8 | Waveform Porting Plan | |||
| 2.3.9 | Mission Critical Analysis | |||
| 2.3.10 | Safety Assessment Report (SAR) | |||
| 2.3.11 | System Performance Specification | |||
| 2.3.12 | System Segment Specification (SSS) | |||
| 2.4 | Program Management | |||
| 2.4.1 | Program Management Reviews (PMRs) | |||
| 2.4.2 | Integrated Baseline Review (IBR) | |||
| 2.4.3 | Contract Performance Report (CPR) | |||
| 2.4.4 | Integrated Master Schedule (IMS) | |||
| 2.4.5 | Software Development Plan (SDP) | |||
| 2.4.6 | Configuration Management Plan (CMP) | |||
| 2.4.7 | Cost and Software Data Reporting (CSDR) | |||
| 2.4.8 | Record of Meeting Report | |||
| 2.4.9 | Presentation Material | |||
| 2.4.10 | Program Protection Planning Support | |||
| 2.4.10.1 | ||||
| 2.5 | Test and Evaluation | |||
| 2.5.1 | Test Bench/Vector Delivery | |||
| 2.5.2 | Physical Configuration Audits (PCA) | |||
| 2.5.3 | Functional Configuration Audits (FCA) | |||
| 2.5.4 | Hardware Test Plan | |||
| 2.5.5 | Hardware Test Procedures | |||
| 2.5.6 | Test Readiness Review (TRR) | |||
| 2.5.7 | Formal Qualification Testing (FQT) | |||
| 2.5.8 | Formal Verification Test (FVT) | |||
| 2.5.9 | First Article Test (FAT) | |||
| 2.5.10 | Acceptance Test and Report | |||
| 2.5.11 | Contractor Development Testing (CDT) | |||
| 2.5.12 | Software Test Plan (STP) | |||
| 2.5.13 | Software Test Description (STD) | |||
| 2.5.14 | Software Test Report (STR) | |||
| 2.5.15 | Security Verification Test (SVT) | |||
| 2.5.16 | Test and Evaluation Support | |||
| 2.5.17 | Support to the JTNC Test & Evaluation Laboratory (JTEL) | |||
| 2.5.18 | Independent Validation and Verification Support | |||
| 2.5.19 | Support to Joint Interoperability Test Center (JITC) | |||
| 2.6 | Training, Laboratory, and Field Support | |||
| 2.6.1 | Capability Training | |||
| 2.6.2 | Modeling and Simulation (M&S) Training | |||
| 2.6.3 | Training Support Package | |||
| 2.7 | Engineering Data | |||
| 2.7.1 | Information Packages | |||
| 2.7.2 | Software Product Specification (SPrS) | |||
| 2.7.3 | Software Design Description (SDD) | |||
| 2.7.4 | Interface Design Description (Application Programming Interface, API) | |||
| 2.7.5 | Software Version Description (SVD) | |||
| 2.7.6 | Waveform Design Specification (WDS) | |||
| 2.7.7 | Management Information Base (MIB) Specification | |||
| 2.7.8 | Data Dictionary | |||
| 2.7.9 | Waveform Software Security Report (WSSR) | |||
| 2.7.10 | Modeling & Simulation (M&S) Models | |||
| 2.7.11 | Physical Layer Modeling and Simulation (M&S) Models | |||
| 2.7.12 | Engineering Drawings (Envelope) | |||
| 2.7.13 | Interface Control Drawings | |||
| 2.7.14 | Bill of Materials | |||
| 2.8 | Modeling and Simulation (M&S) | |||
| 2.8.1 | Modeling & Simulation Plan (MSP) | |||
| 2.8.2 | Modeling & Simulation (M&S) Maintenance | |||
| 2.8.3 | Model Validation Plan (MVP) | |||
| 2.8.4 | Model Usage Manual (MUM) | |||
| 2.9 | Certifications and Qualifications | |||
| 2.9.1 | Information Assurance (IA) Self-Assessment Report | |||
| 2.9.2 | SCA & API Self-Assessment Report | |||
| 2.9.3 | National Security Agency (NSA) Certification | |||
| 2.9.4 | Joint Interoperability Test Command (JITC) Waveform Standards Conformance Test Assessment | |||
| 2.9.5 | JITC Interoperability Assessment | |||
| 2.9.6 | Spectrum Documentation | |||
| 2.9.7 | WDE Ecosystem Certification and Requirements |
| 1.1 | Operational/Site Activation |
| 1.10.1 | System Assembly, Installation and Checkout on Site |
| 1.10.2 | Contractor Technical Support |
| 1.10.3 | Sustainment/Interim Contractor Support |
| 1.11 | Initial Spares and Repair Parts |
WNW
| WBS Code | Element name | |||
| 3 | WNW | |||
| 3.1 | Waveform Task | |||
| 3.1.1 | Development Task | |||
| 3.1.1.1 | WDE Ecosystem Utilization | |||
| 3.1.2 | Enhancement Task | |||
| 3.1.2.1 | WDE Ecosystem Utilization | |||
| 3.1.3 | Maintenance Task | |||
| 3.1.3.1 | WDE Ecosystem Utilization | |||
| 3.1.4 | Product Improvement Task | |||
| 3.1.4.1 | WDE Ecosystem Utilization | |||
| 3.1.5 | Procurement Task | |||
| 3.1.5.1 | WDE Ecosystem Utilization | |||
| 3.2 | Technical Support and Integration Support | |||
| 3.2.1 | Technical Support | |||
| 3.2.2 | Problem Report Investigation and Proposal Development Support | |||
| 3.2.3 | Porting Support | |||
| 3.2.3.1 | Waveform Porting Report | |||
| 3.2.4 | Field Service Representative support | |||
| 3.2.5 | Modeling and Simulation (M&S) Technical Support | |||
| 3.3 | System Engineering | |||
| 3.3.1 | Systems Requirements Review (SRR) | |||
| 3.3.2 | Preliminary Design Review (PDR) | |||
| 3.3.3 | Critical Design Review (CDR) | |||
| 3.3.4 | External Product/Process Teams (IPT) | |||
| 3.3.5 | Technical Interchange Meetings (TIM) | |||
| 3.3.6 | Software Requirements Specification (SRS) | |||
| 3.3.7 | Requirements Traceability Matrix (RTM) | |||
| 3.3.8 | Waveform Porting Plan | |||
| 3.3.9 | Mission Critical Analysis | |||
| 3.3.10 | Safety Assessment Report (SAR) | |||
| 3.3.11 | System Performance Specification | |||
| 3.3.12 | System Segment Specification (SSS) | |||
| 3.4 | Program Management | |||
| 3.4.1 | Program Management Reviews (PMRs) | |||
| 3.4.2 | Integrated Baseline Review (IBR) | |||
| 3.4.3 | Contract Performance Report (CPR) | |||
| 3.4.4 | Integrated Master Schedule (IMS) | |||
| 3.4.5 | Software Development Plan (SDP) | |||
| 3.4.6 | Configuration Management Plan (CMP) | |||
| 3.4.7 | Cost and Software Data Reporting (CSDR) | |||
| 3.4.8 | Record of Meeting Report | |||
| 3.4.9 | Presentation Material | |||
| 3.4.10 | Program Protection Planning Support | |||
| 3.4.10.1 | Program Protection Implementation Plan (PPIP) | |||
| 3.5 | Test and Evaluation | |||
| 3.5.1 | Test Bench/Vector Delivery | |||
| 3.5.2 | Physical Configuration Audits (PCA) | |||
| 3.5.3 | Functional Configuration Audits (FCA) | |||
| 3.5.4 | Hardware Test Plan | |||
| 3.5.5 | Hardware Test Procedures | |||
| 3.5.6 | Test Readiness Review (TRR) | |||
| 3.5.7 | Formal Qualification Testing (FQT) | |||
| 3.5.8 | Formal Verification Test (FVT) | |||
| 3.5.9 | First Article Test (FAT) | |||
| 3.5.10 | Acceptance Test and Report | |||
| 3.5.11 | Contractor Development Testing (CDT) | |||
| 3.5.12 | Software Test Plan (STP) | |||
| 3.5.13 | Software Test Description (STD) | |||
| 3.5.14 | Software Test Report (STR) | |||
| 3.5.15 | Security Verification Test (SVT) | |||
| 3.5.16 | Test and Evaluation Support | |||
| 3.5.17 | Support to the JTNC Test & Evaluation Laboratory (JTEL) | |||
| 3.5.18 | Independent Validation and Verification Support | |||
| 3.5.19 | Support to Joint Interoperability Test Center (JITC) | |||
| 3.6 | Training, Laboratory, and Field Support | |||
| 3.6.1 | Capability Training | |||
| 3.6.2 | Modeling and Simulation (M&S) Training | |||
| 3.6.3 | Training Support Package | |||
| 3.7 | Engineering Data | |||
| 3.7.1 | Information Packages | |||
| 3.7.2 | Software Product Specification (SPrS) | |||
| 3.7.3 | Software Design Description (SDD) | |||
| 3.7.4 | Interface Design Description (Application Programming Interface, API) | |||
| 3.7.5 | Software Version Description (SVD) | |||
| 3.7.6 | Waveform Design Specification (WDS) | |||
| 3.7.7 | Management Information Base (MIB) Specification | |||
| 3.7.8 | Data Dictionary | |||
| 3.7.9 | Waveform Software Security Report (WSSR) | |||
| 3.7.10 | Modeling & Simulation (M&S) Models | |||
| 3.7.11 | Physical Layer Modeling and Simulation (M&S) Models | |||
| 3.7.12 | Engineering Drawings (Envelope) | |||
| 3.7.13 | Interface Control Drawings | |||
| 3.7.14 | Bill of Materials | |||
| 3.8 | Modeling and Simulation (M&S) | |||
| 3.8.1 | Modeling & Simulation Plan (MSP) | |||
| 3.8.2 | Modeling & Simulation (M&S) Maintenance | |||
| 3.8.3 | Model Validation Plan (MVP) | |||
| 3.8.4 | Model Usage Manual (MUM) | |||
| 3.9 | Certifications and Qualifications | |||
| 3.9.1 | Information Assurance (IA) Self-Assessment Report | |||
| 3.9.2 | SCA & API Self-Assessment Report | |||
| 3.9.3 | National Security Agency (NSA) Certification | |||
| 3.9.4 | Joint Interoperability Test Command (JITC) Waveform Standards Conformance Test Assessment | |||
| 3.9.5 | JITC Interoperability Assessment | |||
| 3.9.6 | Spectrum Documentation | |||
| 3.9.7 | WDE Ecosystem Certification and Requirements |
| 1.1 | Operational/Site Activation |
| 1.10.1 | System Assembly, Installation and Checkout on Site |
| 1.10.2 | Contractor Technical Support |
| 1.10.3 | Sustainment/Interim Contractor Support |
| 1.11 | Initial Spares and Repair Parts |
eOTAM
| WBS Code | Element name | |||
| 4 | eOTAM | |||
| 4.1 | Network Service Task | |||
| 4.1.1 | Development Task | |||
| 4.1.1.1 | WDE Ecosystem Utilization | |||
| 4.1.2 | Enhancement Task | |||
| 4.1.2.1 | WDE Ecosystem Utilization | |||
| 4.1.3 | Maintenance Task | |||
| 4.1.3.1 | WDE Ecosystem Utilization | |||
| 4.1.4 | Product Improvement Task | |||
| 4.1.4.1 | WDE Ecosystem Utilization | |||
| 4.1.5 | Procurement Task | |||
| 4.1.5.1 | WDE Ecosystem Utilization | |||
| 4.2 | Technical Support and Integration Support | |||
| 4.2.1 | Technical Support | |||
| 4.2.2 | Problem Report Investigation and Proposal Development Support | |||
| 4.2.3 | Porting Support | |||
| 4.2.3.1 | Waveform Porting Report | |||
| 4.2.4 | Field Service Representative support | |||
| 4.2.5 | Modeling and Simulation (M&S) Technical Support | |||
| 4.3 | System Engineering | |||
| 4.3.1 | Systems Requirements Review (SRR) | |||
| 4.3.2 | Preliminary Design Review (PDR) | |||
| 4.3.3 | Critical Design Review (CDR) | |||
| 4.3.4 | External Product/Process Teams (IPT) | |||
| 4.3.5 | Technical Interchange Meetings (TIM) | |||
| 4.3.6 | Software Requirements Specification (SRS) | |||
| 4.3.7 | Requirements Traceability Matrix (RTM) | |||
| 4.3.8 | Waveform Porting Plan | |||
| 4.3.9 | Mission Critical Analysis | |||
| 4.3.10 | Safety Assessment Report (SAR) | |||
| 4.3.11 | System Performance Specification | |||
| 4.3.12 | System Segment Specification (SSS) | |||
| 4.4 | Program Management | |||
| 4.4.1 | Program Management Reviews (PMRs) | |||
| 4.4.2 | Integrated Baseline Review (IBR) | |||
| 4.4.3 | Contract Performance Report (CPR) | |||
| 4.4.4 | Integrated Master Schedule (IMS) | |||
| 4.4.5 | Software Development Plan (SDP) | |||
| 4.4.6 | Configuration Management Plan (CMP) | |||
| 4.4.7 | Cost and Software Data Reporting (CSDR) | |||
| 4.4.8 | Record of Meeting Report | |||
| 4.4.9 | Presentation Material | |||
| 4.4.10 | Program Protection Planning Support | |||
| 4.4.10.1 | Program Protection Implementation Plan (PPIP) | |||
| 4.5 | Test and Evaluation | |||
| 4.5.1 | Test Bench/Vector Delivery | |||
| 4.5.2 | Physical Configuration Audits (PCA) | |||
| 4.5.3 | Functional Configuration Audits (FCA) | |||
| 4.5.4 | Hwardware Test Plan | |||
| 4.5.5 | Hardware Test Procedures | |||
| 4.5.6 | Test Readiness Review (TRR) | |||
| 4.5.7 | Formal Qualification Testing (FQT) | |||
| 4.5.8 | Formal Verification Test (FVT) | |||
| 4.5.9 | First Article Test (FAT) | |||
| 4.5.10 | Acceptance Test and Report | |||
| 4.5.11 | Contractor Development Testing (CDT) | |||
| 4.5.12 | Software Test Plan (STP) | |||
| 4.5.13 | Software Test Description (STD) | |||
| 4.5.14 | Software Test Report (STR) | |||
| 4.5.15 | Security Verification Test (SVT) | |||
| 4.5.16 | Test and Evaluation Support | |||
| 4.5.17 | Support to the JTNC Test & Evaluation Laboratory (JTEL) | |||
| 4.5.18 | Independent Validation and Verification Support | |||
| 4.5.19 | Support to Joint Interoperability Test Center (JITC) | |||
| 4.6 | Training, Laboratory, and Field Support | |||
| 4.6.1 | Capability Training | |||
| 4.6.2 | Modeling and Simulation (M&S) Training | |||
| 4.6.3 | Training Support Package | |||
| 4.7 | Engineering Data | |||
| 4.7.1 | Information Packages | |||
| 4.7.2 | Software Product Specification (SPrS) | |||
| 4.7.3 | Software Design Description (SDD) | |||
| 4.7.4 | Interface Design Description (Application Programming Interface, API) | |||
| 4.7.5 | Software Version Description (SVD) | |||
| 4.7.6 | Waveform Design Specification (WDS) | |||
| 4.7.7 | Management Information Base (MIB) Specification | |||
| 4.7.8 | Data Dictionary | |||
| 4.7.9 | Waveform Software Security Report (WSSR) | |||
| 4.7.10 | Modeling & Simulation (M&S) Models | |||
| 4.7.11 | Physical Layer Modeling and Simulation (M&S) Models | |||
| 4.7.12 | Engineering Drawings (Envelope) | |||
| 4.7.13 | Interface Control Drawings | |||
| 4.7.14 | Bill of Materials | |||
| 4.8 | Modeling and Simulation (M&S) | |||
| 4.8.1 | Modeling & Simulation Plan (MSP) | |||
| 4.8.2 | Modeling & Simulation (M&S) Maintenance | |||
| 4.8.3 | Model Validation Plan (MVP) | |||
| 4.8.4 | Model Usage Manual (MUM) | |||
| 4.9 | Certifications and Qualifications | |||
| 4.9.1 | Information Assurance (IA) Self-Assessment Report | |||
| 4.9.2 | SCA & API Self-Assessment Report | |||
| 4.9.3 | National Security Agency (NSA) Certification | |||
| 4.9.4 | Joint Interoperability Test Command (JITC) Waveform Standards Conformance Test Assessment | |||
| 4.9.5 | JITC Interoperability Assessment | |||
| 4.9.6 | Spectrum Documentation | |||
| 4.9.7 | WDE Ecosystem Certification and Requirements |
| 1.1 | Operational/Site Activation |
| 1.10.1 | System Assembly, Installation and Checkout on Site |
| 1.10.2 | Contractor Technical Support |
| 1.10.3 | Sustainment/Interim Contractor Support |
| 1.11 | Initial Spares and Repair Parts |
SINCGARS
| WBS Code | Element name | |||
| 5 | SINCGARS | |||
| 5.1 | Waveform Task | |||
| 5.1.1 | Development Task | |||
| 5.1.1.1 | WDE Ecosystem Utilization | |||
| 5.1.2 | Enhancement Task | |||
| 5.1.2.1 | WDE Ecosystem Utilization | |||
| 5.1.3 | Maintenance Task | |||
| 5.1.3.1 | WDE Ecosystem Utilization | |||
| 5.1.4 | Product Improvement Task | |||
| 5.1.4.1 | WDE Ecosystem Utilization | |||
| 5.1.5 | Procurement Task | |||
| 5.1.5.1 | WDE Ecosystem Utilization | |||
| 5.2 | Technical Support and Integration Support | |||
| 5.2.1 | Technical Support | |||
| 5.2.2 | Problem Report Investigation and Proposal Development Support | |||
| 5.2.3 | Porting Support | |||
| 5.2.3.1 | Waveform Porting Report | |||
| 5.2.4 | Field Service Representative support | |||
| 5.2.5 | Modeling and Simulation (M&S) Technical Support | |||
| 5.3 | System Engineering | |||
| 5.3.1 | Systems Requirements Review (SRR) | |||
| 5.3.2 | Preliminary Design Review (PDR) | |||
| 5.3.3 | Critical Design Review (CDR) | |||
| 5.3.4 | External Product/Process Teams (IPT) | |||
| 5.3.5 | Technical Interchange Meetings (TIM) | |||
| 5.3.6 | Software Requirements Specification (SRS) | |||
| 5.3.7 | Requirements Traceability Matrix (RTM) | |||
| 5.3.8 | Waveform Porting Plan | |||
| 5.3.9 | Mission Critical Analysis | |||
| 5.3.10 | Safety Assessment Report (SAR) | |||
| 5.3.11 | System Performance Specification | |||
| 5.3.12 | System Segment Specification (SSS) | |||
| 5.4 | Program Management | |||
| 5.4.1 | Program Management Reviews (PMRs) | |||
| 5.4.2 | Integrated Baseline Review (IBR) | |||
| 5.4.3 | Contract Performance Report (CPR) | |||
| 5.4.4 | Integrated Master Schedule (IMS) | |||
| 5.4.5 | Software Development Plan (SDP) | |||
| 5.4.6 | Configuration Management Plan (CMP) | |||
| 5.4.7 | Cost and Software Data Reporting (CSDR) | |||
| 5.4.8 | Record of Meeting Report | |||
| 5.4.9 | Presentation Material | |||
| 5.4.10 | Program Protection Planning Support | |||
| 5.4.10.1 | Program Protection Implementation Plan (PPIP) | |||
| 5.5 | Test and Evaluation | |||
| 5.5.1 | Test Bench/Vector Delivery | |||
| 5.5.2 | Physical Configuration Audits (PCA) | |||
| 5.5.3 | Functional Configuration Audits (FCA) | |||
| 5.5.4 | Hardware Test Plan | |||
| 5.5.5 | Hardware Test Procedures | |||
| 5.5.6 | Test Readiness Review (TRR) | |||
| 5.5.7 | Formal Qualification Testing (FQT) | |||
| 5.5.8 | Formal Verification Test (FVT) | |||
| 5.5.9 | First Article Test (FAT) | |||
| 5.5.10 | Acceptance Test and Report | |||
| 5.5.11 | Contractor Development Testing (CDT) | |||
| 5.5.12 | Software Test Plan (STP) | |||
| 5.5.13 | Software Test Description (STD) | |||
| 5.5.14 | Software Test Report (STR) | |||
| 5.5.15 | Security Verification Test (SVT) | |||
| 5.5.16 | Test and Evaluation Support | |||
| 5.5.17 | Support to the JTNC Test & Evaluation Laboratory (JTEL) | |||
| 5.5.18 | Independent Validation and Verification Support | |||
| 5.5.19 | Support to Joint Interoperability Test Center (JITC) | |||
| 5.6 | Training, Laboratory, and Field Support | |||
| 5.6.1 | Capability Training | |||
| 5.6.2 | Modeling and Simulation (M&S) Training | |||
| 5.6.3 | Training Support Package | |||
| 5.7 | Engineering Data | |||
| 5.7.1 | Information Packages | |||
| 5.7.2 | Software Product Specification (SPrS) | |||
| 5.7.3 | Software Design Description (SDD) | |||
| 5.7.4 | Interface Design Description (Application Programming Interface, API) | |||
| 5.7.5 | Software Version Description (SVD) | |||
| 5.7.6 | Waveform Design Specification (WDS) | |||
| 5.7.7 | Management Information Base (MIB) Specification | |||
| 5.7.8 | Data Dictionary | |||
| 5.7.9 | Waveform Software Security Report (WSSR) | |||
| 5.7.10 | Modeling & Simulation (M&S) Models | |||
| 5.7.11 | Physical Layer Modeling and Simulation (M&S) Models | |||
| 5.7.12 | Engineering Drawings (Envelope) | |||
| 5.7.13 | Interface Control Drawings | |||
| 5.7.14 | Bill of Materials | |||
| 5.8 | Modeling and Simulation (M&S) | |||
| 5.8.1 | Modeling & Simulation Plan (MSP) | |||
| 5.8.2 | Modeling & Simulation (M&S) Maintenance | |||
| 5.8.3 | Model Validation Plan (MVP) | |||
| 5.8.4 | Model Usage Manual (MUM) | |||
| 5.9 | Certifications and Qualifications | |||
| 5.9.1 | Information Assurance (IA) Self-Assessment Report | |||
| 5.9.2 | SCA & API Self-Assessment Report | |||
| 5.9.3 | National Security Agency (NSA) Certification | |||
| 5.9.4 | Joint Interoperability Test Command (JITC) Waveform Standards Conformance Test Assessment | |||
| 5.9.5 | JITC Interoperability Assessment | |||
| 5.9.6 | Spectrum Documentation | |||
| 5.9.7 | WDE Ecosystem Certification and Requirements |
| 1.1 | Operational/Site Activation |
| 1.10.1 | System Assembly, Installation and Checkout on Site |
| 1.10.2 | Contractor Technical Support |
| 1.10.3 | Sustainment/Interim Contractor Support |
| 1.11 | Initial Spares and Repair Parts |