W-201-2.jpg

JPG image 425 KB Posted

Attached to
Sources Sought Bldg 1 Control Conversion
Solicitation number
FA251725CCSS
Issued by

About this file

This is a technical drawing showing a chilled water system schematic and control sequence for Building 1 at Peterson Air Force Base in Colorado Springs. The drawing (W-201-2) details the layout and components of a chilled water system including pumps, valves, sensors, and an expansion tank, along with associated part numbers and specifications listed in a bill of materials.

The drawing includes detailed sequence of operations for chiller control, secondary chilled water control, primary chilled water pump control, and flow metering systems. Key operational parameters are specified, such as temperature differentials, flow rates (500 GPM threshold), and control logic for the HVAC control CRT system. The system incorporates monitoring of chiller safeties, equipment status, and automated control sequences for starting/stopping chillers and pumps based on specific temperature and pressure conditions. The drawing appears to be part of a controls upgrade project, as indicated by the project title referencing "PAFB DSC8506 Replacement."

View the file

Other files

File Type Posted
W-201-3.jpg JPG image
W-201-4.jpg JPG image
B1 Pneumatic Valves_Dampers Pictures.docx DOCX document
Sources Sought - Bldg 1 Control Conversion.docx DOCX document
W-201-1.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .