The provided document is a project drawing file associated with a state and local contract opportunity issued by the Virginia Community College System for the repair and replacement of major mechanical systems at the Virginia Western Community College campus in Roanoke, Virginia. The project is generally described as upgrades to the mechanical and electrical systems of the Brown Library and Fishburn Hall buildings. Sealed bids are invited, with the deadline for submission being 2:00 P.M. on Monday, September 23, 2024, and the bids will be publicly opened and read aloud the following day. A pre-bid conference is scheduled for 10:00 A.M. on Wednesday, August 21, 2024, at the campus, and attendance is highly recommended for bidders. The contract requires the use of the Owner's web-based project management software, e-Builder, at no cost to the contractor.
The contract requires a Standard Commonwealth Bid Bond (form CO-10.2) and Contract Security regardless of the bid amount. The bidder must be a registered vendor in eVA. Pricing and funding details are not provided in the document, nor are any set-aside requirements or information about incumbent contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VWCC 260-18280-002 Notice of Invitation for Bids.pdf | ||
| VWCC 18280-002 Project Manuals 2024-07-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/26/2024
/2
6/
CONSTRUCTION DOCUMENTS
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
C O
L L E
G E
V
IR
G
IN
IA
W
E S
T E
R N C
O M
M U
N
IT
Y
P R
O J E
C T C
O D
E -1
-0
M E
C H
A N
IC
A L S
Y S
T E
M S
R E
P A
IR
/R
E P
L A
C E M
A J
O
220050.01
R O
A N
O K
E
V A
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
X \2
V
W C
C R e p la c e M e c h S y s t\
C A
D \X re fs \2
A
B o rd e r.
d w g
N a ti o n w id e D ri v e L y n c h b u rg
V A
.9
.1 w il e y w il s o n .c o m
E m p lo y e e -O w n e d
COOLING TOWER
12'L x 6'W x 15'DEEP
WATER VAULT
XFMR
ATS
BROWN LIBRARY
FISHBURN HALL
COURT OF FOUR SEASONS
PARKING LOT 6
M C
N
EIL D
R
IVEUTILITY YARD
PROVIDE TRAFFIC SIGN:
"CAUTION: ROAD NARROWS"
GENERATOR
UNIT
AIR HANDLING
TEMPORARY
LIBRARY
BROWN
PROVIDE TRAFFIC SIGN:
"CAUTION: ROAD NARROWS"
S
S
G-002
ALE MJG
MJG
SCALE:1" = 20'
PLAN
NORTH
SITE PLAN - PHASING
GRAPHIC SCALE MUST BE USED.
IF THIS DRAWING IS REDUCED,
40'20'0'
SCALE: 1" = 20'
PHASING AND TEMPORARY MECHANICAL REQUIREMENTS
GENERAL CONSTRUCTION NOTES
REQUIREMENTS
TEMPORARY UTILITY
1.
2.
3.
4.
5.
6.
MAINTAIN INGRESS AND EGRESS TO ALL PARKING LOTS, ROADS AND BUILDINGS.
7.
8.
9.
10.
11.
AREAS SHALL BE RESTORED TO MATCH ORIGINAL CONDITIONS UPON REMOVAL OF TEMPORARY AIR HANDLING UNIT.
12.
TEMPORARY/RENTAL AIR HANDLING UNIT SHALL BE TESTED AND BALANCED PRIOR TO NORMAL OPERATION OF TEMPORARY
EQUIPMENT.
BROWN LIBRARY AIR HANDLING UNIT AC-C11 REQUIREMENTS
PHASING AND TEMPORARY ELECTRICAL REQUIREMENTS
1. PANEL MP LOCATED IN THE UTILITY YARD SUPPLIES POWER TO BROWN LIBRARY AND FISHBURN HALL VIA UNDERGROUND
FEEDERS. DE-ENERGIZATION OF PANEL MP WILL RESULT IN A COMPLETE OUTAGE TO BROWN LIBRARY AND FISHBURN
HALL.
2. BOTH BUILDINGS WILL REMAIN OCCUPIED DURING CONSTRUCTION. ELECTRICAL SUPPLY SHALL BE MAINTAINED 24 HOURS
PER DAY DURING CONSTRUCTION BY UTILITY PROVIDED TEMPORARY SERVICE AND DISTRIBUTION EQUIPMENT.
3. TIE-INS AND SHUTDOWNS SHALL ONLY OCCUR DURING UNOCCUPIED HOURS, WEEKENDS AND HOLIDAYS. REFER TO VWCC
WEB SITE FOR BUILDING OPERATING HOURS AND SCHEDULE. COORDINATE THE SCHEDULING OF ALL SUCH WORK WITH
VWCC'S FPD & FMS DEPARTMENTS WELL IN ADVANCE OF THE DESIRED SHUTDOWN DATES.
4. BUILDINGS ARE REQUIRED TO OPERATE AT FULL ELECTRICAL CAPACITY. SERVICE SHALL BE SIZED TO HANDLE
BASELINE BUILDING LOADS AS WELL AS TEMPORARY MECHANICAL LOADS. MAXIMUM DEMAND SEEN AT PANEL MP IS
262.1kW.
5. MAINTAIN INGRESS AND EGRESS TO ALL PARKING LOTS, ROADS AND BUILDINGS.
6. PROVIDE 6 FEET TALL TEMPORARY CHAIN LINK CONSTRUCTION FENCE AROUND TEMPORARY ELECTRICAL EQUIPMENT.
ELECTRICAL EQUIPMENT IS PERMITTED TO BE CO-LOCATED WITHIN FENCING FOR TEMPORARY MECHANICAL EQUIPMENT.
ALL GATES SHALL BE EQUIPPED WITH LOCK AND KEY. CONTRACTOR SHALL PROVIDE VWCC WITH COPIES OF ALL KEYS.
7.
8.
PROVIDE ALL TEMPORARY WIRING, WIRING PROTECTION, TERMINATIONS, AND ALL OTHER COMPONENTS REQUIRED FOR A
FULLY FUNCTIONAL ELECTRICAL SYSTEM.
9.
REFER TO SINGLE LINE DIAGRAM PHASING DRAWINGS FOR DETAILED CONNECTIONS.
1.
2.
FIRE ALARM SYSTEMS, FIRE EXTINGUISHERS, AND EXIT SIGNAGE.
ALL LIFE SAFETY SYSTEMS SHALL BE MAINTAINED DURING WORK. THIS INCLUDES BUT IS NOT LIMITED TO
ACCORDANCE WITH REQUIREMENTS ON SHEET G-008..
CONSTRUCTION WITHIN THE OCCUPIED PORTION OF THE GROUND FLOOR OF BROWN LIBRARY SHALL BE PERFORMED IN
WATER AND HEATING WATER TO FISHBURN HALL AND BROWN LIBRARY.
CENTER ON THE FIRST FLOOR AND BOOK STACKS ON THE SECOND FLOOR. THE CENTRAL PLANT PROVIDES CHILLED
BROWN LIBRARY IS A THREE STORY BUILDING WHICH CONTAINS THE TESTING CENTER ON THE GROUND FLOOR, MEDIA
BROWN LIBRARY CENTRAL PLANT.
FISHBURN HALL IS A THREE STORY ADMINISTRATION BUILDING. CHILLED WATER AND HEATING WATER IS SUPPLIED BY
DURING CONSTRUCTION. A RENTAL AIR HANDLING UNIT SHALL BE PROVIDED FOR BROWN LIBRARY GROUND AND FIRST FLOORS.
BOTH BUILDINGS WILL REMAIN OCCUPIED DURING CONSTRUCTION. HEATING AND COOLING SHALL BE MAINTAINED
VWCC'S FPD & FMS DEPARTMENTS WELL IN ADVANCE OF THE DESIRED SHUTDOWN DATES.
WEB SITE FOR BUILDING OPERATING HOURS AND SCHEDULE. COORDINATE THE SCHEDULING OF ALL SUCH WORK WITH
TIE-INS AND SHUTDOWNS SHALL ONLY OCCUR DURING UNOCCUPIED HOURS, WEEKENDS AND HOLIDAYS. REFER TO VWCC
ALL GATES SHALL BE EQUIPPED WITH LOCK AND KEY. PROVIDE VWCC WITH COPIES OF ALL KEYS.
PROVIDE 6 FEET TALL TEMPORARY CHAIN LINK CONSTRUCTION FENCE AROUND TEMPORARY AIR HANDLING UNIT.
SHUTDOWN.
EQUIPMENT SHALL BE MONITORED 24 HOURS A DAY. EQUIPMENT SHALL BE MADE OPERATIONAL WITHIN 4 HOURS OF
EXISTING EMERGENCY GENERATOR AND ATS SERVING EMERGENCY LIGHTS MUST REMAIN INTACT AND OPERATIONAL
DURING CONSTRUCTION. EXISTING EMERGENCY GENERATOR IS TO CONTINUE SERVICE AS A BACKUP POWER SOURCE.
OUTSIDE AIR TEMPERATURE IS 55 DEG F OR BELOW.
THE CHILLED WATER SYSTEM AND COOLING TOWER REPLACEMENT SHALL OCCUR IN THE WINTER SEASON WHEN THE
TEMPERATURE IS ABOVE 70 DEG F.
THE HEATING WATER SYSTEM AND BOILER REPLACEMENT SHALL OCCUR DURING THE SUMMER WHEN THE OUTSIDE
OR BELOW.
THE AIR HANDLING UNIT SHALL BE REPLACED IN THE WINTER WHEN THE OUTSIDE AIR TEMPERATURE IS 55 DEG F
G-004G-002
ITS MINIMUM SETPOINT, THE ELECTRIC HEATER SHALL MODULATE TO MAINTAIN A SUPPLY AIR TEMPERATURE OF 55 DEG F.
TEMPERATURE OF 55 DEG F. UPON A FALL IN SUPPLY AIR TEMPERATURE BELOW 55 DEG F AND WHILE THE OUTSIDE AIR IS AT
THE UNIT SHALL OPERATE IN ECONOMIZER MODE TO MIX RETURN AIR AND OUTSIDE AIR AND PROVIDE A SUPPLY AIR
SETPOINTS.
EXISTING STATIC PRESSURE SENSOR TO CONTROL THE TEMPORARY AHU. COORDINATE WITH EXISTING STATIC PRESSURE
THE SUPPLY FAN SHALL VFD SHALL SHALL MODULATE TO MAINTAIN A CONSTANT DOWNSTREAM STATIC PRESSURE. USE
SEQUENCE OF OPERATION:
2,900 CFM MINIMUM OUTSIDE AIR. SERVES AS THE CENTRAL VAV AIR HANDLING UNIT.
16,800 CFM AT 3.0 INCH EXTERNAL STATIC PRESSURE.
TEMPORARY AHU POWER OPTIONS WITH AVAILABLE TEMPORARY POWER AS SHOWN ON THE ELECTRICAL DRAWINGS.
MERV 8 FILTERS, SUPPLY FAN AND VARIABLE FREQUENCY DRIVE, 30 kW ELECTRIC HEATER WITH SCR CONTROL. COORDINATE
HORIZONTAL DRAW THRU WITH MINIMUM OUTSIDE AIR DAMPER, ECONOMIZER CYCLE, RETURN, BAROMETRIC RELIEF DAMPER, SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
C O
L L E
G E
V
IR
G
IN
IA
W
E S
T E
R N C
O M
M U
N
O J E
C T C
O D
E -1
-0
M E
C H
A N
IC
A L S
Y S
T E
M S
R E
P A
IR
/R
E P
L A
C E M
A J
R O
A N
O K
E
V A
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
X \2
V
W C
C R e p la c e M e c h S y s t\
C A
D \X re fs \2
A
B o rd e r.
d w g
N a ti o n w id e D ri v e L y n c h b u rg
V A
.9
.1 w il e y w il s o n .c o m
E m p lo y e e -O w n e d
F
SA
(E)26X14
(E) 2 8X17
SA
UP
HANDLER
TEMPORARY AIR
(E) 32X14 RA
(E) 14Ø SA
H W
R (E
HWS
(E) 2"
(E) 1-1/4"
HWS
HWS
(E)2"
HWR
(E) 2"
REMOVE LOUVER
AND STORE.
REPLACE WITH
PLYWOOD
HWR
(E) 1-1/4"
HWS
(E )1 -1 /4 "H
W R
CWS
(E)3"
CWR
(E) 40X30 RA
FROM ABOVE
(E) 48X24 SA
UP
F
TIE-IN INTO (E) 76X12
RETURN DUCT
5900 CFM
BASEBOARD
BASEBOARD
TIE-IN INTO (E)32x14
RETURN DUCT
1500 CFM
F
TIE-IN INTO (E) 26X14
OVAL SUPPLY DUCT
7100 CFM
TIE-IN INTO (E)28X10
SUPPLY DUCT
1800 CFM
TIE-IN INTO (E)
48x24 SUPPLY
DUCT
8700 CFM
BASEBOARD
BASEBOARD
(E)3"
(E) 1-1/4"
(E)AC-C11
(E)XFMR
(E)CDP-1
(E)CDP-2
(E)CWP-B
(E)CWP-C
(E)CHILLER-2
(E)CWP-1
(E)CWP-2
AIR
COMP
JAN/TELE
11D
OFFICE
ROOM
MECH
(E) CHILLER-1
(E)CWP-A
STORAGE
STORAGE
CORRIDOR
11B
TESTING
TEMPORARY DISTRIBUTION
PANEL DP-2
TO TEMP DISC
(SEE SHEET G-004)
G-003
ALE MJG
SCALE:1/4" = 1'-0"
NORTH
BROWN LIBRARY PARTIAL PLAN - PHASING
LEGEND:
1 HR FIRE RATED BARRIER
REQUIREMENTS II
TEMPORARY UTILITY
NO SCALE
NORTH
PLAN
KEY PLAN
ON EXTERIOR WALL OF BROWN LIBRARY. SEE SHEET G-004 FOR LOCATION.
PROVIDE TEMPORARY DISTRIBUTION PANELBOARD DP-2. CONNECT TO BROWN TEMP DISC
:KEY NOTES
SCALE: 1/4" = 1'-0"
2' 4' 8'0
IF THIS DRAWING IS A REDUCTION,
GRAPHIC SCALE MUST BE USED.
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
EB
EB
EB
EB
EB TB
EB
EB
EB
EBEB EB
EB
EBEB
EB
D- 1
W W
UT
D
UT
D
UG
UG
C.W.
C.W.
C.W.
C.St.
C.W L.
C.W.
H/C
(Info)
(In fo)
8' W.F.
C.D r.
A.Dr.
Cb.
16"
W
16" W
UE
D
UED
UG
UG
UED
UE
D xS D xS D
UT
UT
UT
UE
UE
UT
D
UT
D
UT
D
UT
D
W W W W
C.S.
FF=1099.48'
FF
=1
1.3
7'
C.W.
eUT eUT
Cooling Tower
UG
xW 8' W
.F.
Ge n
SG
xW xW xW W xUG xUG xUG Wa ter
Va ult
X
XX
X X
X
X
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
VI
R
G
IN
IA
W
ES
TE
R N
C O
M M
U N
IT
Y
C O
LL
EG
E
R
EP
AI
R
/R
EP
LA
C
E M
AJ
O
R M
EC
H
AN
IC
AL
S
YS
TE
M S
PR
O
JE
C
T C
O D
E:
-1
-0
07/26/2024
220050.01
R O
AN
O
KE
, V
A M
R K
D
AT
E R
EV
IS
IO
N
D
ES
C R
IP
TI
O N
X:
\2
0\
V
W C
C R ep la ce M ec h
Sy st
\C
AD
\C iv il\
A1 9_
C _1
.d w g
N at io nw id e
D riv e | L yn ch bu rg
, V A
4.
7.
w ile yw ils on .c om
0%
E m pl oy ee -O w ne d
0 10' 20'
SCALE: 1" = 10'
IF THIS DRAWING IS REDUCED,
GRAPHIC SCALE MUST BE USED.
CTS
GKT
WRM
C-101
SITE RESTORATION PLAN
3.37
3.38
TREES, SHRUBS, VINES
AND GROUND COVERS
TREE PRESERVATION
AND PROTECTION TP
VEGVEG
TP
EROSION AND SEDIMENT CONTROL LEGEND
EROSION AND SEDIMENT CONTROL NOTES:
1. THE AREA OF DISTURBANCE ON THIS PROJECT IS 250 SQUARE FEET. THIS DISTURBANCE IS BELOW THE 10,000 SQUARE FOOT LIMITS OF
DISTURBANCE OUTLINED IN 9VAC25-840-80 AND THE 2,500 SF LIMITS OF DISTURBANCE OUTLINED IN SECTION 11.7-6 OF THE ROANOKE CITY ORDINANCE. AS A RESULT, A FULL EROSION AND SEDIMENT CONTROL PLAN HAS NOT BEEN PREPARED.
2. THE EROSION AND SEDIMENT CONTROL MEASURES SPECIFIED ON THIS DRAWING SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THE VIRGINIA WESTERN COMMUNITY COLLEGE MS4 PROGRAM PLAN, THE VIRGINIA WESTERN COMMUNITY COLLEGE STORMWATER POLLUTION PREVENTION PLAN (SWPPP), AND THE VCCS ANNUAL STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL AND STORMWATER. IN CASE OF CONFLICT
BETWEEN THESE STANDARDS, THE MOST STRINGENT SPECIFICATIONS SHALL APPLY.
3. TREE PROTECTION SHALL BE INSTALLED PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION OR DEMOLITION ACTIVITIES.
4. THE CONTRACTOR SHALL BE LIABLE FOR ANY AND ALL DAMAGE TO TREES DESIGNATED FOR PROTECTION ON THIS PLAN. IF DAMAGE
OCCURS DURING CONSTRUCTION OR DEMOLITION THE TREE SHALL BE REPAIRED UNDER THE DIRECTION OF A QUALIFIED ARBORIST AT NO COST TO THE OWNER. IF ANY DAMAGED TREES CANNOT BE REPAIRED, THEY SHALL BE REPLACED IN KIND AT NO COST TO THE
OWNER.
5. INSTALL SAFETY FENCE TO BLOCK PEDESTRIAN TRAVEL THROUGH THE WORK AREA.
6. CONTRACTOR SHALL DEVELOP PLAN TO DIVERT PEDESTRIAN TRAFFIC AROUND THE WORK AREA AND SUBMIT TO VWCC STAFF FOR
APPROVAL. THE CONTRACTOR SHALL NOT BEGIN CONSTRUCTION WITHOUT FIRST HAVING AN APPROVED PEDESTRIAN TRAFFIC PLAN
IN PLACE.
3.01 SAFETY FENCE
SAF
SAF
BROWN LIBRARY
FIRST FLOOR EL. 1112.00'
GROUND FLOOR EL. 1100.00'
EQUIP. ROOM FLOOR EL. 1095.00'
3.05 SILT FENCE X XXSF
3.33 SODDING SOSO
SITE RESTORATION PLAN
SCALE: 1" = 10'1
TP
GENERAL NOTES:
1. ALL LANDSCAPED AREAS SHALL RETURN TO EXISTING CONDITIONS UPON COMPLETION OF WORK INCLUDING WEED BARRIERS, PLANTINGS, TREES, AND MULCH.
FIELD ROUTE GROUNDING
CIRCUIT TO AVOID DAMAGE
TO EXISTING TREE.
ROUTE GROUNDING
CIRCUIT UNDER
SIDEWALK WITHOUT
DEMO OF CONCRETE.
GROUNDING CIRCUIT. SEE
ELECTRICAL SHEET ES101.
RETURN AREA TO EXISTING
CONDITION UPON COMPLETION
OF THE UTILITY INSTALLATION.
EXISTING
UTILITY
YARD
SO
SO
SO
X X
X X
X X
X X
X X
X X
X X
X X X X
SF
TEMPORARY
OVERHEAD SERVICE.
SEE SHEET G-004.
D. POST-INSTALLED ANCHORS
1. POST-INSTALLED ANCHORS MUST ONLY BE USED WHERE SPECIFIED ON THE CONSTRUCTION DOCUMENTS.
2. THE CONTRACTOR MUST OBTAIN APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLING POST-INSTALLED ANCHORS IN PLACE OF MISSING OR MISPLACED CAST-IN-
PLACE ANCHORS.
3. ANCHORAGE TO CONCRETE:
a. ADHESIVE ANCHORS MUST HAVE BEEN TESTED AND QUALIFIED FOR USE IN ACCORDANCE WITH ACE 355.4 AND ICC-ES AC 308 FOR CRACKED AND UNCRACKED CONCRETE
RECOGNITION.
4. INSTALL ANCHORS PER THE MANUFACTURER’S INSTRUCTIONS, AS INCLUDED IN THE ANCHOR PACKAGING.
5. ANCHOR CAPACITY IS DEPENDANT UPON SPACING BETWEEN ADJACENT ANCHORS AND PROXIMITY OF ANCHORS TO EDGE OF CONCRETE. INSTALL ANCHORS IN ACCORDANCE
WITH SPACING AND EDGE CLEARANCES INDICATED ON THE DRAWINGS.
6. EXISTING REINFORCING BARS IN THE CONCRETE STRUCTURE MAY CONFLICT WITH SPECIFIC ANCHOR LOCATIONS. UNLESS NOTED ON THE DRAWINGS THAT THE BARS CAN BE CUT, THE CONTRACTOR MUST UNDERTAKE TO LOCATE THE POSITION OF AND AVOID CUTTING THE REINFORCING BARS AND AT THE LOCATIONS OF THE CONCRETE ANCHORS.
7. THE CONTRACTOR MUST TAKE MEASURES TO COORDINATE THE CONSTRUCTION SUCH THAT INTERFERENCE OF EXISTING REINFORCING STEEL WITH PLACEMENT OF NEW ANCHORS (DOWELS, SCREW ANCHORS, ADHESIVE ANCHORS) DOES NOT OCCUR. IF EXISTING REINFORCING STEEL IS ENCOUNTERED DURING DRILLING, ADJUST THE ANCHOR LOCATION IF POSSIBLE, AND NOTIFY THE STRUCTURAL ENGINEER. ABANDONED HOLES MUST BE FILLED WITH GROUT. ANCHORS MUST BE SET WITHIN 3 INCHES OF THEIR SPECIFIED LOCATION, BUT AT LEAST 1 INCH FROM ANY ABANDONED HOLE. CARE MUST BE TAKEN NOT TO BREAK OR DAMAGE REINFORCING STEEL DURING DRILLING, UNLESS
OTHERWISE DIRECTED BY THE STRUCTURAL ENGINEER.
E. WOOD
1. TEMPORARY WOOD SUPPORT FRAMING MUST BE CONSTRUCTED OF ONE OF THE FOLLOWING WOOD SPECIES AND OF NUMBER 2 OR BETTER GRADING.
A. HEM-FIR (NORTH); NLGA
B. SOUTHERN PINE; SPIB
C. SOUTHERN PINE OR MIXED SOUTHERN PINE; SPIB
2. WOOD MUST HAVE A PRESERVATIVE TREATMENT BY PRESSURE PROCESS MEETING AWPA UC3B, FOR EXTERIOR USE IN GROUND CONTACT
3. METAL PLATE CONNECTORS MUST MEET 1. HEAVY-GALVANIZED-STEEL SHEET: HOT-DIP, ZINC-COATED STEEL SHEET COMPLYING WITH ASTM A653/A653M; STRUCTURAL STEEL
(SS), HIGH-STRENGTH LOW-ALLOY STEEL TYPE A (HSLAS TYPE A), OR HIGH-STRENGTH LOW-ALLOY STEEL TYPE B (HSLAS TYPE B); G185 COATING DESIGNATION; AND NOT LESS
THAN 0.036 INCH THICK.
4. FASTENERS IN COMPLIANCE WITH SUBMITTED AND APPROVED METAL PLATES AND MEETING ALL IBC 2021 CHAPTER 23 REQUIREMENTS.
5. SUBMIT SHOP DRAWINGS FOR REVIEW AND APPROVAL.
A. GENERAL
1. STRUCTURAL GENERAL NOTES ARE INTENDED TO HIGHLIGHT OR IN SOME CASES SUPPLEMENT PROJECT SPECIFICATIONS. REFER TO THE PROJECT SPECIFICATIONS
FOR COMPLETE CONCRETE WORK COVERAGE.
2. THE DESIGN OF THE STRUCTURE COMPLIES WITH THE INTERNATIONAL BUILDING CODE 2021 AND THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE “USBC” (2021
EDITION).
3. THE DESIGN OF THE COOLING TOWER SUPPORT TO RESIST WIND PRESSURES IS IN ACCORDANCE WITH INTERNATIONAL BUILDING CODE’S SECTION 1609.0, WHICH IS
BASED ON ASCE 7-22, CHAPTER 26. DESIGN INFORMATION IS AS FOLLOWS:
a. BASIC 3 SECOND GUST WIND SPEED .......................................... ...........108 MILES PER HOUR
b. WIND EXPOSURE CATEGORY FOR MAIN RESISTING SYSTEM ….......... B
c. TEMPORARY SUPPPORT STRUCTURES SHALL USE 10 YEAR MEAN RECURRANCE INTERVAL WIND SPEED OF V = 75 MPH
4. THE DESIGN OF THE COOLING TOWER SUPPORT TO RESIST SEISMIC FORCES IS IN ACCORDANCE WITH INTERNATIONAL BUILDING CODE’S SECTION 1613 AND ASCE 7-22.
A. OCCUPANCY CATEGORY …………………..………………………………...... II
B. SEISMIC IMPORTANCE FACTOR (ASCE 7 - TABLE 1.5-2) ………..…........ Ie = 1.0
C. SPECTRAL RESPONSE ACCELERATIONS (USGS SEISMIC HAZARDS PROGRAM)
1. AT SHORT PERIODS ……………………………………………………......... Ss = 0.22 g
2. AT ONE SECOND PERIOD …………………………………………….......... S1 = 0.069 g
D. SITE CLASS (ASCE 7 - TABLE 20.3-1) ……………………………………....... D (ASSUMED)
E. SPECTRAL RESPONSE COEFFICIENTS
1. AT SHORT PERIODS .……………………………………………………........ Sds = 0.18 g
2. AT ONE SECOND PERIOD ……………………….…………………….......... Sd1 = 0.098 g
F. SEISMIC DESIGN CATEGORY (ASCE 7 - TABLES 11.6-1 AND 11.6-2)....... B
G. BASIC SEISMIC FORCE-RESISTING-SYSTEM
• (ASCE 7 - TABLE 12.2-1)………………………………………….................ORDINARY REINFORCED CONCRETE SHEAR WALL
H. RESPONSE MODIFICATION FACTOR (ASCE 7 - TABLE 12.2-1) ….…........ R = 4
I. SEISMIC RESPONSE COEFFICIENT ………………………….……….…........ Cs = 0.278
J. DESIGN BASE SHEAR ……………………………….………………………....... 3.4 KIPS
K. ANALYSIS PROCEDURE ……………………………………............................. EQUIVALENT LATERAL-FORCE
5. THE FOLLOWING ESTIMATED MECHANICAL EQUIPMENT WEIGHTS ARE COORDINATED WITH THE MECHANICAL ENGINEERS’ BASIS OF DESIGN:
a. COOLING TOWER = 12,000 POUNDS
b. FOR CASES WHERE THE PURCHASED EQUIPMENT EXCEEDS THE LISTED ESTIMATED EQUIPMENT WEIGHT BY 10%, CONTACT THE STRUCTURAL ENGINEER TO
DETERMINE IF STRUCTURAL STRENGTHENING IS REQUIRED.
6. IMPOSED CONSTRUCTION LOADS IN EXCESS OF STATED DESIGN LOADS MUST BE APPROVED BY THE STRUCTURAL ENGINEER PRIOR TO THE IMPOSITION OF SUCH
LOADS.
7. THE GENERAL CONTRACTOR AND SUB-CONTRACTORS MUST DETERMINE THE SCOPE OF THE STRUCTURAL WORK FROM THE CONTRACT DOCUMENTS TAKEN AS A WHOLE. THE STRUCTURAL DRAWINGS MUST NOT BE CONSIDERED SEPARATELY FOR PURPOSES OF BIDDING THE STRUCTURAL WORK. DUE CONSIDERATION MUST BE GIVEN TO OTHER STRUCTURAL WORK OR WORK RELATED TO THE STRUCTURE, INCLUDING NECESSARY COORDINATION DESCRIBED OR IMPLIED BY THE
ARCHITECTURAL AND MECHANICAL DRAWINGS.
8. SCALES NOTED ON THE DRAWINGS ARE FOR GENERAL INFORMATION ONLY. NO DIMENSIONAL INFORMATION MUST BE OBTAINED BY DIRECT SCALING OF THE
DRAWINGS.
9. DETAILS, SECTIONS AND NOTES SHOWN ON THESE DRAWINGS ARE INTENDED TO BE TYPICAL AND MUST APPLY TO SIMILAR CONDITIONS ELSEWHERE UNLESS
OTHERWISE SHOWN OR NOTED.
10. STRUCTURAL MEMBERS HAVE BEEN LOCATED AND DESIGNED TO ACCOMMODATE THE MECHANICAL EQUIPMENT AND OPENINGS SPECIFIED BY THE MECHANICAL ENGINEER. ANY SUBSTITUTIONS RESULTING IN REVISIONS TO THE STRUCTURE MUST BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE
STRUCTURAL ENGINEER.
11. COORDINATE STRUCTURAL SUPPORT LOCATIONS WITH EQUIPMENT SERVICE ACCESS CLEARANCES PER EACH EQUIPMENT MANUFACTURER AND PER BUILDING
CODE.
12. PRINCIPAL OPENINGS IN THE STRUCTURE ARE INDICATED ON THE MECHANICAL CONTRACT DOCUMENTS. REFER TO THE MECHANICAL DRAWINGS FOR SLEEVES, CURBS, INSERT, ETC. NOT HEREIN INDICATED. THE LOCATION OF SLEEVES OR OPENINGS IN STRUCTURAL MEMBERS NOT SHOWN IN THE CONTRACT DOCUMENTS
MUST BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR APPROVAL.
13. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL RESULTING REVISIONS TO THE STRUCTURAL SYSTEM AS A RESULT OF ACCEPTANCE OF
CONTRACTOR PROPOSED ALTERNATIVES OR SUBSTITUTIONS.
14. THE GENERAL CONTRACTOR (OR CONSTRUCTION MANAGER) MUST SUBMIT SHOP DRAWINGS FOR ALL STRUCTURAL ELEMENTS SHOWN ON THE CONTRACT DOCUMENTS FOR APPROVAL. THE STRUCTURAL ENGINEER WILL NOT BE RESPONSIBLE FOR THE STRUCTURAL CERTIFICATION AND DESIGN OF THE PROJECT IF THE GENERAL CONTRACTOR FAILS TO OBTAIN APPROVAL OF THE SHOP DRAWINGS. SHOP DRAWINGS ARE REVIEWED AS A CONVENIENCE TO THE GENERAL CONTRACTOR AND ARE NOT A CONTRACT DOCUMENT. THE GENERAL CONTRACTOR MUST STATE ON THE SHOP DRAWINGS THAT CONTRACT DOCUMENT REQUIREMENTS HAVE BEEN MET AND THAT ALL DIMENSIONS, CONDITIONS AND QUANTITIES HAVE BEEN REVIEWED AND VERIFIED AS SHOWN AND/OR CORRECTED
ON THE SHOP DRAWINGS.
15. THE CONTRACTOR MUST BE RESPONSIBLE FOR PROVIDING TEMPORARY BRACING AND SHORING, AS REQUIRED, TO ENSURE VERTICAL AND LATERAL STABILITY OF THE ENTIRE STRUCTURE OR PORTION THEREOF DURING CONSTRUCTION. THIS INCLUDES TEMPORARY ABOVE GRADE PIPE SUPPORTS FOR ELECTRICAL CONDUIT SUPPORT, SEE DETAIL 5 ON S-501 FOR OVERALL SUPPORT MINIMUM PARAMETERS. CONTRACTOR IS RESPONSIBLE FOR DELEGATED DESIGN AND SIGNED AND
SEALED SHOP DRAWING SUBMITTAL FOR REQUIRED SUPPORTS.
16. INFORMATION SHOWN REGARDING EXISTING CONDITIONS HAS BEEN OBTAINED BY LIMITED OBSERVATIONS. AREAS NOT VISIBLE HAVE BEEN ASSUMED TYPICAL
WITH OBSERVED EXISTING CONDITIONS.
17. THE CONTRACTOR MUST MEASURE AND PROVIDE ALL DIMENSIONS, ELEVATIONS AND CONDITIONS AT THE JOB SITE PRIOR TO CONSTRUCTION AND THE SUBMISSION OF SHOP DRAWINGS AND MUST NOTIFY THE ARCHITECT AND/OR STRUCTURAL ENGINEER IMMEDIATELY OF ANY DISCREPANCIES.
18. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR FITTING NEW WORK WITH EXISTING CONSTRUCTION. INFORMATION ON EXISTING BUILDING SHOWN IN THESE DRAWINGS WAS BASED UPON THE INFORMATION SUPPLIED TO WILEY WILSON, INC. THIS INFORMATION IS NOT AS-BUILT DATA AND THE ACTUAL AS-BUILT CONSTRUCTION MAY DIFFER FROM THAT REPRESENTED IN THE DRAWINGS. THE CONTRACTOR MUST VERIFY ALL INFORMATION. VARIATIONS FROM THE DIMENSIONS INDICATED ON THE CONTRACT DOCUMENTS MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND/OR THE STRUCTURAL ENGINEER.
19. INFORMATION ON THE FISHBURN HALL EXISTING BUILDING IS TAKEN FROM STRUCTURAL SHEETS S1-S5 AND S18-S20 BY SMITHEY & BOYNTON – RANDOLPH FRANTZ & JOHN CHAPPELEAR ASSOCIATED ARCHITECTS, DATED AUGUST 7, 1967. INFORMATION ON THE BROWN LIBRARY EXISTING BUILDING IS TAKEN FROM STRUCTURAL SHEETS S12-S20 BY SMITHEY & BOYNTON – RANDOLPH FRANTZ & JOHN CHAPPELEAR ASSOCIATED ARCHITECTS, DATED AUGUST 7, 1967.
20. THE STRUCTURE HAS BEEN DESIGNED FOR THE IN-SERVICE LOADS ONLY.THE METHODS, PROCEDURES, AND SEQUENCES OF CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. SUPPORTING FORMWORK FOR THE CONCRETE CONSTRUCTION MUST NOT BE REMOVED BEFORE THE CONCRETE HAS GAINED SUFFICIENT STRENGTH TO SAFELY SUPPORT THE DEAD AND SUPERIMPOSED LOADS WHICH WOULD BE SUBSEQUENTLY APPLIED. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO MAINTAIN AND ENSURE THE INTEGRITY OF THE STRUCTURE AT ALL STAGES OF CONSTRUCTION.
21. METHODS, PROCEDURES, AND SEQUENCES OF CONSTRUCTION ARE THE RESPONSIBLILITY OF THE CONTRACTOR. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO MAINTAIN AND ENSURE THE INTEGRITY OF THE STRUCTURE AT ALL STAGES OF CONSTRUCTION.
22. THE CONTRACTOR MUST FABRICATE AND ERECT STEEL IN ACCORDANCE WITH OSHA’S SAFETY REQUIREMENTS, 29 CFR 1926 SAFETY STANDARDS FOR STEEL
ERECTION; FINAL RULE.
23. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING STRUTURAL INTERGRITY AND STABILITY AT ALL TIMES AND ANY ASSOCIATED MEANS AND METHODS TO
ACHIEVE THIS.
24. REFER TO THE DEB SPECIAL INSPECTION FORM CO-6 FOR PROJECT SPECIAL INSPECTION REQUIREMENTS.
25. AN INDEPENDENT AGENCY MUST PERFORM SPECIAL INSPECTIONS PER THE INTERNATIONAL BUILDING CODE 2021. IN ACCORDANCE WITH INTERNATIONAL BUILDING CODE SECTION 1704.0, THE RESPONSIBLE INSPECTOR MUST BE A REGISTERED PROFESSIONAL ENGINEER LICENSED IN THE STATE WHERE THE CONSTRUCTION TAKES PLACE. THESE INSPECTIONS ARE IN ADDITION TO THE INSPECTIONS SPECIFIED IN THE PROJECT MANUAL FORMS CO-6a & CO-6b.
C. CONCRETE
1. ALL CONCRETE WORK MUST BE IN ACCORDANCE WITH ACI 301, ACI 318 AND ACI 302.
2. PROVIDE EXTERIOR CONCRETE WITH A MINIMUM COMPRESSIVE STRENGTH (f’c) OF 4,500 PSI AT 28 DAYS AND MAXIMUM W/C RATIO OF 0.40. USE NORMAL WEIGHT AGGREGATES CONFORMING TO ASTM C33 AND TYPE II PORTLAND CEMENT CONFORMING TO ASTM C150 OR BLENDED HYDRAULIC CEMENT CONFORMING TO ASTM C595 TYPE IL. CONCRETE MUST MEET THE FOLLOWING DURABILITY EXPOSURE CATEGORIES: F2, S0, W1, C1. AIR CONTENT OF 6.0% +/-1.5% FOR 3/4" MAXIMUM AGGREGATE.
3. PROVIDE INTERIOR CONCRETE WITH A MINIMUM COMPRESSIVE STRENGTH (f’c) OF 3,500 PSI AT 28 DAYS AND MAXIMUM W/C RATIO OF 0.55. USE NORMAL WEIGHT AGGREGATES CONFORMING TO ASTM C33 AND TYPE II PORTLAND CEMENT CONFORMING TO ASTM C150 OR BLENDED HYDRAULIC CEMENT CONFORMING TO ASTM C595 TYPE IL. CONCRETE
MUST MEET THE FOLLOWING DURABILITY EXPOSURE CATEGORIES: F0, S0, W0, C0.
4. FLY ASH CONFORMING TO ASTM C618, TYPE C, OR F MAY BE USED AS TO REPLACE A PORTION OF THE PORTLAND CEMENT IN A CONCRETE MIX. THE AMOUNT OF PORTLAND CEMENT CONTENT MUST NOT BE LESS THAN 70 PERCENT OF THE TOTAL AMOUNT OF CEMENTITIOUS MATERIAL IN THE MIX.
5. GROUND GRANULATED BLAST-FURNACE SLAG CONFORMING TO ASTM C989, MAY BE USED AS TO REPLACE A PORTION OF THE PORTLAND CEMENT IN A CONCRETE MIX. THE AMOUNT OF PORTLAND CEMENT CONTENT MUST NOT BE LESS THAN 70 PERCENT OF THE TOTAL AMOUNT OF CEMENTITIOUS MATERIAL IN THE MIX.
6. CONCRETE REINFORCEMENT BARS MUST CONFORM TO ASTM A615, GRADE 60. REINFORCEMENT BARS MUST NOT BE TACK WELDED, WELDED, HEATED, OR CUT UNLESS
INDICATED ON THE CONTRACT DOCUMENTS OR APPROVED BY THE STRUCTURAL ENGINEER.
7. WHERE SPECIFIED ON DRAWINGS, USE NON-SHRINK, NON-METALLIC GROUT WHICH CONFORMS TO CORPS OF ENGINEERS SPECIFICATION CRD-C 621-82 OR ASTM C1107.
8. DETAILING OF CONCRETE REINFORCEMENT BARS AND ACCESSORIES MUST CONFORM TO THE RECOMMENDATIONS OF ACI 315 “DETAILS AND DETAILING OF CONCRETE REINFORCEMENT” AND ACI SP-66 “DETAILING MANUAL”. PLACING OF REINFORCING BARS MUST CONFORM TO THE RECOMMENDATIONS OF ACI 315R “MANUAL OF ENGINEERING AND PLACING DRAWINGS FOR REINFORCED CONCRETE STRUCTURES” AND CRSI “MANUAL OF STANDARD PRACTICE”.
9. MIX, TRANSPORT, AND PLACE CONCRETE PER THE RECOMMENDATIONS OF ACI 301.
10. PROVIDE CONCRETE COVER PROTECTION OF REINFORCEMENT PER ACI 318 SECTION 20.6.1.3 WITH STANDARD BAR CHAIRS AND SPACERS REQUIRED TO MAINTAIN MINIMUM
CONCRETE PROTECTION.
11. HORIZONTAL FOOTING AND HORIZONTAL WALL REINFORCEMENT MUST BE CONTINUOUS AND MUST HAVE 90-DEGREE BENDS AND EXTENSIONS, OR CORNER BARS OF
EQUIVALENT SIZE LAPPED 48 BAR DIAMETERS, AT CORNERS AND INTERSECTIONS.
12. CHAMFER EXPOSED EDGES OF CONCRETE ¾”, UNLESS OTHERWISE NOTED.
13. PROTECT AND CURE ALL CONCRETE SURFACES. BEGIN CURING WALLS IMMEDIATELY AFTER STRIPPING FORMS AND FLATWORK IMMEDIATELY AFTER FINISHING.
14. INSTALL AND SECURE EMBEDMENTS SUCH AS THREADED RODS WITHIN SPECIFIED TOLERANCES BEFORE CONCRETE PLACEMENT.
15. CONCRETE FINISHING OF FORMED SURFACES MUST MEET ACI 301 SURFACE FINISH AS INDICATED IN SPECIFICATION.
28. WRITTEN REPORTS MUST BE SUBMITTED TO THE OWNER AND REGISTERED DESIGN PROFESSIONAL STATING COMPLIANCE OR NON-COMPLIANCE WITH DESIGN DOCUMENTS AND SPECIFICATIONS. ALL REPORTS MUST BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE WHERE THE
CONSTRUCTION TAKES PLACE.
29. THE OWNER WILL ENGAGE A THIRD PARTY TESTING AGENCY TO PERFORM THE REQUIRED SPECIAL INSPECTION SERVICES. THE CONTRACTOR MUST COORDINATE W/ THE THIRD PARTY AGENCY TO SCHEDULE TESTING SERVICES. FAILURE TO HIRE A THIRD PARTY TESTING PROVIDER OR FAILURE TO SUBMIT
SIGNED AND SEALED REPORTS INDICATES NON-COMPLIANCE WITH THE CONTRACT DOCUMENTS.
A. GENERAL CONTINUED
B. FOUNDATIONS AND EARTHWORK
1. THE FOUNDATION DESIGN FOR THE STRUCTURE IS FOR AN ASSUMED ALLOWABLE SOIL BEARING PRESSURE OF 1,500 PSF. FOUNDATIONS EXPOSED TO FROST MUST BEAR A
MINIMUM OF 24 INCHES BELOW FINISHED GRADE.
2. WHERE LATERAL EARTH PRESSURES ARE SUPERIMPOSED ON THE FOUNDATION, THE STRUCTURE IS DESIGNED FOR THE FOLLOWING LATERAL EARTH PRESSURES:
a. AT-REST PRESSURE (TOP RESTRAINED WALLS) ...……….. 60 PSF/FT
3. DO NOT OVER EXCAVATE THE FOOTPRINT OF SPREAD AND STRIP FOOTINGS. IF OVER EXCAVATION IS REQUIRED BEYOND THE 3 INCH CONSTRUCTION TOLERANCE, FORM THE
SIDES OF THE FOOTING.
4. CLEAN AND TAMP SHALLOW FOUNDATION EXCAVATIONS TO A UNIFORM SURFACE. IF PLACEMENT OF CONCRETE IS NOT WITHIN 24 HOURS OF FOUNDATION EXCAVATION, TEMPORARILY PROTECT SIDES AND BOTTOMS OF FOUNDATION EXCAVATIONS WITH A POLYETHYLENE MEMBRANE.
5. ALWAYS PROVIDE POSITIVE SURFACE WATER DRAINAGE AWAY FROM THE STRUCTURE.
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
/2
/2
:3
:1
A M
R
S
C
E N d e ta c h e d
.r v t
STRUCTURAL GENERAL
NOTES & ABBREVIATIONS
V
IR
G
IN
IA
W
E S
T E
R N
C O
M M
U N
IT
Y
C O
L L E
G E
R E
P A
IR
/R
E P
L A
C E
M A
J O
R M
E C
H A
N
IC
A L S
Y S
T E
M S
JWR
CAW
07/26/2024
220050.01
S-001
NKT
R O
A N
O K
E V
A
P R
O J E
C T
C O
D E
-1
-0
M R
K D
A T
E R
E V
I S
IO
N D
E S
C R
IP
T
IO
N
7/26/2024
A992 STEEL, 50 KSI
W6X15 SUPPORT BEAM
COORDINATE BOLT
HOLE & CONNECTION
W/ EQUIP MANUF
STAGGERED 1/2" DIA
F1554 GR 36 THREADED
RODS W/ HILTI HIT-HY
200 ADHESIVE @ 12"
OC, 4" MIN EMBED
0' - 0"MATCH EX CONC SUPPORT
T/CONC
6" 1' - 0" 6"
GRAVEL AROUND
NEW CURB TO MATCH
EX CURB
M
IN
C L R
2" CLR
C L R
(3) #4 HORIZ, EF
#4 @ 12" OC STD
DOWEL HOOK INTO
FTG, EF
(2) #4 CONT
TYP
1 1/2"
NEW COOLING TOWER,
SEE MECH
3/4" CHAMFER, TYP
1-1/2" NON-SHRINK,
NON-METALLIC GROUT
NOTES:
1. STRUCTURAL STEEL FASTENERS, THREADED RODS, & MEMBERS MUST BE
HOT-DIPPED GALVANIZED PER ASTM A123 & A153. REPAIR DAMAGED
GALVANIZATION PER ASTM A780.
CL BEAM & FND WALL/FTG
COORDINATE W/EQUIP MANUF
M
IN4
2' - 0"
M
IN4
A992 STEEL, 50 KSI
W6X15 SUPPORT BEAM
COORDINATE BOLT
HOLE & CONNECTION
W/ EQUIP MANUF
STAGGERED 1/2" DIA
F1554 GR 36 THREADED
RODS W/ HILTI HIT-HY
200 ADHESIVE @ 12" OC,
4" MIN EMBED
0' - 0"MATCH EX CONC SUPPORT
T/CONC
TYP
1 1/2"
EX CONC CURB FTG
EX 12" THICK CONC CURB
EX GRAVEL &
SITE GRADE
NEW COOLING
TOWER, SEE MECH
1-1/2" NON-SHRINK,
NON-METALLIC GROUT
NOTES:
1. STRUCTURAL STEEL FASTENERS, THREADED RODS, & MEMBERS MUST BE
HOT-DIPPED GALVANIZED PER ASTM A123 & A153. REPAIR DAMAGED
GALVANIZATION PER ASTM A780.
EX CONC BEAM
BEHIND BRICK
WALL WITHIN
STAIRWELL,
CONTRACTOR TO
CONFIRM
ELEVATION
(4) 1/2" DIA X 7" HILTI
KB TZ2, 5" TYP GA
WT5x16.5
5/8" DIA SHACKLE
BOLT
ANCHORS PASS
THROUGH BRICK
VENEER
" 1
M A
X
MIN
2 1/2"
MESSENGER WIRE
BY UTILITY
PROVIDER (T = 500
LBS MAX)
13' - 0"
TIE IN ELEV
12' - 0"
T/EX BEAM
CONTRACTOR
FIELD VERIFY
NOTES:
1. ANCHOR THROUGH MASONRY JOINTS WHERE POSSIBLE.
2. AFTER ANCHOR REMOVAL PATCH HOLES BACK WITH NON-SHRINK
PATCHING MORTAR, COLOR MATCH SURROUNDING MORTAR BED.
2"
M A
X
M
IN
+/- 1' - 0" +/- 2' - 0" +/- 2' - 0" +/- 1' - 0"
PRECAST CONCRETE
BLOCK SET DOWN
OVER WOOD FOOT
3' - 0" MAXIMUM
WOOD POST, TYP ALL
WOOD OUTRIGGER KICKER
ALL 4 SIDES
NOTES:
1. TEMPORARY SUPPORT IS CONTRACTOR'S DELEGATED DESIGN REQUIREMENT AND MEANS AND
METHODS, SEE NOTES A.15 ON S-001 FOR DETAILS.
2. DESIGN FOR LOADS LISTED ON S-001 IN ADDITION TO WEIGHT OF CONDUITS FROM ELECTRICAL.
3. WHAT IS SHOWN ABOVE OUTLINES GEOMETRIC REQUIREMENTS, THE OVERALL SUPPORT TYPE
AND DESIGN IS UP TO THE CONTRACTOR.
4. SEE NOTE SECTION E ON S-001 FOR WOOD CRITERIA IF WOOD IS USED.
METAL BRACKETS
AS NEEDED
CONDUITS,
COORD W/ ELEC
CONCRETE FRAME
W/ BRICK VENEER
(2) 1/4" X 1-3/4"
TAPCON MASONRY
SCREWS
P1000HS
UNISTRUT
CHANNEL
UNISTRUT RIGID
CONDUIT
CLAMP
NOTES:
1. PROVIDE SUPPORT WITHIN 1'-0" OF TOP & BOTTOM OF CONDUIT.
2. PROVIDE INTERMEDIATE SUPPORTS @ 8'-0" OC MAX.
3. ACCEPTABLE TO USE DETAIL TO CONCRETE ALSO.
4. ANCHOR INTO MASONRY JOINTS.
5. AFTER ANCHOR REMOVAL PATCH HOLES BACK WITH NON-SHRINK
PATCHING MORTAR, COLOR MATCH SURROUNDING MORTAR BED.
SEE ELEC & G-004
F. STRUCTURAL STEEL
1. UNLESS NOTED OTHERWISE, STRUCTURAL STEEL MUST CONFORM TO THE FOLLOWING:
ANCHOR BOLTS ASTM F1554, GRADE 36
WIDE FLANGE SHAPES ASTM A992, 50 KSI
ANGLES ASTM A36
CHANNELS ASTM A36
PLATES A36
2. BOLTS FOR STRUCTURAL STEEL CONNECTIONS MUST BE HIGH STRENGTH BOLTS PER THE REQUIREMENTS OF ASTM A325, TYPE N. UNLESS NOTED OTHERWISE, PROVIDE BOLTS DESIGNED AS BEARING TYPE BOLTS AND INSTALL PER THE “SNUG TIGHT” CONDITION. INSTALL A HARDENED WASHER
UNDER THE ELEMENT TO BE TIGHTENED.
3. ANCHOR BOLTS LOCATED OUTSIDE OF THE BUILDING ENVELOPE MUST BE HOT DIPPED GALVANIZED PER ASTM F2329 UNLESS OTHERWISE NOTED.
5. THE FABRICATOR MUST PREPARE THE SHOP DRAWINGS BASED ON DESIGN LOADS PROVIDED OR CONNECTION DESIGN INFORMATION SHOWN IN THE TYPICAL DETAILS. THE FABRICATOR IS RESPONSIBLE FOR CHOOSING, DESIGNING AND DETAILING ALL CONNECTIONS PARTIALLY DETAILED IN THE CONTRACT DRAWINGS IN ACCORDANCE WITH PART 10 OF THE AISC “MANUAL OF STEEL CONSTRUCTION” FOURTEENTH EDITION.
6. PERFORM WELDING IN ACCORDANCE WITH THE AMERICAN WELDING SOCIETY STANDARD D1.1. PROVIDE ELECTRODES FOR SHOP AND FIELD WELDS IN ACCORDANCE WITH AWS A5.1 OR AWS A5.5, CLASS E70XX, LOW HYDROGEN. ALL WELDS MUST USE FILLER METAL WITH A MINIMUM CVN VALUE OF 20
FT-LBS AT -20 DEGREES FAHRENHEIT.
7. ALL SHOP AND FIELD WELDING MUST BE EXECUTED BY WELDERS AND WELDING OPERATORS WHO HAVE BEEN PREVIOUSLY QUALIFIED BY TEST AS PRESCRIBED IN AWS D1.1 OF THE AMERICAN WELDING SOCIETY TO PERFORM THE TYPES OF WELDS REQUIRED ON THE PROJECT.
8. SHOP OR FIELD WELDS AT NON-BOLTED CONNECTIONS THAT ARE NOT SPECIFICALLY DETAILED MUST BE 3/16” CONTINUOUS FILLETS AT EACH
CONTACT EDGE OR SURFACE.
11. SEE ARCHITECTURAL AND OTHER ENGINEERING DRAWINGS FOR MISCELLANEOUS STEEL NOT SHOWN ON THE STRUCTURAL DRAWINGS.
12. NO FABRICATION MUST PROCEED PRIOR TO SHOP DRAWING APPROVAL.
15. EXPOSED STEEL MUST BE HOT DIPPED GALVANIZED. STEEL SHAPES, PLATES AND BARS MUST BE GALVANIZED PER ASTM A123. STEEL BOLTS, NUTS AND WASHERS MUST BE GALVANIZED PER ASTM A153, CLASS C. DAMAGED AND UNCOATED AREAS MUST BE REPAIRED PER ASTM A780.
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
/2
/2
:3
:1
A M
R
S
C
E N d e ta c h e d
.r v t
TYPICAL STRUCTURAL
DETAILS
V
IR
G
IN
IA
W
E S
T E
R N
C O
M M
U N
IT
Y
C O
L L E
G E
R E
P A
IR
/R
E P
L A
C E
M A
J O
R M
E C
H A
N
IC
A L S
Y S
T E
M S
JWR
CAW
07/26/2024
220050.01
S-501
NKT
R O
A N
O K
E V
A
P R
O J E
C T
C O
D E
-1
-0
1 1/2" = 1'-0"S-501
DETAIL - NEW COOLING TOWER CONC SUPPORT1
1 1/2" = 1'-0"S-501
DETAIL - EX CONC SUPPORT COOLING TOWER CONN2
M R
K D
A T
E R
E V
I S
IO
N D
E S
C R
IP
T
IO
N
1" = 1'-0"S-501
DETAIL - UTILITY TIE TO BLDG3
3/4" = 1'-0"S-501
DETAIL - TEMPARY SITE T-POST5
1" = 1'-0"S-501
DETAIL - CONDUIT SUPPORT TO BRICK VENEER4
G-004 G-004 G-004
MS401 MS401
7/26/2024
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
C O
L L E
G E
V
IR
G
IN
IA
W
E S
T E
R N C
O M
M U
N
O J E
C T C
O D
E -1
-0
M E
C H
A N
IC
A L S
Y S
T E
M S
R E
P A
IR
/R
E P
L A
C E M
A J
R O
A N
O K
E
V A
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
X \2
V
W C
C R e p la c e M e c h S y s t\
C A
D \X re fs \2
A
B o rd e r.
d w g
N a ti o n w id e D ri v e L y n c h b u rg
V A
.9
.1 w il e y w il s o n .c o m
E m p lo y e e -O w n e d
ALE MJG
MJG
SUPPLY DUCT SECTION
SUPPLY GRILLE OR REGISTER
12x6
REGISTER
RETURN OR EXHAUST GRILLE OR
4-WAY BLOW (UON)
WITH ROUND NECK
SQUARE CEILING DIFFUSER
MANUAL BALANCING DAMPER
MOTORIZED DAMPER
TURNING VANES
ELBOW WITH MULTIPLE
RECTANGULAR / FLAT OVAL
(SUPPLY DUCT SHOWN)
ELBOW TURNING DOWN
(SUPPLY DUCT SHOWN)
ELBOW TURNING UP
DN
IN DIRECTION OF ARROW
DUCT SLOPES DOWNWARD
FLEXIBLE DUCT
ROUND DUCT TURNING UP
ROUND DUCT TURNING DOWN
AIR GRILLE
RETURN OR EXHAUST
AIR DUCT SECTION
RETURN OR OUTSIDE
ROUND ELBOW
RD
SQ
ROUND TO SQUARE TRANSITION
DUCT TRANSITION
SQUARE/RECTANGULAR
45 DEGREE ENTRY
BRANCH TAKE-OFF WITH
TEMPERATURE SENSORT
FIRST DIMENSION IS SIDE SHOWN
RECTANGULAR DUCT SIZE, INCHES,
NO. ROOM NUMBER
LEGEND:
CWR
CWS
D
HWR
HWS
HEATING WATER RETURN
DRAIN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DOMESTIC COLD WATER
PLUG VALVE
CHECK VALVE
STRAINER
DIRECTION OF FLOW IN PIPING
BUTTERFLY VALVE
BALL VALVE
PIPE TURNING UP
PIPE TURNING DOWN
CONCENTRIC REDUCER
RELIEF VALVE
PIPE UNION
THERMOMETER
FLEXIBLE CONNECTION
PI
OF ARROW
SLOPE PIPE DOWN IN DIRECTION
CHECK VALVE
SPRING LOADED SILENT
CAPPED PIPE
BOTTOM OF PIPE
PIPE TURNING DOWN FROM
ON 45 DEGREES
PIPE TURNING DOWN
CONDENSATE DRAIN TRAP
HEATING WATER SUPPLY
ASSEMBLY
PRESSURE GAUGE
CAPPED DUCT
ROUND DUCT CONICAL TEE
FIELD MOUNTED DEVICE
SOFTWARE FUNCTION
ELECTRIC OR ELECTRONIC SIGNAL
DAMPER OPERATOR
2 WAY CONTROL VALVE
MOTORM
PANEL UNLESS OTHERWISE NOTED
MOUNTED IN TEMPERATURE CONTROL
HARDWARE LOGIC FUNCTION OR DEVICE
ACCESSIBLE TO OPERATOR
ABBREVIATIONS:
S
ROUND DUCT SIZE, INCHES
UP
IN DIRECTION OF ARROW
DUCT SLOPES UPWARD
GENERAL NOTES:
ACCESSIBLE AND SERVICEABLE, INCLUDING ACCESS DOORS IF REQUIRED.
SO THAT ALL FILTERS, VALVES, MOTORS, DAMPERS, ETC., ARE COMPLETELY
ALL MECHANICAL EQUIPMENT MUST BE INSTALLED IN SUCH A MANNER
DIRECTION OF 30 DEGREES OR GREATER.
PROVIDE AIR TURNING DEVICES IN DUCTWORK AT ANY CHANGES IN
1.
CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS,
INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN 2.
3.
CONFLICTS.
TRADES. MINOR DEVIATIONS FROM THE PLANS MAY BE MADE TO AVOID
COORDINATE THE INSTALLATION OF WORK WITH THE WORK OF OTHER
4.
5.
6.
7.
8.
9.
PIPING AND DUCTWORK. DO NOT PENETRATE STRUCTURAL MEMBERS.
PROVIDE OPENINGS IN BUILDING CONSTRUCTION FOR PASSAGE OF
BEING MAINTAINED.
LOWERED WITH THE REQUIRED FREE AREA AND EXISTING CEILING HEIGHTS
THE DUCTS MUST BE TRANSFORMED, DIVIDED, OFFSET, RAISED OR
OR NOT SAME IS INDICATED. WHERE NECESSARY TO AVOID OBSTRUCTIONS,
OF THE BUILDING OR THE WORK OF OTHER CONTRACTORS, WHETHER
CONTRACTOR FOR BEAMS, COLUMNS, OR OTHER OBSTRUCTIONS
ALL NECESSARY ALLOWANCES AND PROVISIONS MUST BE MADE BY THIS
10.
11.
12.
INTERNAL CLEAR DIMENSIONS.
ALL DUCTWORKS DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE
13.
MECHANICAL CONTRACTOR.
OTHERWISE NOTED) MUST BE FURNISHED AND INSTALLED BY THE
AND IS SHOWN IN DETAILS FOR PIPING, DUCTS, AND EQUIPMENT (UNLESS
ALL MISCELLANEOUS MATERIAL REQUIRED TO ENSURE PROPER INSTALLATION
MANNER WHICH MINIMIZES NOISE AND VIBRATION.
ALL MECHANICAL EQUIPMENT AND SYSTEMS MUST BE INSTALLED IN A
15.
AND SHEET METAL DUCTWORK.
PROVIDE FLEXIBLE CONNECTIONS BETWEEN HVAC EQUIPMENT
AND APPROXIMATE LOCATION OF EQUIPMENT, PIPING AND DUCTWORK.
THESE DRAWINGS ARE SCHEMATIC IN NATURE AND INDICATE THE GENERAL
WITH ELECTRICAL TO AVOID CONFLICTS.
COORDINATE MECHANICAL EQUIPMENT AND MATERIAL LOCATIONS
IN THE DIRECTION OF FLOW. PROVIDE DRAINAGE TYPE FITTINGS.
SLOPE CONDENSATE DRAINS AT 1/8 INCH FALL PER FOOT MINIMUM
14.
EXHAUST AIR DUCT SECTION
OVAL DUCT TURNING UP
OVAL DUCT TURNING DOWN
RD
FO
ROUND TO FLAT OVAL TRANSITION
FLAT OVAL DUCT TRANSITION
FLAT OVAL DUCT CONICAL TEE
FIRST DIMENSION IS SIDE SHOWN
FLAT OVAL DUCT SIZE, INCHES,
12x6
TI
MW MAKEUP WATER
PIPE FLANGE
CDR CONDENSER WATER RETURN
CDS CONDENSER WATER SUPPLY
LIMITS OF DEMOLITION
NEW TO EXISTING CONNECTION
NEW TO EXISTING CONNECTION
GLY GLYCOL
DOMESTIC HOT WATER
1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
GENERAL NOTES
ABBREVIATIONS AND
MECHANICAL LEGEND,
M-001
AAV AUTOMATIC AIR VENT
ABAN ABANDONED
ABV ABOVE
AC AIR HANDLING UNIT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AI ANALOG INPUT
AND LOGIC "AND" OUTPUT IS
HIGH IF ALL INPUTS ARE HIGH
AO ANALOG OUTPUT
ARCH ARCHITECTURAL
BAS BUILDING AUTOMATION SYSTEM
BCP BOILER CIRCULATING PUMP
BEL BELOW
BOD BOTTOM OF DUCT
BTUH BRITISH THERMAL UNIT PER HOUR
CHEM CHEMICAL
CD CEILING DIFFUSER
CDP CONDENSER WATER PUMP
CDR CONDENSER WATER RETURN
CDS CONDENSER WATER SUPPLY
CFM CUBIC FEET PER MINUTE
CH CHILLER
CL CENTERLINE
CLG CEILING
CO2 CARBON DIOXIDE
CO CLEANOUT
CONC CONCRETE
COND CONDENSATE
CONT CONTINUATION
CP CONTROL PANEL
CW DOMESTIC COLD WATER
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
D AIR CONDITIONER DRAIN
DB DRY BULB
DDC DIRECT DIGITAL CONTROL
DEG DEGREE
DI DIGITAL INPUT
DIAMETER
DN DOWN
DO DIGITAL OUTPUT
DPI DIFFERENTIAL PRESSURE INDICATOR
DPS DIFFERENTIAL PRESSURE SWITCH
DPSH DIFFERENTIAL PRESSURE SWITCH HIGH
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DWG DRAWING(S)
DWH DOMESTIC WATER HEATER
(E) EXISTING
EA EACH, EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
EL ELEVATION
ELEV ELEVATOR
EMER EMERGENCY
ESP EXTERNAL STATIC PRESSURE
EW EACH WAY
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
F FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FE FLOW ELEMENT
FIT FLOW INDICATING TRANSMITTER
FL FLOOR
FO FAIL OPEN
FPM FEET PER MINUTE
FR FROM
FS FLOW SWITCH
FT FOOT / FEET
GALV GALVANIZED
H20 WATER
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HS HAND SWITCH
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
IN INCHES
IS CURRENT SWITCH
JS POWER SWITCH (MOTOR STARTER)
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LWT LEAVING WATER TEMPERATURE
MAG MAGNETIC FLOW METER
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH THOUSAND BRITISH THERMAL UNIT PER HOUR
MIN MINIMUM
MT HUMIDITY TRANSMITTER
MW MAKEUP WATER
NC NORMALLY CLOSED
NO NUMBER / NORMALLY OPEN
NOR LOGIC "NOR" (NOT OR) OUTPUT IS HIGH IF AND
ONLY IF ALL OUTPUTS ARE LOW
NOT LOGIC "NOT"
NS SMOKE DETECTOR
OA OUTSIDE AIR
OC ON CENTER
PD PRESSURE DROP
PDI PRESSURE DIFFERENTIAL INDICATOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
PSIG POUNDS PER SQUARE INCH GAUGE
RA RETURN AIR
REFRIG REFRIGERANT
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
SAN SANITARY
SCBA SELF-CONTAINED BREATHING APPARATUS
SCWP SECONDARY CHILLED WATER PUMP
SPSH STATIC PRESSURE SWITCH HIGH
SPT STATIC PRESSURE TRANSMITTER
SQ FT SQUARE FOOT
TEMP TEMPERATURE
TSL TEMPERATURE SWITCH LOW (FREEZESTAT)
TS TEMPERATURE SENSOR
T'STAT THERMOSTAT
TT TEMPERATURE TRANSMITTER
TYP TYPICAL
UG UNDERGROUND
UON UNLESS OTHERWISE NOTED
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
W/ WITH
WB WET BULB
WC WATER COLUMN
XFMR TRANSFORMER
XY RELAY
ZS POSITION SWITCH
DIAMETER
ΔP DIFFERENTIAL PRESSURE
@ AT
BUILDING AUTOMATION SYSTEM:
REQUIREMENTS WITH BAC CONTROL SYSTEMS.
ROAD STE. C. MECHANICSVILLE, VA (804) 569-2473. COORDINATE CONTROLS
MUST BE PROVIDED BY BAS CONTROL SYSTEMS 8420 MEADOW BRIDGE
THE BUILDING AUTOMATION SYSTEM AND DIRECT DIGITAL CONTROLS
AFIT AIR FLOW INDICATING TRANSMITTER
SA SOUND ATTENUATOR / SUPPLY AIR
F
FIRE DAMPER AND ACCESS DOOR
DEMOLITION NOTE
NEW WORK NOTE
2 WAY CONTROL VALVE
CO2
1 INTERLOCK
CARBON DIOXIDE SENSOR
HW
HWP
DOMESTIC HOT WATER
HEATING WATER PUMP
GPM GALLONS PER MINUTE
FC FAIL CLOSED
ET EXPANSION TANK
CWP CHILLED WATER PUMP
AFE AIR FLOW ELEMENT
PI PRESSURE INDICATING
PSI POUNDS PER SQUARE INCH
RD ROOD DRAIN
SG SUPPLY GRILLE
TI TEMPERATURE INDICATING (THERMOMETER)
VS VIBRATION SWITCH
ΔT DIFFERENTIAL TEMPERATURE
F/S
AND ACCESS DOOR
COMBINATION FIRE / SMOKE DAMPER
PER SPECIFICATION SECTION 078413 PENETRATION FIRESTOPPING.
PROVIDE FIRE STOPPING AND UL RATINGS FOR PIPING AND CONDUITS
TS TEST STATION
SPSL STATIC PRESSURE SWITCH LOW
SD SMOKE DETECTOR
AC-C11
VALVE PIT
8" STORM
4" SAN
FD
XFMR
CDP-1
CDP-2
CHILLER-1
FISHBURN
CWP-A
ANDERSON
CWP-B
CWP-C BROWN
BOILER 1
BOILER 2 FCO
FD
FD
FD
FD
TANK
REFRIG
TANK
GLYCOL
DF
WH-2
WH-1
CHILLER-2
FD
FCO
FD
FCO
CWP-1
CWP-2
HWP-B
HWP-A
HWP-C2
HWP-C1
FCO
FD
3/4" CHEM FEED
3/4" CHEM FEED
C D
S
C W
S
8"
CDR
C D
S
PUMPS
FEED
CHEM
REFRIG MONITOR
AIR SAMPLING POINT
REFRIG MONITOR
AIR SAMPLING POINT
AIR
COMP
CWS
3"
CWR
3"
CWS
CWR
4"
4"
CWS
8"
C D
S
ELECTRICAL
PANEL
DIRECT DIGITAL
CONTROL PANELS
SCBA
SCBA
C D
R
C D
R C
W R
CHR
6"
C W
S
4"
C W
S
B R
O W
N
A N
D E
R S
O N
F
IS
H B
U R
N
5"
" 4
C W
S
CHR
6"
C W
R
C W
R
C W
S
C W
S
CWS
CWS
4"
5"
GLY
1"
1" UP TO
EXP TANK
(TYP 2 PLCS)
A N
D E
R S
O N
F
IS
H B
U R
N
C W
R
C W
R
"4
CDR
8"
1"
C W
R
A N
D E
R S
O N
F
IS
H B
U R
N
REFRIGERANT
MONITOR
ROOM
MECH
OPEN OFFICE
REFRIG MONITOR
AIR SAMPLING POINT
MCCC1DP CA
TO COOLING
TOWER
FROM
COOLING
TOWER
REFRIG MONITOR
WARNING LIGHT
REFRIG MONITOR
AIR SAMPLING POINT
EMER EYEWASH
CONTROL
PANEL
JAN/TELE
11D
3" SAN UP/DN
CONTINUATION
SEE DWG MD105 FOR
SECOND FLOOR
3" CWS / CWR UP TO 2
TANKS AT CEILING
EXPANSION
REMOVE
(TYP OF 3)
ABANDONED TO REMAIN
ABANDONED TO REMAIN
1 2 3
C
B
A.3
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
C O
L L E
G E
V
IR
G
IN
IA
W
E S
T E
R N C
O M
M U
N
O J E
C T C
O D
E -1
-0
M E
C H
A N
IC
A L S
Y S
T E
M S
R E
P A
IR
/R
E P
L A
C E M
A J
R O
A N
O K
E
V A
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
X \2
V
W C
C R e p la c e M e c h S y s t\
C A
D \X re fs \2
A
B o rd e r.
d w g
N a ti o n w id e D ri v e L y n c h b u rg
V A
.9
.1 w il e y w il s o n .c o m
E m p lo y e e -O w n e d
SCALE:1/4" = 1'-0"
NORTH
PLAN
BROWN LIBRARY MECHANICAL ROOM CHILLED WATER PIPING PLAN - DEMOLITION
8'4'2'0'
SCALE: 1/4"=1'-0"
GRAPHIC SCALE MUST BE USED.
IF THIS DRAWING IS REDUCED,
MD101
JPH MJG
MJG
SEE DRAWING MD104 FOR CONTINUATION
:GENERAL NOTES
:DEMOLITION NOTES
KEY PLAN
NORTH
PLAN
NO SCALE
DDC PANELS.
REMOVE START / STOP AND STATUS CONTROL WIRING AND CONDUITS TO
REMOVE CHILLED WATER PUMP, PIPING, VALVING AND CONCRETE PAD.
10,000 PSI COMPRESSIVE STRENGTH PER ASTM C109 AT 28 DAYS.
FEATHEREDGE TO 4-INCH, FAST SETTING, SHRINKAGE COMPENSATED AND
CEMENT-BASED, MULTI-PURPOSE REPAIR MATERIAL SUITABLE FOR
REPAIR/PATCH CONCRETE SLAB UPON REMOVAL OF CONCRETE PAD WITH
2 INFILL UNUSED OPENINGS IN 8-INCH MASONRY WALL, SEE NEW WORK DRAWINGS.
PLAN - DEMOLITION
CHILLED WATER PIPING
MECHANICAL ROOM
BROWN LIBRARY
1 HR FIRE RATED BARRIER
LEGEND
3.
IMMEDIATELY UPON REMOVAL OF PIPE.
FIRE STOP ALL PIPE OPENINGS IN 1 HOUR FIRE RATED BARRIER
1. PROVIDE CHILLED WATER SYSTEM DEMOLITION PER CHILLED WATER SYSTEM
DIAGRAM ON DEMOLITION DRAWING MD702.
2. DRAIN AND FLUSH ETHYLENE GLYCOL FROM CHILLED WATER SYSTEM.
PIV
Chiseled Square
1110.66'
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
C O
L L E
G E
V
IR
G
IN
IA
W
E S
T E
R N C
O M
M U
N
O J E
C T C
O D
E -1
-0
M E
C H
A N
IC
A L S
Y S
T E
M S
R E
P A
IR
/R
E P
L A
C E M
A J
R O
A N
O K
E
V A
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
X \2
V
W C
C R e p la c e M e c h S y s t\
C A
D \X re fs \2
A
B o rd e r.
d w g
N a ti o n w id e D ri v e L y n c h b u rg
V A
.9
.1 w il e y w il s o n .c o m
E m p lo y e e -O w n e d
GRAPHIC SCALE MUST BE USED.
IF THIS DRAWING IS REDUCED,
MSD101
JPH MJG
DEMOLITION NOTES:
PLAN
NORTH
PARTIAL SITE PLAN - DEMOLITION
40'20'10'0'
SCALE: 1" = 20'
COOLING
TOWER
ADDITIVE BID ITM #2
PLAN - DEMOLITION
PARTIAL SITE
AT GRADE. COMPLY WITH VSFPC SECTION 5704.2.13. OBTAIN A PERMIT FOR THIS WORK FROM THE LOCAL AHJ.
BE DISCONNECTED AND CAPPED. ABOVE GRADE VENT AND FILL LINE MUST BE REMOVED AND CAPPED
CONTROL BOARD 9VAC 25-580-320. FUEL OIL SUPPLY AND RETURN, FUEL OIL FILL AND VENT LINES SHALL
8,000 GALLON NO. 2 FUEL OIL TANK AND FILL WITH INERT SOLID MATERIAL PER VIRGINIA STATE WATER
ADDITIVE BID ITEM #2: - PUMP OUT AND CLEAN LIQUIDS AND ACCUMULATED SLUDGE FROM ABANDONED
BROWN LIBRARY
FISHBURN HALL
SEE DWG MSD401 FOR
COOLING TOWER COLD
WATER BASIN REPLACEMENT
12' L X 6'W X 15'
DEEP WATER
VAULT
UG FUEL OIL TANK 1
1 2 3
C
B
A.3
AC-C11
8" STORM
4" SAN
FD
XFMR
CDP-1
CDP-2
CHILLER-1
CWP-A
CWP-B
CWP-C
FCO
FD
FD
FD
FD
TANK
REFRIG
WH-1
CHILLER-2
FD
FCO
FD
FCO
CWP-1
CWP-2
ANDERSON
HWP-B
FISHBURN
HWP-A
BROWN
HWP-C2
HWP-C1
BROWN
BASEBOARD
FCO
FD
PUMPS
FEED
CHEM
AIR
COMP
ELECRICAL
PANEL
3/4" HWS/R UP
TO BASEBOARD 3/4" HWS/R UP
TO BASEBOARD
H W
R
3-WAY CONTROL
VALVE IN VERT
DN
H W
SHWS
2"
CUH-1
1-1/4"
B -1 P
-0
G
G
G
D 4"
3/4"
3/4" CW DN
3/4" CW UP
3/4" CW UP
D 2"
M W
-1 /2
M W
/4
C W
CW
1-1/2"
C W
-1 /2
1/2" CW MAKEUP
DN TO CWR
REMOVE 36"Ø, 371 GALLON
COMPRESSION TANK
AT CEILING (TYP OF 2)
1-1/2"
/4
JAN/TELE
11D
OPEN OFFICE
ROOM
MECH
EMER
EYEWASH
SINK
3/4" HW UP
G
OVERFLOW DRAIN
4" COOLING TOWER
1-1/2" MW TO
COOLING TOWER
3" CW
HWS
4"
HWR
4"
HWS
5"
HWR
2"
HB
FLUE
D N
H W
R
H W
R
H W
R
H W
S
4"5"
2"
G 3/4"
/4
CW
3"
H W
S
H W
R H
W R
F
IS
H B
U R
N
H W
S
A N
D E
R S
O N
H W
R
A N
D E
R S
O N
F
IS
H B
U R
N
HWS
H W
R
H W
S
HWR
1-1/4"
HWS
1-1/4" BROWN
HWS
2" 2"
3" CW
(ABAN)
4" CW
UTILITY YARD
5" GAS FROM
UTILITY YARD
2" GAS FROM
BOILER 1
2-1/2"
HWR
1-1/4"
RPZ
B A
S E
B O
A R
D
2"
MCCC1DP CA
CAP
(E /4
HWS
(E) 3/4"
WH-2
6" PVC AIR
INTAKE
BASEBOARD
FIRST FLOOR
GROUND AND
VAV BOXES
GROUND FLOOR
BASEBOARD
2"
VAV BOXES
2" HWS / R UP TO
UP TO ROOF (TYP OF 2)
14" DIA BOILER VENT
UP TO ROOF
HEATER VENT
10" DIA WATER
BASEBOARD
AND HWR UP
1 1/4" HWS
1 1/4"
IN PLACE
ABANDONED
(TYP)
DRINKING FOUNTAIN
TO REMAIN (TYP OF 2)
BOILER CONCRETE PAD
BOILER B-2
TO REMAIN
BCP-2 TO REMAIN
PUMP BOILER
REMAIN
3" HWS TO
REMAIN
3" G TO
TANK TO REMAIN
NEUTRALIZATION
BACK WATER
VALVE PIT
ABANDONED TO REMAIN
ABANDONED TO REMAIN
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
C O
L L E
G E
V
IR
G
IN
IA
W
E S
T E
R N C
O M
M U
N
O J E
C T C
O D
E -1
-0
M E
C H
A N
IC
A L S
Y S
T E
M S
R E
P A
IR
/R
E P
L A
C E M
A J
R O
A N
O K
E
V A
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
X \2
V
W C
C R e p la c e M e c h S y s t\
C A
D \X re fs \2
A
B o rd e r.
d w g
N a ti o n w id e D ri v e L y n c h b u rg
V A
.9
.1 w il e y w il s o n .c o m
E m p lo y e e -O w n e d
SCALE:1/4" = 1'-0"
NORTH
PLAN
BROWN LIBRARY MECHANICAL ROOM HEATING WATER PIPING PLAN - DEMOLITION
8'4'2'0'
SCALE: 1/4"=1'-0"
GRAPHIC SCALE MUST BE USED.
IF THIS DRAWING IS REDUCED,
MD102
SEE DRAWING MD104 FOR CONTINUATION
1. PROVIDE DEMOLITION PER BROWN LIBRARY MECHANICAL ROOM HEATING
WATER SYSTEM DEMOLITION FLOW DIAGRAM ON DRAWING MD701.
:GENERAL NOTES
:DEMOLITION NOTES
KEY PLAN
NORTH
PLAN
NO SCALE
PLAN - DEMOLITION
HEATING WATER PIPING
MECHANICAL ROOM
BROWN LIBRARY
AND 10,000 PSI COMPRESSIVE STRENGTH PER ASTM C109 AT 28 DAYS.
FEATHEREDGE TO 4-INCH, FAST SETTING, SHRINKAGE COMPENSATED
CEMENT-BASED, MULTI-PURPOSE REPAIR MATERIAL SUITABLE FOR
REPAIR/PATCH CONCRETE SLAB UPON REMOVAL OF CONCRETE PAD WITH2.
INFILL UNUSED OPENINGS IN 8-INCH MASONRY WALL, SEE NEW WORK PLANS.
1 HR FIRE RATED BARRIER
LEGEND
REMOVE HEATING WATER PUMP, CONCRETE PAD, PIPING AND
VALVING. REMOVE CONTROL WIRING AND CONDUITS TO DDC PANELS.
GAS TRAIN AND CONTROLS. CONCRETE PAD SHALL REMAIN.
CIRCULATING PUMP, HEATING WATER PIPING AND VALVING, GAS PIPING,
REMOVE GAS FIRED BOILER, FLUE VENT, AIR INTAKE PIPE THROUGH ROOF,
3.
IMMEDIATELY UPON REMOVAL OF PIPE.
FIRE STOP ALL PIPE OPENINGS IN 1 HOUR FIRE RATED BARRIER
ELBOW SHALL REMAIN, SEE NEW WORK DWG M-101 FOR CONTINUATION.
REMOVE HEATING WATER PIPING TO VERTICAL. VERTICAL PIPING ABOVE
S S
S
1 2 3
4 5 6
A
B
CC
B
A.3
MCCC1DP CA
11B
11D
10A
10B
10C
STORAGE
ELEV MACH ROOM
T
36X12
24X10
10X10 10X10
X
X
X
H W
R H
W S
/4
/4
H W
R H
W S
/4
/4
H W
R H
W S
/4
/4
X
X
X
28X10
HWR
HWS
1/2"
/2
X E
X H
F
6"Ø HOLE IN
BOTTOM OF DUCT
T
T
XFMR
CDP-1
CDP-2
CHILLER-1
CWP-A
CWP-B
CWP-C
FCO
FD
TANK
REFRIG
PUMPS
FEED
CHEM
HUM-C11
U P
X E
A
B O
D
A F F
X E
A
B O
D
A F F
30X6
CAPPED
16X6
F
24X12 SG
45° DN
24X12 SG
45° UP
X O
A
100X28 OA
FR ABV
40X30 RA
FR ABV
28X14 RA
FR ABV
48X24 SA-C11 UP
76X30 OPEN ENDED RA
DUCT ABOVE CEILING
102X16 RA
DN TO AC-C11
F
TOILET EXHF-C1
6X24 EA
DDC
TT
DDC
102X64 INTAKE
LOUVER
32X8 RA
(CAPPED)
72X16 RA
DN TO AC-C11
76X12 MOTORIZED
RETURN DAMPER
MECH ROOM
CLASSROOM
T
BREAK ROOM
VAV-G4
VAV-G5
VAV-G1
2"
HWS
2"
HWR
2"
24X24 RG W/
24X8 RETURN
AIR BOOT
(TYP OF 4)
EXHAUST FAN
CONTROL PANELS
VAV BOX
ABANDONED
RETURN FAN FC-3
RETURN
FAN F1
6X4 EA
FR ABV
BOILER 1
BOILER 2
AC-C11
S T
M
SA-C10
42X24 SA
26X14
28X1
D
UP
(ABANDONED)
32X8 RA
X
R A
D N
AIR
COMP
48X22
28X12
(ABANDONED)
20X12 RA
54X24 RA
X R
A
BOX
VAV
H W
R
C W
S
C W
S
H W
S
C W
R
C W
R
H W
R
H W
R
H W
S
REFRIGERANT
MONITOR
CORRIDOR
VAV-G6
76X24 PLENUM
24X2424X24
AIR FAN
FRESH
X
16X6
MD103
46X24 EXHAUST LOUVER
TESTING
DAMPER
CONTROL
REMOVE
DCW
SA
90X24
STORAGE
STORAGE
SEE DWGS MD-101
MD-102 FOR CONT
REMOVE SHEET METAL COVER
4'-0" LD
RETURN
VERTICAL
CAP IN
DRAWN:
CHECK:
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
C O
L L E
G E
V
IR
G
IN
IA
W
E S
T E
R N C
O M
M U
N
O J E
C T C
O D
E -1
-0
M E
C H
A N
IC
A L S
Y S
T E
M S
R E
P A
IR
/R
E P
L A
C E M
A J
R O
A N
O K
E
V A
M R
K D
A T
E R
E V
IS
IO
N D
E S
C R
IP
T
IO
N
X \2
V
W C
C R e p la c e M e c h S y s t\
C A
D \X re fs \2
A
B o rd e r.
d w g
N a ti o n w id e D ri v e L y n c h b u rg
V A
.9
.1 w il e y w il s o n .c o m
E m p lo y e e -O w n e d
16X102 RA
8X32 RA
(CAPPED)
X
X
8X32 RA (ABANDONED)
CORRIDOR
AC-C11
36X14 RA
AIR
COMP
CHILLER 2
4"
-1 /2
-1 /2
4"
CWS4"
CWR
4"
HWS
4"
HWR
2" HWS TO
FISHBURN
3" HWS TO
ANDERSON
MECH ROOM FIN FL
GR FL
FIRST FL
SCBA
24X52 RA
102X64 FA LOUVER
76X24 PLENUM
24X42 SA
24X90 SA
F1
FRESH
AIR FAN
HWP-A
30X76 RETURN
12X76
24X48 SA
30X40 RA
RETURN FAN FC-3
(ABANDONED)
12X20 RA (ABANDONED)1
X R
A
A B
A N
D O
N E
D
F
WH-2 WH-1
CAP DUCT
DUCT IN VERTICAL AND SECOND FLOOR
ABANDONED 14X28 RA TO REMAIN, CAP
TO REMAIN
24X48 SA DUCT
REMAIN
30X40 RA TO
GRAPHIC SCALE MUST BE USED.
IF THIS DRAWING IS REDUCED,
MD103
JPH MJG
MJG
SECTION
SCALE: 1/4" = 1'-0"
MD103
MATCHLINE - SEE DRAWING MD104 FOR CONTINUATION
:DEMOLITION NOTES
PLAN - DEMOLITION
FLOOR HVAC
PARTIAL GROUND
BROWN LIBRARY
1.
:GENERAL NOTES
AND 10,000 PSI COMPRESSIVE STRENGTH PER ASTM C109 AT 28 DAYS.
FEATHEREDGE TO 4-INCH, FAST SETTING, SHRINKAGE COMPENSATED
CEMENT-BASED, MULTI-PURPOSE REPAIR MATERIAL SUITABLE FOR
REPAIR/PATCH CONCRETE SLAB UPON REMOVAL CONCRETE PAD WITH
REMOVE 17,000 CFM AIR HANDLING UNIT WITH 25 HP MOTOR AND CHILLED
WATER COIL. REMOVE ASSOCIATED CONCRETE PAD, DUCTWORK, PIPING AND
CONTROLS. TURN OVER VFD TO OWNER. AC-C11 SERVES GROUND AND FIRST
FLOORS.
REMOVE ELECTRIC CANISTER STEAM HUMIDIFIER AND ASSOCIATED PIPING
AND CONTROLS. REMOVE 3/4" DOMESTIC COLD WATER BACK TO MAIN AND
CAP. NORTEC MODEL NNB050.
ADDITIVE BID ITEM #1: - REMOVE DUPLEX CONTROLS AIR COMPRESSOR AND ASSOCIATED
CONCRETE PAD AND PNEUMATIC TUBING.
REMOVE REFRIGERATED AIR DRYER AND ASSOCIATED WALL SUPPORTS,
PNEUMATIC TUBING, PRESSURE REGULATOR AND FILTERS.
REMOVE PNEUMATIC/ELECTRIC CONTROL PANELS AND ASSOCIATED WIRING,
CONDUITS AND PNEUMATIC TUBING.
REMOVE RETURN FAN WITH 1-1/2 HP MOTOR AND ASSOCIATED CONTROLS.
GREENHECK MODEL BSQ-24-15.
REMOVE ABANDONED 3500 CFM RETURN FAN WITH 1 HP MOTOR.
REMOVE SUPPLY FAN WITH 1-1/2 HP MOTOR AND CONTROLS FROM
REFRIGERANT MONITOR. GREENHECK MODEL BSQ-160.
1 HR FIRE RATED BARRIER
LEGEND
10 INFILL UNUSED 8-INCH MASONRY WALL. SEE NEW WORK PLANS.
2.
IMMEDIATELY UPON REMOVAL OF PIPING AND DUCTWORK.
FIRE STOP ALL PIPE AND DUCT OPENINGS IN 1 HOUR FIRE RATED BARRIER
SCALE:1/4" = 1'-0"
NORTH
PLAN
BROWN LIBRARY PARTIAL GROUND FLOOR HVAC PLAN - DEMOLITION
8'4'2'0'
SCALE: 1/4"=1'-0"
KEY PLAN
NORTH
PLAN
NO SCALE
CONTROL DIAGRAM" ON M-705.
VAV BOX IS EXISTING TO REMAIN. SEE "VAV BOX WITH HEATING COIL
SHT. NO.
SHEET TITLE
REV. NO.
DESIGN:
DATE:
COMM NO:
123456
E
D
A
B
C
123456
C O
L L E
G E
V
IR
G
IN
IA
W
E S
T E
R N C
O M
M U
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .