VOY Falkner Park Restroom Building Request for Proposals-Final.pdf

PDF 465 KB Posted

Attached to
FALKNER PARK RESTROOM BUILDING
Solicitation number
2140442
Issued by
Niagara County, New York

About this file

Summary

This Request for Proposals (RFP) is issued by the Village of Youngstown Department of Public Works, acting through the Village Clerk's Office, for construction of a new ADA-compliant, wood-framed public restroom building with vinyl siding exterior at Falkner Park in Niagara County, New York. The project scope includes site preparation, excavation, concrete foundations, complete structural framing, roofing with TPO single-ply membrane, vinyl exterior cladding, fiberglass-reinforced plastic (FRP) interior wall panels in wet areas, plumbing systems with water service and sanitary sewer connections, complete electrical service with LED lighting and emergency systems, HVAC with electric unit heaters and exhaust ventilation, ADA-compliant fixtures and accessibility features, and all associated site improvements. A mandatory pre-proposal site visit is required on November 16, 2026. Written questions must be submitted by November 30, 2026 at 4:00 PM Eastern Time. Sealed proposals are due on January 13, 2027 at 3:00 PM and will be publicly opened on January 15, 2027. The Village anticipates issuing a Notice to Proceed by January 28, 2027, with a contract duration of six months from the start date. The contract will be awarded to the responsive and responsible proposer whose proposal is most advantageous to the Village, considering all evaluation criteria.

Proposals will be evaluated on a 100-point scale based on: Base Bid Price (50 points, with lowest price receiving maximum points), Qualifications and Experience (20 points), Project Team Qualifications (15 points), Project Schedule (10 points), and Safety Record (5 points). Minimum qualifications for eligibility include five consecutive years of general contracting experience in New York State, completion of at least three comparable wood-frame commercial or institutional projects within the past seven years, a valid New York State contractor's license, an OSHA Experience Modification Rate of 1.0 or lower, demonstrated financial capacity, and no debarment or prevailing wage violations. All work on the project is subject to New York State prevailing wage requirements, with certified payroll reports submitted bi-weekly. The contract will be executed using the AIA A101 Standard Form of Agreement as modified by Supplementary Conditions, with retainage of ten percent until fifty percent completion is achieved, then potentially reduced to five percent. No specific set-asides for minority or women-owned business enterprises are mandated, though proposers are encouraged to involve certified MBEs and WBEs as subcontractors and suppliers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VILLAGE OF YOUNGSTOWN

DEPARTMENT OF PUBLIC WORKS

REQUEST FOR PROPOSALS

FALKNER PARK RESTROOM BUILDING

File No.: 25-086-C

RFP Issue Date:

November 1, 2026

Proposal Due Date:

January 13, 2027

Contract Documents File:

25-086-C, dated November 3, 2025

OFFICIAL NOTICE:

This Request for Proposals is issued pursuant to New York State General

Municipal Law and the procurement policies of the Village of Youngstown. All proposals shall be submitted in accordance with the requirements set forth herein.

Failure to comply with all requirements may result in the rejection of a proposal as non-responsive.

Submit Proposals To:

Village of Youngstown

Village Hall, 240 Lockport Street

Youngstown, New York 14174

Attn: Village Clerk / Department of Public Works

This document and all associated Contract Documents are issued for solicitation purposes only.

Village of Youngstown | Niagara County, New York

REQUEST FOR PROPOSALS | File No. 25-086-C

TABLE OF CONTENTS

Section 1 – Introduction and Notice to Proposers 3

1.1 Issuing Authority | 1.2 Purpose | 1.3 Project Background | 1.4 Nature of Work

Section 2 – Contract Documents 4

2.1 Available Documents | 2.2 Document Availability | 2.3 Examination | 2.4 Addenda

Section 1 – Introduction and Notice to Proposers 3

Section 3 – Scope of Work 5

3.1 General Scope | 3.2 Specific Scope Elements (CSI Divisions) | 3.3 ADA Compliance | 3.4 Prevailing Wages

Section 4 – Proposal Requirements and Format 10

4.1 Required Proposal Contents | 4.2 Format Requirements | 4.3 Mandatory Site Visit | 4.4 Questions

Section 5 – Qualification Requirements 13

5.1 Minimum Qualifications | 5.2 Key Personnel | 5.3 Subcontractor Requirements

Section 6 – Evaluation Criteria and Selection 14

6.1 Evaluation Process | 6.2 Evaluation Criteria | 6.3 Responsive and Responsible Proposers | 6.4 Village Rights

Section 7 – Contract Award and Execution 16

7.1 Award | 7.2 Contract Form | 7.3 Notice to Proceed | 7.4 Duration | 7.5 Retainage | 7.6 Payment

Section 8 – General Terms and Conditions 17

8.1–8.10 Governing Law, Compliance, Equal Opportunity, MWBE, Conflicts, Confidentiality, Costs, Indemnification, Non-Collusion, Iran Divestment

Section 9 – RFP Schedule 19

Section 10 – Submission Address and Contact Information 20

Section 11 – Attachments and Exhibits 20

Village of Youngstown | Falkner Park Restroom Building RFP | File No. 25-086-C

SECTION 1 – INTRODUCTION AND NOTICE TO PROPOSERS

1.1 Issuing Authority

The Village of Youngstown, New York (hereinafter "the Village" or "Owner"), is soliciting competitive proposals from qualified, licensed general contractors for the construction of a new public restroom building at Falkner Park located within the Village of Youngstown, Niagara County, New York. This Request for Proposals (hereinafter "RFP") is issued pursuant to New York State General Municipal Law §103 and the Village's procurement policies. The

Village of Youngstown, acting through its Department of Public Works and Village Clerk, is the sole issuing authority for this RFP and all associated Contract Documents.

1.2 Purpose

The purpose of this RFP is to obtain competitive proposals from qualified contractors to construct a new ADA-compliant, wood-framed restroom building with vinyl siding exterior at Falkner Park. Architectural drawings and technical specifications have been prepared by the Village's Architect/Engineer of Record and are made available to qualified proposers as part of the Contract Documents (File No. 25-086-C, dated November 3, 2025). The Village intends to award a single lump-sum or unit-price contract for all construction work shown in the Contract Documents to the responsive and responsible Proposer whose proposal is most advantageous to the Village, taking into account all evaluation criteria set forth in

Section 6 of this RFP.

1.3 Project Background

Falkner Park is a public recreational park located within the Village of Youngstown serving residents and visitors to the Niagara River waterfront region. The Village has determined that the existing restroom facilities at Falkner Park are inadequate to serve the needs of current and projected park users. Following a review of facility conditions and an assessment of public needs, the Village has elected to construct a new, modern, ADA-compliant restroom building designed to serve park users in an accessible, durable, and sustainable manner consistent with the standards of a municipal public facility in New York State. Architectural drawings and technical specifications (File No. 25-086-C, dated November 3, 2025) have been prepared and are made available to qualified proposers as part of this RFP in accordance with Section 2 herein.

1.4 Nature of Work

The scope of work includes, but is not limited to, the following principal elements. Proposers are directed to review the complete Contract Documents for the full scope of all work required:

● All site preparation, excavation, and earthwork

● Concrete footings and slab-on-grade foundation

● Wood-frame wall and roof construction with structural sheathing and weather-resistive barrier

● Vinyl siding, soffit, and exterior trim

● 60-mil TPO single-ply membrane roofing with R-25 polyisocyanurate insulation

● FRP (Fiberglass-Reinforced Plastic) wall panels at all interior wet areas

● ADA-compliant hollow metal doors with remote access electronic locking system

(LTE cellular)

● Porcelain floor tile and ceramic wall tile finishes

● Complete plumbing — water service connection, sanitary sewer connection, water closets, urinals, lavatories, mop sink, frost-free hose bibbs, and water heater

● Complete electrical — 200-amp service, LED lighting, GFCI devices, exit/emergency lighting

● Electric wall unit heaters and exhaust ventilation in each restroom space

● ADA-accessible site improvements, concrete sidewalks, and lawn restoration

● All work shown on Contract Documents File No. 25-086-C

SECTION 2 – CONTRACT DOCUMENTS

2.1 Available Documents

The following Contract Documents are made available to registered proposers as part of this solicitation:

1. Architectural Drawings, File No. 25-086-C, dated November 3, 2025

2. Project Specifications Manual, File No. 25-086-C

3. Bid Form and Unit Price Schedule

4. Unit Price Alternates Form

5. Bidder Acknowledgments and Certifications

6. This Request for Proposals and all issued Addenda

All documents listed above, together with any Addenda issued by the Village pursuant to

Section 2.4, constitute the Contract Documents for this project. Proposers are responsible for obtaining, reviewing, and understanding all Contract Documents prior to submission of a Proposal.

2.2 Document Availability

Contract Documents may be obtained from the Village of Youngstown Village Hall, 240

Lockport Street, Youngstown, NY 14174, during normal business hours (Monday through

Thursday, 9:00 AM to 4:00 PM and Friday 9:00 AM to 3:30 PM), or by contacting the Village

Clerk's Office. Documents may be provided in electronic PDF format upon written request submitted via email to the Village Clerk. The Village reserves the right to limit distribution of

Contract Documents to bona fide, qualified contractors engaged in public construction in

New York State.

2.3 Examination of Documents

Proposers are expected to carefully examine all Contract Documents, the project site, and all local conditions that may affect the cost, progress, or performance of the Work prior to submitting a Proposal. Proposers shall attend the mandatory pre-proposal site visit as set forth in Section 4.3 of this RFP. Submission of a Proposal constitutes an unequivocal acknowledgment by the Proposer that it has examined all Contract Documents and the project site, is fully familiar with all conditions to be encountered in performing the Work, and is satisfied as to all conditions that may affect the Work, including but not limited to, access, existing utilities, subsurface conditions, climate, and all applicable laws and regulations. No claim for additional compensation will be considered which is based upon alleged ignorance of site conditions, local conditions, or the requirements of the Contract

Documents.

2.4 Addenda

The Village reserves the right to issue written Addenda to modify, supplement, or clarify the

Contract Documents at any time prior to the Proposal Due Date. All Addenda will be distributed by the Village to all registered plan holders of record by email or postal mail. Only the Village's official written Addenda constitute authorized modifications to this RFP; oral statements or representations made by Village staff or officials do not constitute modifications and shall not be relied upon by Proposers. Each Proposer shall acknowledge receipt of all Addenda on the Bid Form (Exhibit C). A Proposal that fails to acknowledge receipt of all issued Addenda may be deemed non-responsive. The Village encourages

Proposers to confirm with the Village Clerk's Office that they are registered as plan holders prior to the Proposal Due Date to ensure receipt of all Addenda.

SECTION 3 – SCOPE OF WORK

3.1 General Scope

The Contractor shall furnish all labor, materials, equipment, tools, supervision, insurance, permits (as specified), bonds, and all other incidentals required to fully complete the Falkner

Park Restroom Building in strict accordance with the Contract Documents, File No. 25-086-

C. The Contractor shall coordinate all work, including all work performed by subcontractors and sub-subcontractors, and shall be solely responsible for construction means, methods, techniques, sequences, procedures, and safety programs and precautions during construction. The Contractor shall be responsible for the acts and omissions of all subcontractors and persons directly or indirectly employed by them. All work shall be performed in a first-class, workmanlike manner using new materials of the quality and type specified in the Contract Documents.

3.2 Specific Scope Elements — Organized by CSI Division

The following scope elements are representative of the principal work required. Proposers are directed to the full Contract Documents (File No. 25-086-C) for complete scope, materials, methods, and quality requirements. The following listing does not relieve the

Contractor of responsibility for furnishing all work shown on the drawings or required by the specifications.

Site and Civil Work (Divisions 01, 02, 31, 32, 33)

● Mobilization and demobilization; establishment and maintenance of temporary facilities, construction site fencing, hoarding, and security throughout the project duration

● Site clearing and grubbing; protection of existing trees, plantings, and park infrastructure from construction damage

● Demolition of any existing site structures, slabs, or improvements as identified in the Contract Documents

● Excavation for footings and foundations to a minimum depth of 48 inches below finished grade in compliance with NYS frost depth requirements for Niagara County

● Structural fill, granular backfill, and compaction to 95% Standard Proctor density beneath all slabs and in all utility trenches

● Subgrade preparation and proof-rolling to confirm adequate bearing capacity prior to concrete placement

● Water service connection to the existing Village water main; meter pit installation;

curb stop; backflow preventer per Village standards

● Sanitary sewer service connection to the existing Village sanitary sewer main; SDR

35 PVC gravity sewer pipe; cleanouts at all required intervals per NYS Plumbing

Code

● Storm drainage connections for all roof drains as shown on Contract Documents

● Erosion and sediment controls installed and maintained in full compliance with NYS

DEC requirements; preparation and maintenance of a Stormwater Pollution

Prevention Plan (SWPPP) throughout construction

● ADA-accessible concrete sidewalks and entry approach pads; detectable warning surfaces (truncated dome pattern) at all curb ramps and grade transitions

● Final site grading, lawn restoration: finish grading, 4-inch minimum topsoil, seeding, and maintenance until vegetative cover is established to the satisfaction of the

Village

Concrete and Foundations (Division 03)

● Continuous reinforced concrete perimeter footings: 4,000 psi minimum compressive strength, air-entrained, placed at a minimum depth of 48 inches below finished grade; reinforcement per structural drawings

● Concrete slab-on-grade: 4,000 psi minimum compressive strength, 4-inch minimum thickness, welded wire fabric reinforcement, installed over 6-mil polyethylene vapor barrier on compacted granular base

● Concrete stem walls and grade beams as shown on structural drawings;

reinforcement per structural engineer's requirements

Wood Framing and Sheathing (Division 06)

● Exterior wall framing: 2x6 Douglas Fir or Southern Yellow Pine studs at 16 inches on center; pressure-treated sill plates installed over a continuous sill gasket on concrete; sill plate anchor bolts per structural drawings

● Double top plates; structural headers (LVL or engineered wood) over all openings as required by structural drawings and per NYS Building Code

● Interior partition framing: 2x4 studs at 16 inches on center; blocking for all accessory mounting locations (grab bars, accessories, equipment) installed prior to closing walls

● Roof framing: rafters or engineered I-joists, ceiling joists, ridge member, and all associated framing members; hurricane ties at every rafter-to-plate connection;

holdown anchors at designated locations per structural drawings

● 7/16-inch APA-rated OSB wall sheathing; 5/8-inch APA-rated OSB roof sheathing;

all fastened per structural engineer's nailing schedule

● Weather-resistive barrier (WRB): self-adhered membrane or Grade D building paper, fully taped at all seams and penetrations; continuous and uninterrupted prior to installation of cladding

● LVL beams and engineered lumber components per structural drawings; shop drawings required

● Metal connector hardware: Simpson Strong-Tie holdowns, joist hangers, hurricane ties, anchor bolts, and all other hardware per structural engineer's specifications

Thermal, Moisture Protection, and Exterior Cladding (Division 07)

● Foundation dampproofing: asphalt-based coating, two coats, applied to exterior face of concrete stem walls below grade; drainage board at exterior of stem walls

● Foundation perimeter insulation: 2-inch extruded polystyrene (XPS) board, R-10 minimum, installed continuous at exterior of stem walls

● Exterior wall cavity insulation: R-21 fiberglass batt insulation in all 2x6 stud cavities; kraft-faced or unfaced per contract documents

● Vinyl siding: VSI-certified, minimum 0.044-inch (44 mil) nominal thickness, double

4-inch or 5-inch horizontal lap profile; complete installation including starter strip, outside and inside corner posts, J-channel, undersill trim, soffit panels, aluminum fascia wrap, and drip caps at all window and door openings; color and profile as selected by Village from manufacturer's standard palette

● TPO single-ply membrane roofing: 60-mil minimum thickness, fully adhered system;

installed over R-25 polyisocyanurate roof insulation; includes cast iron roof drains with strainer domes, all sheet metal flashings, copings, and counterflashings at all penetrations and terminations; 20-year manufacturer's membrane warranty required; installer shall be manufacturer-certified; submit warranty documentation prior to Final Completion

● FRP fiberglass-reinforced plastic wall panels: minimum 0.120-inch (120 mil) thickness (Crane Composites Glasbord or approved equal), ASTM E84 Class A fire rating; installed at all interior wet walls in toilet rooms and mop sink area;

installation over cement board backer on wood framing with approved adhesive and mechanical fasteners; PVC trim molding at all panel edges, inside corners, outside corners, and penetrations; all joints and edges sealed with silicone sealant

● Exterior polyurethane sealants at all exterior joints, penetrations, and transitions;

backer rod at all joints exceeding 3/8-inch width; interior wet-area joints sealed with 100% silicone sealant; all sealants applied per manufacturer's instructions

Openings (Division 08)

● Hollow metal exterior doors: 3'-0" x 7'-0", 16-gauge insulated hollow metal, factory prime painted; frames anchored into wood framing with through-bolts, shimmed plumb and square, perimeter-caulked with backer rod; grout filled frames per manufacturer's requirements

● Grade 1 door hardware at all doors: lever locksets, ball-bearing stainless steel hinges (minimum five knuckle), ADA-compliant door closers with a maximum operating force of 5 lbs, kick plates (stainless steel), wall-mounted door stops, and all required accessories

● Remote access electronic door lock system: LTE cellular-connected, UL 294 listed access control; fail-safe configuration (unlocks on power loss and upon fire alarm activation); exterior components rated IP65 for weather and vandal resistance;

includes cloud management platform with smartphone app for authorized Village

DPW staff; programmable scheduling (daily/seasonal open/close times); audit log with time-stamped entry records; 24-hour UPS battery backup; fully integrated with fire alarm control panel for automatic unlock on alarm; Contractor shall provide a minimum of four (4) hours of training for designated Village DPW staff

Interior Finishes (Divisions 09, 10)

● Gypsum wallboard: 5/8-inch Type X fire-rated at all dry interior walls and ceilings;

taped, bedded, and finished to Level 4 per GA-214

● Cement board tile backer at all wet walls in lieu of gypsum board; installed per manufacturer's instructions prior to tile application

● Porcelain floor tile: slip-resistant finish, DCOF Acutest ≥0.42, minimum 12x12-inch nominal size; set in latex-Portland cement mortar (ANSI A118.4) with sanded grout;

color and pattern selected by Village

● Ceramic wall tile at all wet walls (tile backer areas): full height to 8 feet above finished floor; set in thin-set mortar; grouted and sealed; color selected by Village

● Interior painting: prime coat and two finish coats of semi-gloss latex paint at all gypsum board surfaces; alkyd primer and two coats of alkyd enamel on all hollow metal doors and frames

● Solid plastic (HDPE) toilet partitions: floor-mounted overhead-braced system; ADA-compliant accessible stall in each restroom with required clear floor space and outswing door; color as selected by Village from manufacturer's standard palette

● Stainless steel toilet room accessories (vandal-resistant, surface-mounted or recessed as shown, lockable, ADA-compliant): toilet paper holders, paper towel dispensers, liquid soap dispensers, mirrors (stainless steel framed), sanitary napkin disposal units; all installed at ADA-compliant heights

● Stainless steel ADA grab bars: 1-1/2-inch outside diameter, concealed flange mounting to solid blocking in walls; 42-inch side bar and 36-inch rear bar at each

ADA-accessible water closet stall; all grab bars shall bear the weight of 250 lbs minimum; installed at ADA-required heights and locations

● Recessed fire extinguisher cabinet with semi-recessed door and 2.5A:10B:C dry chemical extinguisher; one per restroom as required by NFPA 10 and the Contract

Documents

Plumbing (Division 22)

● Complete domestic water distribution system: Type L copper tubing above slab, Type K copper below grade; all hot water piping insulated with closed-cell insulation; shut-off ball valves at each fixture branch and at entry to building

● Complete sanitary waste and vent system: PVC Schedule 40 drain, waste, and vent

(DWV) above slab; cast iron soil pipe below slab; all connections to building drain and to public sewer as shown on Contract Documents

● Water closets: floor-mounted, elongated bowl, 1.28 GPF maximum WaterSense certified; ADA-compliant models (17-to-19-inch rim height) at all accessible stalls;

standard-height models at non-accessible stalls per fixture schedule

● Urinals: wall-hung, 0.5 GPF maximum; ADA-compliant; mounted at ADA-required rim height in accessible restroom

● Lavatories: wall-hung, ADA-compliant with open knee clearance; self-closing metering faucets, 0.5 GPM aerators; mounted at ADA-required counter height;

insulated supply and drain in compliance with ADA requirements

● Mop sink: floor-mounted receptor, stainless steel or fiberglass; with mop hook strip on wall, integral hose bibb, and strainer

● Frost-free hose bibbs: ASSE 1019-listed, self-draining, lockable handle with two sets of keys provided to Owner; integral ASSE 1011 vacuum breaker; interior isolation ball valve with wall-accessible access panel; one hose bibb per side of building (two total); mounted at a minimum height of 18 inches above finished grade; hydrostatic tested after installation and prior to insulation of walls

● Electric water heater: point-of-use or central tank-type as shown in Contract

Documents; minimum Energy Factor (EF) of 0.90; sized for simultaneous fixture demand; thermostatic mixing valve where required

● Floor drains: cast iron body, stainless steel strainer, with trap primer connection to nearest lavatory supply line; one drain at each restroom floor as shown on Contract

HVAC and Ventilation (Division 23)

● Electric wall unit heaters in each restroom space: 240V, single-phase; thermostat-controlled; each unit sized to maintain a minimum space temperature of 60°F under design winter conditions and to prevent freeze damage to all interior plumbing within conditioned space; manufacturer's submittal required prior to procurement

● Programmable thermostats at each electric heater; programmable for seasonal scheduling by Village DPW staff

● Exhaust fans: minimum 2 CFM per square foot of restroom floor area; 240V;

activated simultaneously with restroom lighting controls; discharge through weatherproof, backdraft-dampered exterior exhaust cap; ductwork as required to route discharge to exterior away from door and window openings

Electrical (Division 26)

● 200-amp, 120/240V single-phase electrical service entrance; coordination with utility provider (National Grid) for service connection; NEMA 3R-rated distribution panel with main breaker and minimum 20% spare circuit breaker capacity

● All branch circuit wiring in EMT conduit in dry locations; rigid galvanized steel

(RGS) or schedule 40 PVC conduit in wet, damp, or exterior locations; THHN/THWN copper conductors throughout; no aluminum branch circuit wiring permitted

● Interior LED lighting fixtures: vandal-resistant, surface-mounted or recessed;

minimum illumination levels of 50 foot-candles (FC) at lavatory mirrors and 30 FC general lighting throughout restroom spaces

● Exterior LED wall-pack or soffit-mounted fixtures: controlled by photocell; full cutoff optical design (Dark Sky compliant); minimum 5 FC at all building entries;

wiring in weatherproof conduit

● Exit signs and battery-pack emergency lighting: LED type, 90-minute minimum battery backup; installed per NFPA 101 Life Safety Code requirements; locations as shown on electrical drawings

● GFCI receptacles: tamper-resistant, at all wet and damp locations; dedicated 20-amp circuits for each electric heater, water heater, and exhaust fan as required by NEC and Contract Documents

3.3 ADA Compliance

All work shall comply fully with the Americans with Disabilities Act (ADA) 2010 Standards for Accessible Design and ICC/ANSI A117.1-2017 (Accessible and Usable Buildings and

Facilities). The accessible route from the existing park pathways to each restroom building entry, all door hardware, fixture mounting heights, grab bar locations and strengths, minimum turning radii in accessible stalls, maneuvering clearances at doors, and all required accessible signage (including tactile characters and Braille) shall meet or exceed the requirements of the foregoing standards. The Contractor shall prepare and submit to the

Village a completed ADA Compliance Checklist, organized by applicable ADA section, for review and approval prior to requesting a Certificate of Substantial Completion. Non-compliant conditions discovered during the Contractor's own ADA review shall be corrected at the Contractor's expense prior to submission of the checklist.

3.4 Prevailing Wages

All labor employed on this project, whether by the Contractor or any subcontractor or sub-subcontractor at any tier, shall be paid at not less than the prevailing wage rates and supplemental benefits established by the New York State Department of Labor pursuant to

Article 8 of the New York State Labor Law for the applicable trades and classifications in

Niagara County, New York. The Contractor shall obtain the current prevailing wage schedule from the NYS Department of Labor Bureau of Public Work prior to submitting a Proposal, and shall ensure that all wages and benefits paid comply with the schedule in effect at the time of performance of the work. The Contractor shall submit Certified Payroll Reports

(CPRs) on NYS DOL Form PW-347 to the Village on a bi-weekly basis throughout the project.

Failure to comply with prevailing wage requirements may result in contract termination, debarment, and civil and criminal penalties under NYS Labor Law.

SECTION 4 – PROPOSAL REQUIREMENTS AND FORMAT

4.1 Required Proposal Contents

Each Proposal shall be submitted as a complete, bound package. All required items shall be included and organized behind labeled divider tabs in the order listed below. Proposals that are missing required items or that are organized in a manner that substantially impedes the

Village's review may be deemed non-responsive. The Proposer is responsible for ensuring the completeness and accuracy of all information submitted.

Tab 1 – Cover Letter

A signed cover letter printed on the Proposer's company letterhead and addressed to the

Village of Youngstown. The cover letter shall confirm the Proposer's unconditional intent to perform all Work as described in the Contract Documents, identify the Proposer's full legal entity name (as it would appear on the contract), business address, primary contact person for this proposal, telephone number, and email address. The cover letter shall be signed by an authorized officer, member, or partner of the Proposer's legal entity and shall include the title and authority of the signatory.

Tab 2 – Completed Bid Form and Unit Price Schedule

The fully completed Bid Form (Exhibit C, Sheet 1) and Unit Price Schedule (Exhibit C, Sheet

2) with unit prices entered for every line item, the Base Bid Total stated both in figures and in words (where figures and words conflict, words shall govern), and all required signatures, certifications, and acknowledgments completed in full. Prices shall not be altered or modified after submission. Erasures, alterations, or interlineations shall be initialed by the Proposer's authorized signatory.

Tab 3 – Unit Price Alternates

The fully completed Unit Price Alternates sheet (Exhibit D) with add and deduct prices entered for all listed alternates. If no alternates are listed, this tab shall contain a statement to that effect signed by the Proposer.

Tab 4 – Qualifications and Experience

A. Statement of Qualifications:

● Legal name of the Proposer, form of organization (corporation, LLC, partnership, sole proprietorship), state of formation, and principal place of business

● Number of years the Proposer has been continuously engaged in business under its current legal name; if the Proposer has operated under any predecessor name(s) within the past ten (10) years, list all predecessor names and dates

● Names and roles of key personnel proposed to manage and supervise this project, including at minimum the proposed Project Manager and the proposed full-time Site

Superintendent; include their qualifications and relevant project experience

B. Project References: A list of a minimum of three (3) comparable completed projects from the past seven (7) years demonstrating experience with wood-frame construction, public or institutional buildings, and projects of similar or greater scope and value. For each reference project, provide:

● Project name and location (city, state)

● Owner name, contact person name, and current telephone number (references will be checked)

● Brief description of project scope and building type

● Original contract value and final contract value (explain any significant difference)

● Scheduled completion date and actual completion date (explain any significant difference)

● Explanation of any significant claims, disputes, Change Order controversies, or litigation arising from the project

C. Disclosure of Default, Termination, or Bond Calls: A written statement disclosing any project on which the Proposer, or any current principal, officer, or managing member of the

Proposer, has defaulted, been terminated for cause, or had a performance bond called within the past ten (10) years. If none, provide a signed written certification to that effect.

Tab 5 – Subcontractor Listing

Identify the proposed subcontractors for the following trades, at minimum: Plumbing, Electrical, Roofing, and HVAC/Mechanical. For each proposed subcontractor, provide:

company name, contact person name, telephone number, NYS license or registration number for the applicable trade, and a brief description of relevant project experience. The Village reserves the right to reject any subcontractor and to require the Contractor to propose an alternative subcontractor prior to contract execution.

Tab 6 – Project Schedule

A proposed construction schedule in bar-chart (Gantt chart) format, printed on paper of sufficient size to be legible, showing all major phases of work in logical sequence, estimated durations for each phase, and proposed calendar dates for: Notice to Proceed, start of site mobilization, start of construction, milestones for major construction phases, Substantial

Completion, and Final Completion. Identify any long-lead procurement items (e.g., roofing materials, door hardware, electronic locking system, electrical gear) and the proposed procurement strategy for each. The schedule shall demonstrate a realistic plan for completing the Work within the Contract Time set forth in Section 7.4 of this RFP.

Tab 7 – Insurance Certificates

Current Certificates of Insurance confirming the Proposer's existing coverage limits, or a signed written statement from the Proposer's insurance agent or broker confirming the

Proposer's ability to provide the following minimum coverages upon contract award:

● Commercial General Liability: minimum $1,000,000 per occurrence / $2,000,000 general aggregate; coverage shall include completed operations, products liability, and personal and advertising injury; Village of Youngstown to be named as

Additional Insured on a primary and non-contributory basis

● Workers' Compensation and Employer's Liability: statutory limits per New York

State requirements, including coverage for all employees performing Work on this project

● Builder's Risk Insurance: all-risk, completed value form, for full replacement value of all Work in place and materials stored on site or in transit; Village of Youngstown to be named as loss payee

● Automobile Liability: minimum $1,000,000 combined single limit per occurrence covering all owned, non-owned, and hired vehicles

Tab 8 – Certifications

The following completed certifications from the Bid Package (Exhibit E), each fully executed as required:

● NYS Prevailing Wage Certification (signed and notarized)

● Non-Collusion Affidavit (signed and notarized)

● Insurance Certification

● Addenda Acknowledgment Form (acknowledging all Addenda issued by the Village)

● Iran Divestment Act Certification (pursuant to State Finance Law §165-a)

Tab 9 – Additional Information (Optional)

The Proposer may include any additional information it wishes to bring to the Village's attention, including but not limited to: value engineering suggestions with itemized cost implications and technical justification; proposed material or systems substitutions with documentation of equivalency and cost implications; safety record summary including OSHA recordable incident rate for the past three years; or any other information that demonstrates the Proposer's qualifications and capability to successfully complete this project.

4.2 Proposal Format Requirements

● Proposals shall be submitted in a sealed envelope or sealed package. The outside of the sealed package shall be clearly labeled as follows: "PROPOSAL – FALKNER

PARK RESTROOM BUILDING – FILE NO. 25-086-C – DO NOT OPEN BEFORE

JANUARY 15, 2027 AT 3PM"

● One (1) original and two (2) identical copies of the complete Proposal shall be submitted (total of three complete sets). The original shall be clearly marked

"ORIGINAL."

● One (1) electronic copy of the complete Proposal on a USB flash drive in PDF format shall be included in the sealed package

● Proposals submitted by facsimile transmission or email will NOT be accepted under any circumstances

● Proposals must be physically received by the Village Clerk's Office, Village Hall, 240

Lockport Street, Youngstown, New York 14174, no later than January 13, 2027.

● Proposals received after the stated deadline will be returned to the Proposer unopened and will not be considered

● Proposals shall remain valid and irrevocable for a period of sixty (60) calendar days from the date and time of submission

● The Village is not responsible for any delays in delivery by the United States Postal

Service, private courier, or any other delivery service; hand delivery is recommended to ensure timely receipt

4.3 Mandatory Pre-Proposal Site Visit

A mandatory pre-proposal site visit will be held on November 16, 2026 at Falkner Park, Village of Youngstown, New York. Attendance in person by an authorized representative of the Proposer is mandatory and required as a condition of proposal eligibility. Proposals submitted by Proposers whose authorized representative did not sign the sign-in sheet at the mandatory site visit will be deemed non-responsive and will be rejected without further consideration. Sign-in sheets will be maintained by the Village and will constitute the official record of attendance.

Proposers are strongly encouraged to thoroughly examine all existing site conditions during the site visit, including but not limited to: site access points, existing utilities and their locations, existing park infrastructure and areas to be protected, topography and drainage patterns, proximity to public park areas that must remain accessible during construction, and any other conditions that may affect the performance, cost, or scheduling of the Work.

Proposers shall not rely solely upon information provided in the Contract Documents and shall independently verify all relevant site conditions prior to submitting a Proposal.

4.4 Questions and Clarifications

All questions and requests for clarification regarding this RFP or the Contract Documents shall be submitted exclusively in writing via email to the Village Clerk at

ClerksOffice@youngstownny.gov. The subject line of all question emails shall read exactly as follows: "QUESTIONS – FALKNER PARK RESTROOM BUILDING – FILE NO. 25-086-C."

Questions must be received by the Village no later than November 30, 2026 at 4:00 PM

Eastern Time.

Oral responses to questions, and any written responses provided informally outside of the official Addendum process, are not binding on the Village and shall not be relied upon by

Proposers. Written responses to all timely received questions will be issued collectively by

Addendum to all registered plan holders of record. Proposers are advised that questions submitted close to the deadline may not receive a response prior to the Proposal Due Date.

The Village reserves the right, in its sole discretion, to decline to answer any question.

SECTION 5 – QUALIFICATION REQUIREMENTS

5.1 Minimum Qualifications

To be eligible for consideration for award, the Proposer shall meet all of the following minimum qualifications at the time of Proposal submission. Failure to meet any one of the following minimum qualifications shall render the Proposal non-responsive. The Village reserves the right to verify all qualifications and to require supporting documentation.

A. Licensing: The Proposer shall hold a valid, current New York State contractor's license or registration as required by applicable state and local law for the type and value of work to be performed. All subcontractors shall hold valid, current NYS licenses for their respective licensed trades, including without limitation: a NYS licensed master plumber for all plumbing work, a NYS licensed master electrician for all electrical work, and any other license required by New York State law or applicable local regulations. The Contractor shall ensure that all required licenses are maintained in good standing for the duration of the project.

B. Experience: The Proposer shall have a minimum of five (5) consecutive years of continuous experience as a prime general contractor performing commercial or institutional building construction in New York State. The Proposer shall have completed at least three

(3) projects involving wood-frame construction of public, institutional, or commercial buildings that are comparable in scope, complexity, and value to this project, within the past seven (7) years.

C. Financial Capacity: The Proposer shall demonstrate sufficient financial capacity to undertake, finance, and complete the project without interruption. The Village reserves the right to require the apparent low Proposer, prior to contract award, to furnish audited or reviewed financial statements for the two (2) most recent fiscal years, a line of credit letter from the Proposer's financial institution confirming available credit, or such other financial documentation as the Village deems necessary to confirm financial responsibility.

D. Safety Record: The Proposer shall have a current OSHA Experience Modification Rate

(EMR) of 1.0 or lower for the most recent completed policy year. The Proposer shall submit the most recent EMR letter from its insurance carrier with the Proposal. Proposers with an

EMR greater than 1.0 will be deemed non-responsible and will not be considered for award.

E. Good Standing: The Proposer shall not be debarred, suspended, or otherwise prohibited from participation in public contracting by the State of New York, the United States government, or any municipality or agency. The Proposer shall certify in writing, as part of the Certifications (Tab 8), that it is not listed on the New York State Debarment List maintained by the New York State Office of General Services.

F. Prevailing Wage Compliance: The Proposer shall have no outstanding, unresolved violations of New York State Labor Law Article 8 (Prevailing Wage). The Proposer shall certify compliance with this requirement in the NYS Prevailing Wage Certification submitted under Tab 8.

5.2 Key Personnel

The Proposer shall assign a dedicated, full-time on-site Superintendent to this project from the start of construction through Final Completion. The proposed Site Superintendent shall be present on the project site during all working hours and whenever construction activities are in progress. The proposed Site Superintendent shall have a minimum of five (5) years of verifiable experience in direct supervision of wood-frame commercial or institutional construction projects of comparable complexity. Résumés for both the proposed Project

Manager and the proposed Site Superintendent shall be included with the Proposal (Tab 4).

The Proposer shall not substitute the proposed Project Manager or Site Superintendent after contract award without the prior written consent of the Village, which consent shall not be unreasonably withheld provided the replacement individual has equivalent or superior qualifications.

5.3 Subcontractor Requirements

All subcontractors performing licensed trade work — including without limitation plumbing, electrical, and HVAC/mechanical — shall hold valid, current New York State licenses for their respective trades as required by applicable law. The Contractor is solely responsible for verifying and confirming the active licensure of all subcontractors and sub-subcontractors prior to their commencing any work on this project. Evidence of licensure shall be provided to the Village upon request. The Village expressly reserves the right, in its sole discretion, to reject any subcontractor proposed by the Contractor, and to require the

Contractor to identify and propose an acceptable alternative subcontractor prior to contract execution or prior to the commencement of that subcontractor's work.

SECTION 6 – EVALUATION CRITERIA AND SELECTION

6.1 Evaluation Process

The Village of Youngstown will evaluate all responsive and responsible Proposals received by the stated deadline. Proposals determined to be non-responsive or submitted by non-responsible Proposers will be rejected prior to evaluation. Responsive and responsible

Proposals will be reviewed and scored by a Proposal Selection Committee consisting of

Village staff, including representatives of the Department of Public Works, and, where applicable, the project Architect/Engineer of Record. The Selection Committee may, in its discretion, conduct interviews or presentations with the top-ranked Proposer(s), conduct reference checks with owners of prior projects, request supplemental or clarifying information from one or more Proposers, and/or enter into negotiations with one or more

Proposers prior to making a recommendation for award to the Village Board of Trustees. The

Village Board of Trustees retains final authority over contract award.

6.2 Evaluation Criteria

All responsive and responsible Proposals will be evaluated and scored against the following criteria. The maximum possible score is 100 points. The Village will award the contract to the Proposer whose Proposal is deemed most advantageous to the Village, considering all evaluation criteria.

# Criterion Description Maximum

Points

1 Base Bid Price

Total Base Bid amount as stated on the completed Unit Price Schedule. The lowest responsive Base Bid will receive the maximum points; other Proposals will receive proportionately fewer points based on relative price.

2 Qualifications and Experience

Demonstrated experience with comparable wood-frame public or institutional building construction projects in New York State; quality of project references; years in business;

depth of organizational resources;

verifiable record of successful project delivery on similar public construction contracts.

3 Project Team Qualifications and demonstrated relevant experience of the proposed Project Manager and Site Superintendent; organizational capacity and depth of the Proposer's

# Criterion Description Maximum Points team assigned to this project;

experience of proposed key subcontractors.

4 Project Schedule

Reasonableness, clarity, and completeness of the proposed construction schedule; demonstrated understanding of project phasing requirements, long-lead item procurement, and project sequencing;

achievability of proposed Substantial Completion date.

5 Safety Record Current OSHA Experience Modification Rate (EMR); OSHA recordable incident rate for the most recent three completed years; evidence of a formal, written company safety program.

TOTAL

MAXIMUM

POINTS

6.3 Responsive and Responsible Proposers

Only Proposals from responsive and responsible Proposers will be considered for award. A responsive Proposal is one that conforms in all material respects to the requirements of this

RFP, including submission of all required documents, compliance with all formatting and procedural requirements, attendance at the mandatory pre-proposal site visit, and acknowledgment of all issued Addenda. A responsible Proposer is one that has the financial capacity, relevant experience, technical capability, integrity, and human resources necessary to perform the Work in accordance with the Contract Documents. The Village, acting through its Selection Committee and Village Board of Trustees, reserves the right, in its sole judgment, to determine whether any Proposal is responsive and whether any Proposer is responsible, and such determinations shall be final.

6.4 Village's Rights

The Village of Youngstown expressly reserves the following rights with respect to this RFP and any Proposals received:

7. To reject any or all Proposals, in whole or in part, for any reason or for no stated reason, without obligation or liability to any Proposer

8. To waive any informality, irregularity, or technical deficiency in any Proposal, provided such waiver does not result in a material advantage to the Proposer whose

Proposal contains the irregularity

9. To accept a Proposal other than the lowest-price Proposal when, in the Village's sole judgment and discretion, the interests of the Village and the public are best served by doing so, consistent with NYS General Municipal Law

10. To cancel this RFP, in whole or in part, at any time prior to the execution of a contract, without obligation or liability of any kind to any Proposer

11. To negotiate with one or more Proposers prior to award regarding proposed price, scope, schedule, or other terms

12. To award the contract to the Proposer whose Proposal is determined to be most advantageous to the Village, taking into account all evaluation criteria set forth herein

13. To require clarification, supplementation, or correction of any submitted Proposal prior to evaluation or award

14. To re-issue this RFP at any time with modified terms, scope, or requirements

SECTION 7 – CONTRACT AWARD AND EXECUTION

7.1 Award

The Village intends to award a single contract to the selected Proposer for all Work described in the Contract Documents. The contract will not be awarded until the Village Board of

Trustees has authorized the award by formal resolution at a duly noticed public meeting.

Notice of Award will be issued in writing by the Village Clerk to the selected Proposer following approval by the Village Board of Trustees. No Proposer shall have any right, claim, or cause of action against the Village based on a failure to award a contract, nor shall any

Proposer have any right to recover any costs incurred in preparing or submitting a Proposal.

7.2 Contract Form

The contract for this project will be executed using the AIA A101 Standard Form of

Agreement Between Owner and Contractor (most current edition), as modified and supplemented by the Supplementary Conditions and other documents included in the

Project Specifications (File No. 25-086-C). The AIA A201-2017 General Conditions of the

Contract for Construction, as modified by the Supplementary Conditions, will govern the contractual relationship between the Village and the Contractor. Proposers are strongly advised to review the proposed AIA A101 and A201 documents (available for review as

Exhibits F and G) as part of their evaluation of this RFP prior to submitting a Proposal.

Submission of a Proposal constitutes the Proposer's unconditional agreement to execute the contract in the form provided. The selected Proposer shall execute the contract and provide all required bonds, insurance certificates, and other required documents within ten (10) calendar days of receipt of the Notice of Award.

7.3 Notice to Proceed

The Village anticipates issuing a written Notice to Proceed (NTP) by January 28, 2027, subject to final approval by the Village Board of Trustees, satisfaction of all conditions precedent to contract execution (including delivery of required insurance certificates and performance and payment bonds), and receipt of all required permits. The Contract Time shall commence upon the date specified in the Notice to Proceed. The Contractor shall not commence any Work on the project site prior to receipt of the written Notice to Proceed.

7.4 Contract Duration

Final Completion shall be achieved within 6 months of the start date. Time is of the essence with respect to all dates and milestones set forth in the Contract.

7.5 Retainage

Retainage of ten percent (10%) of the earned value of Work completed will be withheld from each monthly progress payment until fifty percent (50%) of the Work has been completed and accepted by the Village. After fifty percent (50%) completion, provided the Work is progressing satisfactorily and there are no outstanding defaults by the Contractor, the

Village may, in its sole discretion, reduce retainage to five percent (5%) of the earned value of the remaining Work. Upon Substantial Completion, the Village may further reduce retainage in accordance with the Contract Documents, retaining an amount sufficient to cover the cost of all incomplete punch list items, as determined by the Village.

7.6 Payment

Progress payments will be made monthly on the basis of Applications for Payment submitted by the Contractor to the Village on the first day of each month (or as otherwise agreed in the

Contract Documents). Each Application for Payment shall include a Schedule of Values breakdown, a Contractor's Certification, updated certified payrolls, and such other documentation as required by the Contract Documents. Payment will be made within 30 calendar days of certification by the Village or its authorized representative

(Architect/Engineer of Record), in accordance with NYS General Municipal Law. All payments are subject to the right of the Village to withhold amounts for uncorrected defective Work, third-party claims, disputed amounts, or other reasons permitted by the

Contract Documents.

SECTION 8 – GENERAL TERMS AND CONDITIONS

8.1 Governing Law

This RFP and any contract awarded pursuant to this RFP shall be governed by, construed, and enforced in accordance with the laws of the State of New York, without regard to conflict of laws principles. Any and all disputes, claims, or legal proceedings arising under or related to the contract shall be resolved exclusively in a court of competent jurisdiction located in

Niagara County, New York. The Contractor irrevocably consents to the jurisdiction and venue of such courts.

8.2 Compliance with Laws

The Contractor shall comply at all times, at its own cost and expense, with all applicable federal, state, and local laws, codes, ordinances, rules, regulations, and orders, including but not limited to: the…