Volume II Chillers W912PF26QA034.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
VMC Villaggio Chillers
Solicitation number
W912PF26QA034
Issued by

About this file

This file is a pricing volume spreadsheet (Volume II) for an RFQ solicitation for air-cooled liquid chillers. The spreadsheet contains detailed pricing and technical specifications for three Clivet WSAT-YSC4 350.8 air-cooled liquid chillers or equivalent products being procured by the Department of the Army Materiel Command Army Contracting Command under solicitation number W912PF26QA034 for the VMC Villaggio Chillers project.

The required chillers must meet specific performance and technical criteria, including a supply voltage of 400/3/50 without neutral, an Energy Efficiency Ratio (EER) of 2.84, a European Seasonal Energy Efficiency Ratio (SEER) of 5.21, and PED European conformity approval for the heat exchanger. Each unit operates on refrigerant R-32 with two refrigeration circuits, includes eight scroll-type compressors, and features twelve AX-type external ventilators. The chillers have approximate dimensions of 7,919 mm in length, 2,228 mm in width, and 2,538 mm in height, with a minimum warranty period of 18 months from the invoice date. This is a combined synopsis/solicitation for commercial products prepared under FAR Part 12, issued as an RFQ where offers are requested without a separate written solicitation document.

View the file

Other files

File Type Posted
RFQ Atch1 W912PF26QA034.pdf PDF
W912PF26A034 - Solicitation VMC Villaggio Chillers.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE (Chillers) Volume II

Statement of Requirements for all items except the one with **:

1) Any applicable commercial warranty that was quoted as included with the equipment.

2) Technical Manual Operator - English and Italian (preferred if in DVD or CD). Industry/Manufacturer standard format is acceptable.

3) Technical Manual Parts English and Italian (preferred if in DVD or CD). Industry/Manufacturer standard format is acceptable.

4) Technical Manual Maintenance English and Italian (preferred if in DVD or CD). Industry/Manufacturer standard format is acceptable.

THE EQUIPMENT SHALL BE CE (European Conformity) or it will be rejected due to not meeting the technical specifications.

VMC Villaggio Chillers
CLIN #QtyUMDescriptionTotal Price (Euros)Total Price (Dollars)
0001 TOTAL3EachClivet WSAT-YSC4 350.8 air-cooled liquid chiller, Excellence model (standard), R-32 refrigerant, 500 to 1500 kW capacity (BRAND NAME OR EQUAL). Includes 12 month warranty from commissioning date or 18 month warranty from billing date.
0002Required Accessories
3EachEN - Supersilenced acoustic configuration€ - 0$ - 0
3EachCREFB - Device for fan consumption reduction of the external section, ECOBREEZE type€ - 0$ - 0
3EachCCM - Microchannel condensed battery in aluminum€ - 0$ - 0
3EachAMMX - Set of spring antivibration mounts€ - 0$ - 0
3EachPPBM - Microchannel coils protection pane€ - 0$ - 0
3EachPGCC - Coil protection grills and compressor compartment€ - 0$ - 0
3EachMF2 - Multifunction phase monitor€ - 0$ - 0
3EachRPRI - Refrigerant leak detector in the casing€ - 0$ - 0
3EachCMSC9 - Serial communication module for Modbus supervisor€ - 0$ - 0
3EachCFSC - Free contacts for compressor status€ - 0$ - 0
3EachECS - ECOSHARE function for the automatic management of a group of units€ - 0$ - 0
3EachSFSTR - Device for inrush current reduction€ - 0$ - 0
3EachFANQE - Ventilation electrical panel€ - 0$ - 0
3EachSDV - Cutoff valve on compressor supply and return€ - 0$ - 0
3EachEVE - Electronic expansion valve€ - 0$ - 0
3EachDSP - Double set point€ - 0$ - 0
3EachTRG - Delivery with full charge of refrigerant gas€ - 0$ - 0
3EachEVPHE - Plate heat exchanger€ - 0$ - 0
3EachPSWSA - Water side differential pressure switch with antifreeze protection€ - 0$ - 0
0002 TOTAL57EachSubtotal€ - 0$ - 0
0003 TOTAL3EachShipping costs for CLINs 0001 and 0002 to Villaggio Bldg 710, Vicenza. **€ - 0$ - 0
0004 TOTAL3EachFirst test for CLIN 0001 chillers consisting of setting up parameters and start up test. The work has to be performed at the end of equipment installation, within ten working days after notification by the US Government. **€ - 0$ - 0
0
Grand Total CLINs 0001 - 0004Exchange rate FY26 $1= Euro 0.9303€ - 0$ - 0

The volume II was developed independently and prior to seeking any formal proposals from Contractors. The costs of subject project were based on market research with local vendors.

File details come from the government source that posted it. Updated .