This is a 100% construction document specification manual prepared by Rhodes+Brito Architects for the Orange County Corrections Department's Female Detention Center FDC Isolation Cell Renovations project, addressing comprehensive renovation of two isolation cell units and complete domestic water piping replacement at the facility located at 400 East South Street in Orlando, Florida. The project specifications encompass Division 22 (Plumbing), Division 23 (HVAC), Division 26 (Electrical), Division 28 (Electronic Safety and Security), and Division 31 (Earthwork) work, with detailed technical requirements for Schedule 80 CPVC domestic water piping replacement, security plumbing fixtures, detention monitoring and control systems, conventional fire-alarm systems, LED interior lighting, emergency and exit lighting, and chemical termite control. The specifications mandate that all new plumbing piping in inmate-accessible areas be enclosed in 16-gauge stainless steel protective chases, require maintaining existing I-Con electronic plumbing control systems compatibility, and necessitate strict adherence to Florida Building Code (8th Edition 2023) and NFPA standards. A non-mandatory pre-bid meeting and site visit are scheduled for July 30, 2025, at 1:00 pm, with sealed bids due by 4:00 pm EST on varying dates between August 26, 2025, and May 12, 2026, through the OpenGov e-Procurement Platform, with a mandatory questions submission deadline of August 11, 2025. The estimated project cost is $4,100,000.00, requiring substantial completion within 335 consecutive calendar days and final completion within 365 consecutive calendar days from the Notice to Proceed, with payment following Florida's Local Government Prompt Payment Act at 5% retainage on progress payments.

The specifications detail extensive technical requirements for plumbing systems including domestic water piping, sanitary waste and vent piping, security plumbing fixtures with stainless steel construction, testing and adjusting and balancing procedures, and commissioning requirements coordinated with the Owner's Commissioning Agent. HVAC specifications address existing duct cleaning, motor requirements, hangers and supports, duct insulation, piping insulation, testing and balancing, and commissioning. Electrical work encompasses low-voltage power conductors and cables, grounding and bonding systems, raceways and boxes, identification systems, commissioning, wiring devices, and LED interior and emergency lighting. Electronic systems specifications include conventional fire-alarm systems and detention monitoring and control systems utilizing PLC technology with hard-control panel interfaces. The contract requires compliance with E-Verify, maintenance of drug-free workplace certification, and submission of references, professional licenses, and workforce demographics. Award will be made to the lowest responsive and responsible bidder, with technical evaluation emphasizing compliance with specifications, installation methodologies appropriate for detention facility infrastructure, and ability to maintain facility operations throughout renovation with minimal disruption to the corrections department's ongoing operations.

View the file

Other files

File Type Posted
Orange_County_Corrections_Department_Female_Detention_Center_Two_Cell_Renovations_and_Complete_Domestic_Water_Piping_Replacement_(Addendum_#32_Revision).pdf PDF
Orange_County_Corrections_Department_Female_Detention_Center_Two_Cell_Renovations_and_Complete_Domestic_Water_Piping_Replacement_(Addendum_#25_Revision).pdf PDF
Orange_County_Corrections_Department_Female_Detention_Center_Two_Cell_Renovations_and_Complete_Domestic_Water_Piping_Replacement_(Addendum_#24_Revision).pdf PDF
Orange_County_Corrections_Department_Female_Detention_Center_Two_Cell_Renovations_and_Complete_Domestic_Water_Piping_Replacement_(Addendum_#22_Revision).pdf PDF
Orange_County_Corrections_Department_Female_Detention_Center_Two_Cell_Renovations_and_Complete_Domestic_Water_Piping_Replacement_(Addendum_#18_Revision).pdf PDF
Orange_County_Corrections_Department_Female_Detention_Center_Two_Cell_Renovations_and_Complete_Domestic_Water_Piping_Replacement_(Addendum_#17_Revision).pdf PDF
Orange_County_Corrections_Department_Female_Detention_Center_Two_Cell_Renovations_and_Complete_Domestic_Water_Piping_Replacement_(Addendum_#16_Revision).pdf PDF
Orange_County_Corrections_Department_Female_Detention_Center_Two_Cell_Renovations_and_Complete_Domestic_Water_Piping_Replacement_(Addendum_#15_Revision).pdf PDF
Orange_County_Corrections_Department_Female_Detention_Center_Two_Cell_Renovations_and_Complete_Domestic_Water_Piping_Replacement_(Addendum_#10_Revision).pdf PDF
Orange_County_Corrections_Department_Female_Detention_Center_Two_Cell_Renovations_and_Complete_Domestic_Water_Piping_Replacement_(Addendum_#5_Revision).pdf PDF
FDC_DW_Replacment_100%_Drawings.pdf PDF
FDC_DW_Replacment_100%_Drawings.pdf PDF
FDC_DW_Replacment_100%_Drawings.pdf PDF
FDC_DW_Replacment_100%_Drawings.pdf PDF
FDC_DW_Replacment_100%_Drawings.pdf PDF
FDC_DW_Replacment_100%_Drawings.pdf PDF
Y25-900-RC_Sign_in_Sheet.pdf PDF
Orange_County_Corrections_Department_Female_Detention_Center_Two_Cell_Renovations_and_Complete_Domestic_Water_Piping_Replacement.pdf PDF
Vol_02_100_2024-05-22.pdf PDF
Vol_01_100_2024-05-22.pdf PDF
Project_Manual.pdf PDF
FDC_DW_Replacment_100%_Drawings.pdf PDF
18019-0024_OCCD_FDC_ISO_CELL_UNITS_F_&_G__100%CD_.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100% Construction Documents

Rhodes+Brito Architects, Inc.

VOLUME 02

PROJECT MANUAL

FOR THE

ORANGE COUNTY CORRECTIONS DEPARTMENT

FDC ISOLATION CELL RENOVATIONS

IN GOLF UNIT F & G

PREPARED FOR

ORANGE COUNTY CAPITAL PROJECTS DIVISION

INTERNAL OPERATIONS CENTER II

400 SOUTH STREET, 5TH FLOOR

ORLANDO, FLORIDA 32801

May 22, 2024

ORANGE COUNTY CORRECTIONS DEPARTMENT RHODES+BRITO ARCHITECTS

FDC ISOLATION CELL RENOVATIONS 18019-0024

TABLE OF CONTENTS 00 0110-1

SECTION 01 0110 - TABLE OF CONTENTS

VOLUME 01

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

00 0000 Cover 00 0103 Statement of Compliance 00 0110 Table of Contents

DIVISION 01 GENERAL REQUIREMENTS

01 1100 Summary of Work 01 2300 Alternates 01 2500 Substitution Procedures 01 2600 Contract Modification Procedures 01 2900 Payment Procedures 01 3100 Project Management and Coordination 01 3119 Project Meetings 01 3200 Construction Progress Documentation 01 3233 Photographic Documentation 01 3234 Pre-Construction Video Recording 01 3300 Submittal Procedures 01 4000 Quality Requirements 01 4200 References 01 6000 Product Requirements 01 7300 Execution 01 7329 Cutting and Patching 01 7700 Closeout Procedures 01 7800 Warranties and Bonds 01 7823 Operation and Maintenance Data 01 7839 Project Record Documents 01 7900 Demonstration and Training

DIVISION 02 EXISTING CONDITIONS

02 4113 Selective Demolition

DIVISION 03 CONCRETE

03 0580 Underslab Vapor Retarder 03 1000 Concrete Forming and Accessories 03 2000 Concrete Reinforcing 03 3000 Cast-In-Place Concrete

DIVISION 04 MASONRY

04 2200 Concrete Unit Masonry

DIVISION 05 METALS

05 0519 Post-Installed Anchors 05 1200 Structural Steel Framing 05 3100 Steel Decking 05 5000 Metal Fabrications 05 5100 Metal Stairs 05 5203 Steel Handrails and Railings

TABLE OF CONTENTS 00 0110-2

05 5313 Bar Gratings

DIVISION 06 WOOD, PLASTICS, AND COMPOSITES

06 0500 Common Work Results for Wood, Plastics, and Composites 06 1000 Rough Carpentry

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 2119 Foamed-In-Place Insulation 07 2200 Roof and Deck Insulation 07 5404 Fully Adhered Single Ply Sheet Roofing 07 6000 Flashing and Sheet Metal 07 8100 Applied Fireproofing 07 8400 Firestopping Systems 07 9000 Joint Protection

DIVISION 08 OPENINGS

08 1100 Metal Doors and Frames 08 3463 Detention Doors and Frames 08 7100 Door Hardware 08 8853 Security Glazing 08 9100 Louvers

DIVISION 09 FINISHES

09 2216 Non-Structural Metal Framing (Not yet included) 09 2423 Portland Cement Stucco 09 2900 Gypsum Board (Not yet included) 09 3000 Tiling (Not yet included) 09 9000 Painting

DIVISION 10 SPECIALTIES

10 2813 Toilet Accessories

DIVISION 11 EQUIPMENT

11 1900 Detention Equipment (Not yet included)

DIVISION 12 FURNISHINGS

Not Used

DIVISION 13 SPECIAL CONSTRUCTION

13 5000 Modular Metal Detention Wall Panel System

TABLE OF CONTENTS 00 0110-3

VOLUME 02

DIVISIONS 14-21

Not Used

DIVISION 22 PLUMBING

22 0517 Sleeves and Sleeve Seals for Plumbing Piping 22 0518 Escutcheons for Plumbing Piping 22 0523.12 Ball Valves for Plumbing Piping 22 0523.14 Check Valves for Plumbing Piping 22 0529 Hangers and Supports for Plumbing Piping and Equipment 22 0553 Identification for Plumbing Piping and Equipment 22 0593 Testing, Adjusting, and Balancing for Plumbing 22 0719 Plumbing Piping Insulation 22 0800 Commissioning of Plumbing 22 1116 Domestic Water Piping 22 1119 Domestic Water Piping Specialties 22 1316 Sanitary Waste and Vent Piping 22 1319 Sanitary Waste Piping Specialties 22 1413 Facility Storm Drainage Piping 22 4600 Security Plumbing Fixtures

DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 0130.52 Existing HVAC Air-Distribution System Cleaning 23 0513 Common Motor Requirements for HVAC Equipment 23 0529 Hangers and Supports for HVAC Piping and Equipment 23 0593 Testing, Adjusting, and Balancing for HVAC 23 0713 Duct Insulation 23 0719 HVAC Piping Insulation 23 0800 Commissioning of HVAC 23 2113 Hydronic Piping 23 2116 Hydronic Piping Specialties 23 3113 Metal Ducts 23 3300 Air Duct Accessories 23 3416 Centrifugal HVAC Fans 23 3713.43 Security Registers and Grilles 23 7313.16 Indoor, Semi-Custom Air-Handling Units

DIVISIONS 24-25

Not Used

DIVISION 26 ELECTRICAL

26 0519 Low-Voltage Electrical Power Conductors and Cables 26 0526 Grounding and Bonding for Electrical Systems 26 0529 Hangers and Supports for Electrical Systems 26 0533 Raceway and Boxes for Electrical Systems 26 0544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 26 0553 Identification for Electrical Systems 26 0800 Commissioning of Electrical Systems 26 2726 Wiring Devices 26 5119 LED Interior Lighting

TABLE OF CONTENTS 00 0110-4

26 5213 Emergency and Exit Lighting 26 5619 LED Exterior Lighting

DIVISION 27 COMMUNICATIONS

Not Used

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

28 4621.13 Conventional Fire-Alarm Systems 28 3112 Detention Monitoring and Control Systems

DIVISIONS 29-30

Not Used

DIVISION 31 EARTHWORK

31 3116 Chemical Termite Control

DIVISIONS 32-49

Not Used

END OF SECTION 00 0110

SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220517 - 1

SECTION 220517 - SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Sleeves.

2. Sleeve-seal systems.

3. Grout.

4. Silicone sealants.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

1.3 INFORMATIONAL SUBMITTALS

A. Field quality-control reports.

PART 2 - PRODUCTS

2.1 SLEEVES

A. Cast-Iron Pipe Sleeves: Cast or fabricated of cast or ductile iron and equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop collar.

B. Steel Pipe Sleeves: ASTM A53/A53M, Type E, Grade B, Schedule 40, anticorrosion coated or galvanized, with plain ends and integral welded waterstop collar.

C. Galvanized-Steel Sheet Sleeves: 0.0239-inch minimum thickness; round tube closed with welded longitudinal joint.

D. PVC Pipe Sleeves: ASTM D1785, Schedule 40.

2.2 SLEEVE-SEAL SYSTEMS

A. Description:

1. Modular sealing-element unit, designed for field assembly, for filling annular space between piping and sleeve.

2. Designed to form a hydrostatic seal of 20 psig minimum.

3. Sealing Elements: EPDM-rubber interlocking links shaped to fit surface of pipe.

Include type and number required for pipe material and size of pipe.

4. Pressure Plates: Carbon steel.

SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220517 - 2

5. Connecting Bolts and Nuts: Carbon steel, with corrosion-resistant coating, ASTM B633 of length required to secure pressure plates to sealing elements.

2.3 GROUT

A. Description: Nonshrink, for interior and exterior sealing openings in non-fire-rated walls or floors.

B. Standard: ASTM C1107/C1107M, Grade B, post-hardening and volume-adjusting, dry, hydraulic-cement grout.

C. Design Mix: 5000-psi, 28-day compressive strength.

D. Packaging: Premixed and factory packaged.

2.4 SILICONE SEALANTS

A. Silicone, S, P, 25, T, NT: Single-component, pourable, plus 25 percent and minus 25 percent movement capability, traffic- and nontraffic-use, neutral-curing silicone joint sealant; ASTM C920, Type S, Grade P, Class 25, Uses T and NT. Grade P Pourable (self-leveling) formulation is for opening in floors and other horizontal surfaces that are not fire rated.

PART 3 - EXECUTION

3.1 SLEEVE INSTALLATION

A. Install sleeves for piping passing through penetrations in floors, partitions, roofs, and walls.

B. For sleeves that will have sleeve-seal system installed, select sleeves of size large enough to provide 1-inch annular clear space between piping and concrete slabs and walls.

C. Install sleeves in concrete floors, concrete roof slabs, and concrete walls as new slabs and walls are constructed.

1. Cut sleeves to length for mounting flush with both surfaces.

a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level.

2. Using grout, seal the space outside of sleeves in slabs and walls without sleeve-seal system.

D. Install sleeves for pipes passing through interior partitions.

1. Cut sleeves to length for mounting flush with both surfaces.

2. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation.

SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220517 - 3

3. Seal annular space between sleeve and piping or piping insulation; use joint sealants appropriate for size, depth, and location of joint.

E. Fire-Resistance-Rated Penetrations, Horizontal Assembly Penetrations, and Smoke Barrier Penetrations: Maintain indicated fire or smoke rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with fire- and smoke-stop materials. Comply with requirements for firestopping and fill materials specified in Section 078413 "Penetration Firestopping."

3.2 SLEEVE-SEAL-SYSTEM INSTALLATION

A. Install sleeve-seal systems in sleeves in exterior concrete walls and slabs-on-grade at service piping entries into building.

B. Select type, size, and number of sealing elements required for piping material and size and for sleeve ID or hole size. Position piping in center of sleeve. Center piping in penetration, assemble sleeve-seal system components, and install in annular space between piping and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make a watertight seal.

3.3 FIELD QUALITY CONTROL

A. Perform the following tests and inspections:

1. Leak Test: After allowing for a full cure, test sleeves and sleeve seals for leaks.

Repair leaks and retest until no leaks exist.

B. Sleeves and sleeve seals will be considered defective if they do not pass tests and inspections.

C. Prepare test and inspection reports.

3.4 SLEEVE AND SLEEVE-SEAL SCHEDULE

A. Use sleeves and sleeve seals for the following piping-penetration applications:

1. Exterior Concrete Walls above Grade:

a. Piping Smaller Than NPS 6: Steel pipe sleeves.

2. Exterior Concrete Walls below Grade:

a. Piping Smaller Than NPS 6: Cast-iron pipe sleeves with sleeve-seal system.

1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.

3. Concrete Slabs-on-Grade:

a. Piping Smaller Than NPS 6: Cast-iron pipe sleeves with sleeve-seal system.

1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.

4. Concrete Slabs above Grade:

a. Piping Smaller Than NPS 6: Steel pipe sleeves.

SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 220517 - 4

5. Interior Partitions:

a. Piping Smaller Than NPS 6: Steel pipe sleeves.

END OF SECTION 220517

ESCUTCHEONS FOR PLUMBING PIPING 220518 - 1

SECTION 220518 - ESCUTCHEONS FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Escutcheons.

2. Floor plates.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

2.2 ESCUTCHEONS

A. One-Piece, Steel Type: With polished, chrome-plated finish and setscrew fastener.

B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped steel with polished, chrome-plated finish and spring-clip fasteners.

C. One-Piece, Stamped-Steel Type: With polished, chrome-plated finish and spring-clip fasteners.

D. Split-Plate, Stamped-Steel Type: With polished, chrome-plated finish; concealed hinge;

and spring-clip fasteners.

2.3 FLOOR PLATES

A. Split Floor Plates: Cast brass with concealed hinge.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install escutcheons for piping penetrations of walls, ceilings, and finished floors.

ESCUTCHEONS FOR PLUMBING PIPING 220518 - 2

B. Install escutcheons with ID to closely fit around pipe, tube, and insulation of insulated piping and with OD that completely covers opening.

1. Escutcheons for New Piping:

a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep pattern.

b. Insulated Piping: One-piece steel with polished, chrome-plated finish.

c. Bare Piping at Wall and Floor Penetrations in Finished Spaces: One-piece steel with polished, chrome-plated finish.

d. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece steel with polished, chrome-plated finish.

e. Bare Piping at Ceiling Penetrations in Finished Spaces: One-piece stamped steel with polished, chrome-plated finish.

C. Install floor plates for piping penetrations of equipment-room floors.

D. Install floor plates with ID to closely fit around pipe, tube, and insulation of piping and with OD that completely covers opening.

1. New Piping: Split floor plate.

2. Existing Piping: Split floor plate.

3.2 FIELD QUALITY CONTROL

A. Using new materials, replace broken and damaged escutcheons and floor plates.

END OF SECTION 220518

BALL VALVES FOR PLUMBING PIPING 220523.12 - 1

SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Brass ball valves.

2. CPVC ball valves.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of valve.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Standards:

1. Domestic water valves intended to convey or dispense water for human consumption must comply with the SDWA, requirements of authorities having jurisdiction, and NSF 61 and NSF 372, or must be certified to be in compliance with NSF 61 and NSF 372 (by an ANSI-accredited third-party certification body) that the weighted average lead content at wetted surfaces is less than or equal to

0.25 percent.

B. ASME Compliance:

1. ASME B1.20.1 for threads for threaded end valves.

2. ASME B16.1 for flanges on iron valves.

3. ASME B16.5 for flanges on steel valves.

4. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.

5. ASME B16.18 for cast copper solder-joint connections.

6. ASME B16.22 for wrought copper and copper alloy solder-joint connections.

7. ASME B16.34 for flanged and threaded end connections

8. ASME B31.9 for building services piping valves.

C. Provide bronze valves made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.

D. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

E. Valve Sizes: Same as upstream piping unless otherwise indicated.

F. Valve Actuator Type:

BALL VALVES FOR PLUMBING PIPING 220523.12 - 2

1. Gear Actuator: For quarter-turn valves NPS 4 and larger.

2. Hand Lever: For quarter-turn valves smaller than NPS 4.

G. Valves in Insulated Piping:

1. Provide 2-inch extended neck stems.

2. Extended operating handles with nonthermal-conductive covering material and protective sleeves that allow operation of valves without breaking vapor seals or disturbing insulation.

3. Memory stops that are fully adjustable after insulation is applied.

2.2 BRASS BALL VALVES

A. Brass Ball Valves, Two Piece with Full Port and Brass Trim, Threaded or Soldered Ends:

1. Standard: MSS SP-110; MSS SP-145.

2. CWP Rating: 600 psig.

3. Body Design: Two piece.

4. Body Material: Forged brass.

5. Ends: Threaded or soldered.

6. Seats: PTFE.

7. Stem: Brass.

8. Ball: Chrome-plated brass.

9. Port: Full.

2.3 CPVC BALL VALVES

A. CPVC Union Ball Valves:

1. Standard: MSS SP-122.

2. Pressure Rating and Temperature: 150 psig at 73 deg F.

3. Body Material: CPVC.

4. Body Design: Union type.

5. End Connections for Valves NPS 2 and Smaller: Detachable, socket.

6. End Connections for Valves NPS 2-1/2 to NPS 4: Detachable, socket or threaded.

7. Ball: CPVC; full port.

8. Seals: PTFE or EPDM-rubber O-rings.

9. Handle: Tee shaped.

B. CPVC Non-Union Ball Valves:

1. Standard: MSS SP-122.

2. Pressure Rating and Temperature: 150 psig at 73 deg F.

3. Body Material: CPVC.

4. Body Design: Non-union type.

5. End Connections: Socket or threaded.

6. Ball: CPVC; full or reduced port.

7. Seals: PTFE or EPDM-rubber O-rings.

8. Handle: Tee shaped.

BALL VALVES FOR PLUMBING PIPING 220523.12 - 3

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion.

Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.

B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.

C. Examine threads on valve and mating pipe for form and cleanliness.

D. Examine mating flange faces for conditions that might cause leakage. Check bolting for proper size, length, and material. Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.

E. Do not attempt to repair defective valves; replace with new valves. Remove defective valves from site.

3.2 INSTALLATION OF VALVES

A. Install valves with unions or flanges at each piece of equipment arranged to allow space for service, maintenance, and equipment removal without system shutdown.

B. Provide support to piping adjacent to valves such that no force is imposed upon valves.

C. Locate valves for easy access.

D. For valves in horizontal piping, install valves with stem at or above center of pipe.

E. Install valves in position to allow full valve actuation movement.

F. Valve Tags: Comply with requirements in Section 220553 "Identification for Plumbing Piping and Equipment" for valve tags and schedules.

G. Adhere to manufacturer's written installation instructions. When soldering or brazing valves, do not heat valves above maximum permitted temperature. Do not use solder with melting point temperature above valve manufacturer's recommended maximum.

H. Adjust or replace valve packing after piping systems have been tested and put into service, but before final adjusting and balancing. Replace valves exhibiting leakage.

3.3 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. If valves with specified CWP ratings are unavailable, provide the same types of valves with higher CWP ratings.

B. Select valves with the following end connections:

BALL VALVES FOR PLUMBING PIPING 220523.12 - 4

1. For Copper Tubing, NPS 2 and Smaller: Threaded ends except where solder-joint valve-end option or press-end option is indicated in valve schedules below.

2. For Copper Tubing, NPS 2-1/2 to NPS 4: Flanged ends except where threaded valve-end option is indicated in valve schedules below.

3.4 DOMESTIC HOT- AND COLD-WATER VALVE SCHEDULE

A. Pipe NPS 2 and Smaller:

1. Brass ball valves, two piece with full port, and brass trim. Provide with threaded or solder-joint ends.

2. Brass ball valves, three piece with full port, and brass trim.

B. Pipe NPS 2-1/2 and Larger:

1. Steel and Iron Valves, NPS 2-1/2 to NPS 4: May be provided with threaded ends instead of flanged ends.

2. Steel ball valves, Class 150 with full port.

3. Iron ball valves, Class 150.

4. Stainless steel ball valves with flanged ends.

C. CPVC Pipe NPS 2 and Smaller: Non-union ball valve.

END OF SECTION 220523.12

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 1

SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Metal pipe hangers and supports.

2. Trapeze pipe hangers.

3. Thermal hanger-shield inserts.

4. Fastener systems.

B. Related Requirements:

1. Section 055000 "Metal Fabrications" for structural-steel shapes and plates for trapeze hangers for pipe and equipment supports.

2. Section 220516 "Expansion Fittings and Loops for Plumbing Piping" for pipe guides and anchors.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Delegated-Design Submittal: For trapeze hangers indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1.3 INFORMATIONAL SUBMITTALS

A. Welding certificates.

1.4 QUALITY ASSURANCE

A. Structural-Steel Welding Qualifications: Qualify procedures and personnel according to

AWS D1.1/D1.1M.

B. Pipe Welding Qualifications: Qualify procedures and operators according to "2015 ASME Boiler and Pressure Vessel Code, Section IX."

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 2

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Delegated Design: Engage a qualified professional engineer, as defined in Section 014000 "Quality Requirements," to design trapeze pipe hangers and equipment supports.

B. Structural Performance: Hangers and supports for plumbing piping and equipment shall withstand the effects of gravity loads and stresses within limits and under conditions indicated according to ASCE/SEI 7.

1. Design supports for multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system contents, and test water.

2.2 METAL PIPE HANGERS AND SUPPORTS

A. Carbon-Steel Pipe Hangers and Supports:

1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.

2. Galvanized Metallic Coatings: Pregalvanized, hot-dip galvanized, or electro-galvanized.

3. Nonmetallic Coatings: Plastic coated or epoxy powder coated.

4. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.

5. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.

B. Copper Pipe and Tube Hangers:

1. Description: MSS SP-58, Types 1 through 58, copper-coated-steel, factory-fabricated components.

2. Hanger Rods: Continuous-thread rod, nuts, and washer made of copper-coated steel.

2.3 TRAPEZE PIPE HANGERS

A. Description: MSS SP-58, Type 59, shop- or field-fabricated pipe-support assembly, made from structural-carbon-steel shapes, with MSS SP-58 carbon-steel hanger rods, nuts, saddles, and U-bolts.

2.4 THERMAL HANGER-SHIELD INSERTS

A. Insulation-Insert Material for Cold Piping: ASTM C552, Type II cellular glass with 100-psig minimum compressive strength and vapor barrier.

B. Insulation-Insert Material for Hot Piping: ASTM C552, Type II cellular glass with 100-psig minimum compressive strength.

C. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 3

D. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.

E. Insert Length: Extend 2 inches beyond sheet metal shield for piping operating below ambient air temperature.

2.5 FASTENER SYSTEMS

A. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete, with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.

B. Mechanical-Expansion Anchors: Insert-wedge-type anchors, for use in hardened portland cement concrete, with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.

1. Indoor Applications: Zinc-coated steel.

2. Outdoor Applications: Stainless steel.

2.6 MATERIALS

A. Aluminum: ASTM B221.

B. Carbon Steel: ASTM A1011/A1011M.

C. Structural Steel: ASTM A36/A36M carbon-steel plates, shapes, and bars; black and galvanized.

D. Stainless Steel: ASTM A240/A240M.

E. Grout: ASTM C1107/C1107M, factory-mixed and -packaged, dry, hydraulic-cement, nonshrink and nonmetallic grout; suitable for interior and exterior applications.

1. Properties: Nonstaining, noncorrosive, and nongaseous.

2. Design Mix: 5000-psi, 28-day compressive strength.

PART 3 - EXECUTION

3.1 APPLICATION

A. Comply with requirements in Section 078413 "Penetration Firestopping" for firestopping materials and installation, for penetrations through fire-rated walls, ceilings, and assemblies.

B. Strength of Support Assemblies: Where not indicated, select sizes of components, so strength will be adequate to carry present and future static loads within specified loading limits. Minimum static design load used for strength determination shall be weight of supported components plus 200 lb.

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 4

3.2 HANGER AND SUPPORT INSTALLATION

A. Metal Pipe-Hanger Installation: Comply with MSS SP-58. Install hangers, supports, clamps, and attachments as required to properly support piping from building structure.

B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-58. Arrange for grouping of parallel runs of horizontal piping, and support together on field-fabricated trapeze pipe hangers.

1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size, or install intermediate supports for smaller-diameter pipes as specified for individual pipe hangers.

2. Field fabricate from ASTM A36/A36M carbon-steel shapes selected for loads being supported. Weld steel according to AWS D1.1/D1.1M.

C. Thermal Hanger-Shield Installation: Install in pipe hanger or shield for insulated piping.

D. Fastener System Installation:

1. Install powder-actuated fasteners for use in lightweight concrete or concrete slabs less than 4 inches thick in concrete, after concrete is placed and completely cured.

Use operators that are licensed by powder-actuated tool manufacturer. Install fasteners according to powder-actuated tool manufacturer's operating manual.

2. Install mechanical-expansion anchors in concrete, after concrete is placed and completely cured. Install fasteners according to manufacturer's written instructions.

E. Pipe-Positioning-System Installation: Install support devices to make rigid supply and waste piping connections to each plumbing fixture.

F. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.

G. Equipment Support Installation: Fabricate from welded-structural-steel shapes.

H. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.

I. Install lateral bracing with pipe hangers and supports to prevent swaying.

J. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms, and install reinforcing bars through openings at top of inserts.

K. Load Distribution: Install hangers and supports, so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.

L. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 5

M. Insulated Piping:

1. Attach clamps and spacers to piping.

a. Piping Operating Above Ambient Air Temperature: Clamp may project through insulation.

b. Piping Operating Below Ambient Air Temperature: Use thermal hanger-shield insert with clamp sized to match OD of insert.

c. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.

2. Install MSS SP-58, Type 39 protection saddles if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation.

a. Option: Thermal hanger-shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.

3. Install MSS SP-58, Type 40 protective shields on cold piping with vapor barrier.

Shields shall span an arc of 180 degrees.

a. Option: Thermal hanger-shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.

4. Shield Dimensions for Pipe: Not less than the following:

a. NPS 1/4 to NPS 3-1/2: 12 inches long and 0.048 inch thick.

b. NPS 4: 12 inches long and 0.06 inch thick.

c. NPS 5 and NPS 6: 18 inches long and 0.06 inch thick.

d. NPS 8 to NPS 14: 24 inches long and 0.075 inch thick.

e. NPS 16 to NPS 24: 24 inches long and 0.105 inch thick.

5. Pipes NPS 8 and Larger: Include wood or reinforced calcium-silicate-insulation inserts of length at least as long as protective shield.

6. Thermal Hanger Shields: Install with insulation of same thickness as piping insulation.

3.3 METAL FABRICATIONS

A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers.

B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations.

C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding;

appearance and quality of welds; and methods used in correcting welding work.

3.4 ADJUSTING

A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.

B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches.

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 6

3.5 PAINTING

A. Touchup: Clean field welds and abraded, shop-painted areas. Paint exposed areas immediately after erecting hangers and supports. Use same materials as those used for shop painting. Comply with SSPC-PA 1 requirements for touching up field-painted surfaces.

1. Apply paint by brush or spray to provide a minimum dry film thickness of 2.0 mils.

B. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas, and apply galvanizing-repair paint to comply with ASTM A780/A780M.

3.6 HANGER AND SUPPORT SCHEDULE

A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.

B. Comply with MSS SP-58 for pipe-hanger selections and applications that are not specified in piping system Sections.

C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finishes.

D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.

E. Use carbon-steel pipe hangers and supports and metal trapeze pipe hangers and attachments for general service applications.

F. Use copper-plated pipe hangers and copper attachments for copper piping and tubing.

G. Use padded hangers for piping that is subject to scratching.

H. Use thermal hanger-shield inserts for insulated piping and tubing.

I. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of noninsulated or insulated, stationary pipes NPS 1/2 to NPS 30.

2. Carbon- or Alloy-Steel, Double-Bolt Pipe Clamps (MSS Type 3): For suspension of pipes NPS 3/4 to NPS 36, requiring clamp flexibility and up to 4 inches of insulation.

3. Adjustable Pipe Saddle Supports (MSS Type 38): For stanchion-type support for pipes NPS 2-1/2 to NPS 36 if vertical adjustment is required, with steel-pipe base stanchion support and cast-iron floor flange.

J. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers NPS 3/4 to

NPS 24.

HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529 - 7

K. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Steel Turnbuckles (MSS Type 13): For adjustment of up to 6 inches for heavy loads.

2. Steel Clevises (MSS Type 14): For 120 to 450 deg F piping installations.

3. Steel Weldless Eye Nuts (MSS Type 17): For 120 to 450 deg F piping installations.

L. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Steel or Malleable-Concrete Inserts (MSS Type 18): For upper attachment to suspend pipe hangers from concrete ceiling.

2. Side-Beam or Channel Clamps (MSS Type 20): For attaching to bottom flange of beams, channels, or angles.

3. Top-Beam Clamps (MSS Type 25): For top of beams if hanger rod is required tangent to flange edge.

4. Side-Beam Clamps (MSS Type 27): For bottom of steel I-beams.

M. Saddles and Shields: Unless otherwise indicated and except as specified in piping system Sections, install the following types:

1. Steel-Pipe-Covering Protection Saddles (MSS Type 39): To fill interior voids with insulation that matches adjoining insulation.

2. Thermal Hanger-Shield Inserts: For supporting insulated pipe.

N. Comply with MSS SP-58 for trapeze pipe-hanger selections and applications that are not specified in piping system Sections.

O. Use powder-actuated fasteners or mechanical-expansion anchors instead of building attachments where required in concrete construction.

END OF SECTION 220529

IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 220553 - 1

SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Pipe labels.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

PART 2 - PRODUCTS

2.1 PIPE LABELS

A. General Requirements for Manufactured Pipe Labels: Preprinted, color coded, with lettering indicating service and showing flow direction in accordance with ASME A13.1.

B. Letter and Background Color: As indicated for specific application under Part 3.

C. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.

D. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings. Also include:

1. Pipe size.

2. Flow-Direction Arrows: Include flow-direction arrows on main distribution piping.

Arrows may be either integral with label or applied separately.

3. Lettering Size: Size letters in accordance with ASME A13.1 for piping.

PART 3 - EXECUTION

3.1 PREPARATION

A. Clean piping and equipment surfaces of incompatible primers, paints, and encapsulants, as well as dirt, oil, grease, release agents, and other substances that could impair bond of identification devices.

IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 220553 - 2

3.2 INSTALLATION, GENERAL REQUIREMENTS

A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.

B. Coordinate installation of identifying devices with locations of access panels and doors.

C. Install identifying devices before installing acoustical ceilings and similar concealment.

D. Locate identifying devices so that they are readily visible from the point of normal approach.

3.3 INSTALLATION OF PIPE LABELS

A. Install pipe labels showing service and flow direction with permanent adhesive on pipes.

B. Pipe-Label Locations: Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:

1. Within 3 ft. of each valve and control device.

2. At access doors, manholes, and similar access points that permit view of concealed piping.

3. Within 3 ft. of equipment items and other points of origination and termination.

4. Spaced at maximum intervals of 25 ft. along each run. Reduce intervals to 10 ft.

in areas of congested piping and equipment.

C. Do not apply plastic pipe labels or plastic tapes directly to bare pipes conveying fluids at temperatures of 125 deg F or higher. Where these pipes are to remain uninsulated, use a short section of insulation or use stenciled labels.

D. Flow-Direction Flow Arrows: Use arrows, in compliance with ASME A13.1, to indicate direction of flow in pipes, including pipes where flow is allowed in both directions.

E. Pipe-Label Color Schedule:

1. Domestic Cold-Water Piping: White letters on an ANSI Z535.1 safety-green background.

2. Domestic Hot-Water Piping: White letters on an ANSI Z535.1 safety-green background

3. Domestic Hot-Water Return Piping White letters on an ANSI Z535.1 safety-green background.

4. Sanitary Waste Piping: White letters on a black background.

END OF SECTION 220553

TESTING, ADJUSTING, AND BALANCING FOR PLUMBING 220593 - 1

SECTION 220593 - TESTING, ADJUSTING, AND BALANCING FOR PLUMBING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. TAB of domestic water system.

2. Pipe-leakage test verification.

3. Testing, adjusting, and balancing of existing plumbing systems and equipment.

1.2 DEFINITIONS

A. AABC: Associated Air Balance Council.

B. NEBB: National Environmental Balancing Bureau.

C. TAB: Testing, adjusting, and balancing.

D. TABB: Testing, Adjusting, and Balancing Bureau.

E. TAB Specialist: An independent entity meeting qualifications to perform TAB work.

F. TDH: Total dynamic head.

1.3 INFORMATIONAL SUBMITTALS

A. Qualification Data: Within 90 days of Contractor's Notice to Proceed, submit documentation that the TAB specialist and this Project's TAB team members meet the qualifications specified in "Quality Assurance" Article.

B. Contract Documents Examination Report: Within 30 days of Contractor's Notice to Proceed, submit the Contract Documents review report, as specified in Part 3.

C. Strategies and Procedures Plan: Within 60 days of Contractor's Notice to Proceed, submit TAB strategies and step-by-step procedures, as specified in "Preparation" Article.

D. Examination Report: Submit a summary report of the examination review required in "Examination" Article.

E. Certified TAB reports.

F. Sample report forms.

G. Instrument calibration reports, to include the following:

1. Instrument type and make.

TESTING, ADJUSTING, AND BALANCING FOR PLUMBING 220593 - 2

2. Serial number.

3. Application.

4. Dates of use.

5. Dates of calibration.

1.4 QUALITY ASSURANCE

A. TAB Specialists Qualifications, Certified by AABC:

1. TAB Field Supervisor: Employee of the TAB specialist and certified by AABC.

2. TAB Technician: Employee of the TAB specialist and certified by AABC.

B. TAB Specialists Qualifications, Certified by TABB:

1. TAB Field Supervisor: Employee of the TAB specialist and certified by TABB.

2. TAB Technician: Employee of the TAB specialist and certified by TABB.

C. Instrumentation Type, Quantity, Accuracy, and Calibration: Comply with requirements in ASHRAE 111, Section 4, "Instrumentation."

D. ASHRAE 111 Compliance: Requirements in ASHRAE 111 applicable to analogous domestic water system and plumbing equipment balancing.

E. ASHRAE 188 Compliance: Comply with balancing and report requirements, Section 8.3 "Balancing."

F. Code and Authorities Having Jurisdiction Compliance: TAB is required to comply with governing codes and requirements of authorities having jurisdiction.

1.5 FIELD CONDITIONS

A. Partial Owner Occupancy: Owner may occupy completed areas of building before Substantial Completion. Cooperate with Owner during TAB operations to minimize conflicts with Owner's operations.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine the Contract Documents to become familiar with Project requirements and to discover conditions in systems designs that may preclude proper TAB of systems and equipment.

B. Examine installed systems for balancing devices, such as test ports, gauge cocks, thermometer wells, flow-control devices, and balancing valves and fittings. Verify that locations of these balancing devices are applicable for intended purpose and are accessible.

TESTING, ADJUSTING, AND BALANCING FOR PLUMBING 220593 - 3

C. Examine approved submittals for plumbing systems and equipment.

D. Examine design data, including plumbing system descriptions, statements of design assumptions for environmental conditions and systems output, and statements of philosophies and assumptions about plumbing system and equipment controls.

E. Examine equipment performance data, including pump curves.

1. Relate performance data to Project conditions and requirements, including pump system effects that can create undesired or unpredicted conditions that cause reduced capacities in all or part of a system.

2. Calculate pump system-effect factors to reduce performance ratings of plumbing equipment when installed under conditions different from the conditions used to rate equipment performance. Compare results with the design data and installed conditions.

F. Examine system and equipment installations, and verify that field quality-control testing, cleaning, and adjusting specified in individual Sections have been performed.

G. Examine test reports specified in individual system and equipment Sections.

H. Examine plumbing equipment and verify that bearings are greased, belts are aligned and tight, filters are clean, and equipment with functioning controls is ready for operation.

I. Examine temporary and permanent strainers. Verify that temporary strainer screens used during system cleaning and flushing have been removed and permanent strainers are installed and clean.

J. Examine control valves for proper installation for their intended function of isolating, throttling, diverting, or mixing fluid flows.

K. Examine system pumps to ensure absence of entrained air in the suction piping.

L. Examine operating safety interlocks and controls on plumbing equipment.

M. Report deficiencies discovered before and during performance of TAB procedures.

Observe and record system reactions to changes in conditions. Record default set points if different from indicated values.

3.2 PREPARATION

A. Prepare a TAB plan that includes the following:

1. Equipment and systems to be tested.

2. Strategies and step-by-step procedures for balancing the systems.

3. Instrumentation to be used.

4. Sample forms with specific identification for all equipment.

B. Perform system-readiness checks of plumbing systems and equipment to verify system readiness for TAB work. Include, at a minimum, the following:

1. Domestic Water System:

TESTING, ADJUSTING, AND BALANCING FOR PLUMBING 220593 - 4

a. Verify leakage and pressure tests on water distribution systems have been satisfactorily completed in accordance with applicable code and authority having jurisdiction.

b. Piping is complete and all points of outlet are installed.

c. Water treatment is complete.

d. Systems are flushed, filled, and air purged.

e. Strainers are clean.

f. Control valves are functioning in accordance with the sequence of operation.

g. Shutoff and balance valves are 100 percent open.

h. Hot-water circulating pumps are operational and proper rotation is verified.

i. Suitable access to balancing devices and equipment is provided.

2. Sanitary Sewage/Drainage System:

a. Leakage and pressure tests on sanitary sewage/drainage systems have been completed in accordance with applicable code and authority having jurisdiction requirements.

b. Piping is complete.

c. Sanitary sewage pumps/drainage pumps are operational.

d. Control valves are functioning in accordance with the sequence of operation.

e. Suitable access to equipment is provided.

3.3 GENERAL PROCEDURES FOR TESTING AND BALANCING

A. Perform testing and balancing procedures on each system in accordance with the procedures contained in ASHRAE 111 and in this Section.

B. Cut insulation, pipes, and equipment casings for installation of test probes to the minimum extent necessary for TAB procedures.

1. Where holes for probes are required in piping or equipment, install pressure and temperature test plugs to seal systems.

2. Install and join new insulation that matches removed materials. Restore insulation, coverings, vapor barrier, and finish in accordance with Section 220716 "Plumbing Equipment Insulation" and Section 220719 "Plumbing Piping Insulation."

C. Mark equipment and balancing devices, including valve position indicators and similar controls and devices, with paint or other suitable, permanent identification material to show final settings.

D. Take and report testing and balancing measurements in inch-pound (IP units.

3.4 PROCEDURES FOR DOMESTIC WATER SYSTEMS

A. Prepare test reports for pumps and other equipment. Obtain approved submittals and manufacturer-recommended testing procedures. Crosscheck the summation of required equipment flow rates with system design flow rates.

B. Prepare schematic diagrams of systems' Record drawings piping layouts.

TESTING, ADJUSTING, AND BALANCING FOR PLUMBING 220593 - 5

C. In addition to requirements in "Preparation" Article, prepare domestic water systems for testing and balancing as follows:

1. Check expansion tank for proper setting.

2. Check water heater for proper discharge temperature setting.

3. Check remotest point of outlet for adequate pressure.

4. Check flow-control valves for proper position.

5. Locate start-stop and disconnect switches, electrical interlocks, and motor controllers.

6. Verify that motor controllers are equipped with properly sized thermal protection.

7. Check that air has been purged from the system.

D. Measure and record upstream and downstream pressure of each piece of equipment.

E. Measure and record upstream and downstream pressure of pressure-reducing valves.

F. Check settings and operation of automatic temperature-control valves, self-contained control valves, and pressure-reducing valves. Record final settings.

G. Check settings and operation of each safety valve. Record settings.

3.5 PROCEDURES FOR TESTING, ADJUSTING, AND BALANCING EXISTING SYSTEMS

A. Perform a preconstruction inspection of existing equipment that is to remain and be reused.

1. Measure and record flows, temperatures, and pressures of each piece of equipment. Compare the values to design or nameplate information, where information is available.

2. Measure motor voltage and amperage. Compare the values to motor nameplate information.

3. Check the condition of filters.

4. Check bearings and other lubricated parts for proper lubrication.

5. Report on the operating condition of the equipment and the results of the measurements taken. Report deficiencies.

B. TAB After Construction: Before performing testing and balancing of renovated existing systems, inspect existing equipment that is to remain and be reused to verify that existing equipment has been cleaned and refurbished in accordance with renovation scope indicated by Contract Documents. Verify the following:

1. New filters are installed.

2. Bearings and other parts are properly lubricated.

3. Deficiencies noted in the preconstruction report are corrected.

C. Perform testing and balancing of existing systems to the extent that existing systems are affected by the renovation work.

1. Compare the indicated system flows of the renovated work to the measured flows, and determine the new pump speed.

2. Verify that the indicated system flows of the renovated work result in velocities and pump speeds that are within the acceptable limits defined by equipment manufacturer.

TESTING, ADJUSTING, AND BALANCING FOR PLUMBING 220593 - 6

3. If calculations increase or decrease the system flow rates by more than 5 percent, make equipment adjustments to achieve the calculated rates. If increase or decrease is 5 percent or less, equipment adjustments are not required.

3.6 PROGRESS REPORTING

A. Initial Construction-Phase Report: Based on examination of the Contract Documents as specified in "Examination" Article, prepare a report on the adequacy of design for system-balancing devices. Recommend changes and additions to system-balancing devices, to facilitate proper performance measuring and balancing. Recommend changes and additions to plumbing systems and general construction to allow access for performance-measuring and -balancing devices.

3.7 FINAL REPORT

A. General: Prepare a certified written report; tabulate and divide the report into separate sections for tested systems and balanced systems.

1. Include a certification sheet at the front of the report's binder, signed and sealed by the certified testing and balancing engineer.

2. Include a list of instruments used for procedures, along with proof of calibration.

3. Certify validity and accuracy of field data.

B. Final Report Contents: In addition to certified field-report data, include the following:

1. Manufacturers' test data.

2. Field test reports prepared by system and equipment installers.

3. Other information relative to equipment performance; do not include Shop

Drawings and Product Data.

C. General Report Data: In addition to form titles and entries, include the following data:

1. Title page.

2. Name and address of the TAB specialist.

3. Project name.

4. Project location.

5. Architect's name and address.

6. Engineer's name and address.

7. Contractor's name and address.

8. Report date.

9. Signature of TAB supervisor who certifies the report.

10. Table of Contents with the total number of pages defined for each section of the report. Number each page in the report.

11. Summary of contents, including the following:

a. Indicated versus final performance.

b. Notable characteristics of systems.

c. Description of system operation sequence if it varies from the Contract

Documents.

12. Nomenclature sheets for each item of equipment.

13. Notes to explain why certain final data in the body of reports vary from indicated values.

TESTING, ADJUSTING, AND BALANCING FOR PLUMBING 220593 - 7

D. System Diagrams: Include schematic layouts of distribution systems. Present each system with single-line diagram and include the following:

1. Flow rates.

2. Pipe and valve sizes and locations.

3. Balancing stations.

4. Position of balancing devices.

END OF SECTION 220593

COMMISSIONING OF PLUMBING SYSTEMS 22 08 00 - 1

SECTION 22 08 00 - COMMISSIONING OF PLUMBING SYSTEMS

PART 1 GENERAL

1.01 DESCRIPTION

A. The requirements of this Section apply to all sections of Division 22.

B. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned are specified in Section 01 91 13 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 13 GENERAL COMMISSIONING REQUIREMENTS. A Commissioning Agent (CxA) appointed by the Department of Veterans Affairs will manage the commissioning process.

1.02 RELATED WORK

A. Section 01 00 00 GENERAL REQUIREMENTS.

B. Section 01 91 13 GENERAL COMMISSIONING REQUIREMENTS.

1.03 SUMMARY

A. This Section includes requirements for commissioning plumbing systems, subsystems and equipment. This Section supplements the general requirements specified in Section 01 91 13 General Commissioning Requirements.

B. Refer to Section 01 91 13 GENERAL COMMISSIONING REQUIREMENTS for more specifics regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.

1.04 DEFINITIONS

A. Refer to Section 01 91 13 GENERAL COMMISSIONING…